O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

31 37 34 CE 01 482,0 482,0 634,8 152,8 1 25 44 34+10,000 A 01 10


25 49 46 C 01 152,8 424,0 271,2 634,8 1 25 44 34+10,000 A 01 230
25 49 46 C 01 271,2 424,0 1.824,0 1.552,8 1 25 44 34+10,000 AT 01 230
43 47 45 EL 01 1.490,8 1.490,8 1.824,0 62,0 1 25 44 34+10,000 AT 01 210
50 78 67 C 02 62,0 286,0 224,0 1.824,0 1 25 44 34+10,000 AT 01 650
50 78 67 C 02 224,0 286,0 578,4 354,4 1 31 37 34 AE 01 660
51 59 56 CE 02 354,4 692,0 337,6 578,4 1 31 37 34 AE 01 440
51 59 56 CE 02 337,6 692,0 830,4 492,8 1 51 59 56 AE 02 50
61 70 65+10,000 EL 02 492,8 3.538,4 3.045,6 830,4 1 51 59 56 AE 02 190
61 70 65+10,000 EL 02 2.580,0 3.538,4 465,6 2.580,0 1 45 63 56 A 02 190
61 70 65+10,000 EL 02 465,6 3.538,4 1.728,0 1.262,4 1 45 63 56 AT 02 190
91 105 98 EL 03 1.262,4 10.543,6 9.281,2 1.728,0 1 45 63 56 AT 02 840
91 105 98 EL 03 2.684,4 10.543,6 6.596,8 2.684,4 1 64 94 82 AT 03 320
91 105 98 EL 03 298,8 10.543,6 6.298,0 298,8 1 104 113 109 AT 04 220
91 105 98 EL 03 3.360,0 10.543,6 2.938,0 3.360,0 1 116 151 136 AT 05 760
91 105 98 EL 03 1.288,8 10.543,6 1.649,2 1.288,8 1 129 141 136 AE 03 760
91 105 98 EL 03 230,4 10.543,6 1.418,8 230,4 1 116 151 136 A 05 760
91 105 98 EL 03 801,6 10.543,6 617,2 801,6 1 154 159 157 AE 04 1.180
91 105 98 EL 03 617,2 10.543,6 854,4 237,2 1 152 172 158 A 06 1.200
79 109 100 C 03 237,2 435,0 197,8 854,4 1 152 172 158 A 06 1.160
79 109 100 C 03 197,8 435,0 1.920,0 1.722,2 1 152 172 158 AT 06 1.160
129 141 136 CE 03 1.074,0 1.074,0 1.920,0 648,2 1 152 172 158 AT 06 440
130 154 149 C 05 235,2 235,2 1.920,0 413,0 1 152 172 158 AT 06 180
155+6,922 182+10,400 166 C 06 278,0 278,0 1.920,0 135,0 1 152 172 158 AT 06 160
161 175 168 EL 04 135,0 9.037,4 8.902,4 1.920,0 2 152 172 158 AT 06 200
110 128 120+18,460 C 04 434,0 434,0 . 1.798,8 1.364,8 1 175 198 191 A 07 1.402
161 175 168 EL 04 1.364,8 9.037,4 7.537,6 1.798,8 2 175 198 191 A 07 460
161 175 168 EL 04 2.208,0 9.037,4 5.329,6 2.208,0 2 175 198 191 AT 07 460
161 175 168 EL 04 2.254,8 9.037,4 3.074,8 2.254,8 2 192 216 204 AE 05 720
161 175 168 EL 04 3.074,8 9.037,4 4.124,4 1.049,6 2 198+10,000 223 211 A 08 860
185 188+10,000 187 C 07 141,0 141,0 4.124,4 908,6 2 198+10,000 223 211 A 08 480
198 202+15,000 200+10,000 C 08 103,0 103,0 4.124,4 805,6 1 198+10,000 223 211 A 08 210
203 216 210 C 09 322,0 322,0 4.124,4 483,6 1 198+10,000 223 211 A 08 20
154 159 157 CE 04 483,6 668,0 184,4 4.124,4 1 198+10,000 223 211 A 08 1.080
154 159 157 CE 04 184,4 668,0 2.352,0 2.167,6 1 198+10,000 223 211 AT 08 1.080
192 216 204 CE 05 1.879,0 1.879,0 2.352,0 288,6 1 198+10,000 223 211 AT 08 140
218 243 236 C 10 288,6 316,0 27,4 2.352,0 1 198+10,000 223 211 AT 08 500
218 243 236 C 10 27,4 316,0 1.219,2 1.191,8 1 224 244 233 A 09 60
227 234 230 CE 06 320,0 320,0 1.219,2 871,8 1 224 244 233 A 09 60
LOCALIZAO E DISTRIBUIO DOS MATERIAIS PARA TERRAPLENAGEM

