Você está na página 1de 7

Position Applied for: Piping Foreman

Profile

OBJECTIVE: Seeking a challenging job in a progressive organization, to be


able to contribute to the development of the company as well as the
satisfaction of the clients and to be able to learn and develop new
knowledge and skills.

Qualification Highlights
8.2 - Years of experience in construction, industrials, gas/oil,
refi neries , petrochemical plants & shipping container.
7.2 - Years in Saudi Arabia with Mohammad Al-Mojil Group
1 Years in Singapore with BAUHENIA MARINE PTE LTD.

PERSONAL DATA:

Birthdate : September 30, 1973


Birthplace : Jasaan Misamis Oriental
Age : 37 Years old
Citizenship : Filipino
Religion : Roman Catholic

EDUCATION:

College : Cagayan de Oro Capitol College College Level


Cagayan de Oro City

Course : Mechanical Engineering

Vocational : National Manpower Youth Council ( NMYC) as TESDA


Tagoloan, Misamis Oriental

Course : Machine Shop and Welding

High School : Jasaan National High School Graduated


Jasaan Misamis Oriental

Elementary : Jasaan Central School Graduated


Jasaan Misamis Oriental
Working Experience/ Skills

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : Manifa Core Hydrocarbon Facility (CHF)


Saudi Aramco Project

Position : FOREMAN-PIPING

Duration : January 2011 Present

Job Description
Implementing of plans and schedule given by superior
Providing of my men with productivity and quality
targets
Providing a specific work instructions and guidelines
needed to carry out work assignments and meet targets
Pushing and motivating the group to attain schedules
and productivity target
Monitoring and reporting of daily work accomplishment
and corresponding man-hour and equipment-hour
utilized
Evaluating work progress and take action to correct
unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : Petrochemicals- CHEVRON


NCP- Daelim Project

Position : FOREMAN-PIPING

Duration : March, 2010 January 2011

Job Description

Plan, organize and direct the activities to the unit


Preparing of detailed 2 weeks look ahead schedule
Determine the manpower, equipment & tools, materials and drawings
needed to meet the target
Prioritizing, allocating, monitoring and expediting of equipment, tools
and manpower needed in unit and ensure availability of the same at the
point of use on time
Evaluating of productivity and work progress and taking preventive and
corrective action
Coordinating with other groups on matters needed to ensure smooth
interfacing of activities
Reviewing and approving of Daily Accomplishment Report submitted by
foremen
Strictly enforced company rules and regulations, quality and safety
policies
Conduct training on subordinates

Company : MOHAMMAD AL-MOJIL GROUP

Project : SAUDI ARAMCO SHELL REFINERY (SASREF) BOP


Ultra Low Sulfur Diesel (ULSD) Project

Position : FOREMAN-PIPING

Duration : June, 2009 February , 2010


Job Description

Implementing of plans and schedule given by superior


Providing of my men with productivity and quality
targets
Providing a specific work instructions and guidelines
needed to carry out work assignments and meet targets
Pushing and motivating the group to attain schedules
and productivity target
Monitoring and reporting of daily work accomplishment
and corresponding man-hour and equipment-hour
utilized
Evaluating work progress and take action to correct
unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : KHURAIS CRUDE CONTRACT


SAUDI ARAMCO Project

Position : FOREMAN-PIPING

Duration : January, 2009 June , 2009

Job Description

Implementing of plans and schedule given by superior


Providing of my men with productivity and quality
targets
Providing a specific work instructions and guidelines
needed to carry out work assignments and meet targets
Pushing and motivating the group to attain schedules
and productivity target
Monitoring and reporting of daily work accomplishment
and corresponding man-hour and equipment-hour
utilized
Evaluating work progress and take action to correct
unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : SAUDI ARAMCO HARADH GOSP 2


