PROPOSAL
Gholhak Station
Site ID: T0434Z
DESIGN
IN BUILDING SOLUTION
PROPOSAL
Table of Contents
Chapter 1 Site summary .................................................................................. 3
Latitude: 35.70736N
Gholhak station offers 2 main entrance for passenger both of them are Shariati street .
Chapter 2 Requirement
2.1 In Building Solution Criteria
z Downlink RX level should be above -85dBm within 95% of the total areas of the station.
z The distributed antenna system will be a passive system.
The DAS cells size is to be dimensioned so that it will be possible to serve the users need of
capacity, with the assumption that GSM in building user generates a traffic based on Irancells figure
of 25m Erlang.
The DAS should support all technologies up to 2.4GHz (including 1800MHz, 2100MHz). All
components in the DAS, such as antennas, splitters, couplers, etc, should be specified for the
mentioned frequency bands.
z The system design aims to minimize uncontrolled or unwanted RF leakage from the site coverage
system to the outdoor environment.
z According to MTNs request, the components in the IBS consist of coaxial RF cables, power
splitters, couplers, Omni antennas. All of passive components are wide-band (800 MHz up to 2500
MHz)
z Detail configuration per site should be negotiated between Irancell and ICI.
3.1.2.1 Downlink:
The downlink coverage problems always happen in this stationbecause the large penetration loss from
outside to metro inside area. Generally base on the experience , we assume the coverage area of one
antenna in 20m radius, the space path loss formula which according the ITU.R.P.1238 for Rx Level
calculation is as below:
N 28 30 22
L(m) 8 10 10
Base on the table above and our experience, N=30 and L (m) =10 is appropriate here, for the same floor,
the final formula for RX lever calculation is as below.
Ls= -28+20lg (900M) +30log (d) + Lf (0) +Lm
Then when we get 16dBm input for antenna, the antenna gain (Ga) is 3 dBi; Loss of human body (Lh) is
3 dB. The Rx Level at the edge of the 20m radius coverage area will be:
Ls= -28+20lg (900) +30log (20) +10= 80.11dB
RxLevel=Pa+Ga Ls =16+3-80.11=-61.11dBm
The total loss =BTS outpower -Rxlevel=31-(-61.11) =92.11dB
Base on the calculation above, the edge Rx Level in floors, Transfer Passageway which include in the
95% coverage areas can satisfy the requirement.
3.1.2.2 Uplink:
The frequency difference between uplink and downlink only 45 MHz, the total
Link loss of uplink can be considered same as the loss of downlink.
system
NO Parameters Unit
DCS 1800
1 Tx power of Handset dBm 30
2 Base station receiver sensitivity dBm -113
3 Total Loss (base on the downlink Loss) dBm 92.11
4 The received power at base station dBm -62.11
Base on this table, and calculate with the path loss, the received power (for Handset TX Power) at the
base station will satisfy the minimal requirement of the base station receiver sensitivity it. It also will
satisfy the principle of the balance of UP Link and Down Link.
150 120 90 50 54 25
Head
Total Call (ERL)(passengers both
space for
in Train and in platform Number of TRX
Traffic
(with consideration Headspace )
(85%)
(54+585)*0.025=15.979 18.794 4
100 40 90 50 18 25
Head
Total Call (ERL)( passengers space for
Number of TRX
in ticket hall) Traffic
(85%)
18*0.025=0.45 0.53 2
According to the table above , it is proposed to deploy 1 GSM900 RRU with 4TRX for the coverage of
the platforms and the tunnels connected to next station or station before.
There should be 1 RRU900 with 2 TRX for the coverage of the ticket hall and the passenger ways.
Because the tunnel is not straight , to avoid the weak coverage in tunnel ,we plan to fix 1 RRU with 2
TRX in tunnel just for enhance the coverage.
BTS configuration is S4(platform) ,S2(Ticket )and S2(Tunnel), both of them are 900MHz .
3.2 Solution
Coverage shall be in accordance with the recommendation provided by MTN. The proposed IBS for
Gholhak Station consists of 4 pcs of omni antennas and 10 pcs of panel antennas. We mainly use omni
antennas to cover the open area like ticket hall, and cover the tunnel with the panel antennas.
3.2.1 BTS
The BTS locates in the Technical room. Base on the request of the irancell, we design 1 set of 900M BTS
with 2 TRX for ticket hall, 1 set of 900M BTS with 4 TRX for platform and train and 1 set of 900M BTS
with 2 TRX in the middle of Tunnel. According to the configurations of BTS and the structure of
Gholhak Station, we set the area of coverage as below:
BTS 900: ticket hall covered with 1 set Huawei BTS with 2 TRX
BTS 900: platform and tunnel covered with 1 set Huawei BTS with 4 TRX
BTS 900: Middle of tunnel covered with 1 set Huawei BTS with 2 TRX
3.2.2 Transmission
Through the transmission survey, decide using fiber for BTS transmission. The metro offers existent fiber
for transmission between stations. The detail refer to attachment< Transmission System Schematic
Diagram >
Chapter 4 Attachment
1. Survey Report
5. BOQ
Building information:
Gholhak Station is one station of Metro Line 1. There are 2 floors underground. One is ticket hall and the
other is platform and two entrances. The distance to the next station Shariati is 900m, pre-station is not
Site ID : T0444Z
1. BTS Information
1.1 BTS Type: S2 + S4+S2
1.2 Type of Radio Cabinet: DBS3900
1.3 BTS supplier: HUAWEI
1.4 Equipment room location: Technical room
1.5 Equipment room areas: 5 square meter
1.6 Installation type (type of cabinet): mounted on the wall
1.7 Main Equipment information:
Power
Type of Dimensions Weight Power
Item Capacity Quantity Remark
Equipment W x D x H(mm) (kg) supply
needed(A)
220V Ticket
1 S2 250/420/520 23 15A 1
AC hall
220V
2 S4 250/420/520 38 15A 1 Platform
AC
220V Middle
3 S2 250/420/520 23 15A 1
AC Tunnel
2. Technical Data
2.1 TOC of BTS: BTS1: 25 dBm S2 , BTS2: 40 dBm S4, BTS3: 25 dBm S2
2.2 Frequency Band: 900 MHz
2.3 BTS configuration: S2+S4+S2
Existed New
Positions: in the Power room
Capacity: 1000KVA
Existed New
Positions: in the Technical room.
Terminal screw dimensions: M10
MET (main earth terminal) Specs: 400*300*10mm 5 hole
Other Requirements: N/A
Grounding cable specification: 25 sq.mm
5. BTS installation position pictures:
Please check the detail layout drawing for the equipment layout and design as following:
Transmission Investigation
Project Name : MTN Irancell IBS Project
Please check the detail layout drawing for the transmission layout and design as following: