DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT OF LENGTH
6.398 KMS FROM CH: 591 TO CH: 5691.7, CH: 6314.9 TO CH:
7100 AND CH: 7187 TO CH: 7700 BETWEEN PRAJAPATI NAGAR
TO SITABURDI
TITLE
DESIGN OF TEST PILE TP-2 FOR INITIAL VERTICAL & INITIAL LATERAL
PILE LOAD TEST
This note is the property of STUP Consultants Pvt. Ltd. It should not be used, copied or reproduced
without their written permission
INTRODUCTION
This design note covers the geotechnical and structural design of test pile (TP-2) to be tested for
initial vertical load test & initial lateral load test near P143 Location Between Seva Sadan
Chowk & Gitanjali Chowk in Nagpur. The location of test pile is mentioned in the drawing. The
reference Bore Hole for design of test pile TP-2 has been taken as BH-P-120. The geotechnical
parameters have been taken from the soil report which has been attached with this design note.
A preliminary design of pile has been carried out for a pier near the test pile location. The
maximum vertical and horizontal load coming on a single pile comes out to be 637t & 24t .
However, for load testing, we have taken the working test load as 725t for initial vertical load
test and 30t for initial lateral load test. The design of pile has been attached as Annexure-A.
Date: 11-05-17 Note No. 11568/DD/DN-02
11
Layer 4
Weathered Rock
15.1
Layer 5
Layer 6
Cub = Average shear strength below base of pile (for the depth of 2*dia of pile), based on N value
Nc = 9
Since during Vertical Load test no Bending Moment is there, therefore pile has been considered as a column
and as per Cl. 15.6.3.2 (Equation 14) of CBC, the maximum permissible load of the Pile in compression = 0.4 fck .A
+ fyc.Asc
Where, fck = characteristic strength of concrete = 35.0 N/mm2
2
Ac = Area of the Pile = /4 *1200^2 = 1130973.4 mm
fyc = Design compressive strength of the reinforcement = fy / (Ym+fy/2000)
2
For Fe 500 grade of reinforcement, fy = 500 N/mm
Ym = 1.15
Therefore, fyc = 500 / (1.15+500/2000) = 357.143 N/mm2
Mimimum Steel required = 0.4 % (as per Cl. 6.11.1 of IS 2911 Part I, Sec-II )
As per IS : 2911 Part 4, Clause 7.4, Horizontal Capacity of the pile will be minimum of
a) 50% of Lateral Load for 12mm deflection at scour level &
b) Lateral Load for 5mm deflection at the same level.
Reinforcement Details:-
Reinf. For Pier
Reqd. Provide
Section
Ast. Mm2 Dia, mm Total No. Layer Spac,mm Ast. mm2 pt %
Sec-1 30420 32 39 2 335 31366 0.8249%
Sec-2 0 #N/A #N/A 2 #N/A #N/A #N/A
Sec-3 0 #N/A #N/A 1 #N/A #N/A #N/A
Sec-4 FALSE FALSE FALSE FALSE FALSE FALSE FALSE
Sec-5 FALSE FALSE FALSE FALSE FALSE FALSE FALSE
Sec-6 FALSE FALSE FALSE FALSE FALSE FALSE FALSE
Direction of Traffic
Y
Overall Span 34 m X 1.026316
(0,0) First Axel
Centre to Centre 32.3 m
Cantilever Projection 0.85 m -0.02632 32.3 0.85
0.85 R(Left-1) R(Left)-2
Overall Length of a Car = 21.8 Influence Line Diagram for R(Left-2)
Axel mkd. Car-2/P4 Car-2/P3 Car-2/P2 Car-2/P1 Car-1/P4 Car-1/P3 Car-1/P2 Car-1/P1
