Você está na página 1de 20

PREFEITURA MUNICIPAL DE MISSO VELHA

OBRA: CONSTRUO DE PRAA


LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO

DADOS ADIMISSIVEIS :

APC - AREA TOTAL DA PRAA CONSTRUIR = 1857.61 m


PMF - PERIMETRO MEIO FIO EXECUTAR = 200.49 m
PMFC - PERIMETRO DO MEIO FIO DOS CANTEIROS EXECUTAR = 447.03 m
ACE - REA TOTAL DOS CANTEIROS EXECUTAR = 168.56 m
APC = REA DE PEDRA CARIRI 280.32 m
API = REA DE PISO INDUSTRIAL 633.99 m
APCP = AREA PISO CONCRETO POLIDO 271.79 m
APCA = AREA DE CALADAS 100.80 m
AVPI= AREA DA VIA EM PISO INTERTRAVADO 402.15 m

1.0 SERVIOS PRELIMINARES

1.1 LOCAO DA OBRA EXECUO DE GABARITO = LEG

LEG = APE

APE = REA DA PRAA EXECUTAR = 1857.61 m

LEG = LOCAO DA OBRA COM EXECUO DE GABARITO = 1,857.61 m

1.2 PLACA PADRO DA OBRA = PPO

PPO = PLACA DA OBRA ( 3,00m X 2,00m ) 6.00 m

APPO = REA DA PLACA PADRO DA OBRA = 6.00 m

1.3 RASPAGEM E LIMPEZA DE TERRENO =

LEG = APC

APC - AREA TOTAL DA PRAA CONSTRUIR = 1,857.61 m

RLT = RASPAGEM E LIMPEZA DO TERRENO 1,857.61 m


OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO
2.0 MOVIMENTO DE TERRA

2.1 ESCAVAO MANUAL SOLO DE 1A.CAT. PROF. ATE 1.50m = EM

EM = ( EMV01 + EMV02 )

EMV01 = ( PMF + PMFC ) x LEMF x HEMF ) =

PMF = PERIMETRO DO MEIO FIO EXECUTAR = 200.49 m


PMFC = PERIMETRO DO MEIO FIO DOS CANTEIROS A EXECUTAR = 447.03 m
LEMF = LARGURA DA ESCAVAO MEIO FIO = 0.15 m
HEM = ALTURA DA ESCAVAO MEIO FIO = 0.20 m
EMS = ESCAVAO MANUAL SAPATAS = (3 x S1=(0,60x2,10) + (3 x S2=(0,80x0,60) + 8 x S3=(0,6X0,60)) = 8.10 m
HES = ALTURA ESCAVAO DAS SAPATAS = 1.00 m
EAB = ESCAVAO MANUAL ALVENARIAS DOS BANCOS = (4ALV01 = (4,20x0,20) + (2ALV02) = (1,00 x 0,20) = 3.76 m
HAB = ALTURA ESCAVAO ALVENARIAS DOS BANCOS = 0.50 m
EM = VOLUME DA ESCAVAO ESCAVACAO MANUAL 29.41 m

VEE = VOLUME DA ESCAVAO = 29.41 m

3.0 PAVIMENTAO

3.1 PAVIMENTAO EM PISO INTERTRAVADO - PPI

PPI = AVPI 402.15 m

3.2 MEIO FIO PR - MOLDADO = MFP

MFP = PMFE + PCE

PMFE = PERIMETRO MEIO FIO EXECUTAR = 200.49 m


PCE = PERIMETRO DOS CANTEIROS A EXECUTAR = 447.03 m

MFP - MEIO FIO EM PRE-MOLDADO = 647.52 m

3.3 AREA DE CALADA - ACAL

ACAL= (CAL X2) x LCAL

CR - COMPRIMENTO DA RUA = 42.00 m


LCAL - LARGURA DA CALADA = 1.10 m

SJT - SARJETA = 92.40 m


OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO
4.0 FUNDAES E ESTRUTURAS

4.1 ALVENARIA DE EMBASAMENTO CERMICO FURADO = AEM

AEM = ((PEAB01) x LEVAB x HEAB)

PEAB02 = PERIMETRO ESCAVAO ALVENARIA DOS BANCOS 02 = 12.80 m


LEAB = LARGURA ESCAVAO ALVENARIA DOS BANCOS = 0.20 m
HEAB = ALTURA ESCAVAO DA ALVENARIA DOS BANCOS = 0.40 m

AEM = ALVENARIA DE EMBASAMENTO COM TIJO LO CERMICO FURADO = 1.02 m

4.2 CONCRETO P/ VIBRAO = CV

CV = VCV

VCV = (EMS x HCS) + (VMAR) =


EMS01 = ESCAVAO MANUAL SAPATAS = 3 x S1=(0,60x2,10) (monumento) 3.78 m
EMS02 = ESCAVAO MANUAL SAPATAS = 3 x S2=(0,80x0,60 =(monumento) 1.44 m
EMS03 = ESCAVAO MANUAL SAPATAS = 8 x S3=(0,6X0,60) = (pergolado) 2.88 m
EMS04 = ESCAVAO MANUAL SAPATAS = 4 x S4 = (0,5 X 1,00) = (banco) 2.00 m
HCS = ALTURA CONCRETO DAS SAPATAS = 0.30 m
ALB01 =AREA DA LAJE DO BANCO TIPO 01 = 1,68 x 2 3.36 m
ALB02 =AREA DA LAJE DO BANCO TIPO 02 = 0,65 x 4 2.60 m
ALB03 =AREA DA LAJE DO BANCO TIPO 02 = 16,55 x 2 33.10 m
HCB = ALTURA CONCRETO DOS BANCOS = 0.10 m
VMAR= VOLUME DO MONUMENTO ARMADO = 3 X ((8,55 +3,00 ) x 0,60 x 0,20) 4.16 m
VPP = VOLUME DO PILAR DO PERGOLADO = 4 x (0,30 x 0,15 x 2,20) 0.40 m
VPB = VOLUME DO PILAR DOS BANCOS = 4 x (2,70 x 0,50 x 0,20) 1.08 m
VVPER = VOLUME DE VIGAS PERGOLADO = 20 x (0,12 x 0,20 x 4,20) 2.02 m

