Você está na página 1de 1

Notes

1. The copyright of this drawing belongs to Adrian L. Norman Limited.


17 16 15 14 13 12 11 10 2. Do not scale off this drawing.
3. All dimensions are in millimetres unless otherwise stated.
4. This drawings to be read in conjunction with all relevant architectural, civil/structural,
S.S DIVIDER and services engineer's drawings and specifications.
5. Should there be discrepancy between English and Chinese notes, the English note
shall be taken as correct. This design and drawing are the exclusive property of ALN
F21 F22
Limited. They cannot be used or reported without the written consent of ALN Limited.

F21 F20

F21
MATERIAL FINISHES CODE LEGEND
F1 F1
CODE DESCRIPTION
F16 F22
F1 AGGREGATE- MID GREY
F22
F2 AGGREGATE - DARK GREY
F17 PA F3 GRANITE - RUSTIC YELLOW, FLAMED FINISH

F18 RAMP UP G F4 GRANITE - GOLDEN YELLOW, LYCHEE FINISH

PA F5 GRANITE - NERO PEPPERINO, FLAMED FINISH


CHANGING ROOM

P
RAMP U
FEMALE

OUTDOOR F1
SHOWER PA F6 GRANITE - ABSOLUTE BLACK, LYCHEE FINISH
PA
F18 PA F1 F7 GRANITE - GREEN CLASSICO, FLAMED FINISH
PA F8 GRANITE - NERO PEPPERINO - LYCHEE FINISH

RA
F21 F1

MP
F9 GRANITE - FORESTA GREEN, FLAMED FINISH

UP
F21 PA F21 F10 GRANITE - BLACK PEARL, HONED FINISH
ARTIFICIAL LAWN
MAKE-UP

F1 F24 F11 GRANITE - BLACK PEARL, FLAMED FINISH


AREA

DRY DECK
F12 GRANITE - BLACK PEARL, LYCHEE FINISH
F19 4R UP S.S DIVIDER
F13 GRANITE - RUSTIC YELLOW, LYCHEE FINISH
WET DECK
PA P UP F16
RAM F14 GRANITE - RUSTIC YELLOW, SAND BRUSHED FINISH
PA F17 F15 GRANITE - GREEN CLASSICO, LYCHEE FINISH
F1
F18
HANDICAP
TOILET

F16 HOMOGENOUS TILE - IVORY, SLIGHTLY TEXTURED FINISH


3R UP PA F21
F17 HOMOGENOUS TILE - BLACK, SLIGHTLY TEXTURED FINISH

PA
H F18 HOMOGENOUS TILE - GREY, SLIGHTLY TEXTURED FINISH
JANITOR

F22 F19 HOMOGENOUS TILE - DARK OAK, TEXTURED FINISH


6R UP
F1 F20 WASHED RIVER PEBBLES - WHITE, SMOOTH FINISH
F18 PA
JACUZZI F21 GRANITE - ROYAL GREY, FLAMED FINISH
PA
F22 F22 POOL MOSAIC TILES - BLUE TONE MIX, TRANSLUCENT

F1 F23 POOL ACCENT MOSAIC TILES - MIX, TRANSLUCENT


F21
F24 ARTIFICIAL LAWN

J F25 HOMOGENOUS TILE - DRAGON GREY, GRIP FINISH


F18 F26 HOMOGENOUS TILE - DRAGON GREEN, GRIP FINISH
F27 HOMOGENOUS TILE - DRAGON BLACK, GRIP FINISH
MALE CHANGING

F21
ROOM

OUTDOOR 3R UP
F28 HOMOGENOUS TILE - DAKOTA, RADIALE FINISH
F22 SHOWER
F29 HOMOGENOUS TILE - DAKOTA, DOGATA FINISH
4R UP
F1 F30 GRANITE - ABSOLUTE BLACK, FLAMED FINISH

PA F31 GRANITE - ABSOLUTE BLACK, HONED FINISH


F1
HANDICAP

PA
TOILET

F32 POOL MOSAIC TILES - MIX 1, TRANSLUCENT


F21
10R UP K F33 POOL MOSAIC TILES - MIX 12, TRANSLUCENT
7R UP
F1 F34 WASHED AGGREGATE - LIGHT BEIGE
MODEL'S CHANGING ROOM

F22 F35 WASHED AGGREGATE - SANDY BEIGE


F1
F36 POOL MOSAIC TILES 2 - BLUE TONE MIX, TRANSLUCENT
F22 F23
PA -
PLANTING AREA LA LAWN AREA
F1 WET DECK MOBILE DJ
F22 TO BE DESIGNED
L SETTING OUT POINT (PATTERN LAID OUT AS SHOWN)
PA
STAGE F19 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19A 19 18 17 16 15 14 13 12

F1 S.S DIVIDER A1

7R UP
TOWEL BIN TRASH BIN

A2

F1
M-SE3

PANTRY

ASIAN LIVE COOKING


DW DW
UP UP

M-SE4
B1

TOILET
DN DN
H-SE3

WESTERN LIVE COOKING


B2
WALK IN CHILLER

MASSAGE

BATHROOM

80L
WALK IN FREEZER

VESTIBULE
C1
SALAMANDER

80L
BEDROOM

WALK-IN
CLOSET

100L
POT
WASHING

100L
D1

F1
STAGE
STAGE
M-SE1 M-SE2 SALAMANDER

H-PE6

WALK-IN
CLOSET
HOT COOKING

OFFICE
UP
DN DN UP

WARMING CABINET
BEDROOM
F20

VESTIBULE
BAIN MARIE

M-PE4 M-PE5 M-PE6


UP
DN

BATHROOM

Coffee Brewer
Hot Tea Juice Disp.

