PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
DANA :
TH. ANGGARAN :
HARGA
JUMLAH
NO JENIS PEKERJAAN SAT VOLUME ANALISA SATUAN
Rp. Rp.
1 2 3 4 5 6 7
JUMLAH XI 22,304,041.71
JUMLAH Rp 26,709,822.26
DIBULATKAN Rp 26,709,000.00
910,270,000.00
Mengetahui, Blitar, - - 2010
PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PERENCANA
(P P T K) CV. WIJAYA MANDIRI
.0
7
2.0
.0
3.0
1
8.0
8.0
1 PEKERJAAN TANAH
# Galian Tanah Pondasi
76.00 X 0.80 x 1.00 = 60.80 m3
# Urugan Pasir Bawah Lantai
10.00 x 10.00 x 0.03 = 3.00
6.00 x 1.70 0 0.03 = 0.31
3.31 m3
2 PEKERJAAN PONDASI
# Aanstampeng
76.00 x 0.80 x 0.20 = 12.16 m3
# Pondasi Batu Kali
76.00 x 1.10 x 0.40 = 33.44 m3
# Pondasi Rolag
10.00 x 55.00 = 550 m2
3 PEKERJAAN PASANGAN
# Pas. Bata Merah
30.00 x 4.00 = 120.00 m2
# Pas. Gewel
6.00 1.50 9
10.00 x 2.00 = 20
2.00 = 49.00 m2
# Luasan Kusen
SKETSA GAMBAR
# Keramik Lantai
43.32 x 4.00 = 173.28
16.74 x 5.00 = 83.70
3.00 X 8.12 x 6.00 = 146.16
10.72 x 7.00 = 75.04
478.18 m2
Skoor 8/12
Kaki Kuda-Kuda8/12
Usuk 5/7
Kaki Kuda-Kuda8/12
Pengapit 2x6/12
Balok Tarik8/12
# Sloof
76.00 x 0.15 x 0.20 = 2.28 m3
# Kolom Praktis
0.15 x 0.15 x 4.00 = 0.09
24.00 = 2.16 m3
# Ring Balk
76.00 x 0.20 x 0.15 = 2.28 m3
# Rabat
0.05 43.32 x 4.00 = 8.66
0.05 16.74 x 5.00 = 4.19
0.05 X 8.12 x 6.00 = 2.44
0.05 10.72 x 7.00 = 3.75
19.04 m3
x 0.15 x 0.20 = - m3
8x = - m3
4.80 x 0.06 x 0.15 = 0.04
4.00 = 0.17 m3
Kusen P2
4.70 x 0.06 x 0.15 = 0.04
1.00 = 0.04 m3
# Kusen PJ1
13.50 x 0.06 x 0.12 = 0.10
1.00 = 0.19 m3
Kusen PJ2
13.30 x 0.06 x 0.12 = 0.10
1.00 = 0.10 m3
# Kusen BV1
5.37 x 0.06 x 0.12 = 0.04
1.00 = 0.04 m3
Kusen BV2
3.86 x 0.06 x 0.12 = 0.03
1.00 = 0.03 m3
TOTAL 0.57 m3
Kusen P1
4.80 x 27 = 129.60
4.00 = 518.40 m2
Kusen P2
4.70 x 27 = 126.90
1.00 = 126.90 m2
Kusen PJ1
13.50 x 27 = 364.50
1.00 = 364.50 m2
Kusen PJ2
13.30 x 27 = 359.10
1.00 = 359.10 m2
Kusen BV1
5.37 x 27 = 144.99
1.00 = 144.99 m2
Kusen BV2
3.86 x 27 = 104.22
1.00 = 104.22 m2
TOTAL = 1,618.11 m2
Tgl : s/d .
