MEMORIA DE CALCULO

PERIODO DE DISEO

Consideramos un periodo de diseo de acuerdo a las exigencias para un sistema de agua potable de esta manera
Determinamos:

Periodo de diseo del sistema de Agua potable : 20 aos


Periodo de diseo del sistema de eliminacion de excretas : 10 aos

N DE BENEFICIARIOS DEL PROYECTO 533 Habitantes

AGUA BAOS
n DESCRIPCION ZONA INSTITUCIONE VIVIENDA
VIVIENDAS S S.
1 SECTOR CANTILANI I 63 Err:509
2 SECTOR COACHI PAMPA II 84 Err:509
3 SECTOR HUARICHEJE III 18 Err:509
4 SECTOR POQUERJACHI IV 28 Err:509
15 13 Err:508 Err:508 193

POBLACION ACTUAL BENEFICIARIA

N DESCRIPCION ZONA VIVIENDAS Hab./Viv. TOTAL


1 SECTOR CANTILANI I 63 2.76 174
2 SECTOR COACHI PAMPA II 84 2.76 232
3 SECTOR HUARICHEJE III 18 2.76 50
4 SECTOR POQUERJACHI IV 28 2.76 77
TOTAL 13 Err:508 533

El numero de Beneficiarios en total es de : 533 Habitantes


MEMORIA DE CALCULO
PERIODO DE DISEO

Consideramos un periodo de diseo de acuerdo a las exigencias para un sistema de agua potable de esta manera
Determinamos:

Periodo de diseo del sistema de Agua potable : 20 aos


Periodo de diseo del sistema de eliminacion de excretas : 10 aos

N DE BENEFICIARIOS DEL PROYECTO 533 Habitantes


POBLACION FUTURA DEL PROYECTO

POBLACION FUTURA TOTAL DEL PROYECTO

Donde:
Pi = 533
r= 1.13%
t= 20
=(1+.)
Entonces tenemos la poblacion fututa al 2036 sera de: 654 Habitantes

CALCULO DE LA POBLACION DE DISEO DEL SISTEMA DE AGUA POTABLE

POBLACION ACTUAL DEMANDANTE DEL SERVICIO DE AGUA POTABLE

Del cuadro desagregado de poblacion demandante del servicio de agua potable

INSTITUCIONE
N DESCRIPCION ZONA VIVIENDAS S
Hab/Viv
1 SECTOR CANTILANI I 63 - 2.76
2 SECTOR COACHI PAMPA II 84 - 2.76
3 SECTOR HUARICHEJE III 18 - 2.76
4 SECTOR POQUERJACHI IV 28 - 2.76
TOTAL 13 Err:508 Err:508 Err:508

Poblacion actual que requiere del servicio de agua potable Err:509 Habitantes

POBLACION FUTURA DEMANDANTE DEL SERVICIO DE AGUA POTABLE

Donde:
Pi = 533
r= 1.13%
t= 20

POB. INSTITUCIONE POB.


N DESCRIPCION ZONA ACTUAL S FUTURA
1 SECTOR CANTILANI I 174 - 213
2 SECTOR COACHI PAMPA II Err:509 284
3 SECTOR HUARICHEJE III Err:509 61
4 SECTOR POQUERJACHI IV Err:509 95
TOTAL 533 0 Err:509
MEMORIA DE CALCULO
PERIODO DE DISEO

Consideramos un periodo de diseo de acuerdo a las exigencias para un sistema de agua potable de esta manera
Determinamos:

Periodo de diseo del sistema de Agua potable : 20 aos


Periodo de diseo del sistema de eliminacion de excretas : 10 aos

N DE BENEFICIARIOS DEL PROYECTO 533 Habitantes

Entonces tenemos la poblacion fututa al 2036 sera de: 653 Habitantes


a potable de esta manera

Habitantes

BAOS
INSTITUCIONE
S.