Gas Plant & Water Injection Pump Supply

Position : FOREMAN-PIPING

Duration : July 26, 2007 November 17, 2008

Job Description:
Implementing of plans and schedule given by superior
Providing of my men with productivity and quality
targets
Providing a specific work instructions and guidelines
needed to carry out work assignments and meet targets
Pushing and motivating the group to attain schedules
and productivity target
Monitoring and reporting of daily work accomplishment
and corresponding man-hour and equipment-hour
utilized
Evaluating work progress and take action to correct
unfavorable deviation
Explaining and enforcing of company rules and
regulation, quality and safety requirements

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : HADDED STEEL PLANT ( Expansion Plant )

Position : LEAD MAN PIPING

Duration : May 11, 2006 May 19, 2007

Job Description

Ensure all pipe fitters / pipe fabricators are suitable, trained and
knowledge on the work Scope and Quality as per client standard.

Withdraw, transport and prepare all necessary pipe materials at


fabrication shop area.

Inform/advise the QA-QC piping inspector to have an actual


inspection and check up of the pre-fit up and assembled pipe
spools prior to full welding or bonding of all pipes joint as per
approved isometric drawing.

Make a necessary documents of the inspected/completed pipe


spools basing on the isometric drawing and to be handed over
to our supervisor for final record and ready for transport to the
field.

Examine and check the work man ship of the completed pipe
spools on the give approved drawing for pipe supports.

Liasons with the Quality Assurance Quality Control (QA-QC)


group to ensure the quality requirements are implemented in
expedient manner.

Complete any necessary application for passes or permit required


by the particular project and assigned to the scoop of work.

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : SAUDI FERTILIZER CORPORATION ( SAFCO ) IV


Expansion Plant Jabail Saudi Arabia

Position : LEAD MAN PIPING

Duration : January 22, 2005 March 26, 2006

Job Description

Works under supervision of my superior


Erection and fit-up of pipe spools both for small bores and
big bores (Carbon Steel, Stainless Steel, Low Temp, p9 and
p11)
Installing of pipe supports and valves to complete the line
Rectify punch list issued by superior prior to hydrotest the
line
Installing of steam tracing line covered with bending and
heating activities
Familiarizing on P&ID, piping arrangement and isometric
drawing on order to
finish the line with quality
Bolt torque for pre-commissioning
Follow the company rules and safety rules

Company : MOHAMMAD AL-MOJIL GROUP


Saudi Arabia

Project : ( JUPC ) UNITED OLEFINS COMPLEX PROJECT


Jubail Industrial City, Saudi Arabia

Position : PIPE FITTER

Duration : December 23, 2002 May 16, 2004

Job Description

Conduct analysis and review of the isometric drawing of the


pertinent prior to fabrication and assembly.

Ensure /properly check exact measurement of pipe spools and to


be cut accordingly in order to avoid wastage of pipe materials and
fittings.

Counter check all materials used before fabrication work whether it is


correct basing on the bill of materials on each isometric drawing.

Counter check the delivered pipe spools and verify the code number
as per given isometric drawing reference and to be installed basing
on the general piping arrangement for mechanical piping group.
Inform directly to the assigned foreman and supervisor in-charge,
if there is some relevant discrepancy of the pipe tools during the
actual installation at the field basing on the given general piping
arrangement drawing.

In charge on initial checking of the location, levelness and alignment


of pipe spools/joints prior to final welding basing the general piping
arrangement drawing fie mechanical piping work.

Responsible on installation of pipe supports of the installed pipe


spools basing on the give approved drawing for pipe supports.

Company : BAUHENIA MARINE PTE LTD.


Singapore

Project : SHIPPING CONTAINER

Position : FITTER / WELDER / LATHE MACHINE OPERATOR

Duration : June 10, 1998 June 13, 1999

Job Description :

Revised line as per job order request from Chief Engineer.

Repair of pipe line fresh water and waste pipe line

Fabricate support, welding and installed

Assist of all engineers assigned on duty

Fabricate of bushing and fitting of bolts for spare.

Repair of hydraulic pipe line

Installed of valve

Você também pode gostar