Você está na página 1de 2

Design of BOLT

TOATL FACTOR LOAD = 800


Design of BOLT DRAIN

No. of HOOKs= 10

Load per hook P = (T /2) = 80 kN


Load on each leg of hook W = P / 2 = 40 kN

Assume HYSD
Crossection areasteel bars A
required with yield on
= Load strength fy =of hook / Design stress
each leg 500 Mpa
of HYSD ( Design stress = 0.87 x fy)
so, A = W / 0.87 fy
2
so, C/s area required A = 91.954 mm
Diameter required d = (A x 4 / )
so, d = 10.818 mm
Add sacrificial thickness of 2 mm

so, Finally Diameter required =(d + 2) = 12.818 mm (say) 16.00 mm

Allowable bond stress for M25 concrete = 1.4 Mpa 60% increase in deformed bars as per is 456 -26.2.1.1

Anchorage length required L = Load on each leg of hook / ( x diameter of anchor hook x bond stress)
so, L = W / ( x D x ) = 355.114 mm

The length anchored hook 360.00 mm

Provide 16.00 mm dia anchor hookes of length (360) mm


12.5M

1m 1m 1m 1m TOP BEAM 600


360

SLAB

360 BOTTOM BEAM 450

LONGITUDNAL SECTION

HILLTY BOLTS 450

TOP BEAM
600

HILLTY BOLTS

SLAB

450 BOTTOM BEAM

300

Você também pode gostar