CV = VOLUME DE CONCRETO P/ VIBRAO = 14.59 m

4.3 LANAMENTO DE CONCRETO = LC

LC = CV

CV = VOLUME DE CONCRETO PARA VIBRAO = 14.59 m

LC = LANAMENTO DE CONCRETO = 14.59 m

4.4 ARMADURA DE AO CA 50/60 = ARM


ARM = ARM.50/60

ARM.50/60 = ARMADURA DE AO 50/60 = 1166.88 Kg

CV = VOLUME DE CONCRETO P/ VIBRAO = 1166.88 Kg


OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO

4.5 FORMA PLANA CHAPA COMPENSADA = FOR

FOR = AFO

AFO = REA DA FORMA = 29.17 m

FOR = REA DE FORMA PLANA CHAPA COMPENSADA = 29.17 m

5.0 PAREDES E PAINIS

5.1 ALVENARIA DE TIJOLO CERMICO = ATC

ATC = ( PTDB 02) =


ATC = PTDB 02 x HT =

PDB02 = PERIMETRO DA ALVENARIA EM TIJOLO CERAMICO DO BANCO MOD 02 = 12.80 m


HT = ALTURA DA ALVENARIA EXECUTAR = 0.35 m
ATCB02 = REA DA ALVENARIA DE TIJOLO CERMICO DO BANCO 02 4.48 m

AATC = REA DA ALVENARIA DE TIJOLO CERMICO A EXECUTAR = 4.48 m

6.0 REVESTIMENTOS

6.1 CHAPISCO = CH

CH = AATC x 2

AATC = REA DA ALVENARIA DE TIJOLO CERMICO A EXECUTAR = 4.48 m


PPM = PERIMETRO PILAR DO MONUMENTO = 1,60 1.60 m
HPM = ALTURA PILAR DO MONUMENTO= (INCLINADO) 11.55 m
QPM = QUANT PILAR DO MONUMENTO= 3.00 un
PPB = PERIMETRO PILAR DOS BANCO 01= (MEDIA) 1.20 m
HPB = ALTURA PILAR DO BANCO 01= 2.20 m
QPB = QUANT PILAR DO BANCO 01= 4.00 un
PPP = PERIMETRO PILAR DOS PERGOLADOS= 0.90 m
HPP = ALTURA PILAR DOS PERGOLADOS= 2.20 m
QPP = QUANT PILAR DOS PERGOLADOS= 8.00 un
AVPER = AREA DE VIGAS PERGOLADO = 20 x (0,12 + 0,12 + 0,20 + 0,20) x 4,20) 53.76 m

AC = REA DO CHAPISCO = 144.56 m

ATCHE = REA TOTAL DO CHAPISCO A EXECUTAR = 144.56 m


OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO
6.2 REBOCO = RB

RB = ACH

ACH = REA DO CHAPISCO = 144.56 m

ATRE = REA TOTAL DO REBOCO A EXECUTAR = 144.56 m

7.0 PISOS

7.1 PISO CIMENTADO = PC

PC = ( ARDF x QR )

ARDF = REA DE PISO DA RAMPA DEFICIENTES FSICOS = 2.20 m


QR = QUANTIDADE DE RAMPAS = 2.00 un

PC = PISO CIMENTADO = 4.40 m

7.2 PISO TTIL = PT

PT = ( APT x QR )

APT = REA DE PISO TTIL RAMPA = 1.35 m


QRA = QUANTIDADE DE RAMPAS EXECUTAR = 2.00 un

PT = PISO TTIL = 2.70 m

7.3 LASTRO EM CONCRETO REGULARIZADO = LCR

LCR = ((PCA x ESP6) + (APCP x ESP8) + (API x ESP6) + (PT x ESP6) + (PC x ESP6))=

PCA = PEDRA CARIRI = 280.32 m


ESP6 = 6 CM 0.06 m
API = AREA DE PISO INDUSTRIAL = 633.99 m
ESP6 = 6 CM 0.06 m
APCP = AREA PISO CONCRETO POLIDO 271.79 m
ESP8 = 8 CM 0.06 m
PT = PISO TTIL = 2.70 m
ESP6 = 6 CM 0.06 m
PC = PISO CIMENTADO = 4.40 m
ESP6 = 6 CM 0.06 m

LCR = LASTRO EM CONCRETO REGULARIZADO = 71.59 m

7.4 PEDRA CARIRI = PCA

PCA = APC
OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO

APC = REA DE PEDRA CARIRI 280.32 m

PCA = PEDRA CARIRI = 280.32 m

7.5 PISO INDUSTRIAL = API

API = API

API = REA DE PISO INDUSTRIAL 633.99 m

API = AREA DE PISO INDUSTRIAL = 633.99 m

7.6 = AREA PISO CONCRETO POLIDO = APCP

APCP= APCP =

APCP = AREA PISO CONCRETO POLIDO 271.79 m

APCP = AREA PISO CONCRETO POLIDO 271.79 m

APCP = AREA PISO CONCRETO POLIDO 271.79 m

7.7 = AREA REVESTIMENTO DOS BANCOS = ARB

ARB= AREA DOS BANCOS TIPO x QUANT DE BANCOS=

ARB01 = AREA BANCO001 = 2,93 x 4 UND 11.72 m


ARB02 = AREA BANCO002 = 1,8 x 2 UND 3.60 m
ARB01 = AREA BANCO001 = 4,37 x 2 UND 8.74 m
ARB = AREA REVESTIMENTO DOS BANCOS 24.06 m

APCP = AREA REVESTIMENTO PORCELANATO BANCO 24.06 m

7.8 = AREA REVESTIMENTO DAS PERGOLAS = ARP

ARP= SOMA DAS FACES x COMPRIMENTRO X QUANTIDADE=

SF = SOMA DAS FACE - 0,12 + 0,12 + 0,20 +0,20 = 0,64 0.64 m


CP = COMPRIEMNTO DA PEA 4.20 m
QP = QUANTIDADE DE PEAS 20.00 m
ARB = AREA REVESTIMENTO DOS BANCOS 53.76 m

APCP = AREA REVESTIMENTO PORCELANATO PERGOLADO 53.76 m

8.0 INSTALAES ELTRICAS


OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO

8.1 INSTALAES ELTRICAS = IEL

IEL = INSTALAES ELETRICAS = 1.00 un.

