MUNICPIO:SANTA MARIA
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS - CAMOBI
CAPTULO DISCRIMINAO TOTAL SEM B.D.I TOTAL COM B.D.I
I SERVIOS PRELIMINARES R$ 63,494.01 R$ 81,081.71
II - ADMINISTRAO LOCAL TOTAL SEM B.D.I. 525,627.67 TOTAL COM B.D.I. 671,226.53
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
III - REDES COLETORAS BACIA 1
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
III - REDES COLETORAS BACIA 1 TOTAL SEM B.D.I. TOTAL COM B.D.I. TOTAL
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015 TOTAL GERAL
MUNICIPIO:SANTA MARIA
III - REDES COLETORAS BACIA 1
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
3 MOVIMENTO DE SOLO 04.00.00.00
3.1 Escavao de Solo Valas 04.02.00.00
3.1.1 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 12,661 6.81 7.97 86,276.49 27.70% 8.70 110,150.70 #N/A
3.1.2 Escavao de valas mecnica, solo 0-3 m 04.02.02.43 m3 7,090 7.22 8.45 51,223.48 27.70% 9.23 65,440.70 #N/A
3.1.3 Escavao de valas mecnica, solo 0-4 m 04.02.02.44 m3 8,141 7.76 9.08 63,201.84 27.70% 9.91 80,677.31 #N/A
3.1.4 Escavao de valas mecnica, solo 0-5 m 04.02.02.45 m3 1,525 8.84 10.34 13,482.07 27.70% 11.29 17,217.25 #N/A
3.1.5 Escavao de valas mecnica, solo 0-6 m 04.02.02.46 m3 1,243 9.53 11.15 11,849.83 27.70% 12.17 15,127.31 #N/A
3.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
3.2.1 Reenchimento compactado percusso 04.09.02.01 m3 21,103 7.24 8.47 152,824.76 27.70% 9.25 195,202.75 #N/A
3.2.2 Reenchimento manual apiloado 04.09.02.02 m3 5,494 11.05 12.92 60,690.02 27.70% 14.11 77,520.34 #N/A
3.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 1004.09.02.03
km) m3 12,497 47.60 55.67 594,830.33 27.70% 60.78 759,567.66 #N/A
3.2.4 Argila ou saibro para aterro/reaterro (inclusive carga, descarga e transporte
04.09.02.09
at 10 km) m3 5,659 21.18 24.77 119,848.28 27.70% 27.04 153,019.36 #N/A
3.2.5 Lastro de areia 04.09.03.01 m3 1,446 54.84 64.14 79,298.21 27.70% 70.03 101,263.38 #N/A
3.2.6 Lastro de brita 04.09.03.02 m3 7 64.85 75.85 453.96 27.70% 82.82 579.74 #N/A
3.3 Carga, Transporte, Descarga 04.10.00.00 -
3.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 19,609 2.73 3.19 53,482.57 27.70% 3.48 68,239.32 #N/A
3.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 19,609 5.88 6.88 115,347.98 27.70% 7.51 147,263.59 #N/A
3.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 13,943 7.37 8.62 102,761.30 27.70% 9.41 131,203.63
3.3.4 Complementao de transporte de solo para emprstimo - 15 km ### m3 5,659 10.99 12.85 62,174.02 27.70% 14.03 79,395.77
-
4 ESCORAMENTO 05.00.00.00 -
4.1 Escoramento Metlico 05.02.00.00 -
4.1.1 Escoramento continuo metlico, blindagem leve, valas at 2 m 05.02.00.40 m2 27,905 13.95 16.31 389,136.62 27.70% 17.81 496,988.05 #N/A
4.2.2 Escoramento contnuo metlico, blindagem pesada, valas acima de 2 m05.02.00.50 m2 19,158 25.70 30.06 492,385.51 27.70% 32.82 628,765.56 #N/A
5 ESGOTAMENTO 06.00.00.00 -
5.1 Esgotamento com Bombas 06.01.00.00 -
5.1.1 Esgotamento com bomba auto-escorvante 3,5 HP, a gasolina 06.01.00.10 h 3,800 4.51 5.27 17,122.23 27.70% 5.75 21,850.00 #N/A
III - REDES COLETORAS BACIA 1 TOTAL SEM B.D.I. - TOTAL COM B.D.I. TOTAL
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
III - REDES COLETORAS BACIA 1
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
6 FUNDAO E ESTRUTURA 08.00.00.00
6.1 Lastro 08.03.00.00
6.1.1 Lastro de brita n 2 08.03.00.14 m3 12 53.45 62.52 641.46 27.70% 68.26 819.12 #N/A
6.2 Frmas e Cimbramentos 08.04.00.00 -
6.2.1 Frmas planas para fundaes, com escoramento 08.04.00.22 m2 266 39.14 45.78 10,411.75 27.70% 49.98 13,294.68 #N/A
6.3 Armaduras 08.05.00.00 -
6.3.1 Armadura CA-50, 6,3 mm a 12,5 mm - Fornecimento, corte (com perda de08.05.00.22
10%), dobra e colocao
kg 3,103 5.82 6.81 18,067.37 27.70% 7.44 23,086.32 #N/A
6.4 Concreto 08.06.00.00 -
6.4.1 Concreto Fck=20 MPa, mnimo 293 kg cimento/m, fins hidrulicos 08.06.00.22 m3 33 356.36 416.79 11,759.73 27.70% 455.07 15,017.31 #N/A
6.5 Caixas e Poos 08.10.00.00 -
6.5.1 Montagem, carga, descarga e transporte de inspeo tubular at DN 15008.10.03.10 un 79 53.22 62.24 4,204.00 27.70% 67.96 5,368.84 #N/A
6.5.2 Montagem, carga, descarga e transporte de tampo de ferro para PV 08.10.04.10 un 232 54.69 63.96 12,687.11 27.70% 69.83 16,200.56 #N/A
6.5.3 Montagem, carga, descarga e transporte de pr-moldados de concreto para
08.10.04.20
PV m 470 50.15 58.65 23,568.50 27.70% 64.04 30,098.80 #N/A
6.5.4 Complementao de transporte de pr-moldados de concreto para PV - 10 km### m 470 8.29 9.70 3,897.95 27.70% 10.59 4,977.30
-
7 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
7.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
7.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 150 09.01.05.04 m 18,381 2.48 2.90 45,575.69 27.70% 3.17 58,267.77 #N/A
7.1.2 Assentamento, carga, descarga e transporte de tubos de PVC DN 200 09.01.05.05 m 1,444 2.86 3.35 4,135.98 27.70% 3.66 5,285.04 #N/A
7.1.3 Assentamento, carga, descarga e transporte de tubos de PVC DN 250 09.01.05.06 m 728 3.44 4.02 2,502.21 27.70% 4.39 3,195.92 #N/A
7.1.4 Assentamento, carga, descarga e transporte de tubos de PVC DN 300 09.01.05.07 m 421 4.05 4.74 1,706.19 27.70% 5.18 2,180.78 #N/A
7.1.5 Assentamento, carga, descarga e transporte de tubos concreto DN 400 09.01.10.09 m 20 22.11 25.86 442.21 27.70% 28.23 564.60 #N/A
7.1.6 Complementao de transporte de tubos de PVC DN 150 - 10 km ### m 18,381 0.73 0.85 13,358.39 27.70% 0.93 17,094.33
7.1.7 Complementao de transporte de tubos de PVC DN 200 - 10 km ### m 1,444 0.77 0.90 1,111.16 27.70% 0.98 1,415.12
7.1.8 Complementao de transporte de tubos de PVC DN 250 - 10 km ### m 728 0.97 1.13 703.36 27.70% 1.23 895.44
7.1.9 Complementao de transporte de tubos de PVC DN 300 - 10 km ### m 421 1.03 1.20 431.95 27.70% 1.31 551.51
7.1.10 Complementao de transporte de tubos de concreto DN 400 - 10 km ### m 20 3.04 3.55 60.71 27.70% 3.88 77.60
III - REDES COLETORAS BACIA 1 TOTAL SEM B.D.I. - TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
III - REDES COLETORAS BACIA 1
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
8 PAVIMENTAO 10.00.00.00
8.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
8.1.1 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 7,546 5.85 6.84 44,130.52 27.70% 7.47 56,368.62 #N/A
8.1.2 Remoo de pavimento articulado 10.01.00.78 m2 12,765 3.69 4.32 47,148.80 27.70% 4.72 60,250.80 #N/A
8.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
8.2.1 Recomposio de pavimento de saibro com basalto decomposto ### m2 5,132 13.23 15.47 67,880.19 27.70% 16.89 86,679.48
8.2.2 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 7,546 35.66 41.71 269,105.83 27.70% 45.54 343,644.84 #N/A
8.2.3 Recomposio de pavimento articulado 10.02.00.78 m2 12,765 19.11 22.35 243,929.58 27.70% 24.40 311,466.00 #N/A
8.3 Recomposio de Base para Pavimentos 10.03.00.00 -
8.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 1,509 53.45 62.52 80,662.99 27.70% 68.26 103,004.34 #N/A
8.4 Transporte de Material -
8.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 1,140 1.13 1.32 1,286.60 27.70% 1.44 1,641.60
III - REDES COLETORAS BACIA 1 TOTAL SEM B.D.I. 3,580,940.49 TOTAL COM B.D.I. 4,572,925.80
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
IV - RAMAIS PREDIAIS DA BACIA 1
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para ramais prediais de esgotos 02.04.01.50 m 10,519 0.69 0.81 7,284.93 27.70% 0.88 9,256.72 #N/A
1.1.2 Cadastro e desenho para ligaes prediais 02.04.02.30 m 10,519 0.64 0.75 6,745.31 27.70% 0.82 8,625.58 #N/A
-
2 MOVIMENTO DE SOLO 04.00.00.00 -
2.1 Escavao de Solo Valas 04.02.00.00 -
2.1.1 Escavao de valas manual, solo 0-2 m 04.02.01.42 m3 2,893 27.68 32.37 80,067.68 27.70% 35.34 102,238.62 #N/A
2.1.2 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 2,893 6.81 7.97 19,713.91 27.70% 8.70 25,169.10 #N/A
2.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
2.2.1 Reenchimento compactado percusso 04.09.02.01 m3 1,394 7.24 8.47 10,095.14 27.70% 9.25 12,894.50 #N/A
2.2.2 Reenchimento manual apiloado 04.09.02.02 m3 2,232 11.05 12.92 24,656.01 27.70% 14.11 31,493.52 #N/A
2.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 10 km)
04.09.02.03 m3 2,232 47.60 55.67 106,238.40 27.70% 60.78 135,660.96 #N/A
2.2.4 Lastro de areia 04.09.03.01 m3 579 54.84 64.14 31,752.19 27.70% 70.03 40,547.37 #N/A
2.3 Carga, Transporte, Descarga 04.10.00.00 -
2.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 2,810 2.73 3.19 7,664.13 27.70% 3.48 9,778.80 #N/A
2.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 2,810 5.88 6.88 16,529.54 27.70% 7.51 21,103.10 #N/A
2.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 2,810 7.37 8.62 20,709.98 27.70% 9.41 26,442.10
-
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Caixas e Poos 08.10.00.00 -
3.1.1 Montagem, carga, descarga e transporte de caixa de calada para ramal predial
08.10.02.10 un 1,570 23.04 26.95 36,176.33 27.70% 29.42 46,189.40 #N/A
3.1.2 Complementao de transporte de caixa de calada para ramal predial esgoto###
- 10 km un 1,570 2.89 3.38 4,537.14 27.70% 3.69 5,793.30
-
4 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
4.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
4.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 100 09.01.05.03 m 10,519 2.12 2.48 22,304.49 27.70% 2.71 28,506.49 #N/A
4.1.2 Complementao de transporte de tubos de PVC DN 100 - 10 km ### m 10,519 0.68 0.80 7,195.00 27.70% 0.87 9,151.53
IV - RAMAIS PREDIAIS DA BACIA 1 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
IV - RAMAIS PREDIAIS DA BACIA 1
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
5 PAVIMENTAO 10.00.00.00
5.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
5.1.1 Remoo de Leivas 10.01.00.11 m2 3,334 3.69 4.32 12,314.46 27.70% 4.72 15,736.48 #N/A
5.1.2 Remoo de placas regulares de basalto 10.01.00.21 m2 333 3.69 4.32 1,229.97 27.70% 4.72 1,571.76 #N/A
5.1.3 Remoo de placas irregulares de basalto 10.01.00.22 m2 400 3.69 4.32 1,477.44 27.70% 4.72 1,888.00 #N/A
5.1.4 Remoo de laje de grs 10.01.00.31 m2 67 3.69 4.32 247.47 27.70% 4.72 316.24 #N/A
5.1.5 Remoo de piso de cimento e areia espessura de 3 a 5 cm 10.01.00.36 m2 2,001 3.69 4.32 7,390.89 27.70% 4.72 9,444.72 #N/A
5.1.6 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 942 5.85 6.84 5,509.00 27.70% 7.47 7,036.74 #N/A
5.1.7 Remoo de blocos pr-moldados 10.01.00.74 m2 133 3.69 4.32 491.25 27.70% 4.72 627.76 #N/A
5.1.8 Remoo de pavimento articulado 10.01.00.78 m2 2,050 3.69 4.32 7,571.88 27.70% 4.72 9,676.00 #N/A
5.1.9 Remoo de ladrilhos hidrulicos 10.01.00.82 m2 67 3.69 4.32 247.47 27.70% 4.72 316.24 #N/A
5.1.10 Remoo de lajotas cermicas 10.01.00.84 m2 67 3.69 4.32 247.47 27.70% 4.72 316.24 #N/A
5.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
5.2.1 Recomposio de leivas 10.02.00.11 m2 3,334 3.69 4.32 12,314.46 27.70% 4.72 15,736.48 #N/A
5.2.2 Recomposio de placas regulares de basalto 10.02.00.21 m2 333 27.08 31.67 9,016.92 27.70% 34.58 11,515.14 #N/A
5.2.3 Recomposio de placas irregulares de basalto 10.02.00.22 m2 400 27.08 31.67 10,831.14 27.70% 34.58 13,832.00 #N/A
5.2.4 Recomposio de lajes de grs 10.02.00.31 m2 67 22.38 26.17 1,499.15 27.70% 28.57 1,914.19 #N/A
5.2.5 Recomposio de piso de cimento e areia espessura 3 cm 10.02.00.36 m2 2,001 20.98 24.54 41,984.38 27.70% 26.79 53,606.79 #N/A
5.2.6 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 942 35.66 41.71 33,593.65 27.70% 45.54 42,898.68 #N/A
5.2.7 Recomposio de blocos pr-moldados 10.02.00.74 m2 133 21.71 25.39 2,887.22 27.70% 27.72 3,686.76 #N/A
5.2.8 Recomposio de pavimento articulado 10.02.00.78 m2 2,050 19.11 22.35 39,173.96 27.70% 24.40 50,020.00 #N/A
5.2.9 Recomposio de ladrilhos hidrulicos 10.02.00.82 m2 67 58.16 68.02 3,896.53 27.70% 74.27 4,976.09 #N/A
5.2.10 Recomposio de lajotas cermicas 10.02.00.84 m2 67 23.91 27.97 1,602.26 27.70% 30.54 2,046.18 #N/A
5.2.11 Recomposio de pavimento de saibro com basalto decomposto ### m2 322 13.23 15.47 4,259.05 27.70% 16.89 5,438.58
5.3 Recomposio de Base para Pavimentos 10.03.00.00 -
5.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 188 53.45 62.52 10,049.46 27.70% 68.26 12,832.88 #N/A
5.4 Transporte de Material -
5.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 142 1.13 1.32 160.26 27.70% 1.44 204.48
IV - RAMAIS PREDIAIS DA BACIA 1 TOTAL SEM B.D.I. 609,665.96 TOTAL COM B.D.I. 778,489.52
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
V - REDES COLETORAS DA BACIA 2
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e Nivelamento para obras de condutos livres 02.04.01.20 m 5,393 0.91 1.06 4,887.68 27.70% 1.16 6,255.88 #N/A
1.1.2 Cadastro e desenho para obras de condutos livres 02.04.02.20 m 5,393 0.73 0.85 3,919.36 27.70% 0.93 5,015.49 #N/A
-
2 SERVIOS PRELIMINARES 03.00.00.00 -
2.1 Trnsito e Segurana 03.02.00.00 -
2.1.1 Sinalizao com cavaletes, placas e cones 03.02.00.10 m 3,775 1.01 1.18 3,808.60 27.70% 1.29 4,869.75 #N/A
2.1.2 Sinalizao luminosa com cavaletes, placas e cones 03.02.00.20 m 1,617 1.64 1.92 2,654.47 27.70% 2.10 3,395.70 #N/A
2.1.3 Tapume de proteo 03.02.00.30 m2 162 19.38 22.67 3,140.02 27.70% 24.75 4,009.50 #N/A
2.1.4 Passadio de ao, espessura 3/4" - 2,00 x 1,00 m 03.02.00.50 un 27 85.94 100.51 2,320.27 27.70% 109.74 2,962.98 #N/A
2.1.5 Instalaes sanitrias mveis para obras lineares 03.02.00.60 m 5,393 0.23 0.27 1,244.97 27.70% 0.29 1,563.97 #N/A
2.2 Remanejamento de Interferncia 03.06.00.00 -
2.2.1 Execuo de tampa de boca de lobo 03.06.00.21 un 6 33.05 38.66 198.33 27.70% 42.21 253.26 #N/A
2.2.2 Remanejamento de rede de gua 03.06.00.22 m 270 42.26 49.43 11,410.92 27.70% 53.97 14,571.90 #N/A
2.2.3 Conserto de rede de gua 03.06.00.23 m 22 20.08 23.49 441.85 27.70% 25.65 564.30 #N/A
2.2.4 Conserto de ramal de gua 03.06.00.24 m 82 11.11 12.99 910.73 27.70% 14.18 1,162.76 #N/A
2.2.5 Execuo de caixa de pluvial 03.06.00.25 un 3 3,235.94 3,784.72 9,707.81 27.70% 4,132.29 12,396.87 #N/A
2.2.6 Remanejamento de rede pluvial DN 300 03.06.00.26 m 19 130.46 152.58 2,478.66 27.70% 166.59 3,165.21 #N/A
2.2.7 Remanejamento de rede pluvial DN 400 03.06.00.27 m 19 159.47 186.51 3,029.85 27.70% 203.64 3,869.16 #N/A
2.2.8 Remanejamento de rede pluvial DN 500 03.06.00.28 m 9 182.93 213.95 1,646.35 27.70% 233.60 2,102.40 #N/A
2.2.9 Remanejamento de rede pluvial DN 600 03.06.00.29 m 9 200.22 234.17 1,801.94 27.70% 255.68 2,301.12 #N/A
-
V - REDES COLETORAS DA BACIA 2 TOTAL SEM B.D.I. 837,839.23 TOTAL COM B.D.I. 1,069,940.33
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VI - RAMAIS PREDIAIS DA BACIA 2
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para ramais prediais de esgotos 02.04.01.50 m 2,591 0.69 0.81 1,794.40 27.70% 0.88 2,280.08 #N/A
1.1.2 Cadastro e desenho para ligaes prediais 02.04.02.30 m 2,591 0.64 0.75 1,661.48 27.70% 0.82 2,124.62 #N/A
-
2 MOVIMENTO DE SOLO 04.00.00.00 -
2.1 Escavao de Solo Valas 04.02.00.00 -
2.1.1 Escavao de valas manual, solo 0-2 m 04.02.01.42 m3 713 27.68 32.37 19,733.24 27.70% 35.34 25,197.42 #N/A
2.1.2 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 713 6.81 7.97 4,858.63 27.70% 8.70 6,203.10 #N/A
2.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
2.2.1 Reenchimento compactado percusso 04.09.02.01 m3 343 7.24 8.47 2,483.95 27.70% 9.25 3,172.75 #N/A
2.2.2 Reenchimento manual apiloado 04.09.02.02 m3 550 11.05 12.92 6,075.63 27.70% 14.11 7,760.50 #N/A
2.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 10 km)
04.09.02.03 m3 550 47.60 55.67 26,178.82 27.70% 60.78 33,429.00 #N/A
2.2.4 Lastro de areia 04.09.03.01 m3 142 54.84 64.14 7,787.24 27.70% 70.03 9,944.26 #N/A
2.3 Carga, Transporte, Descarga 04.10.00.00 -
2.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 692 2.73 3.19 1,887.40 27.70% 3.48 2,408.16 #N/A
2.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 692 5.88 6.88 4,070.62 27.70% 7.51 5,196.92 #N/A
2.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 692 7.37 8.62 5,100.11 27.70% 9.41 6,511.72
-
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Caixas e Poos 08.10.00.00 -
3.1.1 Montagem, carga, descarga e transporte de caixa de calada para ramal predial
08.10.02.10 un 403 23.04 26.95 9,286.03 27.70% 29.42 11,856.26 #N/A
3.1.2 Complementao de transporte de caixa de calada para ramal predial esgoto###
- 10 km un 403 2.89 3.38 1,164.63 27.70% 3.69 1,487.07
-
4 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
4.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
4.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 100 09.01.05.03 m 2,591 2.12 2.48 5,493.96 27.70% 2.71 7,021.61 #N/A
4.1.2 Complementao de transporte de tubos de PVC DN 100 - 10 km ### m 2,591 0.68 0.80 1,772.24 27.70% 0.87 2,254.17
VI - RAMAIS PREDIAIS DA BACIA 2 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VI - RAMAIS PREDIAIS DA BACIA 2
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
5 PAVIMENTAO 10.00.00.00
5.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
5.1.1 Remoo de leivas 10.01.00.11 m2 821 3.69 4.32 3,032.45 27.70% 4.72 3,875.12 #N/A
5.1.2 Remoo de placas regulares de basalto 10.01.00.21 m2 82 3.69 4.32 302.88 27.70% 4.72 387.04 #N/A
5.1.3 Remoo de placas irregulares de basalto 10.01.00.22 m2 98 3.69 4.32 361.97 27.70% 4.72 462.56 #N/A
5.1.4 Remoo de laje de grs 10.01.00.31 m2 16 3.69 4.32 59.10 27.70% 4.72 75.52 #N/A
5.1.5 Remoo de piso de cimento e areia espessura de 3 a 5 cm 10.01.00.36 m2 492 3.69 4.32 1,817.25 27.70% 4.72 2,322.24 #N/A
5.1.7 Remoo de blocos pr-moldados 10.01.00.74 m2 82 3.69 4.32 302.88 27.70% 4.72 387.04 #N/A
5.1.8 Remoo de pavimento articulado 10.01.00.78 m2 820 3.69 4.32 3,028.75 27.70% 4.72 3,870.40 #N/A
5.1.9 Remoo de ladrilhos hidrulicos 10.01.00.82 m2 16 3.69 4.32 59.10 27.70% 4.72 75.52 #N/A
5.1.10 Remoo de lajotas cermicas 10.01.00.84 m2 82 3.69 4.32 302.88 27.70% 4.72 387.04 #N/A
5.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
5.2.1 Recomposio de leivas 10.02.00.11 m2 821 3.69 4.32 3,032.45 27.70% 4.72 3,875.12 #N/A
5.2.2 Recomposio de placas regulares de basalto 10.02.00.21 m2 82 27.08 31.67 2,220.38 27.70% 34.58 2,835.56 #N/A
5.2.3 Recomposio de placas irregulares de basalto 10.02.00.22 m2 98 27.08 31.67 2,653.63 27.70% 34.58 3,388.84 #N/A
5.2.4 Recomposio de lajes de grs 10.02.00.31 m2 16 22.38 26.17 358.01 27.70% 28.57 457.12 #N/A
5.2.5 Recomposio de piso de cimento e areia espessura 3 cm 10.02.00.36 m2 492 20.98 24.54 10,323.00 27.70% 26.79 13,180.68 #N/A
5.2.6 Recomposio de blocos pr-moldados 10.02.00.74 m2 82 21.71 25.39 1,780.09 27.70% 27.72 2,273.04 #N/A
5.2.7 Recomposio de pavimento articulado 10.02.00.78 m2 820 19.11 22.35 15,669.59 27.70% 24.40 20,008.00 #N/A
5.2.8 Recomposio de ladrilhos hidrulicos 10.02.00.82 m2 16 58.16 68.02 930.51 27.70% 74.27 1,188.32 #N/A
5.2.9 Recomposio de lajotas cermicas 10.02.00.84 m2 82 23.91 27.97 1,960.98 27.70% 30.54 2,504.28 #N/A
VI - RAMAIS PREDIAIS DA BACIA 2 TOTAL SEM B.D.I. 147,544.24 TOTAL COM B.D.I. 188,401.08
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VII - REDES COLETORAS DA BACIA 3
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para obras de condutos livres 02.04.01.20 m 500 0.91 1.06 453.15 27.70% 1.16 580.00 #N/A
1.1.2 Cadastro e desenho para obras de condutos livres 02.04.02.20 m 500 0.73 0.85 363.38 27.70% 0.93 465.00 #N/A
-
2 SERVIOS PRELIMINARES 03.00.00.00 -
2.1 Trnsito e Segurana 03.02.00.00 -
2.1.1 Sinalziao com cavaletes, placas e cones 03.02.00.10 m 350 1.01 1.18 353.12 27.70% 1.29 451.50 #N/A
2.1.2 Sinalizao luminosa com cavaletes, placas e cones 03.02.00.20 m 150 1.64 1.92 246.24 27.70% 2.10 315.00 #N/A
2.1.3 Tapume de proteo 03.02.00.30 m2 15 19.38 22.67 290.74 27.70% 24.75 371.25 #N/A
2.1.4 Passadio de ao, espessura 3/4" - 2,00 x 1,00 m 03.02.00.50 un 3 85.94 100.51 257.81 27.70% 109.74 329.22 #N/A
2.1.5 Instalaes sanitrias mveis para obras lineares 03.02.00.60 m 500 0.23 0.27 115.43 27.70% 0.29 145.00 #N/A
2.2 Remanejamento de Interferncia 03.06.00.00 -
2.2.1 Execuo de tampa de boca de lobo 03.06.00.21 un 1 33.05 38.66 33.05 27.70% 42.21 42.21 #N/A
2.2.2 Remanejamento de rede de gua 03.06.00.22 m 25 42.26 49.43 1,056.57 27.70% 53.97 1,349.25 #N/A
2.2.3 Conserto de rede de gua 03.06.00.23 m 2 20.08 23.49 40.17 27.70% 25.65 51.30 #N/A
2.2.4 Conserto de ramal de gua 03.06.00.24 m 8 11.11 12.99 88.85 27.70% 14.18 113.44 #N/A
2.2.5 Execuo de caixa de pluvial 03.06.00.25 un 1 3,235.94 3,784.72 3,235.94 27.70% 4,132.29 4,132.29 #N/A
2.2.6 Remanejamento de rede pluvial DN 300 03.06.00.26 m 2 130.46 152.58 260.91 27.70% 166.59 333.18 #N/A
2.2.7 Remanejamento de rede pluvial DN 400 03.06.00.27 m 2 159.47 186.51 318.93 27.70% 203.64 407.28 #N/A
2.2.8 Remanejamento de rede pluvial DN 500 03.06.00.28 m 1 182.93 213.95 182.93 27.70% 233.60 233.60 #N/A
2.2.9 Remanejamento de rede pluvial DN 600 03.06.00.29 m 1 200.22 234.17 200.22 27.70% 255.68 255.68 #N/A
VII - REDES COLETORAS DA BACIA 3 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VII - REDES COLETORAS DA BACIA 3
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
3 MOVIMENTO DE SOLO 04.00.00.00
3.1 Escavao de Solo Valas 04.02.00.00
3.1.1 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 155 6.81 7.97 1,056.22 27.70% 8.70 1,348.50 #N/A
3.1.2 Escavao de valas mecnica, solo 0-3 m 04.02.02.43 m3 204 7.22 8.45 1,473.85 27.70% 9.23 1,882.92 #N/A
3.1.3 Escavao de valas mecnica, solo 0-4 m 04.02.02.44 m3 603 7.76 9.08 4,681.33 27.70% 9.91 5,975.73 #N/A
3.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
3.2.1 Reenchimento compactado percusso 04.09.02.01 m3 719 7.24 8.47 5,206.89 27.70% 9.25 6,650.75 #N/A
3.2.2 Reenchimento manual apiloado 04.09.02.02 m3 141 11.05 12.92 1,557.57 27.70% 14.11 1,989.51 #N/A
3.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 04.09.02.03 m3 427 47.60 55.67 20,324.28 27.70% 60.78 25,953.06 #N/A
3.2.4 Argila ou saibro para aterr/reaterro (inclusive carga, descarga e transp 04.09.02.09 m3 145 21.18 24.77 3,070.86 27.70% 27.04 3,920.80 #N/A
3.2.5 Lastro de areia 04.09.03.01 m3 37 54.84 64.14 2,029.07 27.70% 70.03 2,591.11 #N/A
3.3 Carga, Transporte, Descarga 04.10.00.00 -
3.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 609 2.73 3.19 1,661.02 27.70% 3.48 2,119.32 #N/A
3.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 609 5.88 6.88 3,582.38 27.70% 7.51 4,573.59 #N/A
3.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 464 7.37 8.62 3,419.73 27.70% 9.41 4,366.24
3.3.4 Complementao de transporte de solo para emprstimo - 15 km ### m3 145 10.99 12.85 1,593.08 27.70% 14.03 2,034.35
-
4 ESCORAMENTO 05.00.00.00 -
4.1 Escoramento Metlico 05.02.00.00 -
4.1.1 Escoramento continuo metlico, blindagem leve, valas at 2 m 05.02.00.40 m2 543 13.95 16.31 7,572.16 27.70% 17.81 9,670.83 #N/A
4.1.2 Escoramento contnuo metlico, blindagem pesada, valas acima de 2 m 05.02.00.50 m2 1,149 25.70 30.06 29,530.79 27.70% 32.82 37,710.18 #N/A
-
5 ESGOTAMENTO 06.00.00.00 -
5.1 Esgotamento com Bombas 06.01.00.00 -
5.1.1 Esgotamento com bomba auto-escorvante 3,5 HP, a gasolina 06.01.00.10 h 120 4.51 5.27 540.70 27.70% 5.75 690.00 #N/A
VII - REDES COLETORAS DA BACIA 3 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VII - REDES COLETORAS DA BACIA 3
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
6 FUNDAO E ESTRUTURA 08.00.00.00
6.1 Lastro 08.03.00.00
6.1.1 Lastro de brita n 2 08.03.00.14 m3 1 53.45 62.52 53.45 27.70% 68.26 68.26 #N/A
6.2 Frmas e Cimbramentos 08.04.00.00 -
6.2.1 Frmas planas para fundaes, com escoramento 08.04.00.22 m2 30 39.14 45.78 1,174.26 27.70% 49.98 1,499.40 #N/A
6.3 Armaduras 08.05.00.00 -
6.3.1 Armadura CA-50, 6,3 mm a 12,5 mm - Fornecimento, corte (com perda de08.05.00.22
10%), dobra e colocao
kg 331 5.82 6.81 1,927.26 27.70% 7.44 2,462.64 #N/A
6.4 Concreto 08.06.00.00 -
6.4.1 Concreto Fck=20 MPa, mnimo 293 kg cimento/m, fins hidrulicos 08.06.00.22 m3 4 356.36 416.79 1,425.42 27.70% 455.07 1,820.28 #N/A
6.5 Caixas e Poos 08.10.00.00 -
6.5.1 Montagem, carga, descarga e transporte de inspeo tubolar at DN 1 08.10.03.10 un 12 53.22 62.24 638.58 27.70% 67.96 815.52 #N/A
6.5.2 Montagem, carga, descarga e transporte de tampo de ferro para PV 08.10.04.10 un 24 54.69 63.96 1,312.46 27.70% 69.83 1,675.92 #N/A
6.5.3 Montagem, carga, descarga e transporte de pr-moldados de concreto para
08.10.04.20
PV m 49 50.15 58.65 2,457.14 27.70% 64.04 3,137.96 #N/A
6.5.4 Complementao de transporte de pr-moldados de concreto para PV - 10 km### m 49 8.29 9.70 406.38 27.70% 10.59 518.91
-
7 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
7.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
7.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 150 09.01.05.04 m 500 2.48 2.90 1,239.75 27.70% 3.17 1,585.00 #N/A
7.1.2 Complementao de transporte de tubos de PVC DN 150 - 10 km ### m 500 0.73 0.85 363.38 27.70% 0.93 465.00
VII - REDES COLETORAS DA BACIA 3 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VII - REDES COLETORAS DA BACIA 3
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
8 PAVIMENTAO 10.00.00.00
8.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
8.1.1 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 533 5.85 6.84 3,117.09 27.70% 7.47 3,981.51 #N/A
8.1.2 Remoo de pavimento articulado 10.01.00.78 m2 41 3.69 4.32 151.44 27.70% 4.72 193.52 #N/A
8.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
8.2.1 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 533 35.66 41.71 19,007.87 27.70% 45.54 24,272.82 #N/A
8.2.2 Recomposio de pavimento articulado 10.02.00.78 m2 41 19.11 22.35 783.48 27.70% 24.40 1,000.40 #N/A
8.3 Recomposio de Base para Pavimentos 10.03.00.00 -
8.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 106 53.45 62.52 5,666.19 27.70% 68.26 7,235.56 #N/A
8.4 Transporte de Material -
8.4.1 Complementao de Transporte de CBUQ - 4km ### ton 81 1.13 1.32 91.42 27.70% 1.44 116.64
-
VII - REDES COLETORAS DA BACIA 3 TOTAL SEM B.D.I. 134,612.93 TOTAL COM B.D.I. 171,901.43
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VIII - RAMAIS PREDIAIS DA BACIA 3
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para ramais prediais de esgotos 02.04.01.50 m 259 0.69 0.81 179.37 27.70% 0.88 227.92 #N/A
1.1.2 Cadastro e desenho para ligaes prediais 02.04.02.30 m 259 0.64 0.75 166.08 27.70% 0.82 212.38 #N/A
-
2 MOVIMENTO DE SOLO 04.00.00.00 -
2.1 Escavao de Solo Valas 04.02.00.00 -
2.1.1 Escavao de valas manual, solo 0-2 m 04.02.01.42 m3 71 27.68 32.37 1,965.02 27.70% 35.34 2,509.14 #N/A
2.1.2 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 71 6.81 7.97 483.82 27.70% 8.70 617.70 #N/A
2.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
2.2.1 Reenchimento compactado percusso 04.09.02.01 m3 34 7.24 8.47 246.22 27.70% 9.25 314.50 #N/A
2.2.2 Reenchimento manual apiloado 04.09.02.02 m3 55 11.05 12.92 607.56 27.70% 14.11 776.05 #N/A
2.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 04.09.02.03 m3 55 47.60 55.67 2,617.88 27.70% 60.78 3,342.90 #N/A
2.2.4 Lastro de areia 04.09.03.01 m3 14 54.84 64.14 767.76 27.70% 70.03 980.42 #N/A
2.3 Carga, Transporte, Descarga 04.10.00.00 -
2.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 69 2.73 3.19 188.19 27.70% 3.48 240.12 #N/A
2.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 69 5.88 6.88 405.89 27.70% 7.51 518.19 #N/A
2.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 69 7.37 8.62 508.54 27.70% 9.41 649.29
-
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Caixas e Poos 08.10.00.00 -
3.1.1 Montagem, carga, descarga e transporte de caixa de calada para ramal predial
08.10.02.10 un 37 23.04 26.95 852.56 27.70% 29.42 1,088.54 #N/A
3.1.2 Complementao de transporte de caixa de calada para ramal predial esgoto###
- 10 km un 37 2.89 3.38 106.93 27.70% 3.69 136.53
-
4 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
4.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
4.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 100 09.01.05.03 m 259 2.12 2.48 549.18 27.70% 2.71 701.89 #N/A
7.1.2 Complementao de transporte de tubos de PVC DN 100 - 10 km ### m 259 0.68 0.80 177.16 27.70% 0.87 225.33
VIII - RAMAIS PREDIAIS DA BACIA 3 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
VIII - RAMAIS PREDIAIS DA BACIA 3
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
5 PAVIMENTAO 10.00.00.00
5.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
5.1.1 Remoo de leivas 10.01.00.11 m2 82 3.69 4.32 302.88 27.70% 4.72 387.04 #N/A
5.1.2 Remoo de placas regulares de basalto 10.01.00.21 m2 8 3.69 4.32 29.55 27.70% 4.72 37.76 #N/A
5.1.3 Remoo de placas irregulares de basalto 10.01.00.22 m2 10 3.69 4.32 36.94 27.70% 4.72 47.20 #N/A
5.1.4 Remoo de laje de grs 10.01.00.31 m2 2 3.69 4.32 7.39 27.70% 4.72 9.44 #N/A
5.1.5 Remoo de piso de cimento e areia espessura de 3 a 5 cm 10.01.00.36 m2 49 3.69 4.32 180.99 27.70% 4.72 231.28 #N/A
5.1.6 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 75 5.85 6.84 438.62 27.70% 7.47 560.25 #N/A
5.1.7 Remoo de blocos pr-moldados 10.01.00.74 m2 3 3.69 4.32 11.08 27.70% 4.72 14.16 #N/A
5.1.8 Remoo de pavimento articulado 10.01.00.78 m2 7 3.69 4.32 25.86 27.70% 4.72 33.04 #N/A
5.1.9 Remoo de ladrilhos hidrulicos 10.01.00.82 m2 2 3.69 4.32 7.39 27.70% 4.72 9.44 #N/A
5.1.10 Remoo de lajotas cermicas 10.01.00.84 m2 8 3.69 4.32 29.55 27.70% 4.72 37.76 #N/A
5.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
5.2.1 Recomposio de leivas 10.02.00.11 m2 82 3.69 4.32 302.88 27.70% 4.72 387.04 #N/A
5.2.2 Recomposio de placas regulares de basalto 10.02.00.21 m2 8 27.08 31.67 216.62 27.70% 34.58 276.64 #N/A
5.2.3 Recomposio de placas irregulares de basalto 10.02.00.22 m2 10 27.08 31.67 270.78 27.70% 34.58 345.80 #N/A
5.2.4 Recomposio de lajes de grs 10.02.00.31 m2 2 22.38 26.17 44.75 27.70% 28.57 57.14 #N/A
5.2.5 Recomposio de piso de cimento e areia espessura 3 cm 10.02.00.36 m2 49 20.98 24.54 1,028.10 27.70% 26.79 1,312.71 #N/A
5.2.6 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 75 35.66 41.71 2,674.65 27.70% 45.54 3,415.50 #N/A
5.2.7 Recomposio de blocos pr-moldados 10.02.00.74 m2 3 21.71 25.39 65.13 27.70% 27.72 83.16 #N/A
5.2.8 Recomposio de pavimento articulado 10.02.00.78 m2 7 19.11 22.35 133.76 27.70% 24.40 170.80 #N/A
5.2.9 Recomposio de ladrilhos hidrulicos 10.02.00.82 m2 2 58.16 68.02 116.31 27.70% 74.27 148.54 #N/A
5.2.10 Recomposio de lajotas cermicas 10.02.00.84 m2 8 23.91 27.97 191.31 27.70% 30.54 244.32 #N/A
5.3 Recomposio de Base para Pavimentos 10.03.00.00 -
5.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 15 53.45 62.52 801.82 27.70% 68.26 1,023.90 #N/A
5.4 Transporte de Material -
5.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 12 1.13 1.32 13.54 27.70% 1.44 17.28
VIII - RAMAIS PREDIAIS DA BACIA 3 TOTAL SEM B.D.I. 16,752.05 TOTAL COM B.D.I. 21,391.10
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
IX - REDES COLETORAS DA BACIA 4
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para obras de condutos livres 02.04.01.20 m 3,004 0.91 1.06 2,722.53 27.70% 1.16 3,484.64 #N/A
1.1.2 Cadastro e desenho para obras de condutos livres 02.04.02.20 m 3,004 0.73 0.85 2,183.16 27.70% 0.93 2,793.72 #N/A
-
2 SERVIOS PRELIMINARES 03.00.00.00 -
2.1 Trnsito e Segurana 03.02.00.00 -
2.1.1 Sinalizao com cavaletes, placas e cones 03.02.00.10 m 2,045 1.01 1.18 2,063.20 27.70% 1.29 2,638.05 #N/A
2.1.2 Sinalizao luminosa com cavaletes, placas e cones 03.02.00.20 m 876 1.64 1.92 1,438.04 27.70% 2.10 1,839.60 #N/A
2.1.3 Tapume de proteo 03.02.00.30 m2 88 19.38 22.67 1,705.69 27.70% 24.75 2,178.00 #N/A
2.1.4 Passadio de ao, espessura 3/4" - 2,00 x 1,00 m 03.02.00.50 un 15 85.94 100.51 1,289.04 27.70% 109.74 1,646.10 #N/A
2.1.5 Instalaes sanitrias mveis para obras lineares 03.02.00.60 m 2,921 0.23 0.27 674.31 27.70% 0.29 847.09 #N/A
2.2 Remanejamento de Interferncia 03.06.00.00 -
2.2.1 Execuo de tampa de boca de lobo 03.06.00.21 un 3 33.05 38.66 99.16 27.70% 42.21 126.63 #N/A
2.2.2 Remanejamento de rede de gua 03.06.00.22 m 147 42.26 49.43 6,212.61 27.70% 53.97 7,933.59 #N/A
2.2.3 Conserto de rede de gua 03.06.00.23 m 12 20.08 23.49 241.01 27.70% 25.65 307.80 #N/A
2.2.4 Conserto de ramal de gua 03.06.00.24 m 45 11.11 12.99 499.79 27.70% 14.18 638.10 #N/A
2.2.5 Execuo de caixa de pluvial 03.06.00.25 un 2 3,235.94 3,784.72 6,471.87 27.70% 4,132.29 8,264.58 #N/A
2.2.6 Remanejamento de rede pluvial DN 300 03.06.00.26 m 11 130.46 152.58 1,435.01 27.70% 166.59 1,832.49 #N/A
2.2.7 Remanejamento de rede pluvial DN 400 03.06.00.27 m 11 159.47 186.51 1,754.13 27.70% 203.64 2,240.04 #N/A
2.2.8 Remanejamento de rede pluvial DN 500 03.06.00.28 m 5 182.93 213.95 914.64 27.70% 233.60 1,168.00 #N/A
2.2.9 Remanejamento de rede pluvial DN 600 03.06.00.29 m 5 200.22 234.17 1,001.08 27.70% 255.68 1,278.40 #N/A
IX - REDES COLETORAS DA BACIA 4 TOTAL SEM B.D.I. 505,775.94 TOTAL COM B.D.I. 645,898.71
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
X - RAMAIS PREDIAIS DA BACIA 4
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para ramais prediais de esgotos 02.04.01.50 m 1,575 0.69 0.81 1,090.77 27.70% 0.88 1,386.00 #N/A
1.1.2 Cadastro e desenho para ligaes prediais 02.04.02.30 m 1,575 0.64 0.75 1,009.97 27.70% 0.82 1,291.50 #N/A
-
2 MOVIMENTO DE SOLO 04.00.00.00 -
2.1 Escavao de Solo Valas 04.02.00.00 -
2.1.1 Escavao de valas manual, solo 0-2 m 04.02.01.42 m3 433 27.68 32.37 11,983.86 27.70% 35.34 15,302.22 #N/A
2.1.2 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 433 6.81 7.97 2,950.61 27.70% 8.70 3,767.10 #N/A
2.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
2.2.1 Reenchimento compactado percusso 04.09.02.01 m3 209 7.24 8.47 1,513.55 27.70% 9.25 1,933.25 #N/A
2.2.2 Reenchimento manual apiloado 04.09.02.02 m3 334 11.05 12.92 3,689.56 27.70% 14.11 4,712.74 #N/A
2.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 10 km)
04.09.02.03 m3 334 47.60 55.67 15,897.68 27.70% 60.78 20,300.52 #N/A
2.2.4 Lastro de areia 04.09.03.01 m3 87 54.84 64.14 4,771.05 27.70% 70.03 6,092.61 #N/A
2.3 Carga, Transporte, Descarga 04.10.00.00 -
2.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 421 2.73 3.19 1,148.26 27.70% 3.48 1,465.08 #N/A
2.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 421 5.88 6.88 2,476.49 27.70% 7.51 3,161.71 #N/A
2.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m 421 7.37 8.62 3,102.81 27.70% 9.41 3,961.61
-
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Caixas e Poos 08.10.00.00 -
3.1.1 Montagem, carga, descarga e transporte de caixa de calada para ramal predial
08.10.02.10 un 225 23.04 26.95 5,184.51 27.70% 29.42 6,619.50 #N/A
3.1.2 Complementao de transporte de caixa de calada para ramal predial esgoto###
- 10 km un 225 2.89 3.38 650.23 27.70% 3.69 830.25
-
4 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
4.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
4.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 100 09.01.05.03 m 1,575 2.12 2.48 3,339.63 27.70% 2.71 4,268.25 #N/A
4.1.2 Complementao de transporte de tubos de PVC DN 100 - 10 km ### m 1,575 0.68 0.80 1,077.30 27.70% 0.87 1,370.25
X - RAMAIS PREDIAIS DA BACIA 4 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
X - RAMAIS PREDIAIS DA BACIA 4
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
5 PAVIMENTAO 10.00.00.00
5.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
5.1.1 Remoo de leivas 10.01.00.11 m2 500 3.69 4.32 1,846.80 27.70% 4.72 2,360.00 #N/A
5.1.2 Remoo de placas regulares de basalto 10.01.00.21 m2 50 3.69 4.32 184.68 27.70% 4.72 236.00 #N/A
5.1.3 Remoo de placas irregulares de basalto 10.01.00.22 m2 60 3.69 4.32 221.62 27.70% 4.72 283.20 #N/A
5.1.4 Remoo de laje de grs 10.01.00.31 m2 10 3.69 4.32 36.94 27.70% 4.72 47.20 #N/A
5.1.5 Remoo de piso de cimento e areia espessura de 3 a 5 cm 10.01.00.36 m2 300 3.69 4.32 1,108.08 27.70% 4.72 1,416.00 #N/A
5.1.6 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 410 5.85 6.84 2,397.76 27.70% 7.47 3,062.70 #N/A
5.1.7 Remoo de blocos pr-moldados 10.01.00.74 m2 20 3.69 4.32 73.87 27.70% 4.72 94.40 #N/A
5.1.8 Remoo de pavimento articulado 10.01.00.78 m2 87 3.69 4.32 321.34 27.70% 4.72 410.64 #N/A
5.1.9 Remoo de ladrilhos hidrulicos 10.01.00.82 m2 10 3.69 4.32 36.94 27.70% 4.72 47.20 #N/A
5.1.10 Remoo de lajotas cermicas 10.01.00.84 m2 50 3.69 4.32 184.68 27.70% 4.72 236.00 #N/A
5.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
5.2.1 Recomposio de leivas 10.02.00.11 m2 500 3.69 4.32 1,846.80 27.70% 4.72 2,360.00 #N/A
5.2.2 Recomposio de placas regulares de basalto 10.02.00.21 m2 50 27.08 31.67 1,353.89 27.70% 34.58 1,729.00 #N/A
5.2.3 Recomposio de placas irregulares de basalto 10.02.00.22 m2 60 27.08 31.67 1,624.67 27.70% 34.58 2,074.80 #N/A
5.2.4 Recomposio de lajes de grs 10.02.00.31 m2 10 22.38 26.17 223.75 27.70% 28.57 285.70 #N/A
5.2.5 Recomposio de piso de cimento e areia espessura 3 cm 10.02.00.36 m2 300 20.98 24.54 6,294.51 27.70% 26.79 8,037.00 #N/A
5.2.6 Recomposio de pavimento flexivel espessura de 6 cm 10.02.00.70 m2 410 35.66 41.71 14,621.44 27.70% 45.54 18,671.40 #N/A
5.2.7 Recomposio de blocos pr-moldados 10.02.00.74 m2 20 21.71 25.39 434.17 27.70% 27.72 554.40 #N/A
5.2.8 Recomposio de pavimento articulado 10.02.00.78 m2 87 19.11 22.35 1,662.50 27.70% 24.40 2,122.80 #N/A
5.2.9 Recomposio de ladrilhos hidrulicos 10.02.00.82 m2 10 58.16 68.02 581.57 27.70% 74.27 742.70 #N/A
5.2.10 Recomposio de lajotas cermicas 10.02.00.84 m2 50 23.91 27.97 1,195.72 27.70% 30.54 1,527.00 #N/A
5.3 Recomposio de Base para Pavimentos 10.03.00.00 -
5.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 82 53.45 62.52 4,383.28 27.70% 68.26 5,597.32 #N/A
5.4 Transporte de Material -
5.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 26 1.13 1.32 29.34 27.70% 1.44 37.44
X - RAMAIS PREDIAIS DA BACIA 4 TOTAL SEM B.D.I. 100,550.63 TOTAL COM B.D.I. 128,395.49
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XI - REDES COLETORAS DA BACIA 5
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para obras de condutos livres 02.04.01.20 m 10,471 0.91 1.06 9,489.87 27.70% 1.16 12,146.36 #N/A
1.1.2 Cadastro e desenho para obras de condutos livres 02.04.02.20 m 10,471 0.73 0.85 7,609.80 27.70% 0.93 9,738.03 #N/A
-
2 SERVIOS PRELIMINARES 03.00.00.00 -
2.1 Trnsito e Segurana 03.02.00.00 -
2.1.1 Sinalizao com cavaletes, placas e cones 03.02.00.10 m 7,330 1.01 1.18 7,395.24 27.70% 1.29 9,455.70 #N/A
2.1.2 Sinalizao luminosa com cavaletes, placas e cones 03.02.00.20 m 3,141 1.64 1.92 5,156.27 27.70% 2.10 6,596.10 #N/A
2.1.3 Tapume de proteo 03.02.00.30 m2 314 19.38 22.67 6,086.21 27.70% 24.75 7,771.50 #N/A
2.1.4 Passadio de ao, espessura 3/4" - 2,00 x 1,00 m 03.02.00.50 un 53 85.94 100.51 4,554.61 27.70% 109.74 5,816.22 #N/A
2.1.5 Instalaes sanitrias mveis para obras lineares 03.02.00.60 m 10,471 0.23 0.27 2,417.23 27.70% 0.29 3,036.59 #N/A
2.2 Remanejamento de Interferncia 03.06.00.00 -
2.2.1 Execuo de tampa de boca de lobo 03.06.00.21 un 11 33.05 38.66 363.60 27.70% 42.21 464.31 #N/A
2.2.2 Remanejamento de rede de gua 03.06.00.22 m 524 42.26 49.43 22,145.63 27.70% 53.97 28,280.28 #N/A
2.2.3 Conserto de rede de gua 03.06.00.23 m 42 20.08 23.49 843.53 27.70% 25.65 1,077.30 #N/A
2.2.4 Conserto de ramal de gua 03.06.00.24 m 159 11.11 12.99 1,765.93 27.70% 14.18 2,254.62 #N/A
2.2.5 Execuo de caixa de pluvial 03.06.00.25 un 6 3,235.94 3,784.72 19,415.61 27.70% 4,132.29 24,793.74 #N/A
2.2.6 Remanejamento de rede pluvial DN 300 03.06.00.26 m 37 130.46 152.58 4,826.87 27.70% 166.59 6,163.83 #N/A
2.2.7 Remanejamento de rede pluvial DN 400 03.06.00.27 m 37 159.47 186.51 5,900.24 27.70% 203.64 7,534.68 #N/A
2.2.8 Remanejamento de rede pluvial DN 500 03.06.00.28 m 16 182.93 213.95 2,926.84 27.70% 233.60 3,737.60 #N/A
2.2.9 Remanejamento de rede pluvial DN 600 03.06.00.29 m 16 200.22 234.17 3,203.45 27.70% 255.68 4,090.88 #N/A
XI - REDES COLETORAS DA BACIA 5 TOTAL SEM B.D.I. 1,941,556.32 TOTAL COM B.D.I. 2,479,424.16
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XII - RAMAIS PREDIAIS DA BACIA 5
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para ramais prediais de esgotos 02.04.01.50 m 5,115 0.69 0.81 3,542.39 27.70% 0.88 4,501.20 #N/A
1.1.2 Cadastro e desenho para ligaes prediais 02.04.02.30 m 5,115 0.64 0.75 3,279.99 27.70% 0.82 4,194.30 #N/A
2 MOVIMENTO DE SOLO 04.00.00.00 -
2.1 Escavao de Solo Valas 04.02.00.00 -
2.1.1 Escavao de valas manual, solo 0-2 m 04.02.01.42 m3 1,407 27.68 32.37 38,940.62 27.70% 35.34 49,723.38 #N/A
2.1.2 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 1,407 6.81 7.97 9,587.79 27.70% 8.70 12,240.90 #N/A
2.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
2.2.1 Reenchimento compactado percusso 04.09.02.01 m3 678 7.24 8.47 4,909.97 27.70% 9.25 6,271.50 #N/A
2.2.2 Reenchimento manual apiloado 04.09.02.02 m3 1,085 11.05 12.92 11,985.56 27.70% 14.11 15,309.35 #N/A
2.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 10 km)
04.09.02.03 m3 1,085 47.60 55.67 51,643.67 27.70% 60.78 65,946.30 #N/A
2.2.4 Lastro de areia 04.09.03.01 m3 281 54.84 64.14 15,409.96 27.70% 70.03 19,678.43 #N/A
2.3 Carga, Transporte, Descarga 04.10.00.00 -
2.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 1,366 2.73 3.19 3,725.70 27.70% 3.48 4,753.68 #N/A
2.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 1,366 5.88 6.88 8,035.36 27.70% 7.51 10,258.66 #N/A
2.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 1,366 7.37 8.62 10,067.56 27.70% 9.41 12,854.06
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Caixas e Poos 08.10.00.00 -
3.1.1 Montagem, carga, descarga e transporte de caixa de calada para ramal predial
08.10.02.10 un 783 23.04 26.95 18,042.08 27.70% 29.42 23,035.86 #N/A
3.1.2 Complementao de transporte de caixa de calada para ramal predial esgoto###
- 10 km un 783 2.89 3.38 2,262.79 27.70% 3.69 2,889.27
-
4 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
4.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
4.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 100 09.01.05.03 m 5,115 2.12 2.48 10,845.85 27.70% 2.71 13,861.65 #N/A
4.1.2 Complementao de transporte de tubos de PVC DN 100 - 10 km ### m 5,115 0.68 0.80 3,498.66 27.70% 0.87 4,450.05
XII - RAMAIS PREDIAIS DA BACIA 5 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XII - RAMAIS PREDIAIS DA BACIA 5
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
5 PAVIMENTAO 10.00.00.00
5.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
5.1.1 Remoo de leivas 10.01.00.11 m2 1,613 3.69 4.32 5,957.78 27.70% 4.72 7,613.36 #N/A
5.1.2 Remoo de placas regulares de basalto 10.01.00.21 m2 161 3.69 4.32 594.67 27.70% 4.72 759.92 #N/A
5.1.3 Remoo de placas irregulares de basalto 10.01.00.22 m2 194 3.69 4.32 716.56 27.70% 4.72 915.68 #N/A
5.1.4 Remoo de laje de grs 10.01.00.31 m2 32 3.69 4.32 118.20 27.70% 4.72 151.04 #N/A
5.1.5 Remoo de piso de cimento e areia espessura de 3 a 5 cm 10.01.00.36 m2 968 3.69 4.32 3,575.40 27.70% 4.72 4,568.96 #N/A
5.1.6 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 556 5.85 6.84 3,251.60 27.70% 7.47 4,153.32 #N/A
5.1.7 Remoo de blocos pr-moldados 10.01.00.74 m2 65 3.69 4.32 240.08 27.70% 4.72 306.80 #N/A
5.1.8 Remoo de pavimento articulado 10.01.00.78 m2 976 3.69 4.32 3,604.95 27.70% 4.72 4,606.72 #N/A
5.1.9 Remoo de ladrilhos hidrulicos 10.01.00.82 m2 32 3.69 4.32 118.20 27.70% 4.72 151.04 #N/A
5.1.10 Remoo de lajotas cermicas 10.01.00.84 m2 161 3.69 4.32 594.67 27.70% 4.72 759.92 #N/A
5.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
5.2.1 Recomposio de leivas 10.02.00.11 m2 1,613 3.69 4.32 5,957.78 27.70% 4.72 7,613.36 #N/A
5.2.2 Recomposio de placas regulares de basalto 10.02.00.21 m2 161 27.08 31.67 4,359.53 27.70% 34.58 5,567.38 #N/A
5.2.3 Recomposio de placas irregulares de basalto 10.02.00.22 m2 194 27.08 31.67 5,253.10 27.70% 34.58 6,708.52 #N/A
5.2.4 Recomposio de lajes de grs 10.02.00.31 m2 32 22.38 26.17 716.01 27.70% 28.57 914.24 #N/A
5.2.5 Recomposio de piso de cimento e areia espessura 3 cm 10.02.00.36 m2 968 20.98 24.54 20,310.29 27.70% 26.79 25,932.72 #N/A
5.2.6 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 556 35.66 41.71 19,828.10 27.70% 45.54 25,320.24 #N/A
5.2.7 Recomposio de blocos pr-moldados 10.02.00.74 m2 65 21.71 25.39 1,411.05 27.70% 27.72 1,801.80 #N/A
5.2.8 Recomposio de pavimento articulado 10.02.00.78 m2 976 19.11 22.35 18,650.63 27.70% 24.40 23,814.40 #N/A
5.2.9 Recomposio de ladrilhos hidrulicos 10.02.00.82 m2 32 58.16 68.02 1,861.03 27.70% 74.27 2,376.64 #N/A
5.2.10 Recomposio de lajotas cermicas 10.02.00.84 m2 161 23.91 27.97 3,850.21 27.70% 30.54 4,916.94 #N/A
5.2.11 Recomposio de pavimento de saibro com basalto decomposto ### m2 81 13.23 15.47 1,071.37 27.70% 16.89 1,368.09
5.3 Recomposio de Base para Pavimentos 10.03.00.00 -
5.3.1 Recomposio de base de brita graduada 10.03.00.10 m 111 53.45 62.52 5,933.46 27.70% 68.26 7,576.86 #N/A
5.4 Transporte de Material -
5.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 35 1.13 1.32 39.50 27.70% 1.44 50.40
XII - RAMAIS PREDIAIS DA BACIA 5 TOTAL SEM B.D.I. 303,792.12 TOTAL COM B.D.I. 387,916.94
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XIII - REDES COLETORAS DA BACIA 6
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para obras de condutos livres 02.04.01.20 m 21,120 0.91 1.06 19,141.06 27.70% 1.16 24,499.20 #N/A
1.1.2 Cadastro e desenho para obras de condutos livres 02.04.02.20 m 21,120 0.73 0.85 15,348.96 27.70% 0.93 19,641.60 #N/A
2 SERVIOS PRELIMINARES 03.00.00.00 -
2.1 Trnsito e Segurana 03.02.00.00 -
2.1.1 Sinalizao com cavaletes, placas e cones 03.02.00.10 m 14,784 1.01 1.18 14,915.58 27.70% 1.29 19,071.36 #N/A
2.1.2 Sinalizao luminosa com cavaletes, placas e cones 03.02.00.20 m 6,336 1.64 1.92 10,401.18 27.70% 2.10 13,305.60 #N/A
2.1.3 Tapume de proteo 03.02.00.30 m2 6,334 19.38 22.67 122,770.97 27.70% 24.75 156,766.50 #N/A
2.1.4 Passadio de ao, espessura 3/4" - 2,00 x 1,00 m 03.02.00.50 un 106 85.94 100.51 9,109.22 27.70% 109.74 11,632.44 #N/A
2.1.5 Instalaes sanitrias mveis para obras lineares 03.02.00.60 m 21,120 0.23 0.27 4,875.55 27.70% 0.29 6,124.80 #N/A
2.2 Remanejamento de Interferncia 03.06.00.00 -
2.2.1 Execuo de tampa de boca de lobo 03.06.00.21 un 22 33.05 38.66 727.19 27.70% 42.21 928.62 #N/A
2.2.2 Remanejamento de rede de gua 03.06.00.22 m 1,056 42.26 49.43 44,629.36 27.70% 53.97 56,992.32 #N/A
2.2.3 Conserto de rede de gua 03.06.00.23 m 85 20.08 23.49 1,707.14 27.70% 25.65 2,180.25 #N/A
2.2.4 Conserto de ramal de gua 03.06.00.24 m 320 11.11 12.99 3,554.06 27.70% 14.18 4,537.60 #N/A
2.2.5 Execuo de caixa de pluvial 03.06.00.25 un 11 3,235.94 3,784.72 35,595.29 27.70% 4,132.29 45,455.19 #N/A
2.2.6 Remanejamento de rede pluvial DN 300 03.06.00.26 m 74 130.46 152.58 9,653.74 27.70% 166.59 12,327.66 #N/A
2.2.7 Remanejamento de rede pluvial DN 400 03.06.00.27 m 74 159.47 186.51 11,800.49 27.70% 203.64 15,069.36 #N/A
2.2.8 Remanejamento de rede pluvial DN 500 03.06.00.28 m 32 182.93 213.95 5,853.67 27.70% 233.60 7,475.20 #N/A
2.2.9 Remanejamento de rede pluvial DN 600 03.06.00.29 m 32 200.22 234.17 6,406.89 27.70% 255.68 8,181.76 #N/A
XIII - REDES COLETORAS DA BACIA 6 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XIII - REDES COLETORAS DA BACIA 6
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
3 MOVIMENTO DE SOLO 04.00.00.00
3.1 Escavao de Solo Valas 04.02.00.00
3.1.1 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 12,119 6.81 7.97 82,583.11 27.70% 8.70 105,435.30 #N/A
3.1.2 Escavao de valas mecnica, solo 0-3 m 04.02.02.43 m3 8,375 7.22 8.45 60,507.28 27.70% 9.23 77,301.25 #N/A
3.1.3 Escavao de valas mecnica, solo 0-4 m 04.02.02.44 m3 6,457 7.76 9.08 50,128.27 27.70% 9.91 63,988.87 #N/A
3.1.4 Escavao de valas mecnica, solo 0-5 m 04.02.02.45 m3 4,082 8.84 10.34 36,087.74 27.70% 11.29 46,085.78 #N/A
3.1.5 Escavao de valas mecnica, solo 0-6 m 04.02.02.46 m3 1,329 9.53 11.15 12,669.69 27.70% 12.17 16,173.93 #N/A
3.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
3.2.1 Reenchimento compactado percusso 04.09.02.01 m3 22,216 7.24 8.47 160,884.94 27.70% 9.25 205,498.00 #N/A
3.2.2 Reenchimento manual apiloado 04.09.02.02 m3 5,773 11.05 12.92 63,772.02 27.70% 14.11 81,457.03 #N/A
3.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 10 km)
04.09.02.03 m3 12,905 47.60 55.67 614,250.25 27.70% 60.78 784,365.90 #N/A
3.2.4 Argila ou saibro para aterro/reaterro (inclusive carga, descarga e transporte
04.09.02.09
at 10 km) m3 6,198 21.18 24.77 131,263.41 27.70% 27.04 167,593.92 #N/A
3.2.5 Lastro de areia 04.09.03.01 m3 1,324 54.84 64.14 72,607.76 27.70% 70.03 92,719.72 #N/A
3.2.6 Lastro de brita 04.09.03.02 m3 316 64.85 75.85 20,493.15 27.70% 82.82 26,171.12 #N/A
3.3 Carga, Transporte, Descarga 04.10.00.00 -
3.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 20,742 2.73 3.19 56,572.77 27.70% 3.48 72,182.16 #N/A
3.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 20,742 5.88 6.88 122,012.74 27.70% 7.51 155,772.42 #N/A
3.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 14,229 7.37 8.62 104,869.15 27.70% 9.41 133,894.89
3.3.4 Complementao de transporte de solo para emprstimo - 15 km ### m3 6,198 10.99 12.85 68,095.88 27.70% 14.03 86,957.94
-
4 ESCORAMENTO 05.00.00.00 -
4.1 Escoramento Metlico 05.02.00.00 -
4.1.1 Escoramento continuo metlico, blindagem leve, valas at 2 m 05.02.00.40 m2 29,528 13.95 16.31 411,769.44 27.70% 17.81 525,893.68 #N/A
4.1.2 Escoramento contnuo metlico, blindagem pesada, valas acima de 2 m 05.02.00.50 m2 17,532 25.70 30.06 450,595.19 27.70% 32.82 575,400.24 #N/A
-
5 ESGOTAMENTO 06.00.00.00 -
5.1 Esgotamento com Bomba 06.01.00.00 -
5.1.1 Esgotamento com bomba auto-escorvante 3,5 HP a gasolina 06.01.00.10 h 4,000 4.51 5.27 18,023.40 27.70% 5.75 23,000.00 #N/A
XIII - REDES COLETORAS DA BACIA 6 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XIII - REDES COLETORAS DA BACIA 6
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
6 FUNDAO E ESTRUTURA 08.00.00.00
6.1 Lastro 08.03.00.00
6.1.1 Lastro de brita n 2 08.03.00.14 m3 11 53.45 62.52 588.00 27.70% 68.26 750.86 #N/A
6.2 Frmas e Cimbramentos 08.04.00.00 -
6.2.1 Frmas planas para fundaes, com escoramento 08.04.00.22 m2 253 39.14 45.78 9,902.90 27.70% 49.98 12,644.94 #N/A
6.3 Armaduras 08.05.00.00 -
6.3.1 Armadura CA-50, 6,3 mm a 12,5 mm - Fornecimento, corte (com perda de08.05.00.22
10%), dobra e colocao
kg 2,873 5.82 6.81 16,728.19 27.70% 7.44 21,375.12 #N/A
6.4 Concreto 08.06.00.00 -
6.4.1 Concreto Fck=20 MPa, mnimo 293 kg cimento/m, fins hidrulicos 08.06.00.22 m3 31 356.36 416.79 11,047.02 27.70% 455.07 14,107.17 #N/A
6.5 Caixas e Poos 08.10.00.00 -
6.5.1 Montagem, carga, descarga e transporte de inspeo tubular at DN 15008.10.03.10 un 98 53.22 62.24 5,215.09 27.70% 67.96 6,660.08 #N/A
6.5.2 Montagem, carga, descarga e transporte de tampo de ferro para PV 08.10.04.10 un 207 54.69 63.96 11,319.96 27.70% 69.83 14,454.81 #N/A
6.5.3 Montagem, carga, descarga e transporte de pr-moldados de concreto para
08.10.04.20
PV m 403 50.15 58.65 20,208.74 27.70% 64.04 25,808.12 #N/A
6.5.4 Complementao de transporte de pr-moldados de concreto para PV - 10 km### m 403 8.29 9.70 3,342.28 27.70% 10.59 4,267.77
-
7 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
7.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
7.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 150 09.01.05.04 m 19,203 2.48 2.90 47,613.84 27.70% 3.17 60,873.51 #N/A
7.1.2 Assentamento, carga, descarga e transporte de tubos de PVC DN 200 09.01.05.05 m 830 2.86 3.35 2,377.33 27.70% 3.66 3,037.80 #N/A
7.1.3 Assentamento, carga, descarga e transporte de tubos de PVC DN 300 09.01.05.07 m 97 4.05 4.74 393.11 27.70% 5.18 502.46 #N/A
7.1.4 Assentamento, carga, descarga e transporte de tubos concreto DN 400 09.01.10.09 m 786 22.11 25.86 17,378.70 27.70% 28.23 22,188.78 #N/A
7.1.5 Assentamento, carga, descarga e transporte de tubos concreto DN 500 09.01.10.11 m 204 31.87 37.27 6,500.63 27.70% 40.69 8,300.76 #N/A
7.1.6 Complementao de transporte de tubos de PVC DN 150 - 10 km ### m 19,203 0.73 0.85 13,955.78 27.70% 0.93 17,858.79
7.1.7 Complementao de transporte de tubos de PVC DN 200 - 10 km ### m 830 0.77 0.90 638.69 27.70% 0.98 813.40
7.1.8 Complementao de transporte de tubos de PVC DN 300 - 10 km ### m 97 1.03 1.20 99.52 27.70% 1.31 127.07
7.1.9 Complementao de transporte de tubos de concreto DN 400 - 10 km ### m 786 3.04 3.55 2,385.71 27.70% 3.88 3,049.68
7.1.10 Complementao de transporte de tubos de concreto DN 500 - 10 km ### m 204 4.45 5.20 906.98 27.70% 5.68 1,158.72
XIII - REDES COLETORAS DA BACIA 6 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XIII - REDES COLETORAS DA BACIA 6
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
8 PAVIMENTAO 10.00.00.00
8.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
8.1.1 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 7,431 5.85 6.84 43,457.97 27.70% 7.47 55,509.57 #N/A
8.1.2 Remoo de pavimento articulado 10.01.00.78 m2 13,696 3.69 4.32 50,587.55 27.70% 4.72 64,645.12 #N/A
8.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
8.2.1 Recomposio de pavimento de saibro com basalto decomposto ### m2 2,161 13.23 15.47 28,583.22 27.70% 16.89 36,499.29
8.2.2 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 7,431 35.66 41.71 265,004.69 27.70% 45.54 338,407.74 #N/A
8.2.3 Recomposio de pavimento articulado 10.02.00.78 m2 13,696 19.11 22.35 261,720.29 27.70% 24.40 334,182.40 #N/A
8.3 Recomposio de Base para Pavimentos 10.03.00.00 -
8.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 1,486 53.45 62.52 79,433.54 27.70% 68.26 101,434.36 #N/A
8.4 Transporte de Material -
8.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 468 1.13 1.32 528.18 27.70% 1.44 673.92
XIII - REDES COLETORAS DA BACIA 6 TOTAL SEM B.D.I. 3,753,594.45 TOTAL COM B.D.I. 4,793,413.85
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XIV - RAMAIS PREDIAIS DA BACIA 6
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para ramais prediais de esgotos 02.04.01.50 m 10,693 0.69 0.81 7,405.44 27.70% 0.88 9,409.84 #N/A
1.1.2 Cadastro e desenho para ligaes prediais 02.04.02.30 m 10,693 0.64 0.75 6,856.89 27.70% 0.82 8,768.26 #N/A
-
2 MOVIMENTO DE SOLO 04.00.00.00 -
2.1 Escavao de Solo Valas 04.02.00.00 -
2.1.1 Escavao de valas manual, solo 0-2 m 04.02.01.42 m3 2,941 27.68 32.37 81,396.15 27.70% 35.34 103,934.94 #N/A
2.1.2 Escavao de valas mecnica, solo 0-2 m 04.02.02.42 m3 2,941 6.81 7.97 20,041.00 27.70% 8.70 25,586.70 #N/A
2.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
2.2.1 Reenchimento compactado percusso 04.09.02.01 m3 1,417 7.24 8.47 10,261.70 27.70% 9.25 13,107.25 #N/A
2.2.2 Reenchimento manual apiloado 04.09.02.02 m3 2,269 11.05 12.92 25,064.74 27.70% 14.11 32,015.59 #N/A
2.2.3 Areia para aterro/reaterro (inclusive carga, descarga e transporte at 10 km)
04.09.02.03 m3 2,269 47.60 55.67 107,999.52 27.70% 60.78 137,909.82 #N/A
2.2.4 Lastro de areia 04.09.03.01 m3 588 54.84 64.14 32,245.74 27.70% 70.03 41,177.64 #N/A
2.3 Carga, Transporte, Descarga 04.10.00.00 -
2.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 2,857 2.73 3.19 7,792.32 27.70% 3.48 9,942.36 #N/A
2.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 2,857 5.88 6.88 16,806.02 27.70% 7.51 21,456.07 #N/A
2.3.3 Complementao de transporte de solo para emprstimo - 10 km ### m3 2,857 7.37 8.62 21,056.38 27.70% 9.41 26,884.37
-
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Caixas e Poos 08.10.00.00 -
3.1.1 Montagem, carga, descarga e transporte de caixa de calada para ramal predial
08.10.02.10 un 1,580 23.04 26.95 36,406.76 27.70% 29.42 46,483.60 #N/A
3.1.2 Complementao de transporte de caixa de calada para ramal predial esgoto###
- 10 km un 1,580 2.89 3.38 4,566.04 27.70% 3.69 5,830.20
-
4 ASSENTAMENTO, CARGA, DESCARGA E TRANSPORTE 09.00.00.00 -
4.1 Assentamento, Carga, Descarga e Transporte de Tubulao 09.01.00.00 -
4.1.1 Assentamento, carga, descarga e transporte de tubos de PVC DN 100 09.01.05.03 m 10,693 2.12 2.48 22,673.44 27.70% 2.71 28,978.03 #N/A
4.1.2 Complementao de transporte de tubos de PVC DN 100 - 10 km ### m 10,693 0.68 0.80 7,314.01 27.70% 0.87 9,302.91
XIV - RAMAIS PREDIAIS DA BACIA 6 TOTAL SEM B.D.I. TOTAL COM B.D.I.
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XIV - RAMAIS PREDIAIS DA BACIA 6
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
5 PAVIMENTAO 10.00.00.00
5.1 Remoo de Pavimentos, Guias e Sarjetas 10.01.00.00
5.1.1 Remoo de leivas 10.01.00.11 m2 3,386 3.69 4.32 12,506.53 27.70% 4.72 15,981.92 #N/A
5.1.2 Remoo de placas regulares de basalto 10.01.00.21 m2 339 3.69 4.32 1,252.13 27.70% 4.72 1,600.08 #N/A
5.1.3 Remoo de placas irregulares de basalto 10.01.00.22 m2 406 3.69 4.32 1,499.60 27.70% 4.72 1,916.32 #N/A
5.1.4 Remoo de laje de grs 10.01.00.31 m2 68 3.69 4.32 251.16 27.70% 4.72 320.96 #N/A
5.1.5 Remoo de piso de cimento e areia espessura de 3 a 5 cm 10.01.00.36 m2 2,032 3.69 4.32 7,505.40 27.70% 4.72 9,591.04 #N/A
5.1.6 Remoo de pavimento flexvel espessura de 6 a 10 cm 10.01.00.70 m2 1,135 5.85 6.84 6,637.71 27.70% 7.47 8,478.45 #N/A
5.1.7 Remoo de blocos pr-moldados 10.01.00.74 m2 135 3.69 4.32 498.64 27.70% 4.72 637.20 #N/A
5.1.8 Remoo de pavimento articulado 10.01.00.78 m2 1,916 3.69 4.32 7,076.94 27.70% 4.72 9,043.52 #N/A
5.1.9 Remoo de ladrilhos hidrulicos 10.01.00.82 m2 68 3.69 4.32 251.16 27.70% 4.72 320.96 #N/A
5.1.10 Remoo de lajotas cermicas 10.01.00.84 m2 339 3.69 4.32 1,252.13 27.70% 4.72 1,600.08 #N/A
5.2 Recomposio de Pavimentos, Guias e Sarjetas 10.02.00.00 -
5.2.1 Recomposio de leivas 10.02.00.11 m2 3,386 3.69 4.32 12,506.53 27.70% 4.72 15,981.92 #N/A
5.2.2 Recomposio de placas regulares de basalto 10.02.00.21 m2 339 27.08 31.67 9,179.39 27.70% 34.58 11,722.62 #N/A
5.2.3 Recomposio de placas irregulares de basalto 10.02.00.22 m2 406 27.08 31.67 10,993.61 27.70% 34.58 14,039.48 #N/A
5.2.4 Recomposio de lajes de grs 10.02.00.31 m2 68 22.38 26.17 1,521.52 27.70% 28.57 1,942.76 #N/A
5.2.5 Recomposio de piso de cimento e areia espessura 3 cm 10.02.00.36 m2 2,032 20.98 24.54 42,634.81 27.70% 26.79 54,437.28 #N/A
5.2.6 Recomposio de pavimento flexvel espessura de 6 cm 10.02.00.70 m2 1,135 35.66 41.71 40,476.43 27.70% 45.54 51,687.90 #N/A
5.2.7 Recomposio de blocos pr-moldados 10.02.00.74 m2 135 21.71 25.39 2,930.64 27.70% 27.72 3,742.20 #N/A
5.2.8 Recomposio de pavimento articulado 10.02.00.78 m2 1,916 19.11 22.35 36,613.32 27.70% 24.40 46,750.40 #N/A
5.2.9 Recomposio de ladrilhos hidrulicos 10.02.00.82 m2 68 58.16 68.02 3,954.68 27.70% 74.27 5,050.36 #N/A
5.2.10 Recomposio de lajotas cermicas 10.02.00.84 m2 339 23.91 27.97 8,106.96 27.70% 30.54 10,353.06 #N/A
5.2.11 Recomposio de pavimento de saibro com basalto decomposto ### m2 336 13.23 15.47 4,444.22 27.70% 16.89 5,675.04
5.3 Recomposio de Base para Pavimentos 10.03.00.00 -
5.3.1 Recomposio de base de brita graduada 10.03.00.10 m3 227 53.45 62.52 12,134.19 27.70% 68.26 15,495.02 #N/A
5.4 Transporte de Material -
5.4.1 Complementao de Transporte de CBUQ - 4 km ### ton 72 1.13 1.32 81.26 27.70% 1.44 103.68
XIV - RAMAIS PREDIAIS DA BACIA 6 TOTAL SEM B.D.I. 632,195.11 TOTAL COM B.D.I. 807,259.83
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XV - REDES AUXILIARES
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 SERVIOS TCNICOS 02.00.00.00
1.1 Locao e Cadastro 02.04.00.00
1.1.1 Locao e nivelamento para obras de condutos livres 02.04.01.20 m 6,236 0.91 1.06 5,651.69 27.70% 1.16 7,233.76 #N/A
1.1.2 Cadastro e desenho para obras de condutos livres 02.04.02.20 m 6,236 0.73 0.85 4,532.01 27.70% 0.93 5,799.48 #N/A
-
2 SERVIOS PRELIMINARES 03.00.00.00 -
2.1 Trnsito e Segurana 03.02.00.00 -
2.1.1 Sinalizao com cavaletes, placas e cones 03.02.00.10 m 4,366 1.01 1.18 4,404.86 27.70% 1.29 5,632.14 #N/A
2.1.2 Sinalizao luminosa com cavaletes, placas e cones 03.02.00.20 m 1,870 1.64 1.92 3,069.79 27.70% 2.10 3,927.00 #N/A
2.1.3 Tapume de proteo 03.02.00.30 m2 187 19.38 22.67 3,624.59 27.70% 24.75 4,628.25 #N/A
2.1.4 Passadio de ao, espessura 3/4" - 2,00 x 1,00 m 03.02.00.50 un 30 85.94 100.51 2,578.08 27.70% 666.00 19,980.00 #N/A
2.1.5 Instalaes sanitrias mveis para obras lineares 03.02.00.60 m 6,236 0.23 0.27 1,439.58 27.70% 0.29 1,808.44 #N/A
2.2 Remanejamento de Interferncia 03.06.00.00 -
2.2.1 Execuo de tampa de boca de lobo 03.06.00.21 un 7 33.05 38.66 231.38 27.70% 42.21 295.47 #N/A
2.2.2 Remanejamento de rede de gua 03.06.00.22 m 312 42.26 49.43 13,185.95 27.70% 53.97 16,838.64 #N/A
2.2.3 Conserto de rede de gua 03.06.00.23 m 25 20.08 23.49 502.10 27.70% 25.65 641.25 #N/A
2.2.4 Conserto de ramal de gua 03.06.00.24 m 95 11.11 12.99 1,055.11 27.70% 14.18 1,347.10 #N/A
2.2.5 Execuo de caixa de pluvial 03.06.00.25 un 4 3,235.94 3,784.72 12,943.74 27.70% 4,132.29 16,529.16 #N/A
2.2.6 Remanejamento de rede pluvial DN 300 03.06.00.26 m 22 130.46 152.58 2,870.03 27.70% 166.59 3,664.98 #N/A
2.2.7 Remanejamento de rede pluvial DN 400 03.06.00.27 m 22 159.47 186.51 3,508.25 27.70% 203.64 4,480.08 #N/A
2.2.8 Remanejamento de rede pluvial DN 500 03.06.00.28 m 10 182.93 213.95 1,829.27 27.70% 233.60 2,336.00 #N/A
2.2.9 Remanejamento de rede pluvial DN 600 03.06.00.29 m 10 200.22 234.17 2,002.15 27.70% 255.68 2,556.80 #N/A
XV - REDES AUXILIARES TOTAL SEM B.D.I. 449,953.95 TOTAL COM B.D.I. 586,246.34
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015
MUNICIPIO:SANTA MARIA
XVI - TRAVESSIAS
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
CUSTO (SEM PREO MXIMO ADMISSVEL
B.D.I.) B.D.I (COM B.D.I)
ITEM DISCRIMINAO CDIGO UN QTDE
APLICADO
UNITRIO TOTAL UNITRIO TOTAL
1 MOVIMENTO DE SOLO 04.00.00.00
1.1 Escavao de Solo Valas 04.02.00.00
1.1.1 Escavao de valas mecnica, solo 0-3 m 04.02.02.43 m3 156 7.22 8.45 1,127.06 27.70% 9.23 1,439.88 #N/A
1.1.2 Escavao de valas mecnica, solo 0-4 m 04.02.02.44 m3 115 7.76 9.08 892.79 27.70% 9.91 1,139.65 #N/A
1.1.3 Escavao de valas mecnica, solo 0-5 m 04.02.02.45 m3 170 8.84 10.34 1,502.92 27.70% 11.29 1,919.30 #N/A
1.2 Aterro, Reaterro, Lastro, Espalhamento e Nivelamento 04.09.00.00 -
1.2.1 Reenchimento compactado percusso 04.09.02.01 m3 265 7.24 8.47 1,919.09 27.70% 9.25 2,451.25 #N/A
1.3 Carga, Transporte, Descarga 04.10.00.00 -
1.3.1 Carga e descarga de solo para bota-fora 04.10.02.01 m3 175 2.73 3.19 477.30 27.70% 3.48 609.00 #N/A
1.3.2 Transporte de solos para bota-fora - 10 km 04.10.02.20 m3 175 5.88 6.88 1,029.42 27.70% 7.51 1,314.25 #N/A
2 ESGOTAMENTO 06.00.00.00 -
2.1 Esgotamento com Bombas 06.01.00.00 -
2.1.1 Esgotamento com bomba auto-escorvante 3,5 HP, a gasolina 06.01.00.10 h 60 4.51 5.27 270.35 27.70% 5.75 345.00 #N/A
3 FUNDAO E ESTRUTURA 08.00.00.00 -
3.1 Lastro 08.03.00.00 -
3.1.1 Lastro de brita n 2 08.03.00.14 m3 5 53.45 62.52 267.27 27.70% 68.26 341.30 #N/A
3.1.2 Lastro de concreto consumo mnimo de cimento 250 kg/m 08.03.00.34 m3 10 293.51 343.29 2,935.13 27.70% 374.82 3,748.20 #N/A
3.2 Frmas e Cimbramentos 08.04.00.00 -
3.2.1 Frmas planas para fundaes, com escoramento 08.04.00.22 m2 929 39.14 45.78 36,362.83 27.70% 49.98 46,431.42 #N/A
3.3 Armaduras 08.05.00.00 -
3.3.1 Armadura CA-50, 6,3 mm a 12,5 mm - Fornecimento, corte (com perda de08.05.00.22
10%), dobra e colocao
kg 6,288 5.82 6.81 36,612.19 27.70% 7.44 46,782.72 #N/A
3.4 Concreto 08.06.00.00 -
3.4.1 Concreto Fck=20 MPa, mnimo 293 kg cimento/m, fins hidrulicos 08.06.00.22 m3 79 356.36 416.79 28,152.08 27.70% 455.07 35,950.53 #N/A
3.5 Caixas e Poos 08.10.00.00 -
3.5.1 Montagem, carga, descarga e transporte de tampo de ferro para PV 08.10.04.10 un 20 54.69 63.96 1,093.72 27.70% 69.83 1,396.60 #N/A
XVI - TRAVESSIAS TOTAL SEM B.D.I. 423,283.11 TOTAL COM B.D.I. 530,459.63
PROPONENTE: SUL CAVA CONSTRUES E COMRCIO LTDA Data: 10/08/2015 TOTAL
PORCENTAGEM TOTAL %
RS M.O. R$ - OUTROS RS
R$ - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #VALUE!
#N/A #VALUE!
-
-
-
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #VALUE!
-
-
R$ - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
R$ - R$ - - -
#N/A #N/A #N/A
TOTAL GERAL #N/A
Municipio : Santa Maria
OBRA: REDES COLETORAS, RAMAIS PREDIAIS E TRAVESSIAS CAMOBI
1 MS 2 MS 3 MS 4 MS 5 MS 6 MS 7 MS 8 MS 9 MS 10 MS
ITEM SERVIOS Valor Global
30 60 90 120 150 180 210 240 270 300
I SERVIOS PRELIMINARES 81,081.71 1,005.41 1,337.85 1,727.04 2,172.99 2,667.59 3,186.51 3,713.54 4,224.36 4,678.41 5,051.39
II ADMINISTRAO LOCAL 671,226.53 8,323.21 11,075.24 14,297.13 17,988.87 22,083.35 26,379.20 30,742.18 34,970.90 38,729.77 41,817.41
III REDES COLETORAS DA BACIA 1 4,572,925.80 56,704.28 75,453.28 97,403.32 122,554.41 150,449.26 179,715.98 209,440.00 238,249.43 263,857.82 284,893.28
IV RAMAIS PREDIAS DA BACIA 1 778,489.52 9,653.27 12,845.08 16,581.83 20,863.52 25,612.31 30,594.64 35,654.82 40,559.30 44,918.85 48,499.90
V REDES COLETORAS DA BACIA 2 1,069,940.33 13,267.26 17,654.02 22,789.73 28,674.40 35,201.04 42,048.65 49,003.27 55,743.89 61,735.56 66,657.28
VI RAMAIS PREDIAS DA BACIA 2 188,401.08 2,336.17 3,108.62 4,012.94 5,049.15 6,198.40 7,404.16 8,628.77 9,815.70 10,870.74 11,737.39
VII REDES COLETORAS DA BACIA 3 171,901.43 2,131.58 2,836.37 3,661.50 4,606.96 5,655.56 6,755.73 7,873.09 8,956.06 9,918.71 10,709.46
VIII RAMAIS PREDIAS DA BACIA 3 21,391.10 265.25 352.95 455.63 573.28 703.77 840.67 979.71 1,114.48 1,234.27 1,332.67
IX REDES COLETORAS DA BACIA 4 645,898.71 8,009.14 10,657.33 13,757.64 17,310.09 21,250.07 25,383.82 29,582.16 33,651.32 37,268.36 40,239.49
X RAMAIS PREDIAS DA BACIA 4 128,395.49 1,592.10 2,118.53 2,734.82 3,441.00 4,224.21 5,045.94 5,880.51 6,689.41 7,408.42 7,999.04
XI REDES COLETORAS DA BACIA 5 2,479,424.16 30,744.86 40,910.50 52,811.73 66,448.57 81,573.05 97,441.37 113,557.63 129,178.00 143,062.77 154,468.13
XII RAMAIS PREDIAS DA BACIA 5 387,916.94 4,810.17 6,400.63 8,262.63 10,396.17 12,762.47 15,245.14 17,766.60 20,210.47 22,382.81 24,167.23
XIII REDES COLETORAS DA BACIA 6 4,793,413.85 59,438.33 79,091.33 102,099.72 128,463.49 157,703.32 188,381.16 219,538.35 249,736.86 276,579.98 298,629.68
XIV RAMAIS PREDIAS DA BACIA 6 807,259.83 10,010.02 13,319.79 17,194.63 21,634.56 26,558.85 31,725.31 36,972.50 42,058.24 46,578.89 50,292.29
XV REDES AUXILIARES 586,246.34 7,269.45 9,673.06 12,487.05 15,711.40 19,287.50 23,039.48 26,850.08 30,543.43 33,826.41 36,523.15
XVI TRAVESSIAS 530,459.63 6,577.70 8,752.58 11,298.79 14,216.32 17,452.12 20,847.06 24,295.05 27,636.95 30,607.52 33,047.63
TOTAL ###
Desembolso Mensal 222,138.22 295,587.15 381,576.13 480,105.18 589,382.85 704,034.84 820,478.26 933,338.80 1,033,659.29 1,116,065.40
% MENSAL 1.24% 1.65% 2.13% 2.68% 3.29% 3.93% 4.58% 5.21% 5.77% 6.23%
% ACUMULADO 1.24% 2.89% 5.02% 7.70% 10.99% 14.92% 19.50% 24.71% 30.48% 36.71%
914,585.16
11 MS 12 MS 13 MS 14 MS 15 MS 16 MS 17 MS 18 MS 19 MS 20 MS 21 MS 22 MS 23 MS 24 MS
330 360 390 420 450 480 510 540 570 600 630 660 690 720
5,318.96 5,456.80 5,456.80 5,318.96 5,051.39 4,678.41 4,224.36 3,713.54 3,186.51 2,667.59 2,172.99 1,727.04 1,337.85 1,005.41
44,032.46 45,173.55 45,173.55 44,032.46 41,817.41 38,729.77 34,970.90 30,742.18 26,379.20 22,083.35 17,988.87 14,297.13 11,075.24 8,323.21
299,983.93 307,757.91 307,757.91 299,983.93 284,893.28 263,857.82 238,249.43 209,440.00 179,715.98 150,449.26 122,554.41 97,403.32 75,453.28 56,704.28
51,068.91 52,392.34 52,392.34 51,068.91 48,499.90 44,918.85 40,559.30 35,654.82 30,594.64 25,612.31 20,863.52 16,581.83 12,845.08 9,653.27
70,188.09 72,006.98 72,006.98 70,188.09 66,657.28 61,735.56 55,743.89 49,003.27 42,048.65 35,201.04 28,674.40 22,789.73 17,654.02 13,267.26
12,359.11 12,679.39 12,679.39 12,359.11 11,737.39 10,870.74 9,815.70 8,628.77 7,404.16 6,198.40 5,049.15 4,012.94 3,108.62 2,336.17
11,276.73 11,568.97 11,568.97 11,276.73 10,709.46 9,918.71 8,956.06 7,873.09 6,755.73 5,655.56 4,606.96 3,661.50 2,836.37 2,131.58
1,403.26 1,439.62 1,439.62 1,403.26 1,332.67 1,234.27 1,114.48 979.71 840.67 703.77 573.28 455.63 352.95 265.25
42,370.96 43,468.98 43,468.98 42,370.96 40,239.49 37,268.36 33,651.32 29,582.16 25,383.82 21,250.07 17,310.09 13,757.64 10,657.33 8,009.14
8,422.74 8,641.02 8,641.02 8,422.74 7,999.04 7,408.42 6,689.41 5,880.51 5,045.94 4,224.21 3,441.00 2,734.82 2,118.53 1,592.10
162,650.22 166,865.25 166,865.25 162,650.22 154,468.13 143,062.77 129,178.00 113,557.63 97,441.37 81,573.05 66,448.57 52,811.73 40,910.50 30,744.86
25,447.35 26,106.81 26,106.81 25,447.35 24,167.23 22,382.81 20,210.47 17,766.60 15,245.14 12,762.47 10,396.17 8,262.63 6,400.63 4,810.17
314,447.95 322,596.75 322,596.75 314,447.95 298,629.68 276,579.98 249,736.86 219,538.35 188,381.16 157,703.32 128,463.49 102,099.72 79,091.33 59,438.33
52,956.24 54,328.59 54,328.59 52,956.24 50,292.29 46,578.89 42,058.24 36,972.50 31,725.31 26,558.85 21,634.56 17,194.63 13,319.79 10,010.02
38,457.76 39,454.38 39,454.38 38,457.76 36,523.15 33,826.41 30,543.43 26,850.08 23,039.48 19,287.50 15,711.40 12,487.05 9,673.06 7,269.45
34,798.15 35,699.93 35,699.93 34,798.15 33,047.63 30,607.52 27,636.95 24,295.05 20,847.06 17,452.12 14,216.32 11,298.79 8,752.58 6,577.70
1,175,182.83 1,205,637.27 1,205,637.27 1,175,182.83 1,116,065.40 1,033,659.29 933,338.80 820,478.26 704,034.84 589,382.85 480,105.18 381,576.13 295,587.15 222,138.22
6.56% 6.73% 6.73% 6.56% 6.23% 5.77% 5.21% 4.58% 3.93% 3.29% 2.68% 2.13% 1.65% 1.24%
43.27% 50.00% 56.73% 63.29% 69.52% 75.29% 80.50% 85.08% 89.01% 92.30% 94.98% 97.11% 98.76% 100.00%
Santa Maria, 10 de agosto de 2015.