Revision action Plan For Plexiglas

Startin Finishin Responsi


No List of Activities Durati g Time g Time ble
on Team
1. 1 05/09/09 05/09/09
1.1.
1.2. (outline)

1.3. (description) 3 08/00/09 11/09/09
1.4. (specification) 3 08/09/09 11/09/09
1.5. (technical analysis) 2 08/09/09 10/09/09
1.6. (BOM) 2 08/09/09 10/09/09
1.7. (man 2 08/09/09 10/09/09
power)
2. (alternative product) 5 08/09/09 13/09/09
2.1. (alternative one) 1 08/09/09 08/09/09
2.1.1. (description) 2 08/09/09 10/09/09
2.1.2. (specification) 2 10/09/09 12/09/09 Plant
3. (production design) 10 08/09/09 18/09/09
3.1. (production 5 08/09/09 12/09/09
operation
members
process design)
3.2. (production 5 13/08/09 18/09/09 ad
Teams of
arregmenta design)
3.3. (manufacturing 10 12/09/09 20/09/09 Plexiglas
methodology process)
3.4. ( ) (tool design ) 5 13/09/09 18/09/09
3.5. (supply 5 08/09/09 12/09/09
and logistics plan)
4. Quality plan