International Power Quality

Discussion Forum

Power Quality Tools - Disturbance Log Sheet

Name : Company and address:


Tel. : Info:

Outside
Date Time environmental Disturbed loads
conditions

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Denis Ruest,
P.Eng.
November 2012
Disturbance Log Sheet

List of
Disturbance Total Estimate of
List of alarms generated
description downtime scrap material
scrap material
Cost of
Persons-hours Other
manpower
affected information
losses
International Power Quality
Discussion Forum

Power Quality Tools - Losses Evaluatio


Cost of losses for
event type 1

ex. Voltage sag

Part - 1 - Materials
Scrap: 1,500.00 $
Second quality products: 500.00 $
Remanufacturing costs: 0.00 $
Other (Specify): 0.00 $
Total: 2,000.00 $
Part - 2 - Workforce
Improductives: 100.00 $
Cleaning 100.00 $
Process restart: 50.00 $
Overtime to catch-up: 150.00 $
Other (Specify): 0.00 $
Total: 400.00 $
Part - 3 - Lost of Sales
0.00 $
Total: 0.00 $
Part - 4 - Equipements
Damages: 0.00 $
Repairs: 0.00 $
Replacement: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Part - 5 - Risks
Contract Lost: 0.00 $
Litigations: 0.00 $
Delivery: 0.00 $
Penalities: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Grand Total (GTn): 2,400.00 $

Estimated number of annual events


10
(NbE):
Estimated Annual
Losses (EAL): 75,000.00 $
Denis Ruest, P.Eng.
November 2012

uality Tools - Losses Evaluation Sheet


Cost of losses for Cost of losses for Cost of losses for
event type 2 event type 3 event type 4

ex. voltage ex. Short


ex. Interruption
transient interruption

1,000.00 $ 0.00 $ 0.00 $


300.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
1,300.00 $ 0.00 $ 0.00 $

100.00 $ 0.00 $ 0.00 $


100.00 $ 0.00 $ 0.00 $
50.00 $ 0.00 $ 0.00 $
150.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
400.00 $ 0.00 $ 0.00 $

0.00 $ 0.00 $ 0.00 $


0.00 $ 0.00 $ 0.00 $

0.00 $ 0.00 $ 0.00 $


0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $

0.00 $ 0.00 $ 0.00 $


0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
0.00 $ 0.00 $ 0.00 $
1,700.00 $ 0.00 $ 0.00 $

30 0 0
=_(=1)^4 _
" " _
International Power Quality
Discussion Forum

Describe
Objectives:

Solution
No. 1

Part - 1 - Equipment and Comissionning 3% Input Inductor


Acquisition: 7,500.00 $
Commissionning: 500.00 $
Other (specify):
Total: 8,000.00 $
Part - 2 - Auxiliairies
Swithgear or Panel: 1,500.00 $
Transformer: 0.00 $
Labor: 2,000.00 $
Other (specify): 200.00 $
Total: 3,700.00 $
Total Acquisition and Installation Cost: 11,700.00 $
Part - 3 - Annual Maintenance
Parts:
Labor (inspection, cleaning, etc.): 100.00 $
Long Term Maintenance (batteries, etc):
Other (specify): 50.00 $
Total: 150.00 $
Part - 4 - Solution effectiveness to solve problem
Estimated Effectiveness for Event type 1 in % (EE%1) 0%
Estimated Effectiveness for Event type 2 in % (EE%2) 90%
Estimated Effectiveness for Event type 3 in % (EE%3) 0%
Estimated Effectiveness for Event type 4 in % (EE%4) 0%
Estimated Global Effectiveness (%) (EE%): 61%
Part - 5 - Electrical Efficiency Level
Power rating in kVA: 6.00
Efficiency Level (%): 97.00
Electricy Cost ($/kWh): 0.120
Duty cycle (average usage): 50%
Annual Electric Losses: 94.61 $
Part - 6 - Payback (simple method)
Annual Losses (Losses Evaluation): 75,000.00 $
Annual Maintenance Cost: -150.00 $
Cost of passtrought disturbances: -28,921.91 $
Annual Electrical Losses: -94.61 $
Annual Savings: 45,833.48 $

Payback period (years): 0.26

To calculate estimated solution effectiveness add the effectiveness of each solutions (=Effectivenes
Note 1 :
annual events) and divide this sum by the estimated annual losses.

Note 2 : The payback period in years is the total acquisition and installation cost divided by the annual savi
Denis Ruest, P.Eng.
November 2012 - rev
mai 2013

Need to increase ride throught capacity of 200 HP Drive for voltage sags and capacitor switchings.

Solution
Comments Comments
No. 2

3% Input Inductor

0.00 $

Box for inductors

2 days
connectors, etc.
0.00 $
0.00 $

0.00 $
(See Note 1)
0%
0%
0%
0%
100 % switching 0% sag 0%
0.00 $

0.00 $
0.00 $
0.00 $
0.00 $
0.00 $

(See Note 2) N/A

ess of each solutions (=Effectiveness in % * Cost per event * number %=(_(=1)^4


ses. % _ _ " "
_)/

ion cost divided by the annual savings


itor switchings.

Solution Solution
Comments
No. 3 No. 4

0.00 $ 0.00 $

0.00 $ 0.00 $
0.00 $ 0.00 $

0.00 $ 0.00 $

0% 0%
0.00 $ 0.00 $

0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $

N/A N/A


" "
Comments