PLAN TIME
Plan Work Hours Time Remaks
a 1 day 17.77 Hours
1
b 1 Shift 8.89 Hours
c 1 Hours 3600 Second
BUCKET SWELL
Equipment capacity Bucket swell
Bucket Swell
Loader OB
a Dossan 500 3.1 0.85 2.64
2 b PC 400 3 0.85 2.55
c PC 300 2.2 0.85 1.87
d PC 200 1.8 0.85 1.53
e PC 200 1.8 0.85 1.53
PRODUCTY / HOURS
Digging Swing Loading
Loader unit
(second) (second) (second)
a Dossan 500 9 6 8
3 b PC 400 6 4 6
c PC 300 6 3 3
d PC 200 4.89 3.3 3
e PC 200 4 2.4 3
Repair PA
66%
66%
66%
66%
66%
64%
64%
64%
Repair PA
49%
49%
49%
49%
49%
48%
48%
48%
ARTICHULATED DUMP TRUCK ( O
Waktu Rata-
Produksi
rata Delay time Cycle Time Cycle Time kapasitas
Articulated
Dumping (det) (det) (menit) Articulated
(Bcm/Jam)
(det)
40 35 360.00 6.00 15.50 155.00
40 35 381.00 6.35 15.50 146.46
40 35 402.00 6.70 15.50 138.81
40 35 423.00 7.05 15.50 131.91
40 35 444.00 7.40 15.50 125.68
40 35 465.00 7.75 15.50 120.00
40 35 486.00 8.10 15.50 114.81
40 35 507.00 8.45 15.50 110.06
40 35 528.00 8.80 15.50 105.68
40 35 549.00 9.15 15.50 101.64
40 35 570.00 9.50 15.50 97.89
40 35 591.00 9.85 15.50 94.42
40 35 612.00 10.20 15.50 91.18
40 35 633.00 10.55 15.50 88.15
40 35 654.00 10.90 15.50 85.32
40 35 675.00 11.25 15.50 82.67
40 35 696.00 11.60 15.50 80.17
40 35 717.00 11.95 15.50 77.82
40 35 738.00 12.30 15.50 75.61
Waktu Rata-
Produksi
rata Delay time Cycle Time Cycle Time kapasitas
DumpTruck
Dumping (det) (det) (menit) dumptruck
(Bcm/Jam)
(det)
40 35 278.00 4.63 6.00 77.70
40 35 296.00 4.93 6.00 72.97
40 35 314.00 5.23 6.00 68.79
40 35 332.00 5.53 6.00 65.06
40 35 350.00 5.83 6.00 61.71
40 35 368.00 6.13 6.00 58.70
40 35 386.00 6.43 6.00 55.96
40 35 404.00 6.73 6.00 53.47
40 35 422.00 7.03 6.00 51.18
40 35 440.00 7.33 6.00 49.09
40 35 458.00 7.63 6.00 47.16
40 35 476.00 7.93 6.00 45.38
40 35 494.00 8.23 6.00 43.72
40 35 512.00 8.53 6.00 42.19
40 35 530.00 8.83 6.00 40.75
40 35 548.00 9.13 6.00 39.42
40 35 566.00 9.43 6.00 38.16
40 35 584.00 9.73 6.00 36.99
40 35 602.00 10.03 6.00 35.88
Waktu Rata-
Produksi
rata Delay time Cycle Time Cycle Time kapasitas
DumpTruck
Dumping (det) (det) (menit) dumptruck
(ton/Jam)
(det)
40 35 514.00 8.57 19.00 133.07
40 35 946.00 15.77 19.00 72.30
40 35 1,258.00 20.97 19.00 54.37
40 35 1,570.00 26.17 19.00 43.57
40 35 1,882.00 31.37 19.00 36.34
40 35 2,194.00 36.57 19.00 31.18
40 35 2,506.00 41.77 19.00 27.29
40 35 2,818.00 46.97 19.00 24.27
40 35 3,130.00 52.17 19.00 21.85
40 35 3,442.00 57.37 19.00 19.87
40 35 3,754.00 62.57 19.00 18.22
40 35 4,066.00 67.77 19.00 16.82
40 35 4,378.00 72.97 19.00 15.62
40 35 4,690.00 78.17 19.00 14.58
40 35 5,002.00 83.37 19.00 13.67
40 35 5,314.00 88.57 19.00 12.87
40 35 5,626.00 93.77 19.00 12.16
