Formwork

INTRODUCTION............................................................................................................................................................3

DESIGNREQUIREMENTS...............................................................................................................................................4

FACTORSRELATINGTOFORMWORK...........................................................................................................................6

HIGHWALLFORMWORK..........................................................................................................................................6

TimberFramedFormwork........................................................................................................................................7

SHEATHING...............................................................................................................................................................8

WALLTYINGSYSTEMS..............................................................................................................................................8

CONSTRUCTIONJOINTS............................................................................................................................................9

SLIPFORM...............................................................................................................................................................10

CLIMBINGORJUMPFORMS...................................................................................................................................10

FormworkStriking......................................................................................................................................................11

Standardsrelatingtoformwork.................................................................................................................................12

ERECTIONFORCOLUMNS,BEAMS,SLABSANDSTAIRS.............................................................................................13

Columns..................................................................................................................................................................13

ColumnFormworkConstruction............................................................................................................................13

Columnformsandjoints........................................................................................................................................14
Formwork Page2

Columnformsandjoints........................................................................................................................................15

Erectionofformworkforcolumns.........................................................................................................................17

Columnformworkconstructionstages..................................................................................................................18

BEAMANDSUSPENDEDSLABFORMWORK...........................................................................................................19

Designandconstructionofbeamformwork..........................................................................................................19

Markingoutandsettingheightsforfalseworks.....................................................................................................20

Constructanderectsidewallsandbeamsoffit.....................................................................................................20

SUSPENDEDSLABS......................................................................................................................................................21

Designandconstructionofslabformwork............................................................................................................21

DeterminingTheBearerSpacing............................................................................................................................22

ErectingBearersAndJoists....................................................................................................................................22

PROPRIETARYFORMWORK....................................................................................................................................23

FALSEWORK............................................................................................................................................................24

Settingupfalsework:..............................................................................................................................................24

STAIRFORMWORK.................................................................................................................................................25

StairFormworkconstruction..................................................................................................................................25

TREADS,NOSINGS,BALUSTRADING.......................................................................................................................26

STRIKING,MAINTENANCE,STORAGEOFFORMWORK..........................................................................................27

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page3

INTRODUCTION
Anumberoffundamentalprinciplesapplytoallformwork.

Considerationmustbegivento:

Acceptabletolerancespermitted;

Useofappropriatematerials;

Standardsofworkmanship;

Constructionforeaseoferectionandstripping;

Careandmaintenanceoftheformwork,sothatthemaximumnumberofreusescanbeachieved.

Formworkisatemporaryconstruction;howevercaremustbetakentopreventdamagetopermanentwork.Threegeneral
principlesgovernformworkdesignandconstruction:

Qualityaccuracyoftheconcreteshapeandthefinalfinishedsurfacequality.

Safetystrengthoftheformworkstructure.Personalsafetyofpeople,bothcarpenters andthepublic.

EconomyThestructuralframeisusuallythemostsignificantcostcomponent,adominantandcriticalfactorinthetimeof
construction.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page4

DESIGNREQUIREMENTS

Whendesigningformwork,considerthefollowing:

1. Strength:Formsandshuttershavetobedesignedtosupportdeadweight,liveloadandhydrostaticpressure.
Sheathingmustberigidenoughtoresistbulging.

Formworkforverticalconcreteelementsi.e.columnsandwallsaresubjecttopressuresontheformface.Thisiscausedby
thefluidactionofthefreshconcrete.Thepressureofthefluidconcreteontheverticalfacesincreasesproportionatelywith
thedepthofconcrete.Themaximumpressurebeingatthebottomoftheform.Thismaximumpressureforthefulldepth
fluidconcreteisthehydrostaticpressureforconcreteandusuallyoccurswhentheconcreteisplacedveryquickly.

Itshouldnotbepossibleforthebracingtobedislodgedbyimpact,orwind,actingfromanydirection.Refertoillustration
below.

Design Pressure

Distribution

Pressure Distribution
H

Hydrostatic
Pressure

P max

Vertical stud

Walers

2. Speedyerectionanddismantling:Theformworkdesignandthemethodsofassemblymustbeassimpleaspossible
toreducetimespentinerectionanddismantling.Theformworkshouldbesimpletoremovewithoutcausingdamagetothe
concrete.