9.0 INSTALAES HIDRULICAS

9.1 INST. HIDRO-SANITRIAS = IHS

IHS = INST. HIDRO-SANITRIAS = 1.00 un.

10.0 PINTURA

10.1 PINTURA COM TINTA EM P A BASE DE CAL = PTP

PH = ( PME x HMF ) + (PMFC x HMF)

PME = PERIMETRO MEIO FIO EXECUTAR = 200.49 m


HMF = ALTURA DO MEIO FIO = ( 0,15 lado de fora + 0,12 lado de cima ) = 0.27 m
PMFC - PERIMETRO DO MEIO FIO DOS CANTEIROS EXECUTAR = 447.03 m
HMF = ALTURA DO MEIO FIO = ( 0,12 lado de cima ) = 0.12 m

APL = REA DE PINTURA EM PO A BASE DE CAL = 107.78 m

10.2 EMASSAMENTO = EMA

EMA = EMB

EMB = REA DE EMBOO = 144.56 m

EMA = EMASSAMENTO ACRILICA = 144.56 m

10.3 PINTURA ACRILICA = PAC

PAC = EMA

EMA = EMASSAMENTO = 144.56 m

PLA = PINTURA ACRILICA = 144.56 m

11.0 ESQUADRIAS METALICAS

11.1 GRADIL METALICO NO BANCO 01 = GMB


OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

MEMRIA DE CLCULO
GMB = AGB01

AGB01 = AREA DE GRADIL DO BANCO 01 = ((1,40+0,8)/2) x 2,20 = 2,42 M 2.42 m

GMB = GRADIL METALICO NOS BANCOS 2.42 m

12.0 URBANIZAO E PAISAGISMO

12.1 GRAMA EM REAS EXTERNAS = GAE

GAE = AGE

AGE = REA DE GRAMA EXECUTAR = 168.56 m

GAE = GRAMA EM REAS EXTERNAS = 168.56 m

12.2 RVORE C/ TUTOR = ARV

ARV = QAV

QAV = QUANTIDADE DE ARVORES PLANTAR = 16.00 un

ARV = PLANTIO DE ARVORES MAIOR QUE 1 M= 16.00 un

13.0 DIVERSOS

13.1 LIMPEZA FINAL DA OBRA = LIMP

LIMP = APC

APC = REA TOTAL PRAA EXECUTAR = 1857.61 m

LG = LIMPEZA GERAL DA OBRA 1,857.61 m


PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAAS PBLICAS
LOCAL: DIVERSAS LOCALIDADES NO MUNICIPIO DE MISSO VELHA - CE.

Data: Maro/2017 Tabela Sinapi Desonerada: Fevereiro/2017 E Tabela Seinfra 24.1 Desonerada BDI:25,00% Leis Sociais 88,66%

Num Cdigo Discriminao Quantidade Und. Preo Unit. Custo Parcial


01 - PRAA DO ESTADIO
1.00 Grupo: SERVIOS PRELIMINARES
1.00 74209/001 PLACA DE OBRA EM CHAPA DE ACO GALVANIZADO 6.00 M2 225.51 1,353.06
LOCACAO CONVENCIONAL DE OBRA, ATRAVS DE GABARITO DE TABUAS CORRIDAS
2.00 73992/001 1,367.40 M2 7.46 10,200.80
PONTALETADAS A CADA 1,50M, SEM REAPROVEITAMENTO
3.00 73948/16 LIMPEZA MANUAL DO TERRENO (C/ RASPAGEM SUPERFICIAL) 1,367.40 M2 3.10 4,238.94
TOTAL R$ 15,792.80
2.00 Grupo: MOVIMENTO DE TERRA
1.00 73965/010 ESCAVAO MANUAL DE VALAS. AF_03/2016 29.41 M3 49.09 1,443.52
TOTAL R$ 1,443.52
3.0 Grupo: PAVIMENTAO
EXECUO DE VIA EM PISO INTERTRAVADO, COM BLOCO RETANGULAR DE 20 X 10
1.00 92401 M2 63.22 0.00
CM, ESPESSURA 10 CM. AF_12/2015
ASSENTAMENTO DE GUIA (MEIO-FIO) EM TRECHO RETO, CONFECCIONADA EM
CONCRETO PR-FABRICADO, DIMENSES 100X15X13X30 CM (COMPRIMENTO X BASE
2.00 94273 647.52 M 29.83 19,315.52
INFERIOR X BASE SUPERIOR X ALTURA), PARA VIAS URBANAS (USO VIRIO).
AF_06/2016
EXECUO DE PASSEIO (CALADA) OU PISO DE CONCRETO COM CONCRETO
3.00 94994 MOLDADO IN LOCO, FEITO EM OBRA, ACABAMENTO CONVENCIONAL, ESPESSURA 8 M2 55.52 0.00
CM, ARMADO. AF_07/2016
TOTAL R$ 19,315.52
4.00 Grupo: FUNDAES E ESTRUTURAS
1.00 95467 EMBASAMENTO C/PEDRA ARGAMASSADA UTILIZANDO ARG.CIM/AREIA 1:4 1.02 M3 308.56 315.97
CONCRETO FCK = 20MPA, TRAO 1:2,7:3 (CIMENTO/ AREIA MDIA/ BRITA 1) PREPARO
2.00 94964 14.59 M3 257.05 3,749.33
MECNICO COM BETONEIRA 400 L. AF_07/2016
LANAMENTO COM USO DE BALDES, ADENSAMENTO E ACABAMENTO DE CONCRETO
3.00 92873 14.59 M3 132.78 1,936.73
EMESTRUTURAS. AF_12/2015
4.00 92884 ARMAO UTILIZANDO AO CA-25 DE 10.0 MM - MONTAGEM. AF_12/2015 1,166.88 KG 8.12 9,475.07
FABRICAO DE FRMA PARA PILARES E ESTRUTURAS SIMILARES, EM CHAPA DE
5.00 92263 29.17 M2 88.16 2,571.80
MADEIRA COMPENSADA RESINADA, E = 17 MM. AF_12/2015
TOTAL R$ 18,048.90
5.00 Grupo: PAREDES E PAINEIS