40 35 5,938.00 98.97 19.00 11.52
40 35 6,250.00 104.17 19.00 10.94
uction
Coal / Hours
201.58
235.90
195.76
162.69
171.93
ATED DUMP TRUCK ( OVERBURDEN )
Depend on situation
ADT yang
Capasitas produksi ADT yang Safety ADT +
Plan Ritase dibutuhkan
PC 400 / jam dibutuhkan factor (10%) safety (unit)
(unit)
Depend on situation
DT yang
Capasitas produksi DT yang Safety DT +
dibutuhkan
PC 400 / jam dibutuhkan factor (10%) safety (unit)
(unit)
Depend on situation
DT yang
Capasitas produksi DT yang Safety DT +
dibutuhkan
PC 300 / jam dibutuhkan factor (10%) safety (unit)
(unit)
Total ADT
(unit)
1
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
d on situation
Total DT
(unit)
2
2
2
3
3
3
3
3
3
3
4
4
4
4
4
4
4
4
5
d on situation
Total DT
(unit)
2
4
6
7
9
10
12
13
15
16
17
19
20
22
23
25
26
28
29
DATABASE CURAH HUJAN DAN LOST TIME
2011
Rain (hours)
Year
JANUARI FEBRUARI MARET APRIL MEY JUNI JULI AGUSTUS SEPTEMBER OKTOBER
2008 57.17 20.64 12.10 39.20 28.99 33.72 4.42 11.25 5.58 33.5
Lost (%)
Year
JANUARI FEBRUARI MARET APRIL MEY JUNI JULI AGUSTUS SEPTEMBER OKTOBER
2008 7.7% 2.3% 1.6% 5.4% 3.9% 4.7% 0.6% 1.5% 0.8% 4.5%
Slippery (hours)
Year
JANUARI FEBRUARI MARET APRIL MEY JUNI JULI AGUSTUS SEPTEMBER OKTOBER
2008 42.9 15.5 11.0 37.0 21.7 25.3 3.3 8.4 4.2 25.1
Lost (%)
Year
JANUARI FEBRUARI MARET APRIL MEY JUNI JULI AGUSTUS SEPTEMBER OKTOBER
2008 5.8% 1.7% 1.5% 5.1% 2.9% 3.5% 0.4% 1.1% 0.6% 3.4%
Assumption 2012
Rain 7.7% 2.3% 1.6% 5.4% 3.9% 4.7% 0.6% 1.5% 0.8% 4.5%
Slippery 5.8% 1.7% 1.5% 5.1% 2.9% 3.5% 0.4% 1.1% 0.6% 3.4%
Total 13.4% 4.0% 3.1% 10.6% 6.8% 8.2% 1.0% 2.6% 1.4% 7.9%
Total
11 12
315.5 326.02 1762.1
Total
NOVEMBER DESEMBER
64.94 57.14 368.7
Average
NOVEMBER DESEMBER
9.0% 7.7% 0.5
Total
NOVEMBER DESEMBER
48.7 42.9 286.0
Average
NOVEMBER DESEMBER
6.8% 5.8% 3.2%
Calender Day : 31
Holiday : 0
Available Day : 31
MOHH : 744
1.00
Calender Day :
Holiday :
Available Day :
MOHH :
Plan Unproductive Time
OVERBURDEN
UNIT Dossan 500
Work plan unit 1
Plan PA 70%
Prod,ty / Hours 182.42
COAL PRODUKSI
UNIT Dossan 500
Work plan unit
Plan PA 49%
Prod,ty / Hours 201.58
OB Activity
1-Dec
Loading
Kamis
Dossan 500 2,269.72
PC 400 -
PC 300 1,873.58
PC 200 1,557.10
PC 200 -
Hauling
COAL Activity
1-Dec
Loading
Kamis
Dossan 500
PC 400 -
PC 300 -
PC 200 -
PC 200
Loading Capability -
Hauling
HINO -
Hauling Capability -
Stripping Ratio -
Comodity
31
2 Plan OB Removal
29 Plan Coal Getting
744 Plan SR
LOADER HAULER
PC 400 PC 300 PC 200 PC 200 ADT VOLVO
0 1 1 5
70% 70% 70% 70% 80%
181.47 150.58 125.15 132.25 75.6
LOADER HAULER
PC 400 PC 300 PC 200 PC 200 ADT VOLVO
0 1 0
49% 65% 49% 49%
235.90 195.76 162.69 171.93
