Você está na página 1de 15

Woh Hup (Pte) Ltd

BCA CEA Project Data

A. Project Brief

1 Name of Project

2 Category of Building

3 Project Brief Description

4 Total no. of Block / Storey

5 Total no. of Units

6 Scope of Works

7 BP No.

8 Factory No.

9 Commencement Date

10 TOP Date

11 Original Contracts Period (Months)

12 Actual Overall Construction Period


(Months)

13 Extension of Time (Months) If Any

14 And Delay with Liquidated Damages


(Days)
15 Reasons for early or late completion

16 Contractual Sum (S$)

17 GFA (sq m)

Page 1 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

B. Project Team

1 Name of Client Name of Company


Name of Contact Person
Designation of Contact Person
Tel
Fax
E-Mail Address
Postal Address
2 Principal Consultant (Architect)
Name of Company
Name of Contact Person
Designation of Contact Person
Tel
Fax
E-Mail Address
Postal Address
3 Structural Consultant
Name of Company
Name of Contact Person
Designation of Contact Person
Tel
Fax
E-Mail Address
Postal Address
4 M&E Consultant
Name of Company
Name of Contact Person
Designation of Contact Person
Tel
Fax
E-Mail Address
Postal Address
Page 2 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

B. Project Team

5 Quantity Surveyor
Name of Company
Name of Contact Person
Designation of Contact Person
Tel
Fax
E-Mail Address
Postal Address
6 Landscape Consultant
Name of Company
Name of Contact Person
Designation of Contact Person
Tel
Fax
E-Mail Address
Postal Address

C. Project Duration
1 1
C Project Duration Piling Basement Superstructure
1 Total duration (Nos. of month)

2 From (month and year)

3 To (month and year)

NOTE 1
The duration of the works shall include the completion of architectural and M&E works.

Page 3 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

D. Actual Construction Cost

D Actual Construction Cost Piling (S$) Basement (S$) Superstructure (S$)


1 Architectural Works NA

2 Structural Works (including Pre-cast)

3 M&E Works NA

4 External Works NA NA

5 Preliminaries

6 Total Cost (S$)

7 2
Grand Total Construction Cost (S$)

NOTE 2
The actual construction cost refers to building cost which includes cost of foundations, structural, architectural, mechanical & electrical
works, fixtures & fittings and related external works & facilities. Development charges, consultancy fees & other government charges are to
be excluded.

Pre-cast Elements Where Applicable


1 Total concrete volume for all RC works (m3)

2 Total concrete volume for Pre-cast Elements (m3)

3 Total cost of Pre-cast Elements (S$)

Page 4 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

E. Constructed Floor Area

E Constructed Area (in m2) sq m


1 3 Basement
3
2 Environmental Deck (if any)
3
3 Superstructure
3
4 Others (please specify)

5 Total Constructed Floor Area (TCA)

Note 3
The Total Constructed Area (TCA) refers to the total constructed structural floor area used in the buildability score calculation
worksheets. It should include the basement, environmental deck, superstructure, roof and/or other areas used in the calculation.

Page 5 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

F. Manpower

F1 Basement works Including site precast Excluding site precast (Man-days would be the
same if there is no site precasting)
1 Site Management Team (Mandays)

2 Structural Works (Mandays)

3 Architectural Works (Mandays)

4 Building Services Works (Mandays)


4
5 Total Mandays used for Basement Works

F2 Superstructure works Including site precast Excluding site precast (Man-days would be the
same if there is no site precasting)
1 Site Management Team (Mandays)

2 Structural Works (Mandays)

3 Architectural Works (Mandays)

4 Building Services Works (Mandays)


4
5 Total Mandays used for Superstructure
Works
F3 Total Mandays used for External Site Works NA

F4 Grand Total Mandays used


Note 4
One Manday = 8 working hours (do not include time taken for tea/meal breaks). Manday reported must include OVERTIME. For
example, if a worker works 10 hours per day for 16 days, the manpower should be reported as (10x16)/8 = 20 Mandays.
Page 6 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

G. Cycle Time Per Typical Floor

G Cycle Time Per Typical Floor Days


1 Maximum cycle time per typical floor

2 Minimum cycle time per typical floor

3 Average cycle time per typical floor

4 Typical floor area (sq m) sq m

H. Productivity Performance

H Performance
1 Total Manday used
(as stated in F4 including site precast)
2 Total Constructed Floor Area (as stated in E5)

3 Productivity (Mandays / sq m) Item 1/item 2

4 Actual Construction Cost (as stated in D7)

5 Cost per Constructed Floor Area Item 4/item 2

6 MYE Entitlement For The Project

7 MYE Actual Usage

8 Project Final Buildablitity Score

Page 7 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

I. EHS Performance

I EHS Performance
1 Number of Fatal Accidents

2 No. of Stop Work Orders Issued by MOM

3 No. of Demerit Points Issued by MOM

4 Total Amount of Fine (S$) Issued by MOM

5 Project Accident Frequency Rate (AFR)

6 Project Accident Severity Rate (ASR)

7 MOM ASAP Awards

8 MOM SIT Awards

9 No. of Stop Work Orders Issued by NEA

10 Total Amount of Fine (S$) Issued by NEA

11 Other EHS Awards

Page 8 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

J. EHS Management Programme Implemented

J EHS aspects, hazards & risks Identified Control & Measures Taken For Each Item
1

NOTE : To include provision for diversion of services and effectiveness in diversion of vehicular & pedestrian flow to minimize
inconvenience to public.
BCA CEA Project Data
Page 9 of 15
Woh Hup (Pte) Ltd

K. Construction Quality

K Quality Management Programme Implemented For


1 Civil & Structural Work

2 Architectural Finishes

3 External Walls

4 External Works

5 Restoration / Make-good to existing structures

6 Complaints from House Owners on standard of workmanship

7 Good Construction Practices Adopted

8 BCA CONQUAS 21 Score =

9 BCA QM Assessment Passing Rate (1st Assessment) = %

Page 10 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

L. Site Constraints / Complexity

L Site Constraints such as difficult terrain, ground conditions, presence of existing underground services, proimity to
sensitive areas, interface with other adjoining projects etc.
1

Page 11 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

M. Technical Constraints / Complexity

M Technical Constraints such as special trades, technical problems arising from design or Clients requirements.

Page 12 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

N. Technical Constraints / Complexity

N Technical Constraints such as special trades, technical problems arising from design or Clients requirements.

Page 13 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

O. Alternative Design &/or Products

O Alternative design &/or products proposed by the Contractor which improve cost effective, buildability, Quality and life
cycle serviceability
1

Page 14 of 15
Woh Hup (Pte) Ltd
BCA CEA Project Data

P. Innovation

P Contractors innovative use of technology, processes &/or special construction methods which improve productivity,
quality, performance and time
1

Page 15 of 15

Você também pode gostar