PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
1 1 10.00
B1 - 1 - - 10.00
1 1 10.00
B1 - 2 - - 10.00
1 1 10.00
B5 - 2 - - 10.00
1 1 10.00
C5 - 1 - - 10.00
1 1 10.00
D4 - 1 - - 10.00
1 1 10.00
D4 - 2 - - 10.00
1 1 10.00
D4 - 3 - - 10.00
1 1 10.00
D4 - 4 - - 10.00
1 1 10.00
D5 - 1 - - 10.00
1 1 10.00
D5 - 2 - - 10.00
1 1 10.00
E1 - 1 - - 10.00
1 1 10.00
E1 - 2 - - 10.00
1 1 10.00
E1 - 3 - - 10.00
1 1 10.00
E2 - 1 - - 10.00
1 1 10.00
E2 - 2 - - 10.00
1 1 10.00
E2 - 3 - - 10.00
1 1 10.00
E3 - 1 - - 10.00
1 1 10.00
E3 - 2 - - 10.00
1 1 10.00
E3 - 3 - - 10.00
1 1 10.00
F2 - 1 - - 10.00
1 1 10.00
F2 - 2 - - 10.00
1 1 10.00
F3 - 1 - - 10.00
1 1 10.00
F3 - 2 - - 10.00
1 1 10.00
F4 - 1 - - 10.00
1 1 10.00
F4 - 2 - - 10.00
1 1 10.00
F5 - 1 - - 10.00
1 1 10.00
F5 - 2 - - 10.00
400.00 R.M
ii) Depth of pile from 10.01 m to 15.0 m
1 1 A1
5.00-1 - - 5.00
1 1 A1
5.00-2 - - 5.00
1 1 A2
5.00-1 - - 5.00
1 1 A2
5.00-2 - - 5.00
1 1 A2
5.00-3 - - 5.00
1 1 A3
5.00-1 - - 5.00
1 1 A3
5.00-2 - - 5.00
1 1 A3
5.00-3 - - 5.00
1 1 A4
5.00-1 - - 5.00
1 1 A4
5.00-2 - - 5.00
1 1 A4
5.00-3 - - 5.00
1 1 A5
5.00-1 - - 5.00
1 1 A5
5.00-2 - - 5.00
1 1 B1
5.00-1 - - 5.00
1 1 B1
5.00-2 - - 5.00
Page 2 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
1 1 B5
5.00-2 - - 5.00
1 1 C5
5.00-1 - - 5.00
1 1 D4
5.00-1 - - 5.00
1 1 D4
5.00-2 - - 5.00
1 1 D4
5.00-3 - - 5.00
1 1 D4
5.00-4 - - 5.00
1 1 D5
5.00-1 - - 5.00
1 1 D5
5.00-2 - - 5.00
1 1 E1
5.00
-1 - - 5.00
1 1 E1
5.00
-2 - - 5.00
1 1 E1
5.00
-3 - - 5.00
1 1 E2
5.00
-1 - - 5.00
1 1 E2
5.00
-2 - - 5.00
1 1 E2
5.00
-3 - - 5.00
1 1 E3
5.00
-1 - - 5.00
1 1 E3
5.00
-2 - - 5.00
1 1 E3
5.00
-3 - - 5.00
1 1 F2
5.00
-1 - - 5.00
1 1 F2
5.00
-2 - - 5.00
1 1 F3
5.00
-1 - - 5.00
1 1 F3
5.00
-2 - - 5.00
1 1 F4
5.00
-1 - - 5.00
1 1 F4
5.00
-2 - - 5.00
1 1 F5
5.00
-1 - - 5.00
1 1 F5
5.00
-2 - - 5.00
200.00 R.M
iii) Depth of pile from 15.01 m to 20.0 m
A1 - 1 1 4.00 - - 4.00
A1 - 1 1 3.82 - - 3.82
A2 - 1 1 3.90 - - 3.90
A2 - 1 1 4.04 - - 4.04
A2 - 1 1 3.92 - - 3.92
A3 - 1 1 3.82 - - 3.82
A3 - 1 1 3.92 - - 3.92
A3 - 1 1 3.80 - - 3.80