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Plan
By Loader By Hauler
This Month
157,935 143,676 143,676
44,835 10,263 10,263
3.5 14.0 14.0
`
DISTANCE TO
HAULER WASTE Supporting Equipment
ADT TEREX HINO Equipment
0 0 PC 200
1000
64% 64% PC 200
75.6 35.9 Dozer
Dozer
DISTANCE TO Greder
HAULER
STOCKPILE Compactor
ADT TEREX HINO
2
8000
60%
24.3
- - - - -
2,150.15 2,150.15 2,150.15 2,150.15 -
- - - - -
- - - - -
2,150.15 2,150.15 2,150.15 2,150.15 2,150.15
- - - - -
rburden cutt
Equip, hauler Used
Terex 4
Volvo 6
Terex 3
- - - - -
2,150.15 - 2,086.53 2,150.15 2,150.15
- - - - -
- - - - -
2,150.15 2,022.90 2,150.15 - -
- - - - -
- - - - -
2,150.15 2,150.15 2,150.15 2,022.90 2,150.15
- - - - -
696.00
51.61
38.71
46.45
27.00
63.00
0.00
2.00
0.00
15.00
1.50
15.00
492.46
475.06
364.96
352.36
Capability (Bcm)
62,884.77
-
51,909.30
43,141.07
-
157,935.14
143,676.02
-
143,676.02
143,676.02
110%
Capability (Ton)
-
-
44,834.98
-
-
44,834.98
10,263.07
10,263.07
10,263.07
436.9%
14.00
PLAN PRODUCTION
DESEMBER
Calender Day : 7
Holiday : 0
Available Day : 7
MOHH : 113.92
COAL PRODUKSI
UNIT Dossan 500 PC 400
Work plan unit 0 0
Plan PA 49.05% 49.05%
Prod,ty / Hours 201.58 235.90
OB Activity
1-Dec 2-Dec
Loading
Kamis Jumat
Dossan 500 2,269.72 2,269.72
PC 400 - -
PC 300 1,873.58 1,873.58
PC 200 1,557.10 1,557.10
PC 200 - -
Hauling
COAL Activity
1-Dec 2-Dec
Loading
Kamis Jumat
Dossan 500
PC 400 - -
PC 300 - -
PC 200 - -
PC 200
Loading Capability - -
Hauling
HINO - -
Hauling Capability - -
Stripping Ratio - -
Plan
Comodity By Loader By Hauler
This Month
Plan OB Removal 36,535 33,184 33,184
Plan Coal Getting 2,150 492 492
Plan SR 17.0 67.4 67.4
LOADER HAU
PC 300 PC 200 PC 200 ADT VOLVO ADT TEREX
1 0 0 0 0
65.00% 49.05% 49.05% 0.00% 0.00%
195.76 162.69 171.93 0.00 0.00
- - - - -
- - - - 2,150.15
- - - - -
- - - - 2,150.15
- - - - 492.18
- - - - 492.18
- - - - 492
- - - - 10.55
PLAN PRODUCTION
DESEMBER
Calender Day : 7
Holiday : 0
Available Day : 7
MOHH : 124.42
DISTANCE TO
HAULER
STOCKPILE
HINO
2
8000
60.00%
24.27
OB Activity
8-Dec 9-Dec
Loading
Kamis Jumat
Dossan 500 2,269.72 2,269.72
PC 400 - -
PC 300 1,873.58 1,873.58
PC 200 1,557.10 1,557.10
PC 200 - -
Hauling
COAL Activity
8-Dec 9-Dec
Loading
Kamis Jumat
Dossan 500
PC 400 - -
PC 300 2,150.15 2,150.15
PC 200 - -
PC 200
Loading Capability 2,150.15 2,150.15
Hauling
HINO 492.18 492.18
Hauling Capability 492.18 492.18
- - - - -
2,150.15 - 2,150.15 2,150.15 2,150.15
- - - - -
Calender Day : 7
Holiday : 0
Available Day : 7
MOHH : 113.92
Hauling
COAL Activity
15-Dec 16-Dec
Loading
Kamis Jumat
Dossan 500
PC 400 - -
PC 300 2,150.15 2,150.15
PC 200 - -
PC 200
Loading Capability 2,150.15 2,150.15
Hauling