Axel Load(T) 16 16 16 16 16 16 16 16
Spacing(m) ** 2.2 12.5 2.2 4.9 2.2 12.5 2.2 0
** It is distance from adjacent front axel.
C.L of Pier Under Consideration
Position of First Axel 34 m
Direction of Traffic
Y
Overall Span 34 m 1.026316 First Axel X (0,0)
Centre to Centre 32.3 m
Cantilever Projection 0.85 m 32.3 0.85 -0.02632
0.85 R(Right-1) R(Right)-2
Influence Line Diagram for R(Right-1)
2.45m 2.217
2.2175m 11.065m 2.45m 2.2175m
5m 2.45m 11.065m 2.45m 2.2175m
Axel mkd. 1 2 3 4 5 6 7 8
Axel Load(T) 16 16 16 16 16 16 16 16
Spacing(m) 0 2.2 12.5 2.2 4.9 2.2 12.5 2.2
C.L of Pier Under Consideration
Position of First Axel 34 m
Only Right Span Loaded
Axel Mkd X Ordinate Reaction Left Span Right Span
Car-1/P1 34 1.0263 16.421 34 34
Car-1/P2 31.8 0.9582 15.331 R(Left-1) R(Left-2) R(right-1) R(Right-2)
Car-1/P3 19.3 0.5712 9.139
Car-1/P4 17.1 0.5031 8.050 Only Right Span Loaded
Car-2/P1 12.2 0.3514 5.622
Car-2/P2 10 0.2833 4.533
Car-2/P3 -2.5 0.0000 0.000
Car-2/P4 -4.7 0.0000 0.000
Car-3/P1 -9.6 0.0000 0.000
Car-3/P2 -11.8 0.0000 0.000
Car-3/P3 -24.3 0.0000 0.000
Car-3/P4 -26.5 0.0000 0.000
Car-4/P1 -31.4 0.0000 0.000
Car-4/P2 -33.6 0.0000 0.000
Car-4/P3 -46.1 0.0000 0.000
Car-4/P4 -48.3 0.0000 0.000
Car-5/P1 -53.2 0.0000 0.000
Car-5/P2 -55.4 0.0000 0.000
Car-5/P3 -67.9 0.0000 0.000
Car-5/P4 -70.1 0.0000 0.000
Maximum Reaction=R(Right-1)= 59.096
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) RJN
Designed By Date:- 11-May-17
DesignFor Pier Near TP-2 R-2 Load-P3
Y
X 1.026316 1.026316
(0,0)
-0.02632 Left Span Right Span -0.02632
34 R(Left-2) R(Right-1) 34
Combined Influence Line Diagram For R(Left-2) & R(Right-1)
Axel mkd. Car-2/P4 Car-2/P3 Car-2/P2 Car-2/P1 Car-1/P4 Car-1/P3 Car-1/P2 Car-1/P1
Axel Load(T) 16 16 16 16 16 16 16 16
Spacing(m) ** 2.2 12.5 2.2 4.9 2.2 12.5 2.2 0
** It is distance from adjacent front axel.
Position of First Axel of 1st Car = 77.6 m
Origin of the co-ordinate is at the starting of L. Span Origin of the co-ordinate is at the starting of R. Span
Sl.No Axel Mkd X Ordinate Reaction Sl.No Axel Mkd X Ordinate Reaction
1 Car-1/P1 34 1.0263 16.421 1 Car-1/P1 77.6 0.0000 0.000
2 Car-1/P2 31.8 0.9582 15.331 2 Car-1/P2 75.4 0.0000 0.000
3 Car-1/P3 19.3 0.5712 9.139 3 Car-1/P3 62.9 0.1316 2.105
4 Car-1/P4 17.1 0.5031 8.050 4 Car-1/P4 60.7 0.1997 3.195
5 Car-2/P1 12.2 0.3514 5.622 5 Car-2/P1 55.8 0.3514 5.622
6 Car-2/P2 10 0.2833 4.533 6 Car-2/P2 53.6 0.4195 6.712
7 Car-2/P3 -2.5 0.0000 0.000 7 Car-2/P3 41.1 0.8065 12.904
8 Car-2/P4 -4.7 0.0000 0.000 8 Car-2/P4 38.9 0.8746 13.994
9 Car-3/P1 -9.6 0.0000 0.000 9 Car-3/P1 34 0.0000 0.000
10 Car-3/P2 -11.8 0.0000 0.000 10 Car-3/P2 31.8 0.0000 0.000
11 Car-3/P3 -24.3 0.0000 0.000 11 Car-3/P3 19.3 0.0000 0.000
12 Car-3/P4 -26.5 0.0000 0.000 12 Car-3/P4 17.1 0.0000 0.000
13 Car-4/P1 -31.4 0.0000 0.000 13 Car-4/P1 12.2 0.0000 0.000
14 Car-4/P2 -33.6 0.0000 0.000 14 Car-4/P2 10 0.0000 0.000
15 Car-4/P3 -46.1 0.0000 0.000 15 Car-4/P3 -2.5 0.0000 0.000
16 Car-4/P4 -48.3 0.0000 0.000 16 Car-4/P4 -4.7 0.0000 0.000
17 Car-5/P1 -53.2 0.0000 0.000 17 Car-5/P1 -9.6 0.0000 0.000
18 Car-5/P2 -55.4 0.0000 0.000 18 Car-5/P2 -11.8 0.0000 0.000
19 Car-5/P3 -67.9 0.0000 0.000 19 Car-5/P3 -24.3 0.0000 0.000
20 Car-5/P4 -70.1 0.0000 0.000 20 Car-5/P4 -26.5 0.0000 0.000
Max Support Reaction From Left Span 59.096 Max Support Reaction From Right Span 44.533
Maximum Pier Reaction(T)
103.628
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) Prepared By:
RJN Date:- 11-May-17
Location:- Pier Near TP-2 R-2 1
Your INPUT has been tagged by CELL
T.O.R
321.10
Levels Material For Pier and Pier Cap
Top of Rail Level 321.103 m Grade of Concrete M 40 Density
Top of Pier Cap Level 318.221 m Grade of Steel Fe 500 2.5
Ground Level 306.822 m Level related Dimensions
Top of Pile Cap Level 306.322 m Ht. Of Rail Sleeper / Plinth 482 mm
Pier Cap Geometry Height of Bearing in mm 100 mm
Surface 1 Bearing Pedestal Height (Min) 300 mm
Surface 2 0.617172 Top of Bearing Level 318.621 m Hn
0.221101 Transverse ecc. Of Pier Cap 0 mm
Surface 3 Depth (Max) of superstructure 2000 mm Section -n-n
Ht. Of Pier Cap 1800 mm
Surface-1& 2 Foundation/ Pilecap below GL 500 mm
L L in m B in m height(m) A in m^2 Vol m^3
B Surface-1 3.8 2.8 10.64
