QINGJIAN INTERNATIONAL

M & E MAJOR EQUIPMENT DELIVERY SCHEDULE:


(ELECTRICAL) Updated: 29 Jun 2015

Target Actual Nos. of


On Site % of
Delivery Delivery Unit
Item Equipment Type FAT SAT / Progres Location Stored Remark
Date at Date On Delivere
Off Site s
YGN Site d
Electrical System
On
1 33 kV HT Switchgear (HVSB/1-1) 10-Oct-15 09-Sep-15 L1 HT Switchroom MIC/IL before 12 Sep 15
Site
On
2 5nos, of 1.6MVA T/F 11-Oct-15 02-Sep-15 L7 Transformer Room MIC/IL before 13 Sep 15
Site
On
4 MSB/7-1 LV Main Switchboard & Capacitor Bank 11-Sep-15 26-Aug-15 L7 LV Switchroom MIC/IL before 30 Aug 15
Site
On
5 3nos, of 2MVA "Cummins" Genset & 3 nos 1000L Day Tank 31-Aug-15 Nil L9 Genset Room MIC/IL before 31 July 15
Site
On
6 Genset Syncronising Panel 31-Aug-15 Nil L9 Genset Room MIC/IL before 31 July 15
Site
On
8 2nos, of 60,000L U/G Diesel Storage Tank 16-Jan-15 22-Jan-15 2 14-Jan-15 100% B1 Fuel Tank Room
Site
On
10 4nos, of Diesel Fuel Pumps 31-Aug-15 Nil L1 Fuel Pump Room MIC/IL before 31 July 15
Site
On
12 33kV HT "Prysmian" cables 30-Sep-15 Nil B1 to L7 Transformer Room MIC/IL before 30 Aug 15
Site
On
13 Busbar Trunking (Schneider) 14-Sep-15 Nil 7th to 9th Sty & Riser MIC/IL before 30 Aug 15