HINO 492.18 492.18
Hauling Capability 492.18 492.18
- - - - -
2,150.15 - 2,086.53 2,150.15 2,150.15
- - - - -
Calender Day : 7
Holiday : 2
Available Day : 5
MOHH : 87.87
Hauling
COAL Activity
22-Dec 23-Dec
Loading
Kamis Jumat
Dossan 500
PC 400 - -
PC 300 2,150.15 2,022.90
PC 200 - -
PC 200
Loading Capability 2,150.15 2,022.90
Hauling
HINO 492.18 463.06
Hauling Capability 492.18 463.06
- - - - -
2,150.15 - - 2,150.15 2,150.15
- - - - -
Calender Day : 3
Holiday : 0
Available Day : 3
MOHH : 52.32
Hauling
COAL Activity
29-Dec 30-Dec
Loading
Kamis Jumat
Dossan 500
PC 400 - -
PC 300 2,150.15 2,022.90
PC 200 - -
PC 200
Loading Capability 2,150.15 2,022.90
Hauling
HINO 492.18 463.06
Hauling Capability 492.18 463.06
17.77 474.68
17.17 457.88
17.50 347.46
16.90 335.46
31-Dec
Capability (Bcm)
Sabtu
2,269.72 60,615.06
- -
1,873.58 50,035.72
1,557.10 41,583.96
- -
5,700.39 152,234.75
5,194.21 138,481.81
- -
5,194.21 138,481.81
5,194 138,481.81
110% 110%
31-Dec
Capability (Ton)
Sabtu
-
- -
2,150.15
- -
2,150.15 42,684.83
492.18 9,770.88
492.18 9,770.88
492 9,770.88
436.9% 436.9%
10.55 14.17
Plan
This Month
15,280
1,447
10.6
PLAN FUEL CONSUMPTION
DESEMBER
1,154.62 31,989.96
559.18 15,492.67
1,565.57 43,375.55
1,605.56 44,483.58
3,152.18 87,191.83
2,920.33 80,778.57
884.81 24,514.47
0.00 0.00
11,842.24 327,826.64
0.00 0.00
1053.72 21,977.61
394.75 8,233.39
2,238.12 46,669.46
394.75 8,233.39
186.88 3,897.72
212.60 4,434.21
276.64 5,769.94
35.35 737.21
77.25 1,611.28
35.35 737.21
225.72 4,707.92
63.78 1,330.26
21.26 443.42
27.30 569.33
5,243.47 109,352.35
17,085.71 437,178.99
968.79 #DIV/0!
5,194.21
492.18
3.00
EVALUATION PLAN VS ACTUAL
DESEMBER
6,000.00
5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,
5,042.99
5,000.00
4,000.00
3,000.00
2,169.81
2,000.00
1,000.00
0.00
1,000.00
0.00
02 Desember 2016 04 Desember 2016 06 Desember 2016 08 Desember 2016 10 Desember 2016 12 Desember 2016
01 Desember 2016 03 Desember 2016 05 Desember 2016 07 Desember 2016 09 Desember 2016 11 Desember 2016 13 Des
Batubara Actual Fuel Achievement
Plan Fuel Rate Fuel Rate Plan SR Actual SR
Acc. Bb Day Acc. Fuel Ob Bb
0.00 0 2.28 #DIV/0! 0.00% #DIV/0! #DIV/0! #DIV/0!
0.00 0 2.28 #DIV/0! 0.00% #DIV/0! #DIV/0! #DIV/0!
0.00 0 2.28 #DIV/0! 0.00% #DIV/0! #DIV/0! #DIV/0!
0.00 0 2.33 #DIV/0! 0.00% #DIV/0! #DIV/0! #DIV/0!
0.00 0 2.28 #DIV/0! 0.00% #DIV/0! #DIV/0! #DIV/0!
0.00 0 2.28 #DIV/0! 0.00% #DIV/0! #DIV/0! #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 67.4 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 39.0 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 29.5 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 24.8 #DIV/0!