1.00 87496 ALVENARIA DE VEDAO DE BLOCOS CERMICOS FURADOS NA HORIZONTAL DE 4.48 M2 54.16 242.64
9X19X19CM (ESPESSURA 9CM) DE PAREDES COM REA LQUIDA MENOR QUE 6M SEM
VOS E ARGAMASSA DE ASSENTAMENTO COM PREPARO MANUAL. AF_06/2014
TOTAL R$ 242.64
6.00 Grupo: REVESTIMENTO
CHAPISCO APLICADO TANTO EM PILARES E VIGAS DE CONCRETO COMO EM
1.00 87879 ALVENARIAS DE PAREDES INTERNAS, COM COLHER DE PEDREIRO. ARGAMASSA 144.56 M2 2.38 344.05
TRAO 1:3 COM PREPARO EM BETONEIRA 400L. AF_06/2014
MASSA NICA, PARA RECEBIMENTO DE PINTURA, EM ARGAMASSA TRAO 1:2:8,
2.00 87530 PREPARO MANUAL, APLICADA MANUALMENTE EM FACES INTERNAS DE PAREDES, 144.56 M2 25.00 3,614.00
ESPESSURA DE 20MM, COM EXECUO DE TALISCAS. AF_06/2014
TOTAL R$ 3,958.05
7.00 Grupo: PISOS
1.00 C1863 PEDRA CARIRI ESP.= 2cm, C/ ARGAMASSA MISTA DE CIMENTO CAL HIDRATADA E AREIA 280.32 M2 37.99 10,649.36
PISO INDUSTRIAL ALTA RESISTENCIA, ESPESSURA 12MM, INCLUSO JUNTAS DE
2.00 72137 633.99 M2 75.83 48,075.46
DILATACAO PLASTICAS E POLIMENTO MECANIZADO
LASTRO DE CONCRETO, PREPARO MECNICO, INCLUSOS ADITIVO
3.00 83534 71.59 M3 413.04 29,570.36
IMPERMEABILIZANTE, LANAMENTO E ADENSAMENTO.
4.00 C4099 POLIMENTO EM CONCRETO NIVELADO LASER 271.79 M2 12.67 3,443.58
PISO CIMENTADO E=1,5CM C/ARGAMASSA 1:3 CIMENTO AREIA ALISADO COLHER
5.00 73465 4.40 M2 27.05 119.02
SOBRE BASE EXISTENTE. (RAMPAS)
PISO PODOTTIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA
6.00 C4624 2.70 M2 65.05 175.64
(FORNECIMENTO E ASSENTAMENTO)
REVESTIMENTO CERMICO PARA PISO COM PLACAS TIPO PORCELANATO DE
7.00 87258 DIMENSES 45X45 CM APLICADA EM AMBIENTES DE REA MENOR QUE 5 M. 77.82 M 81.78 6,364.12
AF_06/2014

TOTAL R$ 98,397.54
PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAAS PBLICAS
LOCAL: DIVERSAS LOCALIDADES NO MUNICIPIO DE MISSO VELHA - CE.

Data: Maro/2017 Tabela Sinapi Desonerada: Fevereiro/2017 E Tabela Seinfra 24.1 Desonerada BDI:25,00% Leis Sociais 88,66%

Num Cdigo Discriminao Quantidade Und. Preo Unit. Custo Parcial


01 - PRAA DO ESTADIO
8.00 Grupo: INSTALAES ELETRICAS
CABO DE COBRE FLEXVEL ISOLADO, 6 MM, ANTI-CHAMA 0,6/1,0 KV, PARA CIRCUITOS
1.00 91931 320.00 M 4.54 1,452.80
TERMINAIS - FORNECIMENTO E INSTALAO. AF_12/2015
CABO DE COBRE FLEXVEL ISOLADO, 10 MM, ANTI-CHAMA 0,6/1,0 KV, PARA CIRCUITOS
2.00 91933 160.00 M 7.10 1,136.00
TERMINAIS - FORNECIMENTO E INSTALAO. AF_12/2015
ELETRODUTO RGIDO ROSCVEL, PVC, DN 50 MM (1 1/2") - FORNECIMENTO E
3.00 93008 160.00 M 9.56 1,529.60
INSTALAO. AF_12/2015
LUVA PARA ELETRODUTO, PVC, ROSCVEL, DN 50 MM (1 1/2") - FORNECIMENTO E
4.00 93013 28.00 M 8.65 242.20
INSTALAO. AF_12/2015
ENTRADA DE ENERGIA ELTRICA AREA MONOFSICA 50A COM POSTE DE
5.00 9540 CONCRETO, INCLUSIVE CABEAMENTO, CAIXA DE PROTEO PARA MEDIDOR E 1.00 UN 816.28 816.28
ATERRAMENTO
QUADRO DE DISTRIBUICAO DE ENERGIA P/ 6 DISJUNTORES TERMOMAGNETICOS
6.00 84402 MONOPOLARES SEM BARRAMENTO, DE EMBUTIR, EM CHAPA METALICA - 1.00 UN 73.50 73.50
FORNECIMENTO E INSTALACAO
7.00 83484 HASTE COPERWELD 3/4" X 3,00M COM CONECTOR 5.00 UN 48.81 244.05
POSTE CONCRETO SEO CIRCULAR COMPRIMENTO=11M E CARGA NOMINAL 200KG
8.00 73783/008 5.00 UN 931.86 4,659.30
INCLUSIVE ESCAVACAO EXCLUSIVE TRANSPORTE - FORNECIMENTO E COLOCAO