3. Tightnessofjoints:Theliquidretainingpropertiesoftheformworkmustbeadequatetopreventleakageofcement
andfineaggregatefromtheconcrete.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page5

4. Rigidity:Braceformworkandsupporttoensurenomovementmaytakeplaceunderwindpressure,orwhenthe
concreteisbeingplacedandvibrated.Theshuttersmustberigidenoughtokeeptheconcretememberwithintheallowable
tolerances.

5. Reuse:Designforunitconstruction,ifpossible,sothatyoucanstrikeandreuseassoonaspossible.Useclamps,
wedges,andsimilardevicestoholdsectionsofformworkinplace.Avoidnailingasmuchaspossible,nailholesandbruising
ofthetimberwillspoilformworkforfurtheruse.Theformworkmaterialmustbedurableandcapableofproducingagood
surfacefinish.

6. Easeofhandling:Formsandshuttersmustbeofasizeandweightthatcanbehandledbythelabourandplant
availableonsite.

Adjustment:Arrangeallprops,shores,andstrutssothattheycanbeproperlyadjusted.Theymustbearonsoleplates,so
thattheloadissafelydistributedontothestructurebelow.

Removalofdebris:Provideallformworkwithspecialcleanoutholestoallowfortheremovalofsawdust,shavings,andother
debrisfromthebottomoftheformworkbeforethepourbegins.

FormworkTolerancesandvariationsinalignment

Columns Upto3mhigh 6mm

Piers 3mto6m 10mm

Walls Above6m 18mm

Variationsfromlevel 6mmin6m 10mmmax.

Variationsfromplanposition 6mbay 12mm

over6mbay 25mm

Nottoencroachoverboundary.

Variationsinsizeandpositionof 6mm
openings,sleeves

Variationsincrosssectionalsize Upto600mm +6mmor3mm

Over600mm 6mm

Variationsinfootings +25mmor12mm

Thickness 0.05ofdimension

Variationsinconsecutivesteps

Rise 1.5mm

Tread 3mm

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page6

FACTORSRELATINGTOFORMWORK
Todesignandconstructsatisfactoryformworkanappreciationofthetypesofloadsand

combinationsofloadsthatactontheformworkisrequired.

Theheaviestloadonformsusuallyoccurswhentheconcreteisbeingplaced.Aswellastheweightoftheconcreteitself,(i.e.
deadload),allowancefortheconcretinggangandtheirgearmustbeconsidered,(i.e.liveload).Depositingwetconcretein
heapscreatesunevenpressureontheformwork.Itisimportanttoevenlyplacetheconcreteinlayers,distributingloads
equallyontheformwork.Inwalls,wetconcreteexertshorizontalburstingpressuresontheverticalsoffit.Thepressureis
reducedasthesemiliquidconcretehardensandbecomesselfsupporting.Formworkconstructionmustbeableto
withstandtheloadsimposed.

HIGHWALLFORMWORK
Therearetwotypesofwallformwork.Onetypeisforwallsrequiringonlyonefaceofformwork,e.g.forbasementwalls.
Theotherisdoublefacedformworkforfreestandingwallsinastructure.

Acknowledgement to the Australian

Government Publishing Service for the use of


their
Wall formwork illustrations.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page7

TimberFramedFormwork.
Thewallformworkframeisconstructedusingeither:

Verticalstudsandhorizontalwalers.

Horizontalwalersandverticalsoldierswiththesheathing(sheeting)fixedatrightangles.

Thespacingandsizeofstudsandwalersisdeterminedbytheloadsimposedontheformwork.Theheightofthewall,
thicknessofthewall,andthethicknessofthesheathingusedmustbeabletowithstandtheloadsplacedontheformwork.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page8

SHEATHING
Therearevarioustypessheathingavailable.Theappropriatesheathingmustbeselectedto
obtainthespecifiedfinishrequired.Optionsinclude:
Sawnorplanedtimberedgesmaybesquarecutortongueandgrooved,toprevent
groutleakage.Analternativeisafoamstripinsertedbetweentheboards.
Plywoodexteriorgradeorformplyareavailableinvariousthickness.Thegrainon
theouterfacemustbeparallelwiththespanofthewallformworkframing.
Temperedhardboardproducesagoodfinish,however,islessresistanttodamageand
multipleuse.
Plasticliningsgiveagoodfinish,however,itmusthaveasolidbacking.
Rubberliningsaresometimesusedfortexturedfinish.
Glassfibreorothersimilarmouldsmaybeusedforvariousarchitecturalfeaturesonwallorwindowpanels.