MASSAGE
F1

TOILET
M-PE3 M-PE2 M-PE1

L3 UP TO L3-MEZZ
BAR

PANTRY
G1

F22
PA
FROM L3-MEZZ DOWN TO L3
RAMP UP
TOWEL BIN TRASH BIN

F&B AREA

CHANGING ROOM
TOWEL BIN TRASH BIN

PA
RAMP UP

FEMALE
OUTDOOR
PA
SHOWER PA

PANTRY
L3 DOWN TO L2-MEZZ

PA
PA

RAM
P
G2

UP
PA
M-PE 8 ARTIFICIAL LAWN

MAKE-UP
AREA
FROM L2-MEZZ UP TO L3
DRY DECK

TOILET
4R UP

F1
WET DECK UP
PA

G3
RAMP
PA

HANDICAP
TOILET
3R UP PA

MASSAGE
PA

JANITOR
BATHROOM
6R UP

H1 PA
JACUZZI
PA

VESTIBULE
DN UP UP DW

BEDROOM
UP

WALK-IN
CLOSET
J1 M-SE5 M-SE6

MALE CHANGING
DN

ROOM
M-PE9 M-PE10 DW
OUTDOOR 3R UP
SHOWER

4R UP
UP

J2
PA

HANDICAP
PA

TOILET
10R UP
7R UP

MODEL'S CHANGING ROOM


L PA
WET DECK

STAGE
MOBILE DJ
TO BE DESIGNED L
7R UP
PICK-UP POINT
LOW HEIGHT WALL

M M

HEATED CABINET

HEATED CABINET
ICU

M
HOT PRODUCTION

FEMALE TOILET AND


DISPENSE BAR

CHANGING ROOM
DN
PA

7R UP
UP
UP

N N
FREEZER
PA

CHILLER

35 34 33 32 31 30 29 28 27 26 25 24 23 PA

MALE TOILET AND CHANGING

ICU
PA 6R UP

ROOM
P POTWASH
P

ICU
STEWARDING
PA STORE
WET DECK PA
PA
DISHWASH
DROP-OFF
BAR
ARTIFICIAL LAWN

F1
FIXED LID

CHILDREN'S POOL PLAY AREA

PA

PA 8R UP 8R UP
PA

Q DN OUTDOOR
SHOWER Q
MOVABLE MOVABLE
UP UP REGISTRATION REGISTRATION
FEMALE TOILET AND

DESK DESK
CHANGING ROOM

R
NURSING NAP AREA
ST 18S SINGLE ROOM
TOILET & BATH
TREATMENT
PRIVATE RM.
SLOP
S-SE3

R ROOM SINGLE TREATMENT SINGLE TREATMENT SINK

ROOM ROOM

BEAUTY SALON

S-PE 7 S-SE2
S

PORTABLE TABLE
SINGLE
TREATMENT
ROOM PANTRY

UP

DN UP DN
RECEPTION S-PE 6 S-SE1
MANAGER'S/ TOILET
CONSULTATION
SINGLE TREATMENT
ROOM ICU

T DOUBLE TREATMENT
ROOM MASSEUSE
SLOP
SINK
DN

T
TOILET & BATH REST AREA WAITING LOUNGE
PREPARATION UP
E G A R O T S AREA
SCOTSMAN-
SELF CONTAINED
AC 126
ICE
ASMACHINE

F1 PA V
S-PE5
V

S
DN UP
S-PE1 S-PE4

UP

S-PE2 S-PE3

W W

F1
22 21 20 19A 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

7R UP
Rev Date Description Drw Chk App

PA N
F1 F20
YELLOW
F1

F1
PA
30-11-2016 FCD ISSUE KL RL AN
MALE TOILET AND CHANGING

F21 F1
PA 6R UP LANDSCAPE MASTERPLANNING URBAN DESIGN
F21
ROOM

F17 P
F17
F20 PA F21

F1 WET DECK PA F1
PA
F21
Unit C, 6/F, Shaw House, Lot 220, Clear Water
F1 Bay Road, Kowloon, Hong Kong
BAR S.S DIVIDER
F1 ARTIFICIAL LAWN C
T: 852 2358 2280 F: 852 2358 2281
F1 E: adrian@aln.com.hk
F24
FIXED LID

CHILDREN'S POOL PLAY AREA


F1 Designed by AN
Drawn by KL
PA F1
F1 Checked by RL
F21 F21
PA Approved by ALN
8R UP 8R UP F21
PA Issued by
F18
Project Title
DN OUTDOOR
SHOWER
Q PROPOSED LANDSCAPE DEVELOPMENT FOR
NEWPORT PROJECT PHASE 3, NEWPORT BOULEVARD
NEWPORT CITY, VILLAMOR, PASAY CITY, PHILIPPINES

UP UP
F21 Drawing Title
MATERIAL FINISHES PLAN
3F SHARED POOL

F21
Scale AS SHOWN
F22 Job No. Stage Drawing No. Rev.
MATERIAL FINISHES PLAN - 3F SHARED POOL A660 WD LP 4.09
A SCALE 1: 100@A1 / 1: 200@A3
F22
Cad Ref. Sheet Size
F22 W:Projects\A660\WD\ LP 4.09 A1

Você também pode gostar