This workbook is to be used for Production Part Approval Process (PPAP) submissions to Jacobs Vehicle Systems
(JVS).
Separate tabs are included for each section of the PPAP (as shown in the AIAG PPAP Manual, Fourth Edition).
For Ease of Use with the forms, you should enter all relevant information in the "Data" tab to avoid having to retype it.
The "Submission Plan" defines what sections are applicable for each level of PPAP.
Supplier shall complete each tab. Included are check boxes to be used if the tab is "not applicable". If a document
cannot be attached into the designated tab, please indicate in the designated tab and add a separate tab or submit as a
separate .pdf document.
Supplier shall fill in areas shaded "yellow". JVS uses sections shaded "blue".
Upon completion, please submit your PPAP to JVS_PPAP@jakebrake.com or as requested in the PPAP purchase order
or instruction from JVS Purchasing or Quality.
Submission Information
Submission Date
Submission Level (see submission plan)
Supplier Information
Supplier Name
Street Address
City
State
Postal Code
Person responsible for PPAP submission
Title
Phone
Fax
e-mail
PPAP Submission Plan
Supplier 0 Part Name 0 Date of Submission 0
Part Number 0 Revision 0 PPAP Level 0
Reason for submission 0
JVS normally requires PPAP level 3, unless otherwise specified. The PPAP P.O. takes precedence.
JVS requires PPAP level 4* (see below) for commercially available product such as fasteners. Item 10 should include material certs, grade certs, mechanical properties, unless otherwise specified. The PPAP
P.O. takes precedence.
This form represents a plan for the submission of requirements. Not all requirements may be applicable in every case.
Key: R - Retain at Supplier S - Submit to JVS W - Waived
Refer to AIAG PPAP Manual, Fourth Edition, for further clarification.
Comments
R S S * S R
Ballooned JVS Part Print
2 Engineering Change Documents, if any
JVS Supplier Change Request or evidence of S S S * S R
engineering approval (e.g. e-mail)
3 Customer Engineering Approval
Conditional
S S S * S R
Approved
Rejected
JVS Supplier Deviation Request
Interim/
4 Design FMEA
R R S * W R
Required, if design responsible.
5 Process Flow Diagram
R R S * W R
6 Process FMEA
R R S * W R
7 Control Plan
R R S * W R
Date
Date
Date
Date
submitted in # 14. JVS Layout -
10 Material, Performance, Test Results
Transfer data to form from certifications,
including the specification limits, and attach R S S * S R
Met Review -
copy of material and test certifications. Other Testing -
11 Initial Process Study
Required for all special characteristics.
Include raw data, histogram, control chart and R R S * W R
capability indices (PpK and CpK).
12 Qualified Laboratory Documentation
Include copies of certifications (e.g. ISO9000, R S S * S R
TS16949, A2LA), as appropriate
13 Appearance Approval Report
W W W W W W N/A Waived Waived N/A
Not applicable to JVS product
14 Sample Product
Clearly identify part(s) used for the results
submitted in # 9. A minimum of 2 parts to be
submitted (one for dimensional analysis and R S S * S R
one for possible destructive testing), unless
otherwise specified.
15 Master Samples
Sample must be retained at the supplier.
Dimensional data for this piece should also be R R R * R R N/A To be retained at supplier To be retained at supplier N/A
included in #9.
16 Checking Aids
List the checking aids with calibration status, R R R * W R
Product Engineer
Outside processes
Characteristics Methods
Inspection Method
C=Calipers, DI=Drop Indicator, G=Gage Pins, I=Indicator, M=Micrometer, P=Profilometer, R=Rockwell Hardness Tester, S=Shadowgraph
Supplier Jacobs
Results
Dimension / Inspection Pc. 3 Inspection
Item Specification Method Pc. 1 Pc. 2 (Retained at Supplier) A/R Method Results A/R
Page 15 of 27
Supplier Jacobs
Results
Dimension / Inspection Pc. 3 Inspection
Item Specification Method Pc. 1 Pc. 2 (Retained at Supplier) A/R Method Results A/R
Page 16 of 27
Material Test Results
Not Applicable
Complete form and attach material certification below. Blanket statements of conformance are unacceptable for any test results.
Applies to performance tests such as fatigue testing, breakaway torque and mechanical properties.
Complete form and attach test certification below (if applicable). Blanket statements of conformance are unacceptable for any test results.
1 pc broke at 214,000
cycles, 2 pcs test
Cycle test per ABC 100,000 cycles stopped at 250,000
AAA TEST LAB SPEC 1234 without failure 6/6/10 3 cycles without failure OK
Initial Process Studies
Process Studies are required for all special (Critical and Major) characteristics. Process
Studies should be included, if possible, for all KCC/KPC
Include raw data, histogram, control chart and capability indices (PpK and CpK)
Not Applicable per Submission Plan
Not Applicable - No Special Characteristics
Process Studies conducted
Min Capability Requirements met (Critical 1.67 CpK and Major 1.33 CpK)
Min Capability Requirements not met - Action plan attached
Process Studies attached below
Process Studies submitted under separate cover
Process Studies included as separate tab(s) in this workbook
Qualified Laboratory Documentation
Not Applicable
Certificate(s) previously submitted (no changes)
Certificate(s) attached
Certificate(s) submitted under separate cover
TS 16949 Certification Issue Date Expiration Date
ISO 9001 Certification Issue Date Expiration Date
ISO 14000 Certification Issue Date Expiration Date
A2LA Certification Issue Date Expiration Date
ISO/IEC17025 Certification Issue Date Expiration Date
Other Certification (Please specify)
Checking Aids
Not Applicable
Note: Does this part contain any restricted or reportable substances? Yes No
Are plastic parts identified with appropriate ISO marking codes? Yes No
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts and have been made to the applicable customer drawings and
specifications and are made from specified materials on regular production tooling with no operations other than the regular production process. I
also certify that documented evidence of such compliance is on file and available for review.
EXPLANATION/COMMENTS: 0
Customer Signature