WALLTYINGSYSTEMS
Thefunctionofformworktyingsystemsistoconnectthetwofacesofthedoublefacedformstogetherandeffectthe
balanceoftheforcesbetweenthem.Thespacingofthetiesandtheforcestheyhavetoresist,isdeterminedbythewallto
bebuiltandtheframingsystemadopted.Whenconsideringtiesforwallforms,selectionismadeonthebasisof:

tiecapacity,

groutlossatthetieholes,

easeofinstallation,

finalappearance

EASICLEANTHROUGHTIE

COILTIE

SHEBOLT

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page9

CONSTRUCTIONJOINTS
Stopendsandconstructionjointsmustalwaysbeformedatrightanglestotheconcretepour.Ifkeyedstopendsare
required,useanangledfilletorasplitinsertforaparallelsidedslot.Constructionjointsatthetopofapourmayrequirea
battenfixedtotheformworktofinishtheconcreteinastraightline.

HorizontalConstructionJoint Split insert for parallel sided slot

StopEnds

Attheendsofwallsandattheplannedpositionsofconstructionjoints,stopendsmustbeconstructed.Duetoreflection
andreboundoftheenergyofvibrationfromthefaceofthestopend,theconcretepressureactingonitcanexceedthat
generallyactingontheformface.

Inmostcasesthestudsoftheformworkdonotcoincidewiththestopendandasaresult,theplywooddeflectsunderthe
concretepressureandgroutandwaterescapespastthestopend.

Acommonmethodofresistingtheforcesonthestopendisbywedgingitoffthewallties.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page10

SLIPFORM
Thisisaformwhichiscontinuallybeingmovedupwards,orsideways,astheconcreteisbeingpoured.Therateofmovement
isregulatedsothattheformsleavetheconcreteonlyafteritisstrongenoughtoretainitsshapeandsupporttheweights
imposedonit.

Verticalstructuressuchaschimneys(HuntlyPowerStation)andcoolingtowers(OhaakiThermalPowerStation)areoften
donethisway.Kerbingandchannellingcanalsobeslipformed.Jackingoftheformscanbedonebyscrew,electric,
pneumatic,butusuallyhydraulic.

CLIMBINGORJUMPFORMS
Thistypeofformworkisdesignedforconstantfloorheightandlayoutformultistoreybuildings.Theformworkis
jumpedupfromonefloortothenextfloorabove.Thesystemisraisedverticallyforconsecutivelifts.Anchorpointsorties
usednearthetopoftheformworkarereusedforthebottomofformworkwhenitislifted.

SkytowerinAucklanduseda4mhighjumpformfortheconstructionofthe500mmthick,12mdiametermaintower
achievingapouraboutevery9days.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page11

FormworkStriking

Theprocessofremovingtheformwork.Theearliesttimethis
canbedoneiswhentheconcretehasdevelopedsufficient
strength.Reinforcedconcretestructuralelements
needtobeabletocarrythemselvesandanyother
superimposedloadsovertheirintendedspans.Strippingtransfer
partsorloadstoconcretestructureshouldbegradually
Striking piece
transferred.Considerationshouldbegivento:
Specificationrequirements,check
sitedocumentsfortheconcrete
strengthrequiredandstrippingtimes.
Theconcreteageandminimum
strengthatthetimeofstripping.
Themethodandsequenceofstripping.
Limitsontheloadstobeplacedonthestructure.
Removeformworkcomponentswithminimumdamage.
Theconditionofthecomponentswilldeterminethereuse
andcosts.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page12

Standardsrelatingtoformwork
NZS3109:1997

Concreteconstruction

providesminimumrequirementsfortheconstructionofreinforcedconcrete,unreinforcedconcrete,prestressedconcrete
oracombinationinelementsofanybuildingorcivilengineeringstructure.

Section5ofthestandardcoversrequirementsfor:

thedesignofformwork,

surfacefinish,

tolerances,

removalofformsandshores,

embeddedsleeves,conduitsandpipes

constructionjoints.