1 PEKERJAAN TANAH
1 Galian tanah Pondasi M3 60.80 SNI II.1.6.1 27,620.00 1,679,296.00
2 Urugan pasir bawah pondasi M3 3.31 SNI II.11.6.11 96,850.00 320,186.10
3 Urugan pasir bawah lantai 10 cm M3 3.31 SNI II.11.6.11 96,850.00 320,186.10
JUMLAH II 2,319,668.20
2 PEKERJAAN PONDASI
1 Anstampeng M3 12.16 SNI III.9.6.9 238,230.00 2,896,876.80
2 Pondasi batu kali 1 : 4 M3 33.44 SNI III.2.6.2 538,140.00 17,995,401.60
3 Pondasi Roolag M2 550.00 SNI IV.2.6.3 158,170.00 86,993,500.00
JUMLAH Rp 303,105,933.95
DIBULATKAN Rp 303,105,000.00
REKAPITULASI
RENCANA ANGGARAN BIAYA
JUMLAH Rp 303,105,933.95
DIBULATKAN Rp 303,105,000.00
SNI
STANDAR NASIONAL INDONESIA
198
1.0000 kg Lem Kayu Rajawali Rp. 40,000.00 =Rp. 40,000.00
Sub Total =Rp. 10,776,000.00
6.0000 Oh Pekerja Rp. 35,000.00 =Rp. 210,000.00
20.0000 Oh Tukang Kayu Rp. 45,000.00 =Rp. 900,000.00
2.0000 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 100,000.00
0.3000 Oh Mandor Rp. 55,000.00 =Rp. 16,500.00
Sub Total =Rp. 1,226,500.00
Total =Rp. 12,002,500.00
Dibulatkan =Rp. 12,002,500.00
VI.3.6.5 1 m2 Pasang Daun Pintu Panel (Mutu Kayu Klas I atau II)
0.0400 m3 Kayu kamper, papan (mutu kayu klas II) Rp. 10,250,000.00 =Rp. 410,000.00
0.5000 kg Lem Kayu Rajawali Rp. 40,000.00 =Rp. 20,000.00
Sub Total =Rp. 430,000.00
1.0000 Oh Pekerja Rp. 35,000.00 =Rp. 35,000.00
2.5000 Oh Tukang Kayu Rp. 45,000.00 =Rp. 112,500.00
0.2500 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 12,500.00
0.0500 Oh Mandor Rp. 55,000.00 =Rp. 2,750.00
Sub Total =Rp. 162,750.00
Total =Rp. 592,750.00
Dibulatkan =Rp. 592,750.00
VI.4.6.6 1 m2 Pasang Daun Pintu dan Jendela Kaca (Mutu Kayu Klas I atau II)
0.0184 m3 Kayu kamper, papan (mutu kayu klas II) Rp. 10,250,000.00 =Rp. 188,600.00
0.3000 kg Lem Kayu Rajawali Rp. 40,000.00 =Rp. 12,000.00
Sub Total =Rp. 200,600.00
0.8000 Oh Pekerja Rp. 35,000.00 =Rp. 28,000.00
2.0000 Oh Tukang Kayu Rp. 45,000.00 =Rp. 90,000.00
0.2000 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 10,000.00
0.0400 Oh Mandor Rp. 55,000.00 =Rp. 2,200.00
Sub Total =Rp. 130,200.00
Total =Rp. 330,800.00
Dibulatkan =Rp. 330,800.00
VI.6.6.13 1 m3 Pasang Konstruksi Kuda-kuda Konvensional (Mutu Kayu Klas I, II, dan III), Bentang 6 m
1.1000 m3 Kayu Klas III (Balok Kayu Kruing) Rp. 7,328,750.00 =Rp. 8,061,625.00
15.0000 kg Besi Plat Begel Rp. 19,250.00 =Rp. 288,750.00
5.6000 kg Paku 3" Rp. 19,800.00 =Rp. 110,880.00
Sub Total =Rp. 8,461,255.00
4.0000 Oh Pekerja Rp. 35,000.00 =Rp. 140,000.00
12.0000 Oh Tukang Kayu Rp. 45,000.00 =Rp. 540,000.00
1.2000 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 60,000.00
0.2000 Oh Mandor Rp. 55,000.00 =Rp. 11,000.00
Sub Total =Rp. 751,000.00
Total =Rp. 9,212,255.00
Dibulatkan =Rp. 9,212,250.00