Rodovia: Subtrecho:
Trecho: Segmento:

O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

244 278+9,000 251 C 11 312,0 312,0 1.219,2 559,8 1 224 244 233 A 09 360
161 175 168 EL 04 559,8 9.037,4 8.477,6 1.219,2 2 224 244 233 A 09 1.300
161 175 168 EL 04 1.920,0 9.037,4 6.557,6 1.920,0 2 224 244 233 AT 09 1.300
161 175 168 EL 04 384,0 9.037,4 6.173,6 384,0 2 227 234 230 AE 06 1.240
161 175 168 EL 04 818,4 9.037,4 5.355,2 818,4 2 253 285 277 A 10 2.180
161 175 168 EL 04 3.072,0 9.037,4 2.283,2 3.072,0 2 253 285 277 AT 10 2.180
245 255 250 EL 05 133,2 4.094,0 3.960,8 133,2 1 290 313 306 A 11 1.120
245 255 250 EL 05 2.208,0 4.094,0 1.752,8 2.208,0 1 290 313 306 AT 11 1.120
245 255 250 EL 05 46,8 4.094,0 1.706,0 46,8 1 315 347 338 A 12 1.760
245 255 250 EL 05 1.706,0 4.094,0 3.072,0 1.366,0 1 315 347 338 AT 12 1.760
283 327 290 C 12 474,0 474,0 3.072,0 892,0 1 315 347 338 AT 12 960
332+3,000 358 353 C 13 118,0 118,0 3.072,0 774,0 2 315 347 338 AT 12 300
284 298 291 EL 06 774,0 8.642,0 7.868,0 3.072,0 1 315 347 338 AT 12 940
284 298 291 EL 06 2.311,2 8.642,0 5.556,8 2.311,2 1 348 376 363 AT 13 1.440
284 298 291 EL 06 33,6 8.642,0 5.523,2 33,6 1 379 388 385 AT 14 1.880
284 298 291 EL 06 1.802,4 8.642,0 3.720,8 1.802,4 1 389 432 411 A 15 2.400
284 298 291 EL 06 3.720,8 8.642,0 4.128,0 407,2 1 389 432 411 AT 15 2.400
359 389 381 C 14 92,0 92,0 4.128,0 315,2 1 389 432 411 AT 15 600
390 415 402 C 15 154,0 154,0 4.128,0 161,2 1 389 432 411 AT 15 180
416 440 427 C 16 161,2 188,0 26,8 4.128,0 1 389 432 411 AT 15 320
416 440 427 C 16 26,8 188,0 319,2 292,4 1 430 436+10,000 434 AE 07 140
349+3,264 358 353+11,632 EL 07 292,4 2.102,0 1.809,6 319,2 2 430 436+10,000 434 AE 07 1.608
349+3,264 358 353+11,632 EL 07 938,4 2.102,0 871,2 938,4 2 432+8,000 454 438+10,000 A 16 1.698
349+3,264 358 353+11,632 EL 07 871,2 2.102,0 2.073,6 1.202,4 2 432+8,000 454 438+10,000 AT 16 1.698
372 389 380+10,000 EL 08 1.202,4 10.882,6 9.680,2 2.073,6 1 432+8,000 454 438+10,000 AT 16 1.160
372 389 380+10,000 EL 08 392,4 10.882,6 9.287,8 392,4 1 455 481 470 A 17 1.790
372 389 380+10,000 EL 08 2.496,0 10.882,6 6.791,8 2.496,0 1 455 481 470 AT 17 1.790
372 389 380+10,000 EL 08 2.928,0 10.882,6 3.863,8 2.928,0 1 482 519 497 AT 18 2.330
372 389 380+10,000 EL 08 57,6 10.882,6 3.806,2 57,6 1 522 524 524 AT 19 2.870
441 465 453 C 17 176,0 176,0 1.131,6 955,6 1 525 539+10,000 532 AT 20 1.580
466 489 481 C 18 194,0 194,0 1.131,6 761,6 1 525 539+10,000 532 AT 20 1.020
490 505 497 C 19 168,0 168,0 1.131,6 593,6 1 525 539+10,000 532 AT 20 700
506 524 516 C 20 90,0 90,0 1.131,6 503,6 1 525 539+10,000 532 AT 20 320
507 523 515 EL 09 503,6 5.761,0 5.257,4 1.131,6 1 525 539+10,000 532 AT 20 340
507 523 515 EL 09 1.125,6 5.761,0 4.131,8 1.125,6 1 556+10,000 574 564 AT 21 980
559 584 571 C 21 458,0 458,0 2.050,8 1.592,8 1 575 609 592 A 22 420
507 523 515 EL 09 1.592,8 5.761,0 2.539,0 2.050,8 1 575 609 592 A 22 1.540
507 523 515 EL 09 2.539,0 5.761,0 3.264,0 725,0 1 575 609 592 AT 22 1.540
585 606+18,951 595 C 22 482,0 482,0 3.264,0 243,0 1 575 609 592 AT 22 60
LOCALIZAO E DISTRIBUIO DOS MATERIAIS PARA TERRAPLENAGEM