NZS3124:1987

Specificationforconcreteconstructionforminorworks

providesminimumrequirementsfortheconstructionofreinforcedandunreinforcedconcreteinminorworksincluding
buildingsoflighttimberframeconstructionwithinthescopeofNZS3604.Alsoconcretemasonryconstructionwithinthe
scopeofNZS4229:1999

Concretemasonrybuildingsnotrequiringspecificengineeringdesign

Thestandardhoweverdoesnotprovidespecificrequirementsforconcreteconstructionthataresubjectedtoaggressive
environments.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page13

ERECTIONFORCOLUMNS,BEAMS,SLABSANDSTAIRS

Columns
Thefunctionofcolumnformworkistoenabletheconstructionofcolumnsthathavethespecifiedsurfacequalityandare
acceptablyaccurateinshapeandpositionwithgoodalignmenttootheradjacentcolumns,wallsandbuildingfacades.
Columnsareoftenconstructedwiththecolumnreinforcementextendingwellabovetheform.Thisisdonesoitcanlapwith
thereinforcementofthenextcolumnorfloortobeconstructedabove.

Theaccuracyrequirementsforcolumnsvaryaccordingtotheirpositioninthebuilding.Thetolerances,whicharethe
maximumpermitteddeviations,arenormallyspecifiedintheprojectdocumentation.

ColumnFormworkConstruction
Toavoidplywoodjoints,itisnormalpracticetocutthesheetslengthwiseinwidthstomatchthecolumnfaces.

Mostcolumnformingmethodsuseplywoodtoformfaces.Thecornerjunctionsoftheplywoodmustbedetailedtoachieve
themaximumtighteningactionfromthecolumnclamps.

Thecornersoftheformareusuallyformedtohavea45degreearris.Timberanglefilletsareusedtoformthearris.Care
mustbetakentoalignthefilletinsidethecolumnform.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page14

Columnformsandjoints

SteelStrapping

Adjustablesteelclamps Boltsthroughtimberyokes

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page15

Columnformsandjoints

Adjustable steel column clamp

Acknowledgement to the Australian


Government Publishing Service for the use

of their Column illustrations.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page16

CIRCULARANDOCTAGONALCOLUMNS
Circularcolumnformwork

Fabricatedsteel,usuallytwopiece,andoftenwithahinge.

Fibrecementpipeswhichareleftinplaceaspermanentformwork.

Cardboardtube.Oneoffformwork,availableinarangeofdiameters,usedwithtimberstrongbacks.Cuttowasteafter
concreteispoured.

Plastictube.Usedinasimilarwaytocardboard.

Octagonalcolumnformwork

Timbersheathingtiedwithstandardcolumnclamps.Cornersneedtohaveinfillpieces.Alternatively,metalstrapcanbe
usedwithouttheneedforcornerinfills.

Timbersheathingwithalternatingcolumnclamps,forlargercolumns.


Vertical Timber sheathing column
Fabricatedsteelwithboltedjoints.

Vertical steel two piece form column

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page17

Vertical Cardboard column braced

Erectionofformworkforcolumns
Beforeerectingcolumnformwork,applyareleaseagenttoallinternalsurfaces.Ifspecified,fixanyrequirededging,metal
corners,arrispiecesorcastedinserts.

Priortotheerectionofformworkforstructuralmembers,itisimportanttochecktheexactlocationofgridsrelatingtothe
structuralmemberbeingformed.Thelocation,sizeofcolumn,height,andspecifiedfinishshouldbeclarifiedfromsite
documentation.Oftenhurdlesrestrictthepositioningofgridlocations,thereforeoffsetsmayberequired.Itisthe
contractorsresponsibilitypriortotheerectiontochecksitedocumentationfortheexactpositionofthestructuralmember
youareworkingon.

