Escolar Documentos
Profissional Documentos
Cultura Documentos
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Schedule Q
A2 Check and review the test equipment documents for calibration validity.
Att. IV, Sec. 7.1
Insure that the input voltage to the test set is regulated. SAES-P-116
A3
Manufacturer recommendation Sec. 3.2
Secure and isolate the area where the test is to be conducted. Place
SAES-P-116
B2 safety fences and sign board around the perimeter.
Sec. 3.2
(NETA 2009, Sec 5.1)
Page 1 of 6
SAUDI ARAMCO ID/PID - 31-August-08 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
After completing the test, all switching devices and the power CB must SAES-P-116
B11
be switched to 'Open' position. (NETA, 2009, Sec 5) Sec. 3.2
The performance of a controller for electric motor driven fire pumps shall
be investigated by subjecting representative samples in commercial form
to the tests. Consideration shall be given to the individual component
ratings within the controller, as compared to the overall controller ratings, SAES-P-116
B13
similarity of the individual components used in a manufacturers line of Sec. 3.2
controllers, and other criteria in determining samples for testing
representative samples of a manufacturers line of similarly constructed
controllers. (UL 218, Annexed D)
C. TEST EQUIPMENT
Schedule Q
C3 The test equipment calibration cycle shall not exceed twelve months.
Att. IV, Sec. 7.1
Equipment 1:
Equipment 2:
Page 2 of 6
SAUDI ARAMCO ID/PID - 31-August-08 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
D. TEST RESULTS
A Phase to Ground
B Phase to Ground
C Phase to Ground
A Phase to B Phase
B phase to C Phase
C phase to A Phase
CLOSE
Control Ckt__
(Do not perform insulation resistance testing on control wiring
connected to solid state components.)
Control Ckt __
Control Ckt __
(Do not perform insulation resistance testing on control wiring
connected to solid state components.)
Control Ckt__
E. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
E1
E2
E3
Schedule Q
Test results are acceptable and in accordance with Saudi Aramco
E4
Engineering Standards and contractual requirements.
Sec. 1.3
Page 3 of 6
SAUDI ARAMCO ID/PID - 31-August-08 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Microhm or millivolt drop values shall not exceed the high levels of the
normal range as indicated in the Manufacturer's published data. If
SAES-P-116
F3 manufacturer's data is not available, investigate any values which
Sec. 3.2
deviate from similar connections by more than 50 percent of the lowest
value. (NETA 2009, Sec 7.16.1.1.3.2.1)
Control wiring insulation resistance should be less than two megohms. SAES-P-116
F5
(NETA 2009, Sec 7.16.1.1.3.2.3) Sec. 3.2
G. FUNCTIONAL TESTING
Microhm or millivolt drop values shall not exceed the high levels of the
normal range as indicated in the manufacturer's published data. If
SAES-P-116
G3 manufacturer's data is not available, investigate any values which
Sec. 3.2
deviate from similar connections by more than 50 percent of the lowest
value. (NETA 2009, Sec 7.16.1.1.3.2.1)
REMARKS:
Page 4 of 6
SAUDI ARAMCO ID/PID - 31-August-08 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
2. Schedule Q -- Quality Requirements (Pro Forma Contract)
3. SAES-P-114 -- Power System and Equipment Protection, 05 December 2012
4. SAES-P-116 -- Switchgear and Control Equipment, 22 May 2012
5. NETA -- Acceptance Testing Specifications for Electrical Power Equipment and Systems (2009)
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 5 of 6
SAUDI ARAMCO ID/PID - 31-August-08 - REV 0 (Standards Cutoff - March 2013) REV 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Fire / Jockey Pump Motors & Controller Calibration, Setting, SATR-P-3417
30-Apr-13 ELECT
and Functional Testing
Attachment - 1
Page 6 of 6