ACKNOWLEDGEMENT

I would like to thank Mr. Y.P. Kajale, Vice President, B G Shirke Construction Technology Pvt.
Ltd. for providing me with an opportunity to carry out the project. I am indebted to Mr. Nikam,
Manager, for having faith in me and allowing me to work on real time project of the company
and for providing constant support throughout the work. I am also grateful to Mr. M K
Hamirwasia, PS-II Instructor who has been a constant source of valuable guidance.

My special thanks to Ms. Pranita, Mrs. Kartiki, Mr. Sharique, Mr. Sunil, Mr. Sachin and all other
BGSCTPL Staff for their kind help throughout the course of my work at the company.
INDEX

Page
Chapter No. Content
No.
1 INTRODUCTION 1
2 OVERVIEW OF THE 3-S SYSTEM 3
2.1 Highlights of '3-s' system 3
2.2 The jointing system and its effectiveness 3
2.1.1 Column to Beam joint 4
2.2.2 Beam to Slab joint 5
2.2.3. Jointing of Staircase 5
2.3 Autoclaved cellular concrete 6
2.3.1 Siporex Slabs 7
2.3.2 Anti-corrosive Treatment 7
3 PROJECT DETAILS 9
LIST OF FIGURES

Figure Page
No. Title No.
2.1 Column to Beam joint 4
2.2 Beam to Slab joint 5
2.3 Jointing of Staircase 5
2.4 Detailing of 3-S beam 6
2.5 Typical 3-S framed structure 8
3.1 Typical floor plan 9
3.2 Structural Framing Plan 10
3.3 Centerline plan 10
3.4 Beam loading calculation 11
3.4 Planwin model 12
3.5 Analysis results 12
3.6 ETABS model 13