1.3 11.97
Surface-2 2.8 2.8 7.84 GL
Surface-3 in m A in m^2 Vol m^3 Section -1-1
Length of rectangular portion = 1.95
1.95 Width of rectangular portion = 1.95
3.80 2.85
Diameter of circular portion = 0.0001
1.95 Height between Surface 2 and 3= 0.5
Total Volume of Pier Cap in m^3 14.82
C.G of the Pier Cap from Surface 1 = 0.791 m Weight of Pier Cap(T)
Level of the Pier Cap C.G. = 317.43 m 37.04
PIER GEOMETRY
d b
Number of Pier Section 3 (max 6 no.) Assumed generalized section of pier is two
Sectional Height 2 m half circles with central rectangular body
Total Height of the Perimeter a
10.099 7.80 d/2
Pier Stem (m) = of Pier Pier Section
Level at the Pier Dimension Area Pier V(m^3) SegmentCG Pier CG(m) CG Lv. of the Pier Wt(T)
Section No. Ht. (Hn)wrt
section (m) section a b d (m^2) above sec frm.section frm.section Pier Part above sec
0 0 N.A 1.95 1.95 0.0001 0.00 0.00 0.00 0.00 #VALUE! 0.00
0 0 N.A 1.95 1.95 0.0001 0.00 0.00 0.00 0.00 #VALUE! 0.00
0 0 N.A 1.95 1.95 0.0001 0.00 0.00 0.00 0.00 #VALUE! 0.00
3 6.099 310.322 1.95 1.95 0.0001 3.80 23.19 3.05 3.05 313.37 57.98
2 8.099 308.322 1.95 1.95 0.0001 3.80 30.80 1.00 4.05 312.37 76.99
1 10.099 306.322 1.95 1.95 0.0001 3.80 38.40 1.00 5.05 311.37 96.00
PEDESTALS CG of Superstructure
SPAN SPAN
Description Unit
Left Right Left(m) Right(m)
No of Pedestal No. 2 2 CG from Top of Str. 0.826 0.826
Height mm 300 300 Dead Load 263.5 263.5
Width mm 800 800 Combined CG fr. topdeck 0.826
Bearing Pedestal Length mm 800 800 Level of combined CG 319.795
Total volume of Pedestal m^3 0.384 0.384 Remarks (if any):-
Weight of Pedestal T 0.96 0.96
Total Wt. T 1.92
Height mm 950
Width mm 1000
Shear Block (1 no.) Length mm 1150
Volume of Pedestal m^3 1.0925 CombinedCG of Pedestal from top of pier cap
Weight of Pedestal T 2.73125 Height in m 0.34
Total Weight of Bearing Pedestals and Shear Block T 4.65125 Level in m 318.56
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) Ltd. RJN
Designed By Date:- 11-May-17
DesignFor Pier Near TP-2 R-2 2
Your INPUT has been tagged by CELL
Left Span Right Span
SPAN
Description Unit
Left Right T.O.R
Overall Span Length m 34 34
Centre to Centre of Bearings m 32.30 32.30
Dead load from Superstructure DL T 264 264 EL-L EL-R
Superimposed Dead Load SIDL T 128 128
Longitudinal eccentricity (+ve for Clockwise)EL-L, EL-R mm -850 850
Transverse eccentricity ET-L, ET-R mm 0 0
Depth of superstructure mm 2000 2000
DL & SIDL :Service Condition Hn
Total Dead Load T 527
Total Longitudinal Moment due to Dead Load T-m 0 Section -n-n
Total Transverse Moment due to Dead Load T-m 0
Total Superimposed Dead Load (SIDL) T 255
Total Longitudinal Moment due toSIDL T-m 0
Total Transverse Moment due to SIDL T-m 0
DL & SIDL :Launching Condition GL
Total Dead Load T 794 Section -1-1
Total Longitudinal Moment due to Dead Load T-m 675
Total Transverse Moment due to Dead Load T-m 0
Total Superimposed Dead Load (SIDL) T 0
Total Longitudinal Moment due toSIDL T-m 0
Total Transverse Moment due to SIDL T-m 0
Live Load (LL) + (Including FPLL)
Live Load For Max Pier Reaction (Single Lane/Track Loaded) T 79.78 60.12
Live Load For Max Moment(ML)(Single Track Loaded) T 79.78 79.78 2050 2050
Maximum Tranverse Eccentric Position of LL mm 2050 Deck
LL : Service Condition - Both Span Loaded + Both Lane / Track Loaded
Total Live Load T 279.80 Pier
Total Longitudinal Moment due to Live Load T-m 33.42
Total Transverse Moment due to Live Load T-m 3.42
LL : Service Condition - Both Span Loaded + Single Lane / Track Loaded
Total Live Load T 139.90
Total Longitudinal Moment due to Live Load T-m 16.71
Total Transverse Moment due to Live Load T-m 288.50
LL : Service Condition - Single Span Loaded + Both Lane / Track Loaded
CL of Superstar
Total Live Load T 159.56
Total Longitudinal Moment due to Live Load T-m 135.63
Total Transverse Moment due to Live Load T-m 1.71
LL : Service Condition - Single Span Loaded + Single Lane / Track Loaded
Total Live Load T 79.78
Total Longitudinal Moment due to Live Load T-m 67.81
Total Transverse Moment due to Live Load T-m 164.40
Remarks (if any):- 1. To get double track load, single track loads are simply multipiled by 2 for avoiding another logical step to the spread sheet. 2.