Err:508
a potable de esta manera

Habitantes

habitantes

aos

DE AGUA POTABLE

POTABLE

TOTAL
Err:509
Err:509
Err:509
Err:509
533

POTABLE

habitantes

aos
a potable de esta manera

Habitantes
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

AFORO
: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y
SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

QUELLOQUELLO
HUMAJALSU I
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 5.90 0.169 0.642
2 1 6.00 0.167 0.631
3 1 6.10 0.164 0.621
4 1 5.90 0.169 0.642
5 1 6.10 0.164 0.621

Promedio : 0.631 l/s

HUARIHUMAA
TAYPITIRA
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 9.54 0.105 0.397
2 1 9.53 0.105 0.397
3 1 9.51 0.105 0.398
4 1 9.50 0.105 0.398
5 1 9.52 0.105 0.398

Promedio : 0.398 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

ANCOCARCA
HUMAJALSU II
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 13.15 0.076 0.288
2 1 13.02 0.077 0.291
3 1 13.05 0.077 0.290
4 1 13.20 0.076 0.287
5 1 13.15 0.076 0.288

Promedio : 0.289 l/s

LIZANI PAMPA I
TORNOCUCHO TITINI I
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 43.10 0.023 0.088
2 1 43.15 0.023 0.088
3 1 43.20 0.023 0.088
4 1 43.15 0.023 0.088
5 1 43.40 0.023 0.087

Promedio : 0.088 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

LIZANI PAMPA I
TORNOCUCHO TITINI II
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 82 0.012 0.046
2 1 80 0.013 0.047
3 1 81 0.012 0.047
4 1 82 0.012 0.046
5 1 82 0.012 0.046

Promedio : 0.047 l/s

LIZANI PAMPA I
KOKORICHINE
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 41.00 0.024 0.092
2 1 41.10 0.024 0.092
3 1 41.20 0.024 0.092
4 1 40.80 0.025 0.093
5 1 40.92 0.024 0.093

Promedio : 0.092 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

LIZANI PAMPA II
OSCULLUNI
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 5.50 0.182 0.688
2 1 5.40 0.185 0.701
3 1 5.38 0.186 0.704
4 1 5.35 0.187 0.708
5 1 5.40 0.185 0.701

Promedio : 0.700 l/s

LLOCALLAMARCA
WALLAPUJU
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 38.41 0.026 0.099
2 1 38.42 0.026 0.099
3 1 38.41 0.026 0.099
4 1 38.40 0.026 0.099
5 1 38.50 0.026 0.098

Promedio : 0.099 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

LLOCALLAMARCA
WAYLLATIRA SOCOSANI
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 21.09 0.047 0.179
2 1 21.05 0.048 0.180
3 1 20.99 0.048 0.180
4 1 20.98 0.048 0.180
5 1 20.99 0.048 0.180

Promedio : 0.180 l/s

HUANCANMITA
PAJCHAPARQUI
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 22.05 0.045 0.172
2 1 22.10 0.045 0.171
3 1 22.00 0.045 0.172
4 1 22.15 0.045 0.171
5 1 22.20 0.045 0.171

Promedio : 0.171 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

QUEUANI I
KALLAHUAYA PUJU
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 32.84 0.030 0.115
2 1 32.89 0.030 0.115
3 1 32.82 0.030 0.115
4 1 32.81 0.030 0.115
5 1 32.88 0.030 0.115

Promedio : 0.115 l/s

QUEUANI II
KALLAHUAYA PUJU
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 26.15 0.038 0.145
2 1 26.28 0.038 0.144
3 1 26.25 0.038 0.144
4 1 26.20 0.038 0.144
5 1 26.15 0.038 0.145

Promedio : 0.144 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

QUEUANI III
HUAYLLAHOJOPATA
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 27.10 0.037 0.140
2 1 27.39 0.037 0.138
3 1 27.21 0.037 0.139
4 1 27.15 0.037 0.139
5 1 27.30 0.037 0.139