LUMINARIA ABERTA PARA ILUMINACAO PUBLICA, PARA LAMPADA A VAPOR DE


9.00 74231/1 MERCURIO ATE 400W E MISTA ATE 500W, COM BRACO EM TUBO DE ACO GALV D=50MM 15.00 UN 128.07 1,921.05
PROJ HOR=2.500MM E PROJ VERT= 2.200MM, FORNECIMENTO E INSTALACAO

RELE FOTOELETRICO P/ COMANDO DE ILUMINACAO EXTERNA 220V/1000W -


10.0 83399 15.00 UN 30.43 456.45
FORNECIMENTO E INSTALACAO
11.0 73831/009 LAMPADA DE VAPOR DE SODIO DE 400WX220V - FORNECIMENTO E INSTALACAO 15.00 UN 60.19 902.85
12.0 72280 IGNITOR PARA PARTIDA LMPADA VAPOR SDIO ALTA PRESSO AT 400W 15.00 UN 43.97 659.55
13.0 74130/001 DISJUNTOR TERMOMAGNETICO MONOPOLAR PADRAO NEMA (AMERICANO) 10 A 30A 24 5.00 UN 10.96 54.80
14.0 83447 CAIXA DE PASSAGEM 40X40X50 FUNDO BRITA COM TAMPA 5.00 UN 130.18 650.90
TOTAL R$ 14,799.33
9.00 Grupo: INSTALAES HIDRULICAS
TUBO, PVC, SOLDVEL, DN 25MM, INSTALADO EM RAMAL OU SUB-RAMAL DE
1.00 89356 80.00 M 14.23 1,138.40
GUAFORNECIMENTO E INSTALAO . AF_12/2014_P

REGISTRO DE GAVETA BRUTO, LATO, ROSCVEL, 3/4", COM ACABAMENTO E


2.00 89987 4.00 UN 75.94 303.76
CANOPLA CROMADOS. FORNECIDO E INSTALADO EM RAMAL DE GUA. AF_12/2014
3.00 83448 CAIXA DE PASSAGEM 50X50X60 FUNDO BRITA C/ TAMPA 4.00 UN 196.73 786.92
TOTAL R$ 2,229.08
10.00 Grupo: PINTURA
APLICAO MANUAL DE PINTURA COM TINTA LTEX ACRLICA EM PAREDES, DUAS
1.00 88489 144.56 M2 9.80 1,416.69
DEMOS. AF_06/2014
2.00 88485 APLICAO DE FUNDO SELADOR ACRLICO EM PAREDES, UMA DEMO. AF_06/2014 144.56 M2 1.82 263.10
3.00 73791/001 PINTURA COM TINTA EM PO INDUSTRIALIZADA A BASE DE CAL, DUAS DEMAOS 105.16 M2 7.49 787.65
TOTAL R$ 2,467.44
11.0 Grupo: ESQUADRIAS
1.00 85096 GRADIL DE ALUMINIO ANODIZADO TIPO BARRA CHATA 2.42 M2 406.76 984.36
TOTAL R$ 984.36
12.0 Grupo: URBANIZAO E PAISAGISMO
1..0 74236/001 PLANTIO DE GRAMA BATATAIS EM PLACAS 168.56 M2 11.93 2,010.92
PLANTIO DE ARVORE REGIONAL, ALTURA MAIOR QUE 2,00M, EM CAVAS DE
2.00 73967/002 16.00 UN 184.92 2,958.72
80X80X80CM
TOTAL R$ 4,969.64
13.0 Grupo: SERVIOS DIVERSOS
1.00 9537 LIMPEZA FINAL DA OBRA 1,367.40 M2 1.95 2,666.43
TOTAL R$ 2,666.43

TOTAL SIMPLES R$ 185,315.25


BDI = 25,00% R$ 46,328.81
TOTAL DA PRAA ESTADIO: R$ 231,644.06
PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAAS PBLICAS
LOCAL: DIVERSAS LOCALIDADES NO MUNICIPIO DE MISSO VELHA - CE.

Data: Maro/2017 Tabela Sinapi Desonerada: Fevereiro/2017 E Tabela Seinfra 24.1 Desonerada BDI:25,00% Leis Sociais 88,66%