2. Transverse moment includes moment due to eccentricity for curvature for LL.
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) Ltd. RJN
Prepared By: Date:- 11-May-17
DesignFor Pier Near TP-2 R-2 3
Horizontal Forces (Non Seismic)
Longitudinal Force:- (This is Tractive ? Braking Force ) Horizontal Long. Force is resisted by
Percentage of Force Reference Longitudinal force depends on the loaded span, as explained in the clause 2.8.2 of IRS: By Shear Block 1
Bridge Rule, corrigendum slip no.30 dated 26-09-02. The percentage has been taken from
Tractive = 20.00% By Neoprene only 0
the NIT provision.
Braking = 18.00%
Dispersion percentage (reference clause 2.8.3 of IRS Bridge Rule ) 0.00% Input 1 for Yes, 0 for No
Span in m 22 25 28 31 34 37
Max no. of axles 5 6 8 9 9 9 SEE EXPLANATORY NOTE ON DISTRIBUTION
Braking Load (T) 14.4 17.28 23.04 25.92 25.92 25.92 OF BRAKING & TRACTIVE FORCES
Tractive Load (T) 16 19.2 25.6 28.8 28.8 28.8
LL : Service Condition - Both Span Loaded + Both Lane / Track Loaded
Span Left Right Design Longitudinal force on Pier
Braking Force (T) 25.92 25.92 54.72
Tractive Force (T) 28.8 28.8
LL : Service Condition - Both Span Loaded + Single Lane / Track Loaded
Span Left Right Design Longitudinal force on Pier
Braking Force (T) 25.92 25.92 28.80 Both the Spans Loaded
Tractive Force (T) 28.8 28.8
LL : Service Condition - Single Span Loaded + Both Lane / Track Loaded
Span Left Right Design Longitudinal force on Pier
Braking Force (T) 25.92 25.92 54.72
Tractive Force (T) 28.8 28.8
LL : Service Condition - Single Span Loaded + Single Lane / Track Loaded
Span Left Right Design Longitudinal force on Pier Single Span Loaded
Braking Force (T) 25.92 25.92 28.8
Tractive Force (T) 28.8 28.8
LONG WELDED RAIL FORCE (TEMP LOAD) DERAILMENT LOAD (Refer Clause 8.13 of DBR)
As per Cl. No. 8.5.2 of DBR Reference :- APPENDIX-IX of IRS Bridge Rule
LWR force for both the track 1.05 T/m The derailment load for max axel load 25T = 9.4 T/m
LWR force on pier (Hl\L-long.) 35.7 Trans(HT)- 0.24 The derailment load for design axel load = 6.016 T/m
The length of the derailment line load / span to be considered as per IRS Bridge rule = 20 m Total Load per span
This load is acting on the edge of the structure I.e. eccentricity w.r.t centre line superstr 4.1 m 120.32 T
The effective eccentricit with respect to centre line of the pier (including eccentric Deck)= 4.1 m
Horizontal Force40% of One Coach Weight(T) = 25.6 acting at Rail Level (m) 321.103 OneSpan Loaded Both Span Loaded
Trans. M (T-m) due to ecc. (Same for Single / both) 6.016 x20 x 4.1 = 493.31 493.31
FORCES DUE TO CURVATURE AND ECCENTRICITY OF TRACK (Refer Clause 8.4 of DBR)
The Centrifugal Force is calculated on the basis of Clause 2.5 of IRS Bridge Rule. As the rails are fixed directly on RCC plinth, the eccentricity of rail track is
ignored. EUDL (W) has been calculated from the table given in Appendix-II for MBG, which is for 25 T axel Load. This is an conservative approach. As an
alternative, Reactions based calculations are detailed below in page 4A; which is more appropriate especially for multi tracks.
