No. of HOOKs= 10
Assume HYSD
Crossection areasteel bars A
required with yield on
= Load strength fy =of hook / Design stress
each leg 500 Mpa
of HYSD ( Design stress = 0.87 x fy)
so, A = W / 0.87 fy
2
so, C/s area required A = 91.954 mm
Diameter required d = (A x 4 / )
so, d = 10.818 mm
Add sacrificial thickness of 2 mm
Allowable bond stress for M25 concrete = 1.4 Mpa 60% increase in deformed bars as per is 456 -26.2.1.1
Anchorage length required L = Load on each leg of hook / ( x diameter of anchor hook x bond stress)
so, L = W / ( x D x ) = 355.114 mm