VI.8.6.15 1 m3 Pasang Konstruksi Gording (Mutu Kayu Klas III)
1.1000 m3 Kayu Klas III (Balok Kayu Kruing) Rp. 7,328,750.00 =Rp. 8,061,625.00
15.0000 kg Baut/Mur Rp. 19,250.00 =Rp. 288,750.00
3.0000 kg Paku 4" Rp. - =Rp. -
Sub Total =Rp. 8,350,375.00
199
Sub Total Rp. 40,000.00
0.1500 Oh Pekerja Rp. 35,000.00 =Rp. 5,250.00
0.0750 Oh Tukang Kayu Rp. 45,000.00 =Rp. 3,375.00
0.0080 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 400.00
0.0080 Oh Mandor Rp. 55,000.00 =Rp. 440.00
Sub Total = Rp 9,465.00
Total =Rp. 49,465.00
Dibulatkan =Rp. 49,460.00
VIII.4.6.6 1 m1 Pasang Bubungan Genteng Prentul Ex. Trenggalek
5.0000 Bh Bubungan Genteng Prentul Ex. Trenggalek Rp. 4,200.00 =Rp. 21,000.00
8.0000 kg Semen PC Rp. 1,500.00 =Rp. 12,000.00
0.0320 m3 Pasir Pasang Rp. 93,500.00 =Rp. 2,992.00
Sub Total =Rp. 35,992.00
200
HASIL
OBSERVASI
DAFTAR ANALISA BAHAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2011
(SEMESTER I)
OL.IV.6 1 m2 Pasang Rangka Atap Genteng Biasa/Prentul (Mutu Kayu Klas II)
0.0120 m3 Kayu kruing, usuk (mutu kayu klas III) Rp. 7,072,500.00 =Rp. 84,870.00
0.0036 m3 Kayu kruing, reng (mutu kayu klas III) Rp. 6,918,750.00 =Rp. 24,907.50
0.2500 kg Paku 2,5" dan Paku 4" Rp. 19,800.00 =Rp. 4,950.00
Sub Total =Rp. 114,727.50
0.1000 Oh Pekerja Rp. 35,000.00 =Rp. 3,500.00
0.1000 Oh Tukang Kayu Rp. 45,000.00 =Rp. 4,500.00
0.0100 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 500.00
0.0050 Oh Mandor Rp. 55,000.00 =Rp. 275.00
Sub Total =Rp. 8,775.00
Total =Rp. 123,502.50
Dibulatkan =Rp. 123,500.00
OL.IV.8 1 m1 Pasang Listplank Ukuran 3 x 20 cm (Mutu Kayu Klas I atau II)
0.0060 m3 Kayu Klas II (Papan Kayu Kamper 3/20) Rp. 10,250,000.00 =Rp. 61,500.00
0.1000 kg Paku 3" Rp. 19,800.00 =Rp. 1,980.00
Sub Total =Rp. 63,480.00
0.1000 Oh Pekerja Rp. 35,000.00 =Rp. 3,500.00
0.2000 Oh Tukang Kayu Rp. 45,000.00 =Rp. 9,000.00
0.0250 Oh Kepala Tukang Kayu Rp. 50,000.00 =Rp. 1,250.00
0.0050 Oh Mandor Rp. 55,000.00 =Rp. 275.00
Sub Total =Rp. 14,025.00
224
BOW
DAFTAR ANALISA BAHAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2011
(SEMESTER I)
III. PEKERJAAN BONGKARAN
III.2.L.4 10 m2 Membongkar dinding tembok yang tipis, terhitung dengan membersihkan bata-batanya
2.000 Oh Pekerja Rp. 35,000.00 =Rp. 70,000.00
0.100 Oh Mandor Rp. 55,000.00 = Rp 5,500.00
Total =Rp. 75,500.00
Dibulatkan =Rp. 75,500.00
(Jikalau tidak dengan membersihkan dihitung setengahnya)
1.000 Oh Pekerja Rp. 35,000.00 =Rp. 35,000.00
0.050 Oh Mandor Rp. 55,000.00 = Rp 2,750.00
Total =Rp. 37,750.00
sehingga 1 m3 menurunkan rangka atap dari kayu menjadi =Rp. 3,775.00
Dibulatkan =Rp. 3,770.00
III.4.L.7 10 m2 Menurunkan Atap Genteng atau Sirap, Jikalau Genteng atau Sirap itu Hendak Dipakai Lagi
2.000 Oh Pekerja Rp. 35,000.00 =Rp. 70,000.00