Promedio : 0.14 l/s

QUEUANI III
HUAYLLAPHOJO PATA
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 38.70 0.026 0.098
2 1 38.91 0.026 0.097
3 1 38.75 0.026 0.098
4 1 38.95 0.026 0.097
5 1 38.98 0.026 0.097

Promedio : 0.097 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

: "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y


SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES Y ANEXOS DE LA
PROYECTO
COMUNIDAD CAMPESINA DE SAN ANTONIO, DISTRITO DE ROSASPATA -
HUANCANE - PUNO"
PROPIETARIO : COMUNIDAD DE SAN ANTONIO
COMUNIDAD : COMUNIDAD DE SAN ANTONIO
DISTRITO : ROSASPATA
PROVINCIA : HUANCANE
DEPARTAMENTO : PUNO

QUEUANI IV
PILAPATA
FECHA : 6/27/2014
HORA : 15:30

Volumen Tiempo de Caudal


N Prueba Caudal (Gln/s)
(Gln) Llenado (s) (L/s)
1 1 83.00 0.012 0.046
2 1 81.00 0.012 0.047
3 1 84.00 0.012 0.045
4 1 82.00 0.012 0.046
5 1 83.00 0.012 0.046

Promedio : 0.046 l/s

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
. MEMORIA DE CALCULO DEL EXPEDIENTE TECNICO .

POTABLE Y
XOS DE LA
OSASPATA -

_____________________________________________________________________________________
VOLUMENES DE SERVICIO
DOTACION DE SERVICIO
Dotacion de Servicio:
De acuerdo al Sistema de Disposicion de Excretas Tenemos:

Letrinas sin Arrastre Hidraulico Letrinas con Arrastre Hidraulico


Costa 50 a 60 l/h/d 90
Sierra 40 a 50 l/h/d 80
Selva 60 a 70 l/h/d 100

Elegimos Como Dotacion : 80 l/h/d

CAUDALES TOTALES DEL PROYECTO PARA VIVIENDAS

Caudal Promedio:

Segn la Formula =()/86400


tenemos que:

Demanda maxima diaria (Qmd) :

=1.3

Demanda maxima horaria (Qmh) :

=2.0

CAUDALES DIVIDIDOS POR ZONAS

De la zonificacion previa que se tuvo hallamos los Caudales para cada zona POR VIVIENDA

INSTITUCIONE Qp Qmd
N DESCRIPCION POBLACION
(l/s)
S (l/s)
1 SECTOR CANTILANI 213 - Err:509 Err:501
2 SECTOR COACHI PAMPA 284 - Err:509 Err:501
3 SECTOR HUARICHEJE 61 - Err:509 Err:501
4 SECTOR POQUERJACHI 95 - Err:509 Err:501
TOTAL Err:508 Err:508 Err:501 Err:501

Caudal Unitario para modelamiento Qu (Qmh/nro de Viv.)= Err:509

23
VOLUMENES DE SERVICIO
DOTACION DE SERVICIO

CAUDAL REQUERIDO VS CAUDAL DE AFORO


Q
Q Aforado SITUACIO
N DESCRIPCION ZONA Requerido
(l/s) (l/s) N
SECTOR CANTILANI 0.404 0.197 Ok
Huarahuarani 0.048
Occopatilla I 0.055
Cantuta uyu 0.080
Collpapata 0.221
SECTOR COACHI PAMPA 0.560 0.263 Ok
Sojori pampa 0.037 0.000
Uma phuju cuyo 0.067
Jiska Pasalla 0.016
II
Jalsupata 0.069
Tajachillani cucho 0.060
Cocha cucho 0.280
Apacheta huyo 0.031
SECTOR HUARICHEJE 0.110 0.056 Ok
Huaricheje 0.020
III
Joccopata I 0.078
Joccopata II 0.012
SECTOR POQUERJACHI 0.122 0.088 Ok
Sojori Parque I 0.038 0.000
Sojori Parque II 0.066
IV
Sojori Parque III 0.018
Sojori pampa 0.017
Aathuyani 0.042 0.000
0.000
TOTAL 1.196 0.605