Erectionsequenceforacolumn
Priortopositioningcolumnformworkcheckthatsteelforthecolumnhasbeeninspectedandclearedforcasting.
Positionformworkforthecolumnfrompredeterminedgrids.
Plumbformworkbothwaysandsecurelysupportusingadjustablesteelprops.
Theproppingangleshouldbe45tothefloor.
Ensurethesteelpropsaresafelysecuredtothecolumnformworkandthefloor,and
thatadjustmentforpushingandpullingisoperational.
Setoutthepositionsofcolumnclampsfromastoreyrod.
Transferthecolumnclamppositionsfromthestoreyrodontocolumnformwork.
Usenailstosupportthearmsofcolumnclampswhilewedging.
Positionandwedgethebottom,middleandtopclampssets.
Checktheformworkatthetopforsquare.
Positionandwedgetheremainderofthecolumnclamps.
Usingaplumbbobsuspendedfromagaugeblockplumbthecolumn.
Whenallthecolumnformworkissecurelyproppedafinalcheckmustbemadefor
plumbandcolumnalignmentbeforeandimmediatelyaftertheconcretehasbeen
pouredandvibrated.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page18

Columnformworkconstructionstages

Columnformworkbracing

Columnformworkbracingperformstwofunctions:

Itmustmaintaintheaccuracyofthecolumnformpositionandplumbsothatitiswithintolerance.

Withstandresultsofforcesactingoneitherthecolumnformworkorthebracing.The forcesmaybewindor
impact.Theseimpactforcescanoccurfromthecollisionof concretebucketsorcraneshoistingmaterials.

Braced column

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page19

BEAMANDSUSPENDEDSLABFORMWORK

Inatypicalreinforcedconcretebuildingframe,theslabsaretheprimaryloadcarryingelement.Theytransfertheirloadto
secondaryelementssuchaswallsorbeams.

Beamscanbegroupedintwocategories.WhenlocatedintheinteriorofthestructuretheyareusuallyTEEBeamsandwhen
ontheperimeterareLBeams.

TEEBEAMS
LBEAMS

Designandconstructionofbeamformwork
Beamsoffitmustbethickenedtimberorstrengthenedplywood.

Beamsides18mmplywoodor25mmboards,withstuds(cleats)at
500to600mmcentres.

Deepbeams(over600mm)shouldhave
walersandties.

Propsorfalseworkmustbeplaced
undertheheadtree,orunderthebearers,
andmustbespacedtosuittheweight
ofconcrete.
Useanglefilletsinthebeamsideto
soffitjointwherepossible.
Allowancemustbemadeforheight
adjustmentofthepropsorfalsework.
Erectionsequenceforconstructingbeamformworkincludes:
Positionofsoleplates;
Markingoutandsettingheightsforfalseworks;
Assembleandpositionprops,adjustableheadjacks,
falseworks,bearersandSpreaders;
Constructanderectsidewallsandbeamsoffit.
Positionofsoleplates
Thepurposeofasoleplateistotransferverticalloadfromoneverticalsupportmembertothefoundation.Thevertical
supportrequiresabaseplatefittedtohelpdistributetheloadtothesoleplate,whichisusuallyasleeper.Ifthesoleplateis
positionedonnaturalground,itisimportantthegroundisgradedandconsolidatedtoalevelsurface.
Theobjectiveistoachievemaximumbearingbeneaththesoleplate.
Oncesoleplatesarepositionedandfirmlybeddedtheyshouldbecheckedforlevel.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page20

Markingoutandsettingheightsforfalseworks
Markoutthepositionofpropsandotherfalseworksupportsonthetopofthesoleplates.

Measuretheheightfromthesoleplatetothetopofthecolumnandmarktheheightontoastoreyrod.

Deductthethicknessofbeamsoffitdepthofjoistandthedepthofbearerfromtheoverallheight.Thisprovidesthe
heighttosetsteelpropsandotherfalseworksupportsystems.

Adjustthefalseworksystemstolengthsdeterminedfromthestoryrod.

Assembleandpositionprops,adjustableheadjacks,falseworks,bearersandspreaders

Thistasknormallyinvolvesworkinginpairs.Itisimportanttobearinmindthesafetyrequiredtoassembleprops
andtemporarysupportsystems.Oftencontinuousormobilescaffoldingareusedtohelperectthefalsework
system.

Layoutlengthsofbearersoneachsideofthecolumns.Jointsshouldbestaggered.

Positionthescaffoldateachendofthebearer.

CarefullypositionbearersintothecentreofproporfalseworkUhead.UsecentralisingpackersnailedtoUhead.

Repeatthisprocedureontheotherside.