R= radius of Curvature (keep blank if curvature=0) 5000 m Calculation of EUDL (W) Left Span Right Span
V=Maximum speed (as per Tender Document) 80 Km/Hr EUDL for shear force (for MBG)= 9.97 9.97
W = Equivalent distributed live load = T/m Converted EUDL for MRT (T/m) 6.38 6.38
C = Horizontal effect in T/m = (W x V 2)/127R = T/m Horizontal effect C in T/m 0.06 0.06
Application of the centrifugal force above rail level [as mm Total Centrifugal Force (T) 2.19
1830
per IRS Bridge Rule, 1830mm for BG and 1450mm for MG] Acting at Level (m) 322.933
RACKING FORCE (Refer Clause 8.8 of DBR)
Horizontal Force due to racking in Transverse Direction =4.0 kN/m= 0.4 T/m, Per Track
Racking Force at Pier:-
1, For Both Span Both Track Loaded = 27.2 T,acting at 321.103 m
2, For Both Span Single Track Loaded = 13.6 T,acting at 321.103 m
1, For Single Span Both Track Loaded = 13.6 T,acting at 321.103 m
1, For Single Span Single Track Loaded = 6.8 T,acting at 321.103 m
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) Designed ByRJN Date:- 11-May-17
Location:- Pier Near TP-2 R-2 4
SEISMIC FORCES (As Per Cl.8.11 of DBR)
As Per IS: 1893 (Part 1) :2002, (Refer IRC-6-2000) Pier Stiffness = K=3EI/L^3 L= Ht. of Pier in m = 11.899
Seismic Zone II Equivalent Dia.In m = 2.2003394 I gross = 1.150611 m^4
Zone Factor Z 0.1 E conc.= 29500000 kN/m2 I crack= 0.80542781 m^4
Importance Factor 1.5 K= 42310 kN/m = 42.31 kN/mm =F
(Refer Modified Seismic Provisions for Cl. 222 of IRC:6-2010) Time period=T= 2 x Sqrt(D/(1000 x F))
Seismic Reduction Factor = 4 D= Dead load in kN = 8707 kN
Sa/g 2.5 T= 0.907 sec Soil Type = Soft
Design Horizontal Seismic Coefficient, a h = (Z I / 2R) X Sa / g Sa/g= 1.84
Therefore a h = 0.1 X 1.5 / (2 X 4) X 2.5 = 0.046875
Design Horizontal Seismic Coefficient, a h
0.046875
Design vertical Seismic Coefficient, a v=2/3x Ah
0.03125
Do you want to input diferent values other than default values (Yes=1/No=0) 0 for Superstructure Seismic Forces
Load / Longitudinal Direction Tranverse Direction Seismic
Description Weight (T) Vertical (+,-)
Force (T) Acting at(m) Force (T) Acting at(m)
Superstructure : Dead Load (DL) 527 24.703125 318.621 24.703125 319.795 16.47
DL
Superstructure : Dead Load (DL) , Launching Condition 794 37.207031 318.621 37.207031 319.795 24.80
Superstructure : Superimposed Dead Load (SIDL) 255 11.953125 318.621 11.953125 321.103 7.97
SIDL
Superstructure : SIDL , Launching Condition 0 0 318.621 0 321.103 0.00
Pedestal Substructure : Pier Cap 37 1.74 317.43 1.74 317.43 1.16
& PierCap Substructure : Pedestals 4.65 0.2180273 318.56184 0.2180273 318.561843 0.15
Substructure : Pier with respect to different section
at Different
Note-1: As per clause 2.12.6 of Bridge Rules:- Horizontal seismic force due to live load on the bridge shall be ignored when acting in
the direction of traffic but when acting in the direction perpendicular to traffic, this is to be considered for 50% of the design live load
without impact
Note-2:- As per 1.5.1.2 of the Design Basis Report of Tender Document, For calculating the stresses due to vertical effect of live load,
50% of the design live load will be considered at the time of earthquake.
Wind is Critical than Seismic, See wind force calculation
Calculation of Tranverse Moment due to Curvature.
Radius of curvature 5000
Eccentricity at centre Left Span Right Sp.
Span Length 34.00 34.00 eccentricity at mid span
Distance X 4999.971 4999.971 X
Eccentricity at centre 0.029 0.029 R
Average Ecc 0.014 0.014
Dead Load 263.50 263.50
SIDL 127.50 127.50
Transverse Moment
Due to Dead Load 3.81 3.81
Due to SIDL 1.84 1.84
Due to LL 0.85 0.85
Due to FFLL 0.13 0.13
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) Designed ByRJN Date:- 11-May-17
Location:- Pier Near TP-2
R-2 4A
FORCES DUE TO CURVATURE AND ECCENTRICITY OF TRACK (Refer Clause 8.4 of DBR)
Level of Section -1= 306.322 m Reference Section 1.00 FOR PILE FOUNDATION
LIVE LOAD
Longitudinal Forces
Description
Due to Eccentricity Due to Braking / Tractive Total ML
Both Span Both Track Loaded 33.42 683 716
Loaded Single Track Loaded 16.71 364 380
Single Span Both Track Loaded 135.63 698 833
Loaded Single Track Loaded 67.81 371 439
Remarks:-
Project:- NAGPUR METRO Revision No. Page No
STUP Consultants (P) Prepared By: RJN Date:- 11-May-17
Location:- Pier Near TP-2 R-2 16
(As per clause 5.13 of IRS Bridge Substructure and Foundation Code)