A4 - 1 1 3.76 - - 3.76
A4 - 1 1 3.62 - - 3.62
A4 - 1 1 3.62 - - 3.62
A5 - 1 1 3.92 - - 3.92
A5 - 1 1 3.92 - - 3.92
B1 - 1 1 3.51 - - 3.51
B1 - 1 1 3.50 - - 3.50
B5 - 1 1 3.52 - - 3.52
C5 - 1 1 3.75 - - 3.75
Page 3 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
D4 - 1 1 3.52 - - 3.52
D4 - 1 1 3.50 - - 3.50
D4 - 1 1 3.53 - - 3.53
D4 - 1 1 3.70 - - 3.70
D5 - 1 1 3.52 - - 3.52
D5 - 1 1 3.60 - - 3.60
E1 - 1 1 3.61 - - 3.61
E1 - 1 1 3.60 - - 3.60
E1 - 1 1 3.62 - - 3.62
E2 - 1 1 3.74 - - 3.74
E2 - 1 1 3.73 - - 3.73
E2 - 1 1 3.56 - - 3.56
E3 - 1 1 3.30 - - 3.30
E3 - 1 1 3.69 - - 3.69
E3 - 1 1 3.71 - - 3.71
F2 - 1 1 3.47 - - 3.47
F2 - 1 1 3.49 - - 3.49
F3 - 1 1 3.73 - - 3.73
F3 - 1 1 3.59 - - 3.59
F4 - 1 1 3.50 - - 3.50
F4 - 1 1 3.77 - - 3.77
F5 - 1 1 3.46 - - 3.46
F5 - 1 1 3.61 - - 3.61
146.89 R.M
2 Extra over the rate in item 1& 2 for chiseling
through rock to a minimum depth of 1.5 times
the diameter of the pile. Chiseling rate must
include cleaning of bore hole thoroughly so
that all the chiseled materials are flushed out
from the bore etc. complete as directed.
Page 4 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
B1 - 1 1 1 0.95 - - 0.95
B1 - 2 1 1 0.85 - - 0.85
B5 - 2 1 1 0.90 - - 0.90
C5 - 1 1 1 0.75 - - 0.75
D4 - 1 1 1 0.85 - - 0.85
D4 - 2 1 1 0.90 - - 0.90
D4 - 3 1 1 0.85 - - 0.85
D4 - 4 1 1 0.90 - - 0.90
D5 - 1 1 1 0.75 - - 0.75
D5 - 2 1 1 0.85 - - 0.85
E1 - 1 1 1 0.85 - - 0.85
E1 - 2 1 1 0.90 - - 0.90
E1 - 3 1 1 0.85 - - 0.85
E2 - 1 1 1 0.88 - - 0.88
E2 - 2 1 1 0.78 - - 0.78
E2 - 3 1 1 0.82 - - 0.82
E3 - 1 1 1 0.95 - - 0.95
E3 - 2 1 1 0.90 - - 0.90
E3 - 3 1 1 0.78 - - 0.78
F2 - 1 1 1 0.85 - - 0.85
F2 - 2 1 1 0.90 - - 0.90
F3 - 1 1 1 0.85 - - 0.85
F3 - 2 1 1 0.78 - - 0.78
F4 - 1 1 1 0.90 - - 0.90
F4 - 2 1 1 0.85 - - 0.85
F5 - 1 1 1 0.80 - - 0.80
F5 - 2 1 1 0.75 - - 0.75
34.42 R.M
5 Conducting SPT at founding depth in bores
selected by the Engineer and furnishing N
values at founding depth conforming to IS
4968 and taking undisturbed samples at 1 1 - - - 1 NOS
founding depth at locations selected by the
Engineer etc. complete all as directed.
