Você está na página 1de 1
f EPIC for Wellhead Topsides, Manifold Platiorm, | PS3 Modifications, Flow Lines & Umbilicals for ( Bul Hanine Re-development (Phase 1B) | Jy ul) Lub P< eu Manine Re-development (Phase 1B) | Ja. es | SPEC | Stsconreact For civ, pire wanpune ano | QelsrPcbomm Sd MISCELLANEOUS WORKS AT HALUL ISLAND NPCC Doc. No.: E7209-0-SW.0001 rev.1 | Date: torosraot7 ev. QP Doc. No: XXX XX IOKK Page 15 of 32 * An emergency response plan is available for the specific work ©) A good coordination with COMPANY/ CONTRACTOR during the course of the work shall be ensured for the authority and public liaison issues ¢) The team shall be in full compliance with journey management system requirements defined for the project ©) The team shall be fully equipped with the necessary personnel protective equipment ) The team members shall take necessary actions to ensure creating minimum impact to the environment during their works at the field in case of leakages 9) _ Nominated focal point for Safety (Safety Officer) shall be available at site right through fh) The SUBCONTRACTOR shall implement all relevant procedures within its HSE pian and maintain documentary records to show that the procedures have been followed i) The SUBCONTRACTOR shall be solely responsible for he following: * Food, transport, accommodation, insurance etc., for his employees nominated for this work * Construction water required any other activity * All required tools and equipment for carrying out Soil investigation + Allnecessary work permits as applicable * Any other facilities required for execution of the work 10 £7208-0-SW.0001 Rt dean copy

Você também pode gostar