0.100 Oh Mandor Rp. 55,000.00 = Rp 5,500.00
Total =Rp. 75,500.00
1 m2 menurunkan atap genteng / sirap =Rp. 7,550.00
Dibulatkan =Rp. 7,550.00
(Jikalau genteng atau sirap tidak dipakai lagi, dihitung 1/2 dari analis ini)
1.000 Oh Pekerja Rp. 35,000.00 =Rp. 35,000.00
0.050 Oh Mandor Rp. 55,000.00 = Rp 2,750.00
Total =Rp. 37,750.00
sehingga 1 m2 menurunkan genteng atau sirap menjadi =Rp. 3,775.00
Dibulatkan =Rp. 3,770.00
222
XV. KELOMPOK BAHAN BANGUNAN, KELISTRIKAN, ANALISA BAHAN DAN UPAH KERJA
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
192
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
14 Kayu kruing, balok (mutu kayu klas III) 6/12, 6/15, 8/12 m3 7,328,750.00
15 Kayu kruing, papan (mutu kayu klas III) 2/20, 3/20, 3/25 m3 8,251,250.00
16 Kayu kruing, usuk (mutu kayu klas III) 4/6, 5/7 m3 7,072,500.00
17 Kayu kruing, reng (mutu kayu klas III) 2/3 m3 6,918,750.00
18 List kayu tahun 1/4 m1 6,050.00
19 List kayu profil 4/4 m1 8,250.00
20 List kayu profil 5/5 m1 8,800.00
21 Bambu Jawa bongkotan 10-12 x 300cm btg 17,600.00
22 Bambu ori 10-12 x 600cm btg 24,200.00
23 Bambu apus 6-10 x 600cm btg 13,200.00
24 Gedek guling - m2 7,150.00
193
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
III BAHAN PENUTUP ATAP DAN PLAFON
1 Harflek 4 mm 40 x 200 cm lbr 16,940.00
2 Harflek 4 mm 50 x 200 cm lbr 19,250.00
3 Harflek 4 mm 60 x 200 cm lbr 23,100.00
4 Woodplek tebal 9 mm 30x400 lbr 111,100.00
5 Woodplek tebal 9mm 20x300 lbr 53,350.00
6 Eternit (lokal) - lbr 9,100.00
7 Eternit (kerang) - lbr 13,200.00
8 Eternit (Gresik) - lbr 16,500.00
9 Gypsum tebal 9 mm 122 x 244 lbr 84,700.00
10 Gypsum tebal 12 mm 122 x 244 lbr 93,500.00
11 List Gypsum 15 x 200 cm btg 26,400.00
12 List Gypsum 10 x 200 cm btg 18,150.00
13 Genteng flam press Jawa/lokal - bh 1,400.00
14 Genteng kaca (model karang pilang) - bh 10,450.00
15 Genteng karang pilang/wisma - bh 4,800.00
16 Genteng bubung karang pilang/wisma - bh 9,600.00
17 Genteng bubung Jawa/lokal - bh 4,400.00
18 Genteng Bambe - bh 5,500.00
19 Genteng bubungan Bambe - bh 9,900.00
20 Genteng prentul ex.Trenggalek - bh 1,600.00
21 Genteng bubungan prentul ex. Trenggalek - bh 4,200.00
13 Genteng Mantili ex Trenggalek - bh 2,000.00
14 Genteng Bubung Mantili ex. Trenggalek - bh 4,500.00
15 Genteng Beton - bh 2,400.00
16 Genteng Bubung Beton - bh 4,800.00
17 Genteng Kanmuri Glasur - bh 7,700.00
18 Genteng Kanmuri Bubung Glasur - bh 20,350.00
19 Genteng KIA Glasur - bh 7,700.00
20 Genteng KIA Bubung Glasur - bh 20,350.00
21 Genteng Impresso Glasur - bh 7,150.00
22 Genteng Bubung Impresso Glasur - bh 19,250.00
15 Seng Talang BJLS 30 l = 90 cm m1 51,400.00
16 Seng Talang BJLS 27 l = 90 cm m1 36,300.00
17 Seng Talang BJLS 27 l = 60 cm m1 32,670.00