Num Cdigo Discriminao Quantidade Und. Preo Unit. Custo Parcial


01 - PRAA DO ESTADIO
1.00 Grupo: SERVIOS PRELIMINARES
1.00 74209/001 PLACA DE OBRA EM CHAPA DE ACO GALVANIZADO 6.00 M2 225.51 1,353.06
LOCACAO CONVENCIONAL DE OBRA, ATRAVS DE GABARITO DE TABUAS CORRIDAS
2.00 73992/001 1,861.95 M2 7.46 13,890.15
PONTALETADAS A CADA 1,50M, SEM REAPROVEITAMENTO
3.00 73948/16 LIMPEZA MANUAL DO TERRENO (C/ RASPAGEM SUPERFICIAL) 1,861.95 M2 3.10 5,772.05
TOTAL R$ 21,015.26
2.00 Grupo: MOVIMENTO DE TERRA
1.00 73965/010 ESCAVAO MANUAL DE VALAS. AF_03/2016 29.41 M3 49.09 1,443.52
TOTAL R$ 1,443.52
3.0 Grupo: PAVIMENTAO
EXECUO DE VIA EM PISO INTERTRAVADO, COM BLOCO RETANGULAR DE 20 X 10
1.00 92401 402.15 M2 63.22 25,423.92
CM, ESPESSURA 10 CM. AF_12/2015
ASSENTAMENTO DE GUIA (MEIO-FIO) EM TRECHO RETO, CONFECCIONADA EM
CONCRETO PR-FABRICADO, DIMENSES 100X15X13X30 CM (COMPRIMENTO X BASE
2.00 94273 647.52 M 29.83 19,315.52
INFERIOR X BASE SUPERIOR X ALTURA), PARA VIAS URBANAS (USO VIRIO).
AF_06/2016
EXECUO DE PASSEIO (CALADA) OU PISO DE CONCRETO COM CONCRETO
3.00 94994 MOLDADO IN LOCO, FEITO EM OBRA, ACABAMENTO CONVENCIONAL, ESPESSURA 8 92.40 M2 55.52 5,130.05
CM, ARMADO. AF_07/2016
TOTAL R$ 49,869.49
4.00 Grupo: FUNDAES E ESTRUTURAS
1.00 95467 EMBASAMENTO C/PEDRA ARGAMASSADA UTILIZANDO ARG.CIM/AREIA 1:4 1.02 M3 308.56 315.97
CONCRETO FCK = 20MPA, TRAO 1:2,7:3 (CIMENTO/ AREIA MDIA/ BRITA 1) PREPARO
2.00 94964 14.59 M3 257.05 3,749.33
MECNICO COM BETONEIRA 400 L. AF_07/2016
LANAMENTO COM USO DE BALDES, ADENSAMENTO E ACABAMENTO DE CONCRETO
3.00 92873 14.59 M3 132.78 1,936.73
EMESTRUTURAS. AF_12/2015
4.00 92884 ARMAO UTILIZANDO AO CA-25 DE 10.0 MM - MONTAGEM. AF_12/2015 1,166.88 KG 8.12 9,475.07
FABRICAO DE FRMA PARA PILARES E ESTRUTURAS SIMILARES, EM CHAPA DE
5.00 92263 29.17 M2 88.16 2,571.80
MADEIRA COMPENSADA RESINADA, E = 17 MM. AF_12/2015
TOTAL R$ 18,048.90
5.00 Grupo: PAREDES E PAINEIS

1.00 87496 ALVENARIA DE VEDAO DE BLOCOS CERMICOS FURADOS NA HORIZONTAL DE 4.48 M2 54.16 242.64
9X19X19CM (ESPESSURA 9CM) DE PAREDES COM REA LQUIDA MENOR QUE 6M SEM
VOS E ARGAMASSA DE ASSENTAMENTO COM PREPARO MANUAL. AF_06/2014
TOTAL R$ 242.64
6.00 Grupo: REVESTIMENTO
CHAPISCO APLICADO TANTO EM PILARES E VIGAS DE CONCRETO COMO EM
1.00 87879 ALVENARIAS DE PAREDES INTERNAS, COM COLHER DE PEDREIRO. ARGAMASSA 144.56 M2 2.38 344.05
TRAO 1:3 COM PREPARO EM BETONEIRA 400L. AF_06/2014
MASSA NICA, PARA RECEBIMENTO DE PINTURA, EM ARGAMASSA TRAO 1:2:8,
2.00 87530 PREPARO MANUAL, APLICADA MANUALMENTE EM FACES INTERNAS DE PAREDES, 144.56 M2 25.00 3,614.00
ESPESSURA DE 20MM, COM EXECUO DE TALISCAS. AF_06/2014
TOTAL R$ 3,958.05
7.00 Grupo: PISOS
1.00 C1863 PEDRA CARIRI ESP.= 2cm, C/ ARGAMASSA MISTA DE CIMENTO CAL HIDRATADA E AREIA 280.32 M2 37.99 10,649.36
PISO INDUSTRIAL ALTA RESISTENCIA, ESPESSURA 12MM, INCLUSO JUNTAS DE
2.00 72137 633.99 M2 75.83 48,075.46
DILATACAO PLASTICAS E POLIMENTO MECANIZADO
LASTRO DE CONCRETO, PREPARO MECNICO, INCLUSOS ADITIVO
3.00 83534 71.59 M3 413.04 29,570.36
IMPERMEABILIZANTE, LANAMENTO E ADENSAMENTO.
4.00 C4099 POLIMENTO EM CONCRETO NIVELADO LASER 271.79 M2 12.67 3,443.58
PISO CIMENTADO E=1,5CM C/ARGAMASSA 1:3 CIMENTO AREIA ALISADO COLHER
5.00 73465 4.40 M2 27.05 119.02
SOBRE BASE EXISTENTE. (RAMPAS)
PISO PODOTTIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA
6.00 C4624 2.70 M2 65.05 175.64
(FORNECIMENTO E ASSENTAMENTO)
REVESTIMENTO CERMICO PARA PISO COM PLACAS TIPO PORCELANATO DE
7.00 87258 DIMENSES 45X45 CM APLICADA EM AMBIENTES DE REA MENOR QUE 5 M. 77.82 M 81.78 6,364.12
AF_06/2014

TOTAL R$ 98,397.54
PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAAS PBLICAS
LOCAL: DIVERSAS LOCALIDADES NO MUNICIPIO DE MISSO VELHA - CE.

Data: Maro/2017 Tabela Sinapi Desonerada: Fevereiro/2017 E Tabela Seinfra 24.1 Desonerada BDI:25,00% Leis Sociais 88,66%

