ORDER TRACKING

PRO no.:84595 In line date:25/06/2


Issue date:13/6/2016 Brand: Turtle
Due date:30/06/2016 Order size:
Style: Color no.:
Operation Start dateEnd date Days taken Causes Remedies
Pocket making 25/6/2016 28/6/2016 4
Pocket attachment to front panel 28/6/2016 29/6/2016 2
Half sleeve edge finish 28/6/2016 28/6/2016 1
Full sleeve placket 27/6/2016 28/6/2016 2 # Whole bundle went to re
Front panel Inspection 4/7/2016 6/7/2016 3 cutting process because of
wrong repeat size. The
Patch attachment to yoke 28/6/2016 30/6/2016 3 # Recutting can be avoided
bundle stuck due to wrong
Front placket making & wash care label 1/7/2016 6/7/2016 5 making the sample properl
sample and wrong cutting of
Sleeve placket cutting & inspection 29/6/2016 2/7/2016 4 this case the sample was w
front panel.
so the whole lot was cut in
Collar making 30/6/2016 11/7/2016 6
wrong manner. Moreover
Cuff making 12/6/2016 13/7/2016 2 checking can be done after
Yoke Attachment 30/6/2016 30/6/2016 1 cutting certain number of
#
Label attachment 1/7/2016 1/7/2016 1 which would depend on the
Slim fit (84594) and regular
Back panel Inspection 1/7/2016 5/7/2016 4 quantity.
fit was done together in
Shoulder Join 6/7/2016 11/7/2016 5 washcare label stage. So
Collar attachment 13/7/2016 14/7/2016 2 # Pending work can be
time taken was 5 days.
before by using more empl
Collar attachment inspection to do the work. It can also b
Sleeve attachment to body 11/7/2016 11/7/2016 1 # Time taken for collar
compensated by overtime
Side Seam (Feed off arm) 11/7/2016 12/7/2016 2 making was 10 days because
working.
of previous pending work of
Side Seam inspection 12/7/2016 12/7/2016 1
PRO 84568 & 84569
Cuff attachment 13/7/2016 14/7/2016 2
Cuff attachment inspection 14/7/2016 14/7/2016 1
Heming 13/7/2016 13/7/2016 1
Bundling 15/7/2016 15/7/2016 1
Despatch 16/7/2016
Total days taken in unit 1 21 days
n line date:25/06/2016
Brand: Turtle
Order size:
Color no.:
Remedies

# Recutting can be avoided by


making the sample properly. In
his case the sample was wrong
o the whole lot was cut in the
wrong manner. Moreover
hecking can be done after
utting certain number of pieces
which would depend on the order
uantity.

# Pending work can be cleared


efore by using more employees
o do the work. It can also be
ompensated by overtime
working.