Plumbsupportsbothwaysandnailspreadersateachendhardagainstthecolumnface.Thisistoprevent
movement.

SecurepropsandfalseworkatUheadandsoleplate.

Placespreadersinpositionatrequiredspacing.

Position,plumbandfixintermediateprops.

Constructanderectsidewallsandbeamsoffit
Fromworkingdrawingsthejoistlengthcanbedeterminedbydevelopingafullsizeorscaledsetoutdrawingofa
crosssectionofthebeambeingconstructed.Allowforformworkandbracingrequiredinthedevelopment.

Markoutapatternjoistfromyoursetoutdrawing.

Markouttherequirednumberofjoistsfromthepattern.Beamjoistsshouldthenbefixedinpositionacrossthe
bearers.

Fixthesoffit.Thewidthofthesoffitcanbedeterminedfromyourfullsizesetout.

Useastringlinetoaccuratelypositionthepanelsusedtoformthesoffitbetweencolumns.Supporttheedgeofthe
soffitpanelsbyplacinganextrajoistundertheendedgeofpanels.

Obtainstudheightsforwallsfromfullsizesetout.

Constructthetimberframewallpanelsinsections.

Erectthewallframestoeachedgeofthesoffitliningadjusteachpanelforplumbandlineusingbraces.

Fixwalers,kickerscleatsandbracingplate.

Fixtieboltsasspecified.
UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page21

SUSPENDEDSLABS
Suspendedfloorslabscanbeconstructedusingcastinsitu,precastunitsoracombinationofboth.Whichevermethodis
used,itisimportanttosupporttheproposedmethodofconstructionusingacombinationoftimberorsteelbearersand
adjustableshoring.Thespacingandtypeofsupportsystemrequiredisdeterminedbytheloadimposedduringthe
constructionprocess.Manufacturersprovidetablestoassistintheselectionandspacingofadjustableshoringsystems.

Theerectionsequenceforconstructingasuspendedfloorslabincludes:

Determiningthebearerspacing;
Erectingbearersandjoists;
Fixingthesheeting;
Preparationforconcrete.

Designandconstructionofslabformwork
Asanumberofcollapseshaveoccurredwhenpouringsuspendedslabs,
carefulattentionmustbegiventotheoverallsupport
system.Unlessusingaproprietaryorwellprovensystem,

engineerdesignisrequired.Deckingwillprobablybeplywood
sheetsorshutters,butboardsandjoistscouldbeused.

Thicksheetsoffibrecementarealsosuitable.Propsandother

falseworkmustbeperfectlyplumbatthetimeofpouringthe
concrete.

Allpropsandfalseworkmustbetiedtogetherandbraced.
Proprietarybearersintimberorsteelareoftenusedas

theirbearingcapacityiseasilydetermined.Considerationmust

begiventotheorderofstriking,andtheinstallationof
permanentorbackpropping.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page22

DeterminingTheBearerSpacing
Tocalculatethebearerspacingmeasurethespanbetweenthesupportingwalls.Dividethespanbytherecommended
bearerspacing.Thiswilldeterminethenumberofspacesbetweenbearers.Dividethespanbythenumberofcalculated
spaces.Thiswillestablishthecentretocentrespacingofbearers.

ErectingBearersAndJoists

Bearers
Positioningbearersforasuspendedslabarethesameasforabeamhowever:itisimportantthatsoleplatesarefirmly
beddedoneithercompactedgroundorlevelconcrete.Bearersupportsmustbeadequatelybraced.Extrabearersmaybe
requiredtosupportjoistsandsheetingeithersideofmajorpenetrations.

Checkthefollowing:

bearersarepositionedandsetinlineandadjustedtothecorrectlevel.

soleplatesarebeddedfirmlyandpositionedcentraltothebearer.

allbearersupportsareplumb.

bearerjoinsaresupported.

bearersareseatedcentrallyinUheads.

supportsspacedasspecifiedandarefirmlyfixedattheheadandbearingplate.

allsupportsarehorizontallyanddiagonallybraced.

Joists
Thepositionofjoistsisdeterminedbythesheetlengthandthecentretocentrespacingoftheintermediatejoists.Check
withthespecificationsofthesheetingmaterialbeingused.Determinetheperimetersupportrequired,layingpatternand
whetherthefacegrainistorunparallelorat90degreestothejoists.Thiswilleffectthejoistarrangement.