Rodovia: Subtrecho:
Trecho: Segmento:

O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

607 633 613 C 23 187,0 187,0 3.264,0 56,0 1 575 609 592 AT 22 420
525 540 532+10,000 EL 10 56,0 1.150,0 1.094,0 3.264,0 1 575 609 592 AT 22 1.190
525 540 532+10,000 EL 10 1.094,0 1.150,0 2.134,8 1.040,8 1 611 635 627 AT 23 1.890
430 436+10,000 434 CE 07 266,0 266,0 2.134,8 774,8 1 611 635 627 AT 23 3.860
585 596 592 CE 08 774,8 921,0 146,2 2.134,8 1 611 635 627 AT 23 700
585 596 592 CE 08 146,2 921,0 1.105,2 959,0 1 585 596 592 AE 08 50
540 575 557+10,000 EL 11 959,0 13.578,0 12.619,0 1.105,2 1 585 596 592 AE 08 690
540 575 557+10,000 EL 11 220,8 13.578,0 12.398,2 220,8 1 626 629+10,000 628 AE 09 1.410
540 575 557+10,000 EL 11 956,4 13.578,0 11.441,8 956,4 1 635+10,000 655+5,000 643 AT 24 1.710
540 575 557+10,000 EL 11 1.185,6 13.578,0 10.256,2 1.185,6 1 655+15,334 682 667 AT 25 2.190
540 575 557+10,000 EL 11 229,2 13.578,0 10.027,0 229,2 1 686+10,000 694+10,000 691 AT 26 2.670
540 575 557+10,000 EL 11 1.682,4 13.578,0 8.344,6 1.682,4 1 695 713 709 AT 27 3.030
540 575 557+10,000 EL 11 567,6 13.578,0 7.777,0 567,6 1 746+5,000 753+10,000 750+15,000 A 28 3.865
540 575 557+10,000 EL 11 696,0 13.578,0 7.081,0 696,0 1 746+5,000 753+10,000 750+15,000 AT 28 3.865
540 575 557+10,000 EL 11 1.160,4 13.578,0 5.920,6 1.160,4 1 754 778 767 A 29 4.190
626 629+10,000 628 CE 09 184,0 184,0 2.304,0 2.120,0 1 754 778 767 AT 29 2.780
766+9,996 772 770 CE 10 271,0 271,0 2.304,0 1.849,0 1 754 778 767 AT 29 60
796 803 799+18,167 CE 11 470,0 470,0 2.304,0 1.379,0 1 754 778 767 AT 29 658
633+10,000 659+1,434 643 C 24 249,0 249,0 2.304,0 1.130,0 1 754 778 767 AT 29 2.480
659+10,000 674 665 C 25 75,0 75,0 2.304,0 1.055,0 1 754 778 767 AT 29 2.040
698 713 706 C 26 454,0 454,0 2.304,0 601,0 1 754 778 767 AT 29 1.220
753 765+7,000 762+5,000 C 28 42,0 42,0 2.304,0 559,0 1 754 778 767 AT 29 95
767 789 778 C 29 140,0 140,0 2.304,0 419,0 1 754 778 767 AT 29 220
789+11,227 808 801 C 30 207,0 207,0 2.304,0 212,0 1 754 778 767 AT 29 680
810 812 812 CE 12 107,0 107,0 2.304,0 105,0 1 754 778 767 AT 29 900
809 826 817 C 31 105,0 194,0 89,0 2.304,0 1 754 778 767 AT 29 1.000
608 617 612+10,000 EL 12 931,0 931,0 2.290,8 1.359,8 1 779 804 796 AT 30 3.670
634 647 640+10,000 EL 13 1.359,8 3.004,0 1.644,2 2.290,8 1 779 804 796 AT 30 3.110
634 647 640+10,000 EL 13 1.644,2 3.004,0 5.031,6 3.387,4 1 805 829 819 A 31 3.570
746+5,000 750 748+5,000 C 27 156,0 156,0 5.031,6 3.231,4 1 805 829 819 A 31 1.415
814+10,000 821 818 CE 13 768,0 768,0 5.031,6 2.463,4 1 805 829 819 A 31 20
660+10,00 671 665+15,000 EL 14 2.463,4 3.431,2 967,8 5.031,6 1 805 829 819 A 31 3.065
660+10,00 671 665+15,000 EL 14 967,8 3.431,2 2.304,0 1.336,2 1 805 829 819 AT 31 3.065
676 697 686+10,000 EL 15 1.336,2 10.911,0 9.574,8 2.304,0 1 805 829 819 AT 31 2.650
676 697 686+10,000 EL 15 325,2 10.911,0 9.249,6 325,2 1 766+9,996 772 770 AE 10 1.670
676 697 686+10,000 EL 15 564,0 10.911,0 8.685,6 564,0 1 796 803 799+18,167 AE 11 2.268
676 697 686+10,000 EL 15 128,4 10.911,0 8.557,2 128,4 1 810 812 812 AE 12 2.510
676 697 686+10,000 EL 15 921,6 10.911,0 7.635,6 921,6 1 814+10,000 821 818 AE 13 2.630
676 697 686+10,000 EL 15 319,2 10.911,0 7.316,4 319,2 1 823 828 826 AE 14 2.790
LOCALIZAO E DISTRIBUIO DOS MATERIAIS PARA TERRAPLENAGEM