REQUERIDO AFORADO
No se requiere Volumen de Reserva
0.605 < Err:509

VOLUMENES DE SERVICIO
=(0.2086400)/1000

RESUMEN DE VOLUMENES REQUERIDOS

VOL.
N DESCRIPCION Qp. CALCULADO
(m3)
1 SECTOR CANTILANI ### 3.41
2 SECTOR COACHI PAMPA ### 4.55
3 SECTOR HUARICHEJE ### 0.97
4* SECTOR POQUERJACHI ### 1.52
13 10.45

24
Tenemos:

n Arrastre Hidraulico
l/h/d
l/h/d
l/h/d

ENDAS

Qmh
(l/s)
Err:501
Err:501
Err:501
Err:501
Err:501

l/s

25
RO

e Volumen de Reserva

ERIDOS

VOL.
ASUMIDO
(m3)
8.00
10.00
5.00
4.00
27.00

26
CALCULO DE LA LINEA DE LINEA DE CONDUCCION CACAPUNCO - B
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 1 1/2


Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 43.4

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+000 3,880.99 0.00 Err:509 3880.985 0.000 3880.985


0+010 3,879.74 0.01 Err:509 124.600 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+020 3879.553 0.01 Err:509 18.600 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+030 3,879.37 0.01 Err:509 18.500 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+040 3,879.18 0.01 Err:509 18.600 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+050 3,878.60 0.01 Err:509 58.400 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+060 3,877.81 0.01 Err:509 79.100 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+067.77 3,875.43 0.01 Err:509 305.920 Err:509 43.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PERDIDA TOTAL (m): Err:509


ALTURA ESTATICA(m): 5.56
PRESION DE ENTREGA (m) : Err:509
CALCULO DE LA LINEA DE LINEA DE CONDUCCION CACAPUNCO - B
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 1 1/2


Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 43.4

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

GRADIENTE HIDRAULICA - LINEA DE CONDUCCION


3882.00

3881.00

3880.00

3879.00

3878.00
ALTITUD
3877.00

3876.00

3875.00

3874.00

3873.00

3872.00
0 5 10 15 20 25 30 35 40 45 50 55 60 65

LONGITUD
LINEA PIEZOMETRICA COTA TERRENO PLANO DE CARGA COTA EJE DE TUBERIA
UNCO - B

OBSERVACION

CAPTACION CACAPUNCO 1

CAM DE REUNION
UNCO - B

OBSERVACION
CALCULO DE LA LINEA DE LINEA DE CACAPUNCO - A
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+000 3,880.69 0.00 Err:509 3880.691 0.000 3880.691


