Checklist for PCC

Project : Doc. No. : QA/CL-EXC/


Client : Project Location :

CONTRACTOR LOCATION DATE

YES

1 Check Surface Preparation

2 Check Marking & levels to be done with respect to drawing

3 Check for Form work

4 Check for finished level

5 Check for mixing of cement, sand and aggregate & adequate material

6 Check for Pouring height

7 Do not allow extra cement mortar on top of PCC for smooth finishing

8 Check for Agrregate test report. (Fine aggregates/Cement /Water)

9 Check for Ramming with proper tools

10 Check for Button marking for PCC thickness

11 Check for curing atleast 7days


Remarks of Quality Assurance Engineer:

Signature Date Remarks/ Comments


Checked By:
Approved By:
QA/CL-EXC/

DATE

NO NA
Comments