FORM OF PRELIMINARY ESTIMATE

PLEASE MAKE THE PRICED BILL OF QUANTITIES BY THE FOLLOWING TABLE AND FILL UP
ALL BLANK SPACES IN THIS PRELIMINARY ESTIMATE.

CONSTRUCTION COST TOTAL

1-1 ARCHITECTURAL WORK SUB TOTAL


1-1-1 PRELIMINARY WORK

1-1-2 EXCAVATIONS

1-1-3 PILE AND HARD CORE

1-1-4 CONCRETE

1-1-5 CONCRETE FORM


1-1-6 STEEL REINFORCEMENT
1-1-7 STRUCTURAL STEEL

1-1-8 CONCRETE BLOCK & BRICK

1-1-9 WATERPROOFING

1-1-10 MASONRY
1-1-11 TILE WORK

1-1-12 CARPENTRY

1-1-13 ROOFING

1-1-14 METAL
1-1-15 PLASTER AND CEMENT MORTAR

1-1-16 METAL SASH AND DOOR


1-1-17 TIMBER SASH AND DOOR

1-1-18 GLASS AND GLAZING

1-1-19 PAINTING

1-1-20 INTERIOR AND EXTERIOR FINISH

1-1-21 MISCELLANEOUS
1-2 AIR-CONDITIONING AND VENTILATING WORK SUB TOTAL
1-2-1 AIR-CONDITIONING

1-2-2 MECHANICAL VENTILATION

1-2-3 BASEMENT FRESH AIR AND EXHAUST AIR

1-2-4 STAIRCASE PRESSURRIZATION AND SMOKE


1-3 PLUMBING WORK SUB TOTAL

1-3-1 WATER SUPPLY


1-3-2 HOT WATER SUPPLY
1-3-3 SWIMMING POOL WATER FILTRATION

1-3-4 PUMPS AND TANKS


1-3-5 DRAINGE WATER

1-3-6 STORM WATER


1-3-7 WASTE WATER TREATMENT
1-3-8 FIRE FIGHTING AND FIRE PROTECTION

1-4 ELECTRICAL WORK SUB TOTAL

1-4-1 POWAER SUPPLY


1-4-2 GROUNDING (EARTHING) WORK
1-4-3 SWITCHBOARD AND CABINETS

1-4-4 ENGINE GENERATOR


1-4-5 LIGHTNG FIXTURES
1-4-6 LIGHTNING PROTECTION

1-4-7 PUBLIC ADDRESS

1-4-8 CCTV
1-4-9 TELEPHON AND DATA CABLING

1-4-10 CATV
1-4-11 SECURITY ACCESS CONTROL

1-4-12 PARKING SECURITY GATE CONTROL

1-4-13 VIDEO DOOR PHONE

1-4-14 FIRE ALARM

1-5 ELEVATOR WORK SUB TOTAL


1-5-1 ELEVATOR
COMMON TEMPORARY CONSTRUCTION
COST
SITE OVERHEAD COST

ADOMINISTRATIV EXPENSE

GUROUND TOTAL