0+020 3,879.57 0.02 Err:509 56.000 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+040 3879.337 0.02 11.700 #VALUE! 54.20 #VALUE! #VALUE! #VALUE! Err:509 Err:509 Err:509
0+060 3,879.10 0.02 11.650 #VALUE! 54.20 #VALUE! #VALUE! #VALUE! Err:509 Err:509 Err:509
0+080 3,878.52 0.02 29.050 #VALUE! 54.20 #VALUE! #VALUE! #VALUE! Err:509 Err:509 Err:509
0+096 3,875.43 0.02 198.449 #VALUE! 54.20 #VALUE! #VALUE! #VALUE! Err:509 Err:509 Err:509
0+096 3,875.43 3875.430 0.000 3875.430
0+100 3,873.20 0.02 Err:509 266.000 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+120 3,865.90 0.02 Err:509 365.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+140 3,864.23 0.02 Err:509 83.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+160 3,862.68 0.02 Err:509 77.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+180 3,861.69 0.02 Err:509 49.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+200 3,860.71 0.02 Err:509 49.200 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+220 3,859.91 0.02 Err:509 39.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+240 3,858.88 0.02 Err:509 51.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+260 3,857.37 0.02 Err:509 75.950 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+280 3,855.85 0.02 Err:509 75.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+300 3,854.41 0.02 Err:509 72.050 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+320 3,853.01 0.02 Err:509 70.050 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+340 3,852.30 0.02 Err:509 35.050 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+360 3,851.78 0.02 Err:509 26.450 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+380 3,851.25 0.02 Err:509 26.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+400 3,851.13 0.02 Err:509 5.700 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+420 3,851.12 0.02 Err:509 0.850 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+440 3,851.10 0.02 Err:509 0.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+460 3,851.08 0.02 Err:509 0.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+480 3,851.06 0.02 Err:509 0.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+500 3,852.88 0.02 Err:509 -90.650 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+520 3,856.14 0.02 Err:509 -163.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
CALCULO DE LA LINEA DE LINEA DE CACAPUNCO - A
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+540 3,859.41 0.02 Err:509 -163.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+560 3,861.44 0.02 Err:509 -101.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+580 3,862.85 0.02 Err:509 -70.450 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+600 3,864.26 0.02 Err:509 -70.450 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+620 3,865.42 0.02 Err:509 -58.250 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+640 3,866.45 0.02 Err:509 -51.650 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+660 3,867.49 0.02 Err:509 -51.600 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+680 3,868.57 0.02 Err:509 -54.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+700 3,869.48 0.02 Err:509 -45.450 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+720 3,869.48 0.02 Err:509 0.000 --- 54.20 --- Err:509 Err:509 Err:509 Err:509 Err:509
0+721.51 3,869.48 0.00 Err:509 0.000 --- 54.20 --- Err:509 Err:509 Err:509 Err:509 Err:509

PERDIDA TOTAL (m): Err:509


ALTURA ESTATICA(m): 11.21
PRESION DE ENTREGA (m) : Err:509
CALCULO DE LA LINEA DE LINEA DE CACAPUNCO - A
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

GRADIENTE HIDRAULICA - LINEA DE CONDUCCION


3885.00

3880.00

3875.00

3870.00

3865.00
ALTITUD
3860.00

3855.00

3850.00

3845.00

3840.00

3835.00
20 60 100 140 180 220 260 300 340 380 420 460 500 540 580 620 660 700
0 40 80 120 160 200 240 280 320 360 400 440 480 520 560 600 640 680 720
LONGITUD
LINEA PIEZOMETRICA COTA TERRENO PLANO DE CARGA COTA EJE DE TUBERIA
O-A

OBSERVACION

CAPTACION CACAPUNCO 2

CAM DE REUNION
O-A

OBSERVACION

RESERVORIO DE 13M3
O-A

OBSERVACION
CALCULO DE LA LINEA DE LINEA DE CONDUCCION ARMACHURANA
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+000 3,876.98 0.00 Err:509 3876.975 0.000 3876.975