LF- Longitudinal force
GI 1.00DL + 1.2SIDL + 1.1LL + 1.1LF +1.1TF LWR is considered only for SLS condition
G II a 1.0DL(Launching) + 1.2 SIDL +1.0EQ (Long. & Vertical Up)
G II a' (i) 1.00DL + 1.2SIDL + 1.0LL + 1.0LF +1.0TF+1.0 LWR (Both Span Both Track)
G II a' (ii) 1.0DL + 1.2 SIDL + 1.0LL + 1.0LF +1.0 TF+1.0 LWR (Both Span Single Track)
G II a' (iii) 1.00DL + 1.2SIDL + 1.0LL + 1.0LF +1.0 TF+1.0 LWR (Single Span Both Track)
G II b (i) 1.00DL + 1.2SIDL + 1.00LL(50%) + 1.00LF/TF(50%) + 1.00EQ(Horizontal (Long.) & vertical downward)
G II b (ii) 1.00DL + 1.2SIDL + 1.0LL(50%) + 1.00LF/TF(50%) + 1.00EQ(Horizontal (Long.) & vertical upward)
G II b (iii) 1.00DL + 1.2SIDL + 1.00LL(50%) + 1.00LF/TF(50%) + 1.00EQ(Horizontal (Trans) & vertical downward)
G II b (iv) 1.00DL + 1.2SIDL + 1.00LL(50%) + 1.00LF/TF(50%) + 1.00EQ(Horizontal (Trans) & vertical upw Pile Group Eccentricity w.r,t Pier
GV 1.00DL + 1.2SIDL + 1.0LL+1.00/1.75 *Derail L Along X (Long)Direction (m) 0.053033
Comb-4b DL + SIDL + LL +Derail Load (Double Span Loaded) Along Y (Trans)Direction (m) 0.053033
0.13889
This load combinations are based on SLS condition 0.13889
LOAD COMBINATION LOADS ON PILE GROUP LOADS ON PILE
Index Description P (T) HL (T) HT (T) ML (Tm) MT (Tm) Pmax Pmin Lateral(H) Moment
Both Span Both Track Loaded 1478 61 32 976 635 593 146 17 0
Loaded Single Track loaded 1305 33 17 546 784 511 141 9 0
GI
Single Span Both Track Loaded 1326 61 17 1097 377 536 127 16 0
Loaded Single Track Loaded 1229 33 10 607 473 457 157 9 0
G II a Launching Case 1102 51 15 985 151 433 118 13 0
G II a' (i) LWR +Both Sapn Both Track 1447 91 30 1396 587 637 86 24 0
G II a' (ii) LWR +Both Sapn Single Track 1289 65 16 1005 723 562 82 17 0
G II a' (iii) LWR + Single Sapn Both Track 1309 91 16 1506 353 585 69 23 0
G II b (i) Both Span Both Track Loaded 1301 78 32 721 460 489 161 21 0
(Long Loaded Single Track loaded 1221 65 24 526 508 449 162 17 0
Seis, Vert Single Span Both Track Loaded 1231 78 24 776 325 461 155 21 0
down) Loaded Single Track Loaded 1186 65 20 553 357 423 170 17 0
G II b (ii) Both Span Both Track Loaded 1280 78 32 720 459 484 156 21 0
(Long Loaded Single Track loaded 1201 65 24 525 507 444 157 17 0
Seis, Vert Single Span Both Track Loaded 1211 78 24 775 324 455 150 21 0
up) Loaded Single Track Loaded 1167 65 20 552 356 418 166 17 0
G II b (iii) Both Span Both Track Loaded 1301 43 73 550 768 508 142 21 0
(Trans Loaded Single Track loaded 1221 30 62 355 767 461 149 17 0
Seis, Vert Single Span Both Track Loaded 1231 43 63 605 591 474 142 19 0
down) Loaded Single Track Loaded 1186 30 57 382 596 432 161 16 0
G II b (iv) Both Span Both Track Loaded 1280 43 73 549 767 503 137 21 0
(Trans Loaded Single Track loaded 1201 30 62 354 766 456 145 17 0
Seis, Vert Single Span Both Track Loaded 1211 43 63 604 590 469 137 19 0
up) Loaded Single Track Loaded 1167 30 57 381 595 427 156 16 0
Single Span Both Track Loaded 1377 55 15 1006 849 602 87 14 0
GV
Single Span Single Track Loaded 1289 30 8 561 937 530 114 8 0
Both Span Both Track Loaded 1447 91 30 1396 587 637 86 24 0
Normal
Loaded Single Track loaded 1289 65 16 1005 723 562 82 17 0
Case +
LWR Single Span Both Track Loaded 1309 91 16 1506 353 585 69 23 0
Loaded Single Track Loaded 1220 65 9 1060 440 513 97 16 0
NOTE:- Description Max P MaxTens Max H Max M
ML=ML(at top of pilecap)+HL*Ht. of Pile Cap Envelope of Maximum Forces 637.16 69.04 23.97 0
Depth of Pile Cap = 1.8 m Pmax - - 637 593
Pmin - - 86 146
Corresponding Forces
Lateral H 23.97 23.15 - 17
Moment at top of pile M 0.00 0.00 0 -
Load Case For:-
Maximum Load :- LWR Case : Both Span and Both Track Loaded
Minimum Load or Max Tension:- LWR Case : Single Span and Both Track Loaded
Maximum Horizontal Force:- LWR Case : Both Span and Both Track Loaded
Maximum Moment :- Normal Case : Both Span and Both Track Loaded
Pile Foundation Design Project NAGPUR METRO
STUP Consultants (P) Ltd. Based on Rivet Theory Designed by RJN Date 11-May-17
Developed By :- Amit Chakraborty Location Pier Near TP-2
Input For Pile:- Page= 19
Number of Columns are to be designed? 1 R-2 Diameter of Pile= 1200 mm Remarks:-
Number of Load Cases considered? 26 MaximumVertical = 7250 KN 1. Reactions of columns are to be copied from
Want to view detail results?(Y/N) Y Edge in m 0.15 Maximum Tension= -400 KN STAAD or other analysis software and pest at A21.