18 Seng Talang BJLS 30 l = 45 cm m1 26,400.00
19 Seng Datar BJLS 30 80 x 180 cm lbr 88,000.00
20 Seng Gelombang BJLS 40 80 x 180 cm lbr 112,000.00
21 Seng Gelombang BJLS 30 80 x 180 cm lbr 88,500.00
22 Seng Gelombang BJLS 30 80 x 300 cm lbr 145,200.00
23 Seng Gelombang BJLS 30 80 x 150 cm lbr 75,000.00
20 Seng Datar BJLS 27 80 x 180 cm lbr 73,700.00
21 Karet Talang l = 60 cm m1 12,100.00
22 Karet Talang l = 90 cm m1 15,200.00
23 Fiberglass "Kano Flash" l = 92 cm. m1 67,650.00
194
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
21 Teakwood tebal 3 mm ( 4' x 8' ) lbr 127,000.00
22 Teakwood tebal 3 mm 90 x 210 cm lbr 90,750.00
23 Tripleks tebal 9 mm ( 4' x 8' ) lbr 163,350.00
24 Tripleks tebal 3 mm ( 4' x 8' ) lbr 60,500.00
25 Plywood tebal 6 mm ( 4' x 8' ) lbr 108,900.00
26 Plywood tebal 4 mm 90 x 210 cm lbr 75,350.00
27 Plywood tebal 4 mm ( 4' x 8' ) lbr 90,750.00
28 Plywood tebal 2 mm ( 4' x 8' ) lbr 84,700.00
IV BAHAN BESI/LOGAM
1 Besi begel/baut - kg 19,250.00
2 Besi beton polos - kg 10,000.00
4 Besi plat aluminium tebal 2 mm 4' x 8' lbr 726,000.00
5 Besi plat bordes tebal 3 mm 4' x 8' lbr 1,331,000.00
6 Besi plat strip panjang tebal 3 mm (30x6000)mm m1 42,350.00
7 Kawat ikat beton (bendrat) - kg 18,150.00
10 Pintu Alumunium (kualitas II) 70 x 200 cm lbr 299,750.00
13 Slimar alumunium - m1 125,000.00
14 Sunscreen Alumunium - m1 85,000.00
15 Pagar besi ulir komplit dengan mainan - m2 632,500.00
16 Pintu pagar besi ulir komplit dengan mainan - m2 737,000.00
17 Rolling door aluminium - m2 709,500.00
18 Pintu plat harmonika - m2 1,265,000.00
19 Atap twin lite rangka pipa stainlis steel - m2 740,000.00
20 Atap twin lite rangka pipa besi - m2 605,000.00
21 Teralis besi - m2 498,300.00
22 Teralis aluminium - m2 623,150.00
23 Railling stainless steel 2" m2 898,260.00
24 Kusen Pintu Aluminium Silver "HC" 4 / 12 m1 106,400.00
25 Kusen Pintu Aluminium Coklat "YKK" 5 / 10 m1 126,700.00
26 Kusen Jendela Aluminium Silver "HC" 4 / 12 m1 99,800.00
27 Kusen Jendela Aluminium Coklat "YKK" 5 / 10 m1 126,700.00
28 Waterstop "Maspion" 250 mm m1 206,800.00
29 Sealent - tube 41,250.00
195
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
V BAHAN LANTAI
1 Paving stone per segi abu-abu, cetak kering t = 6 cm m2 44,550.00
2 Paving stone per segi abu-abu, cetak basah t = 6 cm m2 63,800.00
5 Paving stone segi 6 abu-abu, cetak kering t = 6 cm m2 45,100.00
6 Paving stone segi 6 merah, cetak basah t = 6cm m2 61,600.00
7 Tegel keramik 10 x 20 m2 58,300.00
8 Tegel keramik polos 15 x 15 m2 46,200.00
10 Tegel keramik, Asia 20 x 25 m2 63,250.00
11 Tegel keramik, berserat 30 x 30 m2 59,400.00
12 Tegel keramik putih, Asia 30 x 30 m2 46,200.00
13 Tegel keramik, kasar 20 x 20 m2 55,000.00
