Você está na página 1de 1
Piping Diag! @ Water Circuit Ss cs songs clas wie puap me \roa gan wcraicerconiauny | eet ¢ [oleae ran _ [ol onc ol afr steel Water Circuit Connection Procedure GENERAL REMARKS ON PIPE-LAYING WORK 1 The ange of equipment be supped by LS is enciosod bythe ‘wo-dot chain ino —1} 2. For igo clamor, pipe connections, ot. refer tthe mechan callayout diagram [OUTLINE] 8. The maximum operating pressure inthe chile and cooing eter 8 gion? 4. Concerning temperature canto of cooing water, refr io anat- ex diagram. [CONTROL OF COOLING WATER TEMPERATURE} } 5. Provide separate chile and colng water pumps fo each absorpion machine. ow ato of hills and cooing war should content the spodteatons. 6. Provide a blooder inthe cooling water no for conel a cooing water aly LS Absorption Chiller 7st a srainer raving a mesh of 10 or so. 8 sala steam sop vito shut of asta ine to a cil when tho leis nat parte, 9. Povo teint ard out ipng or hile and cong water _wahthe stop valve so thatthe piping canbe cleaned easy 1) sal homoreters and pressure gauges slocations con- venient for serving inte int and cute wate ines. 2) sal ar vont vas for walr Ines at poston ave the absarpbon machine. 5) sal rain vas fr water ines at poston botom he absarpbon mactn, and en extend thm up othe ich 4) For cherical clearing, sal the sop vas fr caring bhetwoon the unt and each sop vale al th inte ute.

Você também pode gostar