Manually also reactions can be given but those data
If Yes, Column Node No = 1 Maximum Horizontal= 300 KN
should follow the same format.
Spacing of Piles=
Print (Y/N)?N Y 0.225 Consider 2. For Single Pile & Double Piles, Moment in
To print detail 3.6 m piles are not shown.
Start Col Sl. No Edge Distance 150 mm Calculation Progress Counter
1 Mx Height of Pile cap in m Column Case PileFdn PileNo
End Col Sl. No X
Long. Consider 1 26 4 4
1 1.8 m Complete Direction:- Long
Mz
Max Number of Piles to be used in Fdn= 12 12 (upperlimit 12)Top of pile cap below GL in m
Minmum Number of Piles to be used in Fdn= 4 4 0.5
Percentage of increase in capacity (%)= 25.00% (In case of Seismic / Wind)
Trans OUT PUT
Column / Case No P(x), KN Z
P(y), KN P(z), KN Mx (KN-m) My(KN-m) Mz(KN-m) Seis / Wind No. Orientation Pmax (KN) Pmin(KN) H(KN Remarks
(Y/N)
1 Comb-1 610.45 14783.44 323.26 6351.64 0.00 9758.36 N 4 Long 6615.528 -132.0102 206.9478 OK
Comb-2 325.33 13048.20 173.66 7839.94 0.00 5462.60 N 4 Long 5805 -47 145 OK
Comb-3 610.45 13264.47 173.66 3768.95 0.00 10968.93 N 4 Long 6088 -201 185 OK
Comb-4 325.33 12288.72 98.86 4729.03 0.00 6067.88 N 4 Long 5342 119 132 OK
Comb-5 511.90 11022.85 153.57 1509.88 0.00 9852.07 Y 4 Long 3950 1088 122 OK
Comb-6 911.95 14467.94 296.30 5873.93 0.00 13959.12 N 4 Long 6994 -642 251 OK
Comb-7 652.75 12890.46 160.30 7226.93 0.00 10053.89 N 4 Long 6257 -565 189 OK
Comb-8 911.95 13087.06 160.30 3526.03 0.00 15059.64 N 4 Long 6514 -705 235 OK
Comb-9 783.87 13006.52 321.04 4603.49 0.00 7211.99 Y 4 Long 5054 690 206 OK
Comb-10 654.27 12210.39 241.95 5075.39 0.00 5258.98 Y 4 Long 4659 752 173 OK
Comb-11 783.87 12309.61 243.33 3250.43 0.00 7761.91 Y 4 Long 4793 678 198 OK
Comb-12 654.27 11861.93 203.09 3571.79 0.00 5533.94 Y 4 Long 4438 837 169 OK
Comb-13 783.87 12796.33 321.04 4592.34 0.00 7200.85 Y 4 Long 5006 648 206 OK
Comb-14 654.27 12014.99 241.95 5065.02 0.00 5248.62 Y 4 Long 4615 713 173 OK
Comb-15 783.87 12112.37 243.33 3239.97 0.00 7751.45 Y 4 Long 4748 638 198 OK
Comb-16 654.27 11673.00 203.09 3561.77 0.00 5523.92 Y 4 Long 4395 798 169 OK
Comb-17 429.39 13006.52 727.27 7677.23 0.00 5501.92 Y 4 Long 5216 528 221 OK
Comb-18 299.79 12210.39 622.30 7672.64 0.00 3548.91 Y 4 Long 4765 647 190 OK
Comb-19 429.39 12309.61 626.91 5907.07 0.00 6051.83 Y 4 Long 4907.9 562 203 OK
Comb-20 299.79 11861.93 572.12 5960.49 0.00 3823.86 Y 4 Long 4519 755 180 OK
Comb-21 429.39 12796.33 727.27 7666.08 0.00 5490.77 Y 4 Long 5169 485 221 OK
Comb-22 299.79 12014.99 622.30 7662.27 0.00 3538.54 Y 4 Long 4720 607 190 OK
Comb-23 429.39 12112.37 626.91 5896.61 0.00 6041.37 Y 4 Long 4863 522 203 OK
Comb-24 299.79 11673.00 572.12 5950.47 0.00 3813.84 Y 4 Long 4476 717 180 OK
Comb-25 554.95 13774.61 148.50 8492.56 0.00 10062.75 N 4 Long 6634 -481 145 OK
Comb-26 295.75 12887.56 80.50 9365.37 0.00 5607.26 N 4 Long 5955 -190 91 OK
Pile Foundation Design Project NAGPUR METRO
STUP Consultants (P) Ltd.
R-2
Based on Rivet Theory Designed by RJN Date 11-May-17 Page= 20
Developed By :- Amit Chakraborty Location Pier Near TP-2
Y
Detail Calculation:- For Column Node No. = 1 Parameters:- Enhanced Pile Capacity for Seismic / Wind
Diameter of Pile = 1200 mm Vertical Capacity of Pile= 9063 KN
Size of Pile Cap Vertical Capacity of Pile= 7250 KN Tension Capacity of Pile=(-ve value)
-500 KN
L in m = 5.10 B in m= 5.10 -400
Tension Capacity of Pile=(-ve value) KN Mx X Horizontal capacity = 375 KN
Depth of Pile Cap = 1.8 m Horizontal capacity = 300 KN Long.