Rodovia: Subtrecho:
Trecho: Segmento:

O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

676 697 686+10,000 EL 15 648,0 10.911,0 6.668,4 648,0 1 830 837+10,000 834+10,000 AE 15 2.960
676 697 686+10,000 EL 15 1.747,2 10.911,0 4.921,2 1.747,2 1 830 859 840+10,000 A 32 3.080
676 697 686+10,000 EL 15 2.784,0 10.911,0 2.137,2 2.784,0 1 830 859 840+10,000 AT 32 3.080
676 697 686+10,000 EL 15 65,0 10.911,0 2.072,1 65,0 1 844+0,00 844+0,00 844 ALR 01 3.150
676 697 686+10,000 EL 15 22,0 10.911,0 2.050,1 22,0 1 858+10,000 858+10,000 858+10,000 ALR 02 3.440
676 697 686+10,000 EL 15 463,2 10.911,0 1.586,9 463,2 1 848+5,000 854 851+13,597 AE 16 3.304
676 697 686+10,000 EL 15 1.586,9 10.911,0 1.950,0 363,1 1 861 876 871 A 33 3.690
759 764+10,00 761+15,000 EL 16 363,1 433,0 69,9 1.950,0 1 861 876 871 A 33 2.185
759 764+10,00 761+15,000 EL 16 69,9 433,0 1.440,0 1.370,1 1 861 876 871 AT 33 2.185
827 837+10,000 833 C 32 153,0 153,0 1.440,0 1.217,1 1 861 876 871 AT 33 760
837+15,000 846+10,000 840+10,000 C 33 152,0 152,0 1.440,0 1.065,1 1 861 876 871 AT 33 610
847+15,000 856 853 C 34 44,0 44,0 1.440,0 1.021,1 1 861 876 871 AT 33 360
857 877 864+10,000 C 35 399,0 399,0 1.440,0 622,1 1 861 876 871 AT 33 130
861+10,00 861+10,00 861 CLR 01 26,0 26,0 1.440,0 596,1 2 861 876 871 AT 33 200
862+0,000 862+0,000 862 CLR 02 15,7 15,7 1.440,0 580,4 1 861 876 871 AT 33 180
865+0,000 865+0,000 865 CLR 03 27,0 27,0 1.440,0 553,4 1 861 876 871 AT 33 120
823 828 826 CE 14 266,0 266,0 1.440,0 287,4 1 861 876 871 AT 33 900
830 837+10,000 834+10,000 CE 15 287,4 540,0 252,6 1.440,0 1 861 876 871 AT 33 730
830 837+10,000 834+10,000 CE 15 252,6 540,0 696,0 443,4 1 868 873 871 AE 17 730
848+5,000 854 851+13,597 CE 16 386,0 386,0 696,0 57,4 1 868 873 871 AE 17 386
868 873 871 CE 17 57,4 580,0 522,6 696,0 1 868 873 871 AE 17 50
868 873 871 CE 17 16,5 580,0 506,1 16,5 1 874+10,000 874+10,000 874+10,000 ALR 03 70
868 873 871 CE 17 20,4 580,0 485,8 20,4 1 968+0,00 968+0,00 968 ALR 04 1.940
868 873 871 CE 17 485,8 580,0 999,6 513,8 1 950 979 963+14,419 AT 34 1.854
950 968 963+14,419 C 36 390,0 390,0 999,6 123,8 1 950 979 963+14,419 AT 34 50
968+10,000 985 979 C 37 123,8 390,0 266,2 999,6 1 950 979 963+14,419 AT 34 306
968+10,000 985 979 C 37 266,2 390,0 693,6 427,4 1 982 990 986+15,000 AT 35 155
961 967 964 EL 17 427,4 1.947,9 1.520,5 693,6 1 982 990 986+15,000 AT 35 455
961 967 964 EL 17 1.064,4 1.947,9 456,1 1.064,4 1 994 1009 1001 AT 36 740
961 967 964 EL 17 456,1 1.947,9 1.897,2 1.441,1 1 1015 1040 1030 AT 37 1.320
986 1003 993 C 38 431,0 431,0 1.897,2 1.010,1 1 1015 1040 1030 AT 37 740
1004 1015 1013 C 39 211,0 211,0 1.897,2 799,1 1 1015 1040 1030 AT 37 340
1015 1029 1018 C 40 168,0 168,0 1.897,2 631,1 1 1015 1040 1030 AT 37 240
1030 1035+5,000 1033 C 41 213,0 213,0 1.897,2 418,1 1 1015 1040 1030 AT 37 60
1036 1054 1045 C 42 331,0 331,0 1.897,2 87,1 1 1015 1040 1030 AT 37 300
1.041 1.051 1046 EL 18 87,1 6.349,0 6.261,9 1.897,2 1 1015 1040 1030 AT 37 320
1.041 1.051 1046 EL 18 1.279,2 6.349,0 4.982,7 1.279,2 1 1041 1061 1051 AT 38 100
1.041 1.051 1046 EL 18 1.420,8 6.349,0 3.561,9 1.420,8 1 1062 1077+5,000 1071 AT 39 500
1.041 1.051 1046 EL 18 13,8 6.349,0 3.548,1 13,8 1 1027+10,000 1027+10,000 1027+10,000 ALR 05 370
LOCALIZAO E DISTRIBUIO DOS MATERIAIS PARA TERRAPLENAGEM

