The Lean Six Sigma Yellow Belt Examination
Mock Exam V1.1
Instructions
3. Please use a pencil and NOT ink to mark your answers in the Answer sheet
provided.
6 What step in the 5S methodology requires that safety equipment and emergency
procedures are made clearly visible for all?
a) Seiketsu - Standardizing
b) Seiso - Shine
c) Shitsuke - Sustain
d) Seiton - Straighten
8 What metrics are considered first when deciding What to Measure in a process?
a) Supplier capability
b) Input requirements
c) Process functionality
d) Customer requirements
a) Common cause
b) Non-assignable
c) Special cause
d) Natural
a) Ordinal
b) Attribute
c) Continuous
d) Categorical
13 What term is given to represent the maximum value minus the minimum value in a
data set?
a) Mean
b) Range
c) Variance
d) Mode
a) Increasing sales
b) Customer needs
c) Change management
d) Management skills
19 What quality activity is focused on preventing defects during production, rather than
looking for defects in the end product?
a) Quality assurance
b) Quality approval
c) Quality control
d) Quality inspection
1. Number of features
2. Size in centimeters
3. Weight in kilograms
4. Pressure per square centimeter
a) 1, 2, 3
b) 1, 2, 4
c) 1, 3, 4
d) 2, 3, 4
a) Honda
b) Mitsubishi
c) Toyota
d) Subaru
1. Semi-finished products
2. Items made as they are needed
3. Minimal materials stocked
4. Reduced fluctuation
a) 1, 2, 3
b) 1, 2, 4
c) 1, 3, 4
d) 2, 3, 4
1. Tree diagram
2. Clustering items together
3. 5S steps
4. 6 Ms
a) 1, 2, 3
b) 1, 2, 4
c) 1, 3, 4
d) 2, 3, 4
27 Which of the following steps are used to construct a Failure Mode and Effect
Analysis (FMEA)?
a) 1, 2, 3
b) 1, 2, 4
c) 1,3, 4
d) 2, 3, 4
29 Which is NOT one of the eight pillars within the TPM House of Quality?
a) Focused improvement
b) Training and education
c) Quality maintenance
d) Emergency planning
31 What is the final aim of the Cause and Effect Matrix used in decision making?
a) 1, 2, 3
b) 1, 2, 4
c) 1, 3, 4
d) 2, 3, 4
a) No correlation
b) Positive correlation
c) Simple correlation
d) Negative correlation
a) Qualitative in nature
b) Based on typical examples
c) Quick and easy to collect
d) Measured on a continuous scale
35 Which type of Customer Waste' is MOST likely to be the cause of an end product
that fails to meet the customer's expectations?
a) Delay
b) Duplication
c) Over-production
d) Unclear communication
41 What Lean Six Sigma term is used to describe over-production, defects, inventory
and movement?
a) Waste
b) 5S steps
c) Time and motion
d) Overburden
a) Statement of requirement
b) Standard operation procedure
c) Time and motion study
d) Records and forms
45 Which activity does NOT belong to the Plan step in the PDCA approach?
a) An activity required for the process that the customer doesn't want to pay for
b) An activity to change the product that the customer is willing to pay for
c) An action taken to correct a defect or error in the process
d) An action in the process that prevents changes to a product or service
47 What is the Process Capability index (Cp) formula where USL is the Upper
Specification Limit, LSL is the Lower Specification Limit and S is the standard deviation?
a) Cp = (LSL - USL) / 3S
b) Cp = (LSL - USL) / 6S
c) Cp = (USL - LSL) / 3S
d) Cp = (USL - LSL) / 6S
a) Operating instructions
b) Process flow mapping
c) Visual inspection
d) Publication boards with pictures
a) Champion
b) Project Manager
c) Master Black Belt
d) Orange Belt