0+020 3,873.53 0.02 Err:509 172.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+040 3871.063 0.02 Err:509 123.450 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+060 3,868.41 0.02 Err:509 132.650 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+080 3,865.53 0.02 Err:509 144.000 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+100 3,863.59 0.02 Err:509 97.100 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+120 3,861.99 0.02 Err:509 79.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+140 3,860.82 0.02 Err:509 58.500 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+160 3,859.84 0.02 Err:509 49.200 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+180 3,858.85 0.02 Err:509 49.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+200 3,857.75 0.02 Err:509 55.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+220 3,856.43 0.02 Err:509 65.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+240 3,855.11 0.02 Err:509 65.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+260 3,853.80 0.02 Err:509 65.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+280 3,852.48 0.02 Err:509 65.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+300 3,851.17 0.02 Err:509 65.750 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+320 3,850.38 0.02 Err:509 39.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+340 3,849.82 0.02 Err:509 28.250 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+360 3,849.25 0.02 Err:509 28.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+380 3,848.76 0.02 Err:509 24.550 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+400 3,848.37 0.02 Err:509 19.200 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+420 3,847.99 0.02 Err:509 19.250 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+440 3,847.61 0.02 Err:509 19.200 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+460 3,847.22 0.02 Err:509 19.250 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+480 3,846.84 0.02 Err:509 19.200 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+500 3,846.39 0.02 Err:509 22.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+520 3,845.78 0.02 Err:509 30.650 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+540 3,845.16 0.02 Err:509 30.650 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+560 3,844.61 0.02 Err:509 27.600 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
CALCULO DE LA LINEA DE LINEA DE CONDUCCION ARMACHURANA
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+580 3,844.30 0.02 Err:509 15.500 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+600 3,843.99 0.02 Err:509 15.500 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+620 3,843.69 0.02 Err:509 14.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+640 3,843.55 0.02 Err:509 7.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+660 3,843.40 0.02 Err:509 7.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+680 3,843.26 0.02 Err:509 7.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+700 3,843.11 0.02 Err:509 7.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+720 3,842.96 0.02 Err:509 7.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+740 3,842.82 0.02 Err:509 7.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+760 3,842.73 0.02 Err:509 4.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+780 3,842.74 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+800 3,842.74 0.02 Err:509 -0.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+820 3,842.75 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+840 3,842.76 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+860 3,842.76 0.02 Err:509 -0.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+880 3,842.77 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+900 3,842.78 0.02 Err:509 -0.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+920 3,842.78 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+940 3,842.79 0.02 Err:509 -0.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+960 3,842.80 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+980 3,842.80 0.02 Err:509 -0.350 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+000 3,842.89 0.02 Err:509 -4.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+020 3,842.99 0.02 Err:509 -4.850 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+040 3,843.09 0.02 Err:509 -4.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+060 3,843.18 0.02 Err:509 -4.900 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+080 3,843.33 0.02 Err:509 -7.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+100 3,843.72 0.02 Err:509 -19.550 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+120 3,844.11 0.02 Err:509 -19.600 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+140 3,844.50 0.02 Err:509 -19.550 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+160 3,844.89 0.02 Err:509 -19.550 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
CALCULO DE LA LINEA DE LINEA DE CONDUCCION ARMACHURANA
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

1+180 3,845.28 0.02 Err:509 -19.600 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+200 3,845.57 0.02 Err:509 -14.300 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+220 3,845.40 0.02 Err:509 8.500 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+240 3,845.23 0.02 Err:509 8.450 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+260 3,845.06 0.02 Err:509 8.500 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+280 3,844.95 0.02 Err:509 5.400 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+300 3,845.11 0.02 Err:509 -8.050 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+320 3,845.28 0.02 Err:509 -8.050 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+340 3,846.06 0.02 Err:509 -39.000 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+360 3,850.22 0.02 Err:509 -208.250 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+380 3,854.07 0.02 Err:509 -192.600 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+400 3,859.68 0.02 Err:509 -280.150 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+420 3,860.67 0.02 Err:509 -49.850 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+440 3,861.67 0.02 Err:509 -49.850 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+460 3,862.67 0.02 Err:509 -49.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+480 3,863.66 0.02 Err:509 -49.850 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+500 3,864.18 0.02 Err:509 -25.950 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+520 3,864.40 0.02 Err:509 -10.800 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+540 3,865.09 0.02 Err:509 -34.500 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+560 3,865.30 0.02 Err:509 -10.550 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1+575.74 3,869.48 0.02 Err:509 -265.502 Err:509 54.20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PERDIDA TOTAL (m): Err:509


ALTURA ESTATICA(m): 7.50
PRESION DE ENTREGA (m) : Err:509
CALCULO DE LA LINEA DE LINEA DE CONDUCCION ARMACHURANA
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 2
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 54.2

