Escolar Documentos
Profissional Documentos
Cultura Documentos
EPS PROJECT
ABU DHABI OIL CO. LTD (JAPAN)
ITR (DAILY) FOR TARGET ENGINEERING
Daily ITR No. HSF-TAR-ITR-18/MAY Date of Issue - 17-MAY-17
Intervention
Point
RFI
Reference Inspecti Refere
Sl. Internal Ref. RFI Rev Date for Time for Description of work / Item to be Reference Activity Applicable Checklist
Discipline Drawing ITP Title Location on nce TR Remarks
No. No. . Inspection Inspection Inspected Project ITP No. No. Report No.
Target
ADOC
No. Status RFI
TPI
TR
No.
Weld Visual
RFI-HSF- Inspection
09.00 AM TO HD-EC-CM-
3 Module Piping TARGET-TF- 0 18-May-17 Weld Visual Examination - ITP for Module Installation 4.6 W W W Mubarraz - - Report:HSFITP- Mechanical
05.00 PM ZQXS-5011
MEC-0089 TEC-MOG-0006, F-
01
RFI-HSF-
4
Radiographic Film Interpretation for HD-EC-CM-
Module Piping TARGET-TF- 0 18-May-17 10.00 AM - ITP for Module Installation 4.8 W W W W Mubarraz - - Intertek Format Mechanical
Module Piping ZQXS-5011
MEC-0085
RFI-HSF-
Radiographic Film Interpretation for HD-EC-CM-
5 Pipeline TARGET-TF- 0 18-May-17 10.00 AM - ITP for Pipeline 6.3 W W W W Mubarraz - - Intertek Format Mechanical
Pipeline ZQXS-5003
MEC-0090
RFI-HSF-
6
Cathodic Protection Installation and HD-EC-CM-
Pipeline TARGET-TF- 0 18-May-17 10.00 AM - ITP for Pipeline 9.4 W W S Mubarraz - - Holiday Test Report Mechanical
testing ZQXS-5003
MEC-0088
DESIGNATION QA/QC
SIGNATURE
DATE 13-May-17