Num Cdigo Discriminao Quantidade Und. Preo Unit. Custo Parcial


01 - PRAA DO ESTADIO
8.00 Grupo: INSTALAES ELETRICAS
CABO DE COBRE FLEXVEL ISOLADO, 6 MM, ANTI-CHAMA 0,6/1,0 KV, PARA CIRCUITOS
1.00 91931 320.00 M 4.54 1,452.80
TERMINAIS - FORNECIMENTO E INSTALAO. AF_12/2015
CABO DE COBRE FLEXVEL ISOLADO, 10 MM, ANTI-CHAMA 0,6/1,0 KV, PARA CIRCUITOS
2.00 91933 160.00 M 7.10 1,136.00
TERMINAIS - FORNECIMENTO E INSTALAO. AF_12/2015
ELETRODUTO RGIDO ROSCVEL, PVC, DN 50 MM (1 1/2") - FORNECIMENTO E
3.00 93008 160.00 M 9.56 1,529.60
INSTALAO. AF_12/2015
LUVA PARA ELETRODUTO, PVC, ROSCVEL, DN 50 MM (1 1/2") - FORNECIMENTO E
4.00 93013 28.00 M 8.65 242.20
INSTALAO. AF_12/2015
ENTRADA DE ENERGIA ELTRICA AREA MONOFSICA 50A COM POSTE DE
5.00 9540 CONCRETO, INCLUSIVE CABEAMENTO, CAIXA DE PROTEO PARA MEDIDOR E 1.00 UN 816.28 816.28
ATERRAMENTO
QUADRO DE DISTRIBUICAO DE ENERGIA P/ 6 DISJUNTORES TERMOMAGNETICOS
6.00 84402 MONOPOLARES SEM BARRAMENTO, DE EMBUTIR, EM CHAPA METALICA - 1.00 UN 73.50 73.50
FORNECIMENTO E INSTALACAO
7.00 83484 HASTE COPERWELD 3/4" X 3,00M COM CONECTOR 5.00 UN 48.81 244.05
POSTE CONCRETO SEO CIRCULAR COMPRIMENTO=11M E CARGA NOMINAL 200KG
8.00 73783/008 5.00 UN 931.86 4,659.30
INCLUSIVE ESCAVACAO EXCLUSIVE TRANSPORTE - FORNECIMENTO E COLOCAO

LUMINARIA ABERTA PARA ILUMINACAO PUBLICA, PARA LAMPADA A VAPOR DE


9.00 74231/1 MERCURIO ATE 400W E MISTA ATE 500W, COM BRACO EM TUBO DE ACO GALV D=50MM 15.00 UN 128.07 1,921.05
PROJ HOR=2.500MM E PROJ VERT= 2.200MM, FORNECIMENTO E INSTALACAO

RELE FOTOELETRICO P/ COMANDO DE ILUMINACAO EXTERNA 220V/1000W -


10.0 83399 15.00 UN 30.43 456.45
FORNECIMENTO E INSTALACAO
11.0 73831/009 LAMPADA DE VAPOR DE SODIO DE 400WX220V - FORNECIMENTO E INSTALACAO 15.00 UN 60.19 902.85
12.0 72280 IGNITOR PARA PARTIDA LMPADA VAPOR SDIO ALTA PRESSO AT 400W 15.00 UN 43.97 659.55
13.0 74130/001 DISJUNTOR TERMOMAGNETICO MONOPOLAR PADRAO NEMA (AMERICANO) 10 A 30A 24 5.00 UN 10.96 54.80
14.0 83447 CAIXA DE PASSAGEM 40X40X50 FUNDO BRITA COM TAMPA 5.00 UN 130.18 650.90
TOTAL R$ 14,799.33
9.00 Grupo: INSTALAES HIDRULICAS
TUBO, PVC, SOLDVEL, DN 25MM, INSTALADO EM RAMAL OU SUB-RAMAL DE
1.00 89356 80.00 M 14.23 1,138.40
GUAFORNECIMENTO E INSTALAO . AF_12/2014_P

REGISTRO DE GAVETA BRUTO, LATO, ROSCVEL, 3/4", COM ACABAMENTO E


2.00 89987 4.00 UN 75.94 303.76
CANOPLA CROMADOS. FORNECIDO E INSTALADO EM RAMAL DE GUA. AF_12/2014
3.00 83448 CAIXA DE PASSAGEM 50X50X60 FUNDO BRITA C/ TAMPA 4.00 UN 196.73 786.92
TOTAL R$ 2,229.08
10.00 Grupo: PINTURA
APLICAO MANUAL DE PINTURA COM TINTA LTEX ACRLICA EM PAREDES, DUAS
1.00 88489 144.56 M2 9.80 1,416.69
DEMOS. AF_06/2014
2.00 88485 APLICAO DE FUNDO SELADOR ACRLICO EM PAREDES, UMA DEMO. AF_06/2014 144.56 M2 1.82 263.10
3.00 73791/001 PINTURA COM TINTA EM PO INDUSTRIALIZADA A BASE DE CAL, DUAS DEMAOS 105.16 M2 7.49 787.65
TOTAL R$ 2,467.44
11.0 Grupo: ESQUADRIAS
1.00 85096 GRADIL DE ALUMINIO ANODIZADO TIPO BARRA CHATA 2.42 M2 406.76 984.36
TOTAL R$ 984.36
12.0 Grupo: URBANIZAO E PAISAGISMO
1..0 74236/001 PLANTIO DE GRAMA BATATAIS EM PLACAS 168.56 M2 11.93 2,010.92
PLANTIO DE ARVORE REGIONAL, ALTURA MAIOR QUE 2,00M, EM CAVAS DE
2.00 73967/002 16.00 UN 184.92 2,958.72
80X80X80CM
TOTAL R$ 4,969.64
13.0 Grupo: SERVIOS DIVERSOS
1.00 9537 LIMPEZA FINAL DA OBRA 1,861.95 M2 1.95 3,630.80
TOTAL R$ 3,630.80

TOTAL SIMPLES R$ 222,056.05


BDI = 25,00% R$ 55,514.01
TOTAL DA PRAA ESTADIO: R$ 277,570.06
VALOR ESTIMATIVA ORAMENTARIA

OBRA : CONSTRUO DE PRAAS

LOCAL: MUNICIPIO DE MISSO VELHA


VALOR R$/M
NOME DA PRAA AREA
R$ 169.40
PRAA DO ESTADIO 1,861.95 M R$ 277,570.06
SITIO ESCONDIDO 423.37 M R$ 71,720.89
RIACHO DAS PALMEIRAS 320.50 M R$ 54,294.22
PASSAGEM DE PEDRA 499.00 M R$ 84,532.97
PRAA BOA VISTA 962.55 M R$ 163,060.55
CASSIMIRO FARIAS 329.00 M R$ 55,734.16
RIACHO SECO 498.00 M R$ 84,363.57
SITIO PINTADO 429.80 M R$ 72,810.16
VALOR TOTAL R$ 864,256.00
PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAA
LOCAL: VICENTE FECHINE SEDE DO MUNICIPIO DE MISSO VELHA - CE

