Você está na página 1de 3

Saudi Aramco 8020-611-ENG (12/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
INSTRUMENT SPECIFICATION SHEET - PRESSURE RELIEF VALVES CONVENTIONAL & BALANCED TYPES

FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

1 INSTRUMENT TAG NUMBER


AZJ

PZV-0001
LPG
2 SERVICE STO TANK
GENERAL DATA
3 SERIAL NUMBER
ZFP

(NOTE 4)
4 P & ID NUMBER RA-750881.001
5 MANUFACTURER *
6 MODEL NUMBER *
7 REQUISITION NO.
MATERIAL SOURCE
8 AMS STOCK NO.
ISSUED FOR CONSTRUCTION

9 DESIGN TYPE CONVENTIONAL

10 MATERIAL SA216 WCC CS


DESCRIPTION

11 SIZE INLET OUTLET 3/4" 1"


12 CONNECTION RATING INLET OUTLET 300# 150#
BODY

13 FLANGE FACING TYPE INLET OUTLET RF RF


14 SEAT TYPE
15 BONNET (OPEN / CLOSED) CLOSED
16
17
18 NOZZLE AND DISC 316SS
TRIM MATERIAL

19 GUIDE 316SS
20 SPRING C. ALLOY STL.
JO/EWO

BI-00450

21 SPRING COATING NICKEL PLATED


22 BELLOWS
23
07/10/09
DATE

24 CAP (SCREWED / BOLTED) SCREWED


25 LIFTING LEVER
0

(PLAIN / PACKED) NO
ACCESSORIES

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN F
26 TEST GAG (YES / NO) NO
REV
NO.

00

27 VENT WITH BUG SCREEN (YES / NO) NO


DISCIPLINE
ENGINEER
28 AUXILIARY PISTON (YES / NO) NO
BTF 29 LIQUID TRIM (YES / NO) YES

DATE:
07/10/09 30
PROJECT 31 ASME CODE (>15 PSIG) DIV (I / VIII) STAMP VIII YES VIII YES YES YES
SELECTION
BASIS OF

ENGINEER
JAMAL
32 FIRE BLOCKED DISCHARGE (F / BD) BD
33 OTHER
DATE: 07/10/09
CERTIFIED 34
35 PROCESS FLUID VAPOUR LPG
AZJ
36 CORROSIVE COMPOUNDS NIL
07/10/09
DATE:
37 REQUIRED CAPACITY 330 GPM
CONSTRUCTION
AGENCY 38 MW OR SP. GR. @ RELIEVING TEMPERATURE 0.54

39 VISCOSITY @ RELIEVING TEMPERATURE CP VENDOR TO ADVICE

DATE: 40 WT % FLASH MW OF VAPOR VTA VTA


OPERATIONS
41 TEMPERATURE NORMAL @ RELIEF F 89 110
SERVICE CONDITIONS

42 PRESSURE NORMAL DESIGN PSIG 150 250


43 SET PRESSURE PSIG 200
DATE:
44 SUPERIMPOSED BACK PRESSURE PSIG N/A
CONTROL NUMBER
VERIFICATION

45 BUILT-UP BACK PRESSURE PSIG ATM


EDSD

46 TOTAL MAXIMUM BACK PRESSURE PSIG N/A

47 COLD DIFFERENTIAL SET PRESSURE PSIG 200


DATE:

48 ACCUMULATION OVERPRESSURE % PSIG


BY:

10 20

49 BLOWDOWN % VENDOR TO ADVICE


CERTIFICATION

50 DISCHARGES TO
PROVAL/CERTIFICATION REQUIREMENTS,
THIIS INDICATES THAT REV. NO.___________

ATMOSPHERE
00

CC) NO.: __________________________.


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


10-00450-0005-008

51 MAXIMUM ALLOW BELLOWS BACK PRESSURE (NOTE 4) PSIG


52
53
54

ISS FOR PZV-0001


REVISION

DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

PRESSURE RELIEF VALVE - FAC. NO. 1043 ISS


Q43 J RE 750880
MANIFA OFF PLANT FACILITY 001 00
APP
R

(DC

MANIFA SAUDI ARABIA JO / EWO: BI-10-00450-0005

EDSD/8020-611-1-1299.XLS
Saudi Aramco 8020-611-ENG (12/1999)

ENGG CERT PMT OPRNS


SAUDI ARABIAN OIL COMPANY
INSTRUMENT SPECIFICATION SHEET - PRESSURE RELIEF VALVES CONVENTIONAL & BALANCED TYPES

55 INSTRUMENT TAG NUMBER PZV-0001

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AZJ

56 CAL. MAX. TAIL PIPE VELOCITY FT/SEC N/A


57 DESIGN LIMIT ON TAIL PIPE VELOCITY FT/SEC N/A
ZFP

PIPING 58 CALCULATED LINE PIPING PRESSURE LOSS PSIG 0.3


59 INLET PRESSURE LOSS LIMIT (3% SET PRESSURE) PSIG 6
60
61
62
ISSUED FOR CONSTRUCTION

63 SPRING RANGE (NOTE 4) VTA


SPRING

PSIG
DATA

64 MANUFACTURER'S SPRING NUMBER (NOTE 4) VTA


DESCRIPTION

65
66 CALCULATED ORIFICE AREA (REFER SH.3) SQ. IN. VTA
ORIFICE
AREA

VTA
67 SELECTED API ORIFICE AND AREA API SQ. IN. VTA

68 ACTUAL ORIFICE AREA (NOTE 4) SQ. IN. VTA


69
70 SET PRESSURE OF LOW VALVE PSIG N/A
71 SET PRESSURE OF INTERMEDIATE VALVE
MULTIPLE

PSIG N/A
VALVES

72 SET PRESSURE OF HIGH VALVE PSIG N/A


73 SET PRESSURE OF SPARE VALVE PSIG N/A
74
JO/EWO

BI-00450

75
76
DATE

07/10/09
REV.
NO.
00
R

DISCIPLINE
ENGINEER
BTF
07/10/09
DATE:
PROJECT
ENGINEER

JAMAL
07/10/09
DATE:

CERTIFIED

AZJ
07/10/09
DATE:
CONSTRUCTION
AGENCY

DATE:

OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE
BY:
ON CERTIFICATION

ERTIFICATION REQUIREMENTS,

____________________________
ES THAT REV. NO.__________

10-00450-0005-008
WING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

ISS FOR PZV-0001 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISIO

OF THIS DRAW
THIS INDICATE

APPROVAL/CE

ISS
(DCC) NO. ___

PRESSURE RELIEF VALVE - FAC. NO. 1043


Q43 J RE 750880
MANIFA OFF PLANT FACILITY 2 of 3 00
MANIFA SAUDI ARABIA JO / EWO: BI-10-00450-0005

EDSD/8020-611-2-1299.XLS
Saudi Aramco 8020-611-ENG (12/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
INSTRUMENT SPECIFICATION SHEET - PRESSURE RELIEF VALVES CONVENTIONAL & BALANCED TYPES

FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

77 INSTRUMENT TAG NUMBER


AZJ

PZV-0001
78 A REQUIRED ORIFICE AREA SQ.IN. VTA
79 A' VTA
ZFP

EXPOSED SURFACE AREA OF VESSEL SQ.FT.


80 C SPECIFIC HEAT COEFF. (SEE API RP 520) VTA
81 F' VALVE FACTOR VTA
82 G SPECIFIC GRAVITY VTA
83 K d COEFFICIENT OF DISCHARGE VTA
84 K b BACK PRESSURE CORRECTION FACTOR VTA
ISSUED FOR CONSTRUCTION

NOMENCULATURE

85
86 KSH SUPERHEATED STEAM CORRECTION FACTOR VTA
DESCRIPTION

87 K N NAPIER CORRECTION FACTOR VTA


88 K W BACK PRESSURE CORRECTION FACTOR VTA
89 K V VISCOSITY CORRECTION FACTOR VTA
90 M MOLECULAR WEIGHT VTA
91 P1 SET P + OVER P + ATM. P PSIA 234.6
92 P SET PRESSURE PSIG 200
93 Pb BACK PRESSURE PSIG 0
94 T RELIEVING TEMPERATURE R VTA
95 Q LIQUID FLOW GPM VTA
96 W GAS / VAPOR / STEAM FLOW LB/HR VTA
JO/EWO

BI-00450

97 Z COMPRESSIBILITY FACTOR
98
ORIFICE AREA CALCULATIONS BASED ON API RP 520 PART 1

GAS/VAPOR
07/10/09
DATE

1/2
W (TZ)
A= 1/2

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN F
CK d P1 K b (M)
NO.
REV

00

99
DISCIPLINE STEAM
ENGINEER
BTF W
A=
DATE: 07/10/09 51.5 P K K N K SH
1 d
PROJECT
ENGINEER
100 CERTIFIED LIQUID
JAMAL

07/10/09 1/2
DATE: Q (G)
CERTIFIED
A= 1/2
38 K d K W K V (P+OVER P-P )
b
AZJ
07/10/09
DATE: 101
CONSTRUCTION
AGENCY GAS EXPANSION
F' A'
DATE: A
(P1 ) 1/2
OPERATIONS

NOTES:
DATE:
1. THESE CALCULATIONS DETERMINE MINIMUM REQUIRED ORIFICE AREA. TRUE VALVE CAPACITY DEPENDS ON ACTUAL ORIFICE SELECTED.
CONTROL NUMBER
VERIFICATION

2. VENDOR TO CHECK CALCULATION AND SELECTION AND RETURN COPY OF COMPLETED OR CORRECTED SHEET TO BUYER.
3. FOR GENERAL RELIEF VALVE SPECIFICATION REFER TO 34-AMSS-611.
EDSD

4. VENDOR TO PROVIDE THIS VALUE.


DATE:

5. WHEN A SPECIFIC MANUFACTURER'S VALUE IS USED. THE MANUFACTURER'S SIZING FORMULA MAY BE ATTACHED.
BY:
REVISIION CERTIFICATION

CERTIFICATION REQUIREMENTS,

____________________________.
TES THAT REV. NO.___________
AWING IS COVERED, FOR ALL

G COMPLETION CERTIFICATE
00

6. VTA VENDORTOADVICE
10-00450-0005-008

7.* BYVENDOR

ISS FOR PZV-0001 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ISS
THIS INDICAT

(DCC) NO.: __
BY DRAWING
APPROVAL/C

PRESSURE RELIEF VALVE - FAC.


FAC NO
NO. 1043
OF THIS DRA

Q43 J R E 750880
MANIFA OFF PLANT FACILITY 3 of 3 00
MANIFA SAUDI ARABIA JO / EWO: BI-10-00450-0005

EDSD/8020-611-3-1299.XLS

Você também pode gostar