Markoutthejoistspacingonthesidewallsclearlyidentifyingthejoistsattheendofeachsheet.

Sheetingedgesmustfallonthecentreofajoist.

Cutrequirednumberofjoiststolength.

Positionthejoistscentrallyoverthesetoutlines.

FixingTheSheeting
Ifusingformplyforsheeting,itisimportanttoavoiddamagingtheedgesofsheets.
Bysealingtheedgesofsheetsyouwillpreventswelling.
Positionthefirstrowofsheetingstraightandsquare,thiswillmakefittingtheremaindersimpler.
Fixintermediatesheeting.
Nailoffsheets,sealandinstallanybevelledtrimrequiredtoexternalandinternalcorners.
Somespecificationsrequiresurfacetapetobeappliedoverbuttjoints.
Checkthatjointsaresealed,levelandtight.
Intersectionsatedgebeamformworkareplanedflat.
Sheetingisfixedasspecified.
UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page23

Jointsarewatertight.
Anypanelscuttoaccommodatepenetrationsoropeningsarethecorrectshapeanddimensionandintherequired
position.
Alljointsofsheetsarefullysupported.

PreparationForConcrete
Taskstobecompletedbeforetheconcreteiscastinclude:
Clearingthedeckingofalldebris;
Markingoutforreinforcing;
Applyareleaseagenttosheeting;
Checksitedocumentationandwithsubcontractorstoaccommodatesleeves,penetrationsandconduitforservices;
Fixreinforcingsteelinaccordancewithstructuraldetails;
Finalcleanandinspectionrequired.

PROPRIETARYFORMWORK
ProprietaryformworkSystemsaresuppliedbycompaniessuchasBoralAcrow,andRapidMetalDevelopmentsinNZ,andfor
specificprojectsareoftensuppliedbyoverseascompanies.

BoralAcrowsupplies:

UForm(Universal):forwalls,columns,beams,andslabswithvariousaccessoriesforscaffoldingsupport.Shuttersare
joinedwithsnapties.

"Flexibleform":forcurvedstructures,andcanbecombinedwith"Uform".

Forsomeprojects,specialformworkisdesignedandconstructed,oftenworkinginconjunctionwithanoverseascompany.

TEMPORARYPROPPING(SHORING)

Asearlystrikingofbeamandslabsoffitformworkisdesirableforearlyreuse,someformoftemporarysupportisgenerally
needed.

Althoughofatemporarynature,itisoftencalledpermanentpropping,withtemporaryproppingbeingusedwhileconcreteis
poured.

Typicalpermanentshoringorpropping

Undisturbed:Formsarestruckwithoutdisturbingthepropsthataretobeleftinplace.Proprietarysystemsallowthis.

Secondary:Propsareplacedindesignedlocationsbeforedisturbinganyoftheexistingprops.

Partial:Thesoffitformworkisstruckshutterbyshutterandnewpropsareplacedprogressively.

Total:Thecompletesoffitisstruckandreproppedbeforeanyconstructionworkcommencesabove.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page24

FALSEWORK

Falseworkistemporarystructureorframeworkusedinconstructiontosupportmaterials,equipment,orformwork.(SeeOSH
SafetyinConstructionGuideNo7)

Mostfalseworkisvertical,supportingbeamsandslabs.Falseworkmustbeengineerdesigned.

Aswellassupportingtheweight,allowancemustbemadeforsidewaypressuressuchaswind,stacksofmaterialscausing
eccentricloading,propsoutofplumb,formworkbeing

struckbymachineryorcraneloads.

Falseworkcanbe:

timber;
scaffoldtubewithadjustablescrewjacks,toporbottom,orboth;
proprietarypropsuchasAcrowprop;
proprietarybracedframesuchasAcrowshore;
proprietaryfloorcentre(atelescopicbeam);
proprietarybeamclampssuchasAcrowbeamclampwhichcombinesformworkandfalsework.

Settingupfalsework:
Basemustbelevelandfirm.Asoleplateispreferable;
Propsandframesmustbeplacedasperdesign;
Placepropscentrallyundermembers;
Bracefalseworkintwodirections;
Floorcentresmusthavefullbearingfortheendtongues;
Beamsmustbecentredoverpropstopreventeccentric(outofline)loading.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page25

STAIRFORMWORK
Pointstoconsiderwhendesigningstairformwork
Stairformworkmustsupporttheweightofconcrete.Theweightofthethroatofthestairandthestepswillhaveto
besupported.
Becauseoftheslopeofthestair,someoftheforceistransmittedsideways.Allformworkmustbewelltiedtogether
topreventsidewaymovement.
Considerthefinishofthestairtreadsandtypeofnosing.Spacemayhavetobeleftforpurposemadenosing.

Step nosing

Riser, vertical or
raked

Rebate for purpose


made nosing
Throat

Thedesignofthestairmustconformtothestairdesignregulationse.g.residentialorcommercial.RefertotheBuildingCode
D1forstairdesignandregulations.

StairFormworkconstruction
Sheathingcanbedressedboardslaidacrossorlongitudinallyorusesheetmaterialsuchasplywoodorparticle
board.
Dressedboardsmayhavesheetmaterialfixedontoptopreventlossofgrout.
Joistsandbearersmustbespacedtoavoidunduesaggingofanypartofthestructure.Selecttimbercarefullyto
avoidweaknessescausedbyknotsorcrossgrain.
Verticalstrutsmusthaveameansofheightadjustmentandbeverysecurelyfixedtothebearerstoprevent
sidewaysmovement.
Placeandfixriserboardsaccurately.Forsafetyallstepsmustbethesamesize.
Ensurethatallreinforcingsteelisplacedexactlyasshownonthedrawings.Misplacingthesteel,particularlyin
depth,canalterthestrengthofthefinishedstair.Ensureadequatecoveronexteriorstairs.
Placeinsertsforbalustersandnosingpiecesasrequired.

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page26

CROSSSECTIONOFSTAIRFORMWORK

TREADS,NOSINGS,BALUSTRADING.

Treads
Itisverydifficulttoputahighqualityfinishonthesurfaceofinsitupouredstepsbecauseofthedifficultyingettingunder
andaroundtheriserboardsandstrongbacks.Itisgenerallybettertoallowforlaterplasteringorcoveringofthestepswith
tilesetc.

Raiser form

Beveled at 450 for trowel

access

UNITECNewZealandAppliedTechnologyInstitute Revised2009
Formwork Page27

Nosings
Concretenosingsareverypronetochipping.Itiscommonpracticetoreinforcethecornerwithapurposemadenosingsuch
as:
Vinyl,aluminium,ceramic,etc.Nosingsalsohelptomakethestepsnonslip.

Balustrading
Provisionmustbemadeforfixingbalustradingunlessitistobefixedatthesurfaceusingmasonrybolts.Balustradingcanbe
madefromgalvanisedwroughtiron,galvanisedpipe,aluminium,stainlesssteel,etc.,mostofwhichissitemeasuredafter
stepshavebeenpoured.

Balustradingactsasaguardrailing.Itmustbestrongenoughtoresistapersonfallingagainstitandbeleast900mmto1m
high.

Precaststairways
Inmanybuildingsandinparticularinmultistoreybuildings,thereareoftenagreaternumberofidenticalstairflights.In
thesecasestheadvantagesofprecastingthestairsmeritconsideration.

STRIKING,MAINTENANCE,STORAGEOFFORMWORK

Striking
Ascolumnandbeamsideformworkwillberemovedbeforebeamandslabsoffitformwork,provisionmustbemadeforeasy
removalandinthecorrectorder.
Ifbeamandslabsoffitformworkistoberemovedbeforetheconcretehasachievedworkingstrength,permanentpropping
orshoringisrequired.
Takecaretoavoiddamagetoformworkwhichistobereused.Eightormoreusesmaybeobtainedfromtimberformwork.

Maintenance
Cleanformswithstiffbrushandcleancoldwater.
Usescrapersonlyasalastresort.
Keepformswelloiledtopreventdelaminationofplywoodorrustingofsteelandalwaysoiltheedges.

Storageofforms
Anyformworkwithsteelcomponentsshouldbestoredinthedry.
Avoiddirectsunlightontimberforms.
Storeclearofthegroundwithouttwistorbend,andkeepfreeofdirt.

UNITECNewZealandAppliedTechnologyInstitute Revised2009