0.

4
Add 0.15
Add 0.075
4 0.625 2.5 starter bars

0.699 0.599
Ddt 0.1 (cover 0.25*2sides)
0.599 (horizonal in stirrup)

1.2
Ddt 0.1 (cover 0.25*2sides)
2 1.1 2.2 (vertical in stirrups) 1.1m

0.599
Add 2.2
Add 0.5 ( .25*2overlaps)
3.299 Total length' 0.25m

1.199
Ddt 0.1 (cover 0.25*2sides)
1.099 (bottom rebar)

0.3
Ddt 0.1 (cover 0.25*2sides)
2 0.2 0.4 (vertical bars

1.099
0.4
1.499 Total length' 0.2
1.099m

1.062
Ddt 0.1 (cover 0.25*2sides)
0.962 (horizonal in stirrup)
0.962m
1.2
Ddt 0.1 (cover 0.25*2sides)
2 1.1 2.2 (vertical in stirrups)
1.1m
0.962
Add 2.2
Add 0.5 ( .25*2overlaps)
3.662 Total length' 0.25m

1.562
Ddt 0.1 (cover 0.25*2sides)
1.462 (bottom rebar)

0.3
Ddt 0.1 (cover 0.25*2sides)
2 0.2 0.4 (vertical bars

1.462
0.4
1.862 Total length' 0.2
1.462

Rings
consider stirrup key to be 0.95xdiameter
0.962m
0.699
Ddt 0.1 (cover 0.25*2sides)
2 0.599 1.198

1.062
0.1 (cover 0.25*2sides)
2 0.962 1.924

1.198
1.924
0.1 (Stirrup key) 9.5
3.222 0.095
Takeoff Summary
No. Length Total
6 3.299 19.794 (Top U bars) 6T16.03@200
4 3.662 14.648 (Top U bars) 4T16.03@200
8 1.499 11.992 (Bottom U bars 8T16.01@200B2
6 1.862 11.172 (Bottom U bars 6T16.02@200B1
5 3.222 16.11 (Stirrups) 5T10.04@200B2
4 0.625 2.5 (Starter Bars)

Concrete C30 General list steel


Reinfocement : Yield 460
Concrete cover: 50 No. Type
Overlapping 50Diameter
1T
Bar Bending Table 2T
Diameter 10 16 3T
Frame Stirrup 3T
Yield 460 Anchorages 100 150 4T
5T

Matrials Schedule
Item Unit
T16 6m
T10 6m

BOQ
Item Unit
T16 Kg
T10 Kg
0.599
General list steel
Bar Bending Schedule
Number Unit Length BS Code Shape Total LengIndex
Per Element Of Elements Total
16 8 1 8 1.499 11.992
16 6 1 6 1.862 11.172
16 4 1 4 3.662 14.648
16 6 1 6 1.499 8.994
10 5 1 5 3.222 16.11
16 4 1 4 0.625 2.5

metres
Matrials Schedule Total T16 49.306
Qty Rate Amount 8.21766667 Total T10 16.11
9
3 77.91565
9.944444

Qty Rate Amount 1


78
10