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

GRADIENTE HIDRAULICA - LINEA DE CONDUCCION


3880.00

3870.00

3860.00

ALTITUD
3850.00

3840.00

3830.00

3820.00
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500

LONGITUD
LINEA PIEZOMETRICA COTA TERRENO PLANO DE CARGA COTA EJE DE TUBERIA
HURANA

OBSERVACION

CAP. ARMACHURANA
HURANA

OBSERVACION
HURANA

OBSERVACION

RESERVORIO DE 13M3
HURANA

OBSERVACION
CALCULO DE LA LINEA DE LINEA DE CONDUCCION
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 1
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 29.4

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+000 3,878.00 0.000 Err:509 3878.000 0.000 3878.000


0+005 3,876.88 0.005 Err:509 223.600 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+010 3875.763 0.005 Err:509 223.800 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+015 3,874.65 0.005 Err:509 223.600 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+020 3,873.53 0.005 Err:509 223.800 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+025 3,872.41 0.005 Err:509 223.600 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+030 3,871.29 0.005 Err:509 223.600 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+035 3,870.17 0.005 Err:509 223.800 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+039.48 3,869.17 0.004 Err:509 223.661 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PERDIDA TOTAL (m): Err:509


ALTURA ESTATICA(m): 8.83
PRESION DE ENTREGA (m) : Err:509
CALCULO DE LA LINEA DE LINEA DE CONDUCCION
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 1
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 29.4

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

GRADIENTE HIDRAULICA - LINEA DE CONDUCCION


3880.00

3878.00

3876.00

3874.00
ALTITUD
3872.00

3870.00

3868.00

3866.00

3864.00
0 5 10 15 20 25 30 35 40

LONGITUD
LINEA PIEZOMETRICA COTA TERRENO PLANO DE CARGA COTA EJE DE TUBERIA
ON

OBSERVACION

CAPTACION PUKARA

RESERVORIO DE 2M3
ON

OBSERVACION
CALCULO DE LA LINEA DE LINEA DE CONDUCCION
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 1
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 29.4

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

0+000 3,881.60 0.00 Err:509 3881.598 0.000 3881.598


0+010 3,880.83 0.01 Err:509 76.900 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+020 3880.059 0.01 Err:509 77.000 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+030 3,879.29 0.01 Err:509 76.900 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+040 3,878.52 0.01 Err:509 76.900 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+050 3,877.15 0.01 Err:509 136.800 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+060 3,875.79 0.01 Err:509 136.800 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+070 3,874.42 0.01 Err:509 136.800 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0+078.56 3,873.25 0.01 Err:509 136.682 Err:509 29.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PERDIDA TOTAL (m): Err:509


ALTURA ESTATICA(m): 8.35
PRESION DE ENTREGA (m) : Err:509
CALCULO DE LA LINEA DE LINEA DE CONDUCCION
TUBERIA CLASE 10
h maxima presion 75 m

Comercial (Pulg) 1
Caudal Max.Diar. Q= Err:509 Coef. Flujo. (C) = 150 interior (mm) 29.4

Niv. Dinmico Caudal Pendiente Calculado Comercial Vel. Calcul. Velocidad Alt. Piezom. Cota Piezom.
KM Longitud (Km) Hf (m) Presin (m)
(m) (Lts/Seg) (m/Km) (mm) (mm) (m/seg) Real (m/seg) (m) (msnm)

GRADIENTE HIDRAULICA - LINEA DE CONDUCCION


3884.00

3882.00

3880.00

3878.00
ALTITUD
3876.00

3874.00

3872.00

3870.00

3868.00
0 10 20 30 40 50 60 70

LONGITUD
LINEA PIEZOMETRICA COTA TERRENO PLANO DE CARGA COTA EJE DE TUBERIA
ON

OBSERVACION

CAP. AGUILACCACCA

RESERVORIO DE 3M3
ON

OBSERVACION