Você está na página 1de 2

UiTM/FSKM/CS/ITS411/F2

ITS411 Faculty of Computer and Mathematical


Sciences
F2 SYSTEM REQUIREMENT OUTLINE
FORM
ReportGuideline

CoverPage[PleaseusethelatestformatprovidedandcoverpageshouldbeinYELLOWcolor]

Pleaseusetheproposaloutlineformonly.Proposalsubmittedwithoutusingtheoutlineprovidedwillberejected.
PleaseuseChapter2andChapter4ofSystemsAnalysisandDesignasreference

Duedate:20thApril2017before4pm

SCOR
CRITERIA DESCRIPTION E
1-10
SYSTEM ANALYSIS

UNDERSTAND
THE PROBLEM [Please state the problem of the current system or any new
AND opportunity that could be created based on current situation]
OPPORTUNITY

[Define the specific boundaries of the project together with users of


DEFINE PROJECT
the system and where to use the system]
SCOPE AND
CONSTRAINTS
[List out any possible constraint in developing the system]

[Gather data from the stakeholder of the system especially on the


PERFORM FACT- current business process that has been practiced in the organization
FINDING which can be used in the system that will be developed in order to
transform data into information]

EVALUATE [List out the feasibility study - Operational, Technical, Economic and
FEASIBILITY Schedule]

SYSTEM REQUIREMENT

[List out any possible input for your system based on the entity that
INPUT
you have identified]
OUTPUT [List out any possible output that your system will be producing]

PROCESS [List out all process involved in your system]


[List out all possible performance that you plan to have in your
PERFORMANCE
system]
CONTROL [List out the way to control your system performance and security]
Overall
Comments

Lecturer Name MDM SITI SALBIAH Signatu Dat


UiTM/FSKM/CS/ITS411/F2
HAMZAH re e

Você também pode gostar