Escolar Documentos
Profissional Documentos
Cultura Documentos
Discussion Forum
Outside
Date Time environmental Disturbed loads
conditions
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Denis Ruest,
P.Eng.
November 2012
Disturbance Log Sheet
List of
Disturbance Total Estimate of
List of alarms generated
description downtime scrap material
scrap material
Cost of
Persons-hours Other
manpower
affected information
losses
International Power Quality
Discussion Forum
Part - 1 - Materials
Scrap: 1,500.00 $
Second quality products: 500.00 $
Remanufacturing costs: 0.00 $
Other (Specify): 0.00 $
Total: 2,000.00 $
Part - 2 - Workforce
Improductives: 100.00 $
Cleaning 100.00 $
Process restart: 50.00 $
Overtime to catch-up: 150.00 $
Other (Specify): 0.00 $
Total: 400.00 $
Part - 3 - Lost of Sales
0.00 $
Total: 0.00 $
Part - 4 - Equipements
Damages: 0.00 $
Repairs: 0.00 $
Replacement: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Part - 5 - Risks
Contract Lost: 0.00 $
Litigations: 0.00 $
Delivery: 0.00 $
Penalities: 0.00 $
Other (Specify): 0.00 $
Total: 0.00 $
Grand Total (GTn): 2,400.00 $
30 0 0
=_(=1)^4 _
" " _
International Power Quality
Discussion Forum
Describe
Objectives:
Solution
No. 1
To calculate estimated solution effectiveness add the effectiveness of each solutions (=Effectivenes
Note 1 :
annual events) and divide this sum by the estimated annual losses.
Note 2 : The payback period in years is the total acquisition and installation cost divided by the annual savi
Denis Ruest, P.Eng.
November 2012 - rev
mai 2013
Need to increase ride throught capacity of 200 HP Drive for voltage sags and capacitor switchings.
Solution
Comments Comments
No. 2
3% Input Inductor
0.00 $
2 days
connectors, etc.
0.00 $
0.00 $
0.00 $
(See Note 1)
0%
0%
0%
0%
100 % switching 0% sag 0%
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
0.00 $
Solution Solution
Comments
No. 3 No. 4
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0% 0%
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
0.00 $ 0.00 $
N/A N/A
" "
Comments