14 Tegel keramik, Super Milan 40 x 40 m2 73,700.00
16 Tegel keramik, Mulia 30 x 30 m2 45,100.00
18 Tegel keramik, Arwana 30 x 30 m2 49,500.00
19 Tegel keramik, Asia 30 x 30 m2 45,100.00
20 Tegel keramik, Classic 30 x 30 m2 60,500.00
23 Tegel keramik, Granito 30 x 30 m2 209,000.00
24 Tegel keramik, Granito 40 x 40 m2 280,500.00
25 Tegel keramik Granite Black 40 x 40 m2 292,600.00
26 Tegel keramik Granite Polish 40 x 40 m2 257,000.00
27 Tegel keramik Model Granito Hitam 60 x 60 m2 140,000.00
28 Ubin keramik artistik 5 x 20 bh 11,550.00
29 Ubin keramik artistik 10 x 20 bh 20,900.00
30 Ubin keramik artistik 15 x 15 m2 49,500.00
31 Ubin keramik artistik 20 x 20 m2 56,650.00
32 List Keramik/Border 10 x 20 bh 11,000.00
33 Stepnoiseng 10x 40 bh 20,000.00
34 Stepnoiseng 7 x 30 bh 15,000.00
VI BAHAN PENGECATAN
1 Cat besi Emco tanda Bintang - kg 72,000.00
2 Cat kayu Emco tanda Bintang - kg 72,000.00
3 Meni besi/kayu, cap Pedang - kg 21,000.00
4 Thinner A spesial "Altech" - ltr 28,000.00
5 Thinner A biasa "Power" - ltr 22,000.00
6 Thinner B spesial - ltr 11,000.00
7 Minyak cat/afduner - ltr 11,000.00
8 Cat tembok eksterior Mowilex - ltr 92,400.00
9 Cat tembok Alcabond - kg 27,500.00
10 Cat tembok Alcaplast - kg 8,800.00
11 Cat tembok Wallsealer - kg 19,800.00
12 Cat tembok Vinylex - kg 20,350.00
13 Cat tembok Decolith - kg 17,000.00
14 Cat tembok Metrolith - kg 19,800.00
15 Cat tembok Cathylac - kg 19,800.00
196
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
16 Cat tembok Cendana - kg 17,600.00
17 Cat genteng Matex - kg 48,400.00
18 Kertas gosok - lbr 5,000.00
19 Plamur tembok - kg 9,900.00
20 Plamur kayu - kg 20,900.00
21 Plamur besi - kg 35,200.00
22 Lem Rajawali untuk Kayu - kg 40,000.00
23 Lem Rajawali untuk Tembok - kg 18,100.00
24 Lem kayu khusus (Vinyl) - kg 15,800.00
25 Soda Api - kg 16,500.00
26 Teak Oil - ltr 29,700.00
27 Residu - ltr
27 Kuas Eterna 3" bh 11,000.00
28 Kuas Eterna 4" bh 16,500.00
29 Kuas Eterna 5" bh 20,900.00
30 Kalsium - kg 1,300.00
31 Coating - kg 44,000.00
197
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
27 Hak angin lurus (bisa disetel maju/mundur) "SES" - set 82,500.00
28 Pegangan pintu (model standar) p = 20 cm bh 74,800.00
29 Spring knip "Picasso" - bh 19,800.00
30 Door closer "Belucci" - bh 233,200.00
31 Door stopper "Belucci" - bh 49,500.00
32 Rel pintu dorong, biasa - btg 116,600.00
33 Rel pintu dorong, J4 SES - btg 225,500.00
198
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
1 Kaca polos t = 3 mm m2 54,450.00
2 Kaca polos t = 5 mm m2 66,550.00
3 Kaca polos t = 9 mm m2 133,100.00
4 Kaca rayban t = 5 mm m2 78,650.00
5 Kaca es/buram t = 5 mm m2 121,000.00
6 Krepyak kaca nako 15 x 70 cm (includ kerangka) t = 5 mm daun 30,250.00