0.00 0 2.28 #DIV/0! 0.00% #DIV/0! 27.4 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 24.0 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 21.8 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 20.2 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 19.0 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 18.0 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 17.3 #DIV/0!
0.00 0 2.33 #DIV/0! 0.00% #DIV/0! 17.7 #DIV/0!
0.00 0 3.01 #DIV/0! 0.00% 0.00% 17.1 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 16.6 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 16.1 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 15.7 #DIV/0!
0.00 0 3.01 #DIV/0! 0.00% 0.00% 15.4 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 15.1 #DIV/0!
0.00 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 15.1 #DIV/0!
0.00 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 15.1 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 14.8 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 14.6 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 14.4 #DIV/0!
0.00 0 3.01 #DIV/0! 0.00% 0.00% 14.2 #DIV/0!
0.00 0 3.00 #DIV/0! 0.00% 0.00% 14.0 #DIV/0!
V/0! #DIV/0!
4.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21 5,194.21
5,042.99
4,891.77
2,169.81
12 Desember 2016 14 Desember 2016 16 Desember 2016 18 Desember 2016 20 Desember 2016 22 Desember 2016 24 Desember 20160.00 26 D
mber 2016 13 Desember 2016 15 Desember 2016 17 Desember 2016 19 Desember 2016 21 Desember 2016 23 Desember 2016 25 Desember 20
4,891.77
0.00 2016
26 Desember 28 Desember 2016 30 Desember 2016
er 2016 27 Desember 2016 29 Desember 2016
"OB"
B-1 210,000 BCM / M
"Material" PRODUCTION
1 EXCAVATOR PC 400
Volume i
9 ADT
Total Bucket / Trip a
Volume DT b=axi
Target DT Trip / 1 Day / 1 Way c = 11 / b
10 RIT
Hauling Distance d
Maximum Speed average e
Loading f = a x ii
Hauling g = ( d / e ) x 60
Dumping h
Return i=g
Queuing j
9 DT
Total Bucket / Trip a
Volume DT b=axi
Total Dump Truck / 1 Day / 1 Way c = 11 / b
10 RIT
Hauling Distance d
Maximum Speed average e
Loading f = a x ii
Hauling g = ( d / e ) x 60
Dumping h
Return i=g
Queuing j
AMOUNT UNIT
10,000.0 MT / Month
1.30 MT / BCM
21.0 :1
1.0
210,000.0 BCM
7,000.0 BCM / day
ION
1
2.8 BCM / Bucket
30.0 seconds 2
1.0 PIT 6
0.3 km
20.0 Km / Hours
3.0 minutes
0.9 minutes
1.0 minutes
0.9 minutes
1.0 minutes
6.8 minutes
142.0 Trip
1.0 PIT
0.3 km
20.0 Km / Hours
1.5 minutes
0.9 minutes
1.0 minutes
0.9 minutes
1.0 minutes
5.3 minutes
182.0 Trip
1.0 PIT
seconds
times / day
BCM / day
Excavator / Day
PIT
Excavator / PIT
Excavator / PIT
"COAL" GETTING &
B-2 70,000 MT / Mo
"Material" HAULING in MT
1 EXCAVATOR PC 300
Volume i
9 DUMP TRUCK 20 T
Total Bucket / Trip a
Volume DT b=ixa
Total Dump Truck / 1 Day / 1 Way c=8/b
10 TRIP
Hauling Distance d
Maximum Speed average e
Loading f = a x ii
Hauling g = ( d / e ) x 60
Dumping h
Return i=g
Queuing j
AMOUNT UNIT
n MT
1.9 MT / Bucket
30.0 seconds
1.0 PIT
8.0 km
60.0 Km / Hours
5.0 minutes
24.0 minutes
2.0 minutes
24.0 minutes
2.0 minutes
57.0 minutes
17.0 Trip
1.0 PIT
1 Digger Unit
Excavator Dossan 500 1
Excavator PC 400 1
Excavator PC 300 1
Excavator PC 200 1
2 Hauler Unit
Articulated Volvo A40F 5
3 Support Unit
Dozer D 85 ss 2
Water Pump Multi Flow 2
Tower Lamp Dossan 2
Light Vehicle 3
Phisycal Produc, per
Availibility Hour
80% 182.42
70% 181.47
70% 150.58
80% 120
80% 75.6
80%
80%
80%
80%