Rodovia: Subtrecho:
Trecho: Segmento:

O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

1.041 1.051 1046 EL 18 11,8 6.349,0 3.536,3 11,8 1 1051+0,00 1051+0,00 1.051 ALR 06 100
1.041 1.051 1046 EL 18 334,8 6.349,0 3.201,5 334,8 1 1077+10,000 1087+15,000 1083 A 40 740
1.041 1.051 1046 EL 18 984,0 6.349,0 2.217,5 984,0 1 1077+10,000 1087+15,000 1083 AT 40 740
1.041 1.051 1046 EL 18 1.292,4 6.349,0 925,1 1.292,4 1 1088 1109 1092+5,000 AT 41 925
1.041 1.051 1046 EL 18 925,1 6.349,0 4.427,5 3.502,5 1 1110 1137+0,347 1121 A 42 1.500
1056+5,239 1068 1061 C 43 313,0 313,0 4.427,5 3.189,5 1 1110 1137+0,347 1121 A 42 1.200
1069 1075 1073 C 44 267,0 267,0 4.427,5 2.922,5 1 1110 1137+0,347 1121 A 42 960
1111 1124 1116 CE 18 1.566,0 1.566,0 4.427,5 1.356,5 1 1110 1137+0,347 1121 A 42 100
1077+15,000 1087+10,000 1083 C 45 88,0 88,0 4.427,5 1.268,5 1 1110 1137+0,347 1121 A 42 760
1090+15,000 1118 1102 C 46 360,0 360,0 4.427,5 908,5 1 1110 1137+0,347 1121 A 42 380
1124 1138+10,000 1133 C 47 85,0 85,0 4.427,5 823,5 1 1110 1137+0,347 1121 A 42 240
1.059 1.062 1060+10,000 EL 19 823,5 2.248,0 1.424,5 4.427,5 1 1110 1137+0,347 1121 A 42 1.210
1.059 1.062 1060+10,000 EL 19 1.424,5 2.248,0 2.593,7 1.169,1 1 1110 1137+0,347 1121 AT 42 1.210
1.098 1.104 1101 EL 20 1.169,1 4.509,0 3.339,9 2.593,7 1 1110 1137+0,347 1121 AT 42 400
1.098 1.104 1101 EL 20 235,2 4.509,0 3.104,7 235,2 1 1137+5,000 1144 1141+10,000 A 43 810
1.098 1.104 1101 EL 20 648,0 4.509,0 2.456,7 648,0 1 1137+5,000 1144 1141+10,000 AT 43 810
1.098 1.104 1101 EL 20 922,8 4.509,0 1.533,9 922,8 1 1144+10,000 1154+10,000 1151 AT 44 1.000
1.098 1.104 1101 EL 20 1.533,9 4.509,0 1.879,2 345,3 1 1111 1124 1116 AE 18 300
1.144 1.153 1148+10,000 EL 21 345,3 8.422,0 8.076,7 1.879,2 1 1111 1124 1116 AE 18 650
1.144 1.153 1148+10,000 EL 21 346,8 8.422,0 7.729,9 346,8 1 1127 1129 1129 AE 19 390