Weight of Pile Cap= 1366 KN Spacing of Pile = 3.6 m Mz
Edge Distance of Pile Cap= 0.15 m
Orientation of Pile Group = Longitudinal
Reaction (Directly Taken From Analysis) Geometry of Pile Foundation
Seis / Trans Z
Column /
Case No P(x), KN P(y), KN P(z), KN Mx (KN-m)My(KN-m) Mz(KN-m) Wind Pile Fdn proposed with 4 Piles
Node No
(Y/N)
1 Comb-1 542 12967 626 15214 0 9077 N Co-ordinates
Comb-2 289 11517 502 16005 0 5063 N Pile No. X(m) Z(m) XCoeff Zcoeff Layout of Piles (NTS)
Comb-3 542 11774 502 12614 0 10028 N 1 1.80 1.80 0.14 0.14
-1.80 1.80
Comb-4 289 10920 441 13265 0 5539 N 2 -1.80 1.80 -0.139 0.139 1.80 1.80
Comb-5 468 10076 140 1962 0 8342 Y 3 -1.80 -1.80 -0.14 -0.14
Comb-6 787 12703 623 14876 0 12615 N 4 1.80 -1.80 0.14 -0.14
Comb-7 556 11385 511 15594 0 8966 N Z X Axis
Comb-8 787 11618 511 12512 0 13480 N
Comb-9 699 11488 439 9468 0 6242 Y
Comb-10 583 10823 373 9650 0 4417 Y
Comb-11 699 10941 375 8140 0 6674 Y
-1.80 1.80
Comb-12 583 10549 342 8332 0 4633 Y
Z Axis
-1.80 -1.80
Comb-13 699 11308 439 9458 0 6232 Y
Comb-14 583 10655 373 9641 0 4408 Y
Comb-15 699 10771 375 8131 0 6665 Y X
Comb-16 583 10387 342 8323 0 4624 Y
Comb-17 382 11488 798 11911 0 4968 Y
Comb-18 267 10823 712 11680 0 3143 Y (Pile Cap as shown is schematic only)
Comb-19 382 10941 717 10243 0 5400 Y 12.96 12.96 PileCap Dimension:-
Comb-20 267 10549 671 10192 0 3359 Y X^2 Z^2 Length Lx in m = 5.10 m
Comb-21 382 11308 798 11901 0 4959 Y Length Lz in m = 5.10 m
Comb-22 267 10655 712 11671 0 3135 Y Xcoeff= X / X^2,
Zcoeff= Z / ^2
Comb-23 382 10771 717 10234 0 5391 Y
Comb-24 267 10387 671 10184 0 3351 Y Load in Pile = P=(Py+Wt of Pile Cap)/ (No. of Piles)+Mx . Z Coeff of Pile + Mz . X Coeff of the Pile
Comb-25 493 12306 309 16409 0 9202 N Percentage of increase in Pile Capa for Wind / seismic Case =25.00%
Comb-26 262 11530 253 17001 0 5120 N
Load Cases
Pile No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 6616 5805 6088 5342 3950 6994 6257 6514 5054 4659 4793 4438 5006 4615 4748 4395 5216 4765 4908 4519 5169 4720 4863 4476 6634 5955
2 4094 4399 3302 3803 1633 3490 3767 2770 3320 3433 2939 3151 3275 3391 2896 3110 3836 3891 3408 3586 3791 3850 3365 3546 4078 4533
3 -132 -47 -201 119 1088 -642 -565 -705 690 752 678 837 648 713 638 798 528 647 562 755 485 607 522 717 -481 -190
4 2389 1360 2584 1657 3405 2862 1926 3039 2424 1979 2531 2124 2379 1937 2489 2083 1908 1520 2063 1688 1863 1478 2020 1648 2075 1232
P(Max) 6616 5805 6088 5342 3950 6994 6257 6514 5054 4659 4793 4438 5006 4615 4748 4395 5216 4765 4908 4519 5169 4720 4863 4476 6634 5955
P(Min) -132 -47 -201 119 1088 -642 -565 -705 690 752 678 837 648 713 638 798 528 647 562 755 485 607 522 717 -481 -190
H(Max) 207 145 185 132 122 251 189 235 206 173 198 169 206 173 198 169 221 190 203 180 221 190 203 180 145 91
Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK
P(Max) 1734 1579 1601 1479 1675 1770 1629 1649 1765 1687 1698 1638 1743 1666 1677 1618 1809 1716 1730 1661 1786.76 1694.48 1708.43 1640.15 1734.45 1623.33
P(Min) 981 936 949 953 667 909 867 879 772 758 763 768 748 735 739 745 728 729 731 746 703.404 705.968 707.852 723.352 885.371 889.122
H(Max) 32 17 29 15 101 46 33 44 114 108 113 107 114 108 113 107 118 109 112 106 118.056 109.208 111.824 106.057 25.8918 13.8953
Remarks OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK