455A730E_LTE_TELOGO
(MALANG)
SINGLE SITE ACCEPTANCE
Abstract
This document is to provide report for XL Axiata on as Single Site Acceptance on JPS project.
RND PMO
PT.HUAWEI TECH INVESTMENT
PT. XL AXIATA Tbk PT. XL AXIATA Tbk
Waqas 2017-04-03
Contents
1 Introduction................................................................................................................. 3
1.1 General Site Information ............................................................................................... 3
1.2 Summary of Important Key Performance Indicator on Drive Test.................................. 4
2 Performance Result .................................................................................................... 5
2.1 Drive Test Event ........................................................................................................... 6
2.2 Drive Test Plot .............................................................................................................. 7
2.2.1 RSRP (Reference Signal Received Power) .................................................................. 7
2.2.2 SINR (Signal to Noise & Interference Ratio .................................................................. 8
2.2.3 PCI Plot ........................................................................................................................ 9
2.2.4 Transmission Mode .................................................................................................... 10
2.3 Stationary Test ........................................................................................................... 11
2.3.1 Downlink (FTP) Throughput ........................................................................................ 11
2.3.2 Uplink (FTP) Throughput ............................................................................................ 11
2.3.3 Speed Test (Using OOKLA & OpenSignal) ................................................................. 12
2.4 Functional Test ........................................................................................................... 12
3 Site Audit ................................................................................................................... 13
3.1 Cell Basic Info. Audit................................................................................................... 13
3.2 Service Impacted Alarms ............................................................................................ 13
3.3 Feature Audit .............................................................................................................. 13
4 Conclusion ................................................................................................................ 14
5 Justification .............................................................................................................. 15
5.1 Long Ping latency & RTT Justification......................................................................... 15
3 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID
Waqas 2017-04-03
1 Introduction
Basic KPI report is provided to XL Axiata as part of LTE Project deliverables on cell level.
Waqas 2017-04-03
Waqas 2017-04-03
2 Performance Result
Cell level KPI aggregate into 1 day, taken at Cell Busy Hour except availability.
Date (Start - End) 15 June 17 to 15 June 17
Availability
No Name Reference Measured On Sector 1 Sector 2 Sector 3 Status
1 Radio Network Availability Rate > 98% Cell Daily 99.96% 99.96% 99.96% Pass
Accessibility
N Statu
Name Ref Measured On Value
o s
1 Session Setup Success Rate 99.89% Cell Busy Hour 100.00% Pass
2 CSFB Call Setup Success Rate (CSFB SR) 100.00% Cell Busy Hour 100.00% Pass
Voice - Incoming Call Setup Success Rate (Merge with
3 100.00% Cell Busy Hour 100.00% Pass
Outgoing and Incoming)
Retainability
No Name Ref Measured On Value Status
1 Session Abnormal Release Rate (SARR) <2% Cell Busy Hour 07% Pass
Integrity
No Name Reference Measured On Value Status
1 UL Packet Loss (PDCP) <1e-3 Cell Busy Hour 1.94967E-05 Pass
2 DL Packet Loss (PDCP) <1e-3 Cell Busy Hour 3.09403E-07 Pass
> 21.2 Mbps
(3 MHz)
> 70.3 Mbps
3 Downlink Peak PDCP User Throughput (10 MHz) Cell Daily 63.610994 Info only*
> 105.4
Mbps (15
MHz)
> 7.2 Mbps
(3 MHz)
> 26.2 Mbps
4 Uplink Peak PDCP User Throughput Cell Daily 24.815855 Info only*
(10 MHz)
> 40.5 Mbps
(15 MHz)
5 RTT Latency <= 8ms Cell Busy Hour 1.094870456 Info only*
6 Jitter (Uplink and Downlink) < 50 ms Cell Busy Hour N/A Info only*
* Depend on user behavior
6 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID
Waqas 2017-04-03
Mobility
N Measured Statu
Name Ref Value
o On s
> Cell Busy
1 HO Success Rate - Intra Frequency (IN & OUT) 100.00% Pass
95% Hour
> Cell Busy
2 HO Success Rate - Inter Frequency (IN & OUT) 0.00% Null
95% Hour
PS Inter-RAT HO Success Rate (IN & OUT) for WRAN (PSHO > Cell Busy
3 100.00% Pass
IRAT) 90% Hour
Waqas 2017-04-03
Waqas 2017-04-03
Waqas 2017-04-03
c
10 (16)
SINGLE SITE ACCEPTANCE REPORT
prepared No. Program Site ID
Waqas 2017-04-03
Waqas 2017-04-03
Waqas 2017-04-03
Waqas 2017-04-03
3 Site Audit
SUMMAR
SCENARI DRM BSS
Y
O UDPATE DESCRIPTIO SURVEY
SITE 3G SITE 4G TOWER SITE NAME SOLUTIO FINAL CABINET
BSS (21 N (21 feb STATUS
N BSS (21
Feb 2017) 2017)
Feb 2017)
1.Reuse
UMPTb1
existing
Scenario
2.Add
3: Insert
Scenario 1xUBBPd3 Existing cabinet NO
Board RF
355A730G 455A730E A730_TLOGOSARI_MALANG 3: Insert 3.Reuse OL/U2100/GS NEED
+ Insert
Board RF 3xMRFUV2 M SURVEY
BBU
existing
Board
4.Add
3xMRFUV2
donor
alarm.xlsx
No service impacted alarms found
Waqas 2017-04-03
4 Conclusion
Waqas 2017-04-03
5 Justification
Ping 1000
t1 t1 t2 t2t3 t3t4 t4
RTT = t1
Ping Latency (UE to FTP) = t1 + t2 + t3 + t4 + t4 + t3 + t2 + t1 = 31.43 (UE ping Huawei FTP)
Waqas 2017-04-03