RESUMO DO ORAMENTO

ITEM SERVIOS % TOTAL TOTAL


001 SERVIOS PRELIMINARES 9.46% 21,015.26
002 MOVIMENTO DE TERRA 0.65% 1,443.52
003 PAVIMENTAO 22.46% 49,869.49
004 FUNDAES E ESTRUTURAS 8.13% 18,048.90
005 PAREDES E PAINEIS 0.11% 242.64
006 REVESTIMENTO 1.78% 3,958.05
007 PISOS 44.31% 98,397.54
008 INSTALAES ELETRICAS 6.66% 14,799.33
009 INSTALAES HIDRULICAS 1.00% 2,229.08
010 PINTURA 1.11% 2,467.44
011 ESQUADRIAS 0.44% 984.36
012 URBANIZAO E PAISAGISMO 2.24% 4,969.64
013 SERVIOS DIVERSOS 1.64% 3,630.80
TOTAL GERAL: 80.00% 222,056.05
BDI = 25,00% 20.00% 55,514.01
TOTAL GERAL: 100.00% 277,570.06
PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAAS PBLICAS
LOCAL: DIVERSAS LOCALIDADES NO MUNICIPIO DE MISSO VELHA - CE.

RESUMO DO ORAMENTO

ITEM SERVIOS / LOCALIDADE % TOTAL TOTAL

001 OBRA: CONSTRUO DE PRAA 80.00% 222,056.05


002 0.00%
003 0.00%
004 0.00%

005 0.00%
006 0.00%

007 0.00%

008 0.00%

009 0.00%
PREFEITURA MUNICIPAL DE MISSO VELHA
OBRA: CONSTRUO DE PRAAS PBLICAS
LOCAL: DIVERSAS LOCALIDADES NO MUNICIPIO DE MISSO VELHA - CE.

CRONOGRAMA FSICO - FINANCEIRO

MS 01 MS 02 MS 03 MS 04 MS 05 MS 06 MS 07 MS 08 MS 09
ITEM SERVIOS TOTAL %
Valor(R$) % Valor(R$) % Valor(R$) % Valor(R$) % Valor(R$) % Valor(R$) % Valor(R$) % Valor(R$) % Valor(R$) %
001 66,616.82 30.00 88,822.42 40.00 66,616.82 30.00 - - - - - - - - - - - - 222,056.05 80.00%
002 - - - - - - - - - - - - - - - - - 0.00%
003 - - - - - - - - - - - - - - - - - 0.00%
009 - - - - - - - - - - - - - - - - - 0.00%
TOTAL SIMPLES 66,616.82 24.00% 88,822.42 32.00% 66,616.82 24.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 222,056.05 80.00%
BDI = 25,00% 16,654.20 6.00% 22,205.61 8.00% 16,654.20 6.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 55,514.01 20.00%
TOTAL GERAL 83,271.02 30.00% 111,028.03 40.00% 83,271.02 30.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
277,570.06 100.00%
TOTAL ACUMULADO 83,271.02 30.00% 194,299.04 70.00% 277,570.06 100.00% 277,570.06 100.00% 277,570.06 100.00% 277,570.06 100.00% 277,570.05 100.00% 277,570.05 100.00% 277,570.05 100.00%
BANCO 02

A1=A4 2 0.45 1.7 1.53


A2=A3 2 0.45 0.8 0.72
A5= 4 0.1 1.7 0.68
2.93 M
AREA TOTAL 4 2.93 11.72 M

BANCO 01

A1= 1 0.6 1.7 1.02


A2= 1 0.6 1.1 0.66
A3= 0.1 0.6 2 0.12
A3= 0.1 1.7 2 0.34
A3= 0.1 1.1 2 0.22
1.8 M
AREA TOTAL 2 1.8 3.6 M

BANCO 01

A1= 1 0.45 4.15 1.8675


A2= 1 0.45 3.7 1.665
A3= 0.1 4.2 2 0.84
A3= 0.1 3.75 2 0.75
A3= 0.1 0.45 2 0.09
4.3725 M
AREA TOTAL 2 4.3725 8.745 M

AREAS DESCRIMINAO
248.07
1 138.27 633.99 PISO INDUSTRIAL
247.65

101.4
2 16.93 126.09 PISO CONCRETO POLIDO CINZA
7.76

3 145.7 145.70 PISO CONCRETO POLIDO VERDE

4 280.32 280.32 PEDRA CARIRI

50.4 PISO PARA CALADA 46.68


4A 100.80
50.4 40.93

179.99 PAVIMENTAO EM INTERTRAVADO


5 402.15
222.16
92401 EXECUO DE VIA EM PISO INTERTRAVADO, COM B
2.56
9.6
27.31
16.5 VEGETAO
6 168.56
16.5
9.9
27.69
6 168.56

58.5

AREA TOTAL 1,857.61


157.33
170.15
Meio Fio Interno 447.03
194.51
125.53

42.55
42.55
Meio Fio externo 200.49
42.55
42.55
30.29

Meio Fio Canteiros 647.52

ELETRICA
A B C D E TOTAL
CAIXA 1 11.7 11.70
CAIXA 2 11.7 13.85 25.55
CAIXA 3 11.7 13.85 14.3 39.85
CAIXA 4 11.7 13.85 11.77 37.32
CAIXA 5 11.7 15.65 27.35
141.77
163.04
160
ERTRAVADO, COM BLOCO RETANGULAR DE 20 X 10 M2 CR 63,22
23.40 4
51.10 5
79.70 5
74.64 5
54.70 6
283.54 25
326.07 28.75
320 28