1.144 1.153 1148+10,000 EL 21 674,4 8.422,0 7.055,5 674,4 1 1131 1136 1134 AE 20 290
1.144 1.153 1148+10,000 EL 21 188,4 8.422,0 6.867,1 188,4 1 1180 1182 1181 AE 21 650
1.144 1.153 1148+10,000 EL 21 184,8 8.422,0 6.682,3 184,8 1 1199 1201+12,000 1201 AE 22 1.050
1.144 1.153 1148+10,000 EL 21 344,4 8.422,0 6.337,9 344,4 1 1154+15,000 1166 1159 A 45 210
1.144 1.153 1148+10,000 EL 21 1.080,0 8.422,0 5.257,9 1.080,0 1 1154+15,000 1166 1159 AT 45 210
1.144 1.153 1148+10,000 EL 21 260,4 8.422,0 4.997,5 260,4 1 1167 1191 1180 A 46 630
1.144 1.153 1148+10,000 EL 21 2.304,0 8.422,0 2.693,5 2.304,0 1 1167 1191 1180 AT 46 630
1.144 1.153 1148+10,000 EL 21 16,5 8.422,0 2.677,0 16,5 1 1126+10,000 1126+10,000 1126+10,000 ALR 07 440
1.144 1.153 1148+10,000 EL 21 22,6 8.422,0 2.654,3 22,6 1 1136+0,000 1136+0,000 1.136 ALR 08 250
1.144 1.153 1148+10,000 EL 21 15,6 8.422,0 2.638,7 15,6 1 1168+15,000 1168+15,000 1168+15,000 ALR 09 405
1.144 1.153 1148+10,000 EL 21 1.965,6 8.422,0 673,1 1.965,6 1 1192 1216+15,000 1200 AT 47 1.030
1.144 1.153 1148+10,000 EL 21 222,1 8.422,0 451,0 222,1 1 1217 1240+7,977 1228 A 48 1.590
1.144 1.153 1148+10,000 EL 21 451,0 8.422,0 2.246,3 1.795,3 1 1217 1240+7,977 1228 AT 48 1.590
1158 1179 1169 C 48 336,0 336,0 2.246,3 1.459,3 1 1217 1240+7,977 1228 AT 48 1.180
1181 1202+15,000 1191 C 49 89,0 89,0 2.246,3 1.370,3 1 1217 1240+7,977 1228 AT 48 740
1127 1129 1129 CE 19 289,0 289,0 2.246,3 1.081,3 1 1217 1240+7,977 1228 AT 48 1.980
1131 1136 1134 CE 20 562,0 562,0 2.246,3 519,3 1 1217 1240+7,977 1228 AT 48 1.880
1180 1182 1181 CE 21 157,0 157,0 2.246,3 362,3 1 1217 1240+7,977 1228 AT 48 940
1199 1201+12,000 1201 CE 22 154,0 154,0 2.246,3 208,3 1 1217 1240+7,977 1228 AT 48 540
LOCALIZAO E DISTRIBUIO DOS MATERIAIS PARA TERRAPLENAGEM

Rodovia: Subtrecho:
Trecho: Segmento:

O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

1220+15,000 1237 1221+15,000 C 51 208,3 1.846,0 1.637,7 2.246,3 1 1217 1240+7,977 1228 AT 48 125
1207 1212 1209 C 50 44,4 44,4 945,6 901,2 1 1241 1265 1251 A 49 840
1240 1243 1242 CE 23 256,0 256,0 945,6 645,2 2 1241 1265 1251 A 49 180
1257 1258 1257+13,742 CE 24 76,0 76,0 945,6 569,2 1 1241 1265 1251 A 49 134
1220+15,000 1237 1221+15,000 C 51 569,2 1.846,0 1.068,5 945,6 1 1241 1265 1251 A 49 585
1220+15,000 1237 1221+15,000 C 51 1.068,5 1.846,0 2.304,0 1.235,5 1 1241 1265 1251 AT 49 585
1.165 1.171 1168 EL 22 1.235,5 4.402,0 3.166,5 2.304,0 2 1241 1265 1251 AT 49 1.660
1.165 1.171 1168 EL 22 244,8 4.402,0 2.921,7 244,8 2 1266 1288 1274 A 50 2.120
1.165 1.171 1168 EL 22 2.112,0 4.402,0 809,7 2.112,0 2 1266 1288 1274 AT 50 2.120
1.165 1.171 1168 EL 22 307,2 4.402,0 502,5 307,2 2 1240 1243 1242 AE 23 1.480
1.165 1.171 1168 EL 22 91,2 4.402,0 411,3 91,2 2 1257 1258 1257+13,742 AE 24 1.794
1.165 1.171 1168 EL 22 411,3 4.402,0 973,2 561,9 2 1270 1277 1274 AE 25 2.120
1.213 1222+10,00 1217+15,000 EL 23 561,9 8.983,0 8.421,1 973,2 1 1270 1277 1274 AE 25 1.125
1.213 1222+10,00 1217+15,000 EL 23 806,4 8.983,0 7.614,7 806,4 1 1305 1311 1307+10,000 AE 26 1.795
1.213 1222+10,00 1217+15,000 EL 23 1.056,0 8.983,0 6.558,7 1.056,0 1 1290 1307 1302+15,000 AT 51 1.700
1.213 1222+10,00 1217+15,000 EL 23 5.060,4 8.983,0 1.498,3 5.060,4 1 1307+10,000 1322 1316 A 52 1.965
1.213 1222+10,00 1217+15,000 EL 23 1.392,0 8.983,0 106,3 1.392,0 1 1307+10,000 1322 1316 AT 52 1.965
1.213 1222+10,00 1217+15,000 EL 23 106,3 8.983,0 1.570,8 1.464,5 1 1312 1321 1317 AE 27 1.985
1.261 1.268 1264+10,000 EL 24 1.464,5 5.379,0 3.914,5 1.570,8 1 1312 1321 1317 AE 27 1.050
1.261 1.268 1264+10,000 EL 24 680,4 5.379,0 3.234,1 680,4 1 1325 1329 1327 AE 28 1.250
1.261 1.268 1264+10,000 EL 24 792,0 5.379,0 2.442,1 792,0 1 1323 1336 1329 AT 53 1.290
1.261 1.268 1264+10,000 EL 24 249,6 5.379,0 2.192,5 249,6 1 1339 1344 1342 AT 54 1.550
1.261 1.268 1264+10,000 EL 24 1.911,6 5.379,0 280,9 1.911,6 1 1345 1370 1361 AT 55 1.930
1.261 1.268 1264+10,000 EL 24 280,9 5.379,0 1.174,8 893,9 1 1371 1394 1384 A 56 2.390
1270 1277 1274 CE 25 811,0 811,0 1.174,8 82,9 1 1371 1394 1384 A 56 2.200
1305 1311 1307+10,000 CE 26 82,9 672,0 589,1 1.174,8 1 1371 1394 1384 A 56 1.530
1305 1311 1307+10,000 CE 26 589,1 672,0 2.208,0 1.618,9 1 1371 1394 1384 AT 56 1.530
1238 1268 1264 C 52 114,0 114,0 2.208,0 1.504,9 1 1371 1394 1384 AT 56 2.400
1.295 1.301 1298 EL 25 1.504,9 9.195,0 7.690,1 2.208,0 1 1371 1394 1384 AT 56 1.720
1.295 1.301 1298 EL 25 166,8 9.195,0 7.523,3 166,8 1 1395 1419 1409 A 57 2.220
1.295 1.301 1298 EL 25 2.304,0 9.195,0 5.219,3 2.304,0 1 1395 1419 1409 AT 57 2.220
1.295 1.301 1298 EL 25 1.130,4 9.195,0 4.088,9 1.130,4 1 1367 1378+10,000 1374 AE 29 1.520
1.295 1.301 1298 EL 25 585,6 9.195,0 3.503,3 585,6 1 1382+13,308 1390 1387 AE 30 1.780
1.295 1.301 1298 EL 25 11,9 9.195,0 3.491,4 11,9 1 1330+0,00 1330+0,00 1.330 ALR 10 640
1.295 1.301 1298 EL 25 12,1 9.195,0 3.479,3 12,1 1 1332+0,00 1332+0,00 1.332 ALR 11 680
1.295 1.301 1298 EL 25 9,7 9.195,0 3.469,6 9,7 1 1435+10,000 1435+10,000 1435+10,000 ALR 12 2.750
1.295 1.301 1298 EL 25 663,6 9.195,0 2.806,0 663,6 1 1447 1454 1452 AE 31 3.080
1.295 1.301 1298 EL 25 1.999,2 9.195,0 806,8 1.999,2 1 1420 1445 1430+6,000 AT 58 2.646
1.295 1.301 1298 EL 25 806,8 9.195,0 3.276,0 2.469,2 1 1446 1471 1452 A 59 3.080
LOCALIZAO E DISTRIBUIO DOS MATERIAIS PARA TERRAPLENAGEM