7 Kaca buram t = 3 mm m2 90,750.00
8 Kaca cermin t = 3 mm m2 162,200.00
199
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
11 Pipa PVC "Maspion" tipe D 4" - 400 btg 148,500.00
12 Pipa PVC "Maspion" tipe D 5" - 400 btg 234,300.00
13 Lem PVC "Wavin" - tube 8,800.00
14 Keni PVC tipe AW 1/2" bh 1,500.00
15 Keni PVC tipe AW 3/4" bh 2,200.00
16 Keni PVC tipe AW 2" bh 9,900.00
17 Keni PVC tipe AW 3" bh 14,850.00
18 Keni PVC tipe AW 4" bh 22,000.00
19 Keni PVC tipe AW 5" bh 28,600.00
20 Klem PVC - bh 4,950.00
21 Talang PVC U "Maspion" 400 cm bh 96,800.00
22 Talang PVC U 400 cm bh 78,650.00
23 Clam Talang PVC U - bh 6,600.00
24 Shock Talang PVC U - bh 6,600.00
25 Tutup Talang PVC U - bh 6,600.00
26 Corong Talang PVC U - bh 18,150.00
200
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SATUAN
(Rp)
1 2 3 4 5
15Stater lampu TL - bh 88,000.00
16Lampu pijar 25,40,75 / 220 V "Philips" - bh 6,600.00
17Bola lampu Armateur "Philips" 250 watt bh 66,000.00
18Lampu hemat energi 18 W / 220 V (Philips) - bh 38,500.00
19Lampu hemat energi 18 W / 220 V (Osram) - bh 31,900.00
20Lampu TL 20 W / 220 V, komplit balast - bh 92,400.00
(Philips)
21 Lampu TL 40 W / 220 V, komplit balast - bh 165,000.00
(Philips)
22 Kabel NYM. 2 x 2,5 - m1 11,000.00
23 Kabel NYY. 1 x 2,5 - m1 7,700.00
24 Kabel twisted Indonesia 3 x 70 x 50 mm2 m1 7,150.00
25 Kabel twisted multi kabel m1 7,150.00
26 Instalasi listrik - titik 150,000.00
27 Penangkal Petir Lengkap (2 Spit), tinggi 10 m - unit 2,420,000.00
(Tidak termasuk izin dari Depnaker)
XIV TANAMAN UNTUK TAMAN
1 Tanaman Pucuk Merah - bh 90,000.00
2 Tanaman Palem Ekor Tupai - bh 312,500.00
3 Tanaman Dadap Merah - bh 62,500.00
4 Tanaman Kana jepang - bh 16,500.00
5 Rumput gajah - bh 11,000.00
XV BAHAN BBM DAN ALAT BERAT
1 Bensin - ltr 4,500.00
2 Solar - ltr 4,500.00
3 Minyak tanah - ltr 5,500.00
4 Oli mesin Mesran - ltr 33,000.00
5 Minyak pelumas - ltr 37,400.00
Sumber data : Hasil Survey Dinas Pekerjaan Umum Daerah Kota Blitar, Asosiasi Profesi Kota Blitar, dan Badan
Pusat Statistik (BPS) Kota Blitar
Catatan :
1. Harga diatas berlaku di Kota Blitar
2. Harga diatas sudah termasuk pajak (PPN 10%) serta biaya umum dan keuntungan yang wajar (15%)
201
XV. KELOMPOK BAHAN BANGUNAN, KELISTRIKAN, ANALISA BAHAN DAN UPAH KERJA
HARGA TRIWULAN I
NO. JENIS BAHAN UKURAN SAT.
(Rp)
1 2 3 4 5
Sumber data : Hasil Survey Dinas Pekerjaan Umum Daerah Kota Blitar, Asosiasi Profesi Kota Blitar, dan Badan
Pusat Statistik (BPS) Kota Blitar
Catatan :
1. Upah kerja diatas berlaku di Kota Blitar
2. Upah kerja diatas sudah termasuk pajak (PPh maks. 3,0%)
196
EKOSAPTO SOFIASUSENO, ST Ir. ERNA SANTI, MT
Pembina Penata Tingkat I
NIP. 19540629 198212 1 001 NIP. 19670516 199803 2 005