Rodovia: Subtrecho:
Trecho: Segmento:

O R I G E M D E S T I N O
ESTAQUEAMENTO CENTRO ESCAVAO CORTE ATERRO ESTAQUEAMENTO CENTRO ESCAVAO DISTNCIA DE
VOLUME CLASSIFICAO
DE MASSA DE MASSA TRANSPORTE
INICIAL FINAL CD. N m TOTAL DISTRIBUIR TOTAL DISTRIBUIR ( 1 , 2 e 3 ) INICIAL FINAL CD. N
"CM" "CM" (m)

1269 1286 1278 C 53 131,0 131,0 3.276,0 2.338,2 1 1446 1471 1452 A 59 3.480
1287 1302+10,000 1299 C 54 656,0 656,0 3.276,0 1.682,2 2 1446 1471 1452 A 59 3.060
1303+10,000 1307 1305+10,000 C 55 18,0 18,0 3.276,0 1.664,2 1 1446 1471 1452 A 59 2.930
1310 1320+5,000 1317 C 56 78,0 78,0 3.276,0 1.586,2 1 1446 1471 1452 A 59 2.700
1321 1352 1335 C 57 177,0 177,0 3.276,0 1.409,2 1 1446 1471 1452 A 59 2.340
1354 1365 1361 C 58 80,0 80,0 3.276,0 1.329,2 1 1446 1471 1452 A 59 1.820
1368 1373 1371 C 59 203,0 203,0 3.276,0 1.126,2 2 1446 1471 1452 A 59 1.620
1383 1389 1387 C 60 173,0 173,0 3.276,0 953,2 1 1446 1471 1452 A 59 1.300
1312 1321 1317 CE 27 953,2 1.309,0 355,8 3.276,0 1 1446 1471 1452 A 59 2.700
1312 1321 1317 CE 27 355,8 1.309,0 2.400,0 2.044,2 1 1446 1471 1452 AT 59 2.700
1325 1329 1327 CE 28 567,0 567,0 2.400,0 1.477,2 1 1446 1471 1452 AT 59 2.500
1367 1378+10,000 1374 CE 29 942,0 942,0 2.400,0 535,2 1 1446 1471 1452 AT 59 1.560
1382+13,308 1390 1387 CE 30 488,0 488,0 2.400,0 47,2 1 1446 1471 1452 AT 59 1.300
1447 1454 1452 CE 31 47,2 553,0 505,8 2.400,0 1 1446 1471 1452 AT 59 50
1447 1454 1452 CE 31 505,8 553,0 2.832,0 2.326,2 1 1472 1505 1487 AT 60 700
1390 1415+14,974 1404 C 61 168,0 168,0 2.832,0 2.158,2 1 1472 1505 1487 AT 60 1.660
1416 1445 1442 C 62 165,0 165,0 2.832,0 1.993,2 1 1472 1505 1487 AT 60 900
1446 1465+12,000 1459 C 63 194,0 194,0 2.832,0 1.799,2 2 1472 1505 1487 AT 60 560
1466 1487 1472 C 64 210,0 210,0 2.832,0 1.589,2 1 1472 1505 1487 AT 60 300
1488 1505 1498 C 65 110,0 110,0 2.832,0 1.479,2 1 1472 1505 1487 AT 60 220
1609+0,00 1609+0,00 1.609 CLR 04 16,5 16,5 2.832,0 1.462,7 1 1472 1505 1487 AT 60 2.440
1316+10,000 1316+10,000 1.316 CLR 05 14,3 14,3 2.832,0 1.448,4 1 1472 1505 1487 AT 60 3.420
1363+0,000 1363+0,000 1.363 CLR 06 15,3 15,3 2.832,0 1.433,1 1 1472 1505 1487 AT 60 2.480
1.456 1.463 1459+10,000 EL 28 1.433,1 3.311,0 1.877,9 2.832,0 2 1472 1505 1487 AT 60 550
1.131 1.135 1133 SM 01 479,6 479,6 575,5 95,9 1 1.131 1.135 1133 PSM 01 50
1183+1,00 1196+11,00 1189+16,000 RS 01 1.053,0 1.053,0 1.263,6 210,6 1 3183+1,00 3196+11,00 3189+16,000 PRS 01 40.000