CIVIL WORKS
Page 5 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
PC2 1 4 2.65 0.32 0.65 2.23
Less -1 4 0.63 0.34 0.65 -0.55
PC3 1 1 2.65 0.81 0.65 1.39
LIFT PIT 1 1 5.23 1.32 2.40 16.63
b)Plinth beam earth work excavation 0.00
PB1, PB1-1 0.00
Grid 2nd&3rd[10.125-(.4+2.05+1.025)] 1 2 6.65 0.23 0.35 1.06
PB2, PB2-1
Grid E [6.145-(1.025+2.05+0.76)] 1 1 2.31 0.75 0.35 0.61
Grid F [7.895-(1.025+2.05+1.025)] 1 1 3.80 0.75 0.35 1.00
PB3
Grid D [8.825-(1.12+2.05+.4)] 1 1 5.26 0.75 0.35 1.38
Grid 4 [10.105-(.4+2.05+1.12)] 1 1 6.54 0.75 0.35 1.72
Grid 3- 4 [5.46-(1.12+1.025)] 1 1 3.32 0.75 0.35 0.87
Grid 1- 2[3.715-(.4+1.12)] 1 1 2.20 0.75 0.35 0.58
Grid A- E[7.785-(1.12+2.05+1.025)] 1 1 3.59 0.75 0.35 0.94
PB4
Grid F [3.18-(1.025+1.025)] 1 1 1.13 0.75 0.35 0.30
Grid 4-5 [3.365-(.4+1.025)] 1 1 1.94 0.75 0.35 0.51
Grid 2-3 [2.43-(.76+.76)] 1 1 0.91 0.75 0.35 0.24
Grid 5 [10.105-(1.025+.4+2.05+2.05)] 1 1 4.58 0.75 0.35 1.20
PB5
Grid 1-2[3.715-(.4+.115)] 1 1 3.20 0.75 0.35 0.84
Grid C4-C5[3.365-(1.0254+.4)] 1 1 1.94 0.75 0.35 0.51
PB6
GridA' 1-B'1[3.715-(.4+.115)] 1 1 3.20 0.75 0.35 0.84
Grid C'1-C'2[3.785-(.115+.115)] 1 1 3.56 0.75 0.35 0.93
80.58 CUM
Page 6 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
PB2, PB2-1
Grid E [6.145-(1.025+2.05+0.76)] 1 1 2.31 0.53 0.15 0.18
Grid F [7.895-(1.025+2.05+1.025)] 1 1 3.80 0.53 0.15 0.30
PB3
Grid D [8.825-(1.12+2.05+.4)] 1 1 5.26 0.53 0.15 0.42
Grid 4 [10.105-(.4+2.05+1.12)] 1 1 6.54 0.53 0.15 0.52
Grid 3- 4 [5.46-(1.12+1.025)] 1 1 3.32 0.53 0.15 0.26
Grid 1- 2[3.715-(.4+1.12)] 1 1 2.20 0.53 0.15 0.17
Grid A- E[7.785-(1.12+2.05+1.025)] 1 1 3.59 0.53 0.15 0.29
PB4
Grid F [3.18-(1.025+1.025)] 1 1 1.13 0.53 0.15 0.09
Grid 4-5 [3.365-(.4+1.025)] 1 1 1.94 0.53 0.15 0.15
Grid 2-3 [2.43-(.76+.76)] 1 1 0.91 0.53 0.15 0.07
Grid 5 [10.105-(1.025+.4+2.05+2.05)] 1 1 4.58 0.53 0.15 0.36
PB5
Grid 1-2[3.715-(.4+.115)] 1 1 3.20 0.53 0.15 0.25
Grid C4-C5[3.365-(1.0254+.4)] 1 1 1.94 0.53 0.15 0.15
PB6
GridA' 1-B'1[3.715-(.4+.115)] 1 1 3.20 0.53 0.15 0.25
Grid C'1-C'2[3.785-(.115+.115)] 1 1 3.56 0.53 0.15 0.28
Basement area
[A4-A5]-[F4-F5] 1 1 3.18 9.53 1.50 45.40
[A3-A4]-[F3-F4] 1 1 5.23 9.76 1.50 76.56
[A2-A2]-[E2-E3] 1 1 2.13 7.85 1.50 25.13
[A1-A2]-[E1-E2] 1 1 3.55 7.39 1.50 39.42
Less wall -1 1 3.28 0.23 1.50 -1.12
216.21 CUM
B Antitermite Treatment
1 Antitermite Treatment 1 1 15.24 10.37 - 158.0
158.0 SQM
Page 7 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
LIFT PIT 1 1 4.93 4.05 0.15 2.99
b)Plinth beam
PB1, PB1-1
Grid 2nd&3rd[10.125-(.4+2.05+1.025)] 1 2 6.65 0.53 0.15 1.06
PB2, PB2-1
Grid E [6.145-(1.025+2.05+0.76)] 1 1 2.31 0.53 0.15 0.18
Grid F [7.895-(1.025+2.05+1.025)] 1 1 3.80 0.53 0.15 0.30
PB3
Grid D [8.825-(1.12+2.05+.4)] 1 1 5.26 0.53 0.15 0.42
Grid 4 [10.105-(.4+2.05+1.12)] 1 1 6.54 0.53 0.15 0.52
Grid 3- 4 [5.46-(1.12+1.025)] 1 1 3.32 0.53 0.15 0.26
Grid 1- 2[3.715-(.4+1.12)] 1 1 2.20 0.53 0.15 0.17
Grid A- E[7.785-(1.12+2.05+1.025)] 1 1 3.59 0.53 0.15 0.29
PB4
Grid F [3.18-(1.025+1.025)] 1 1 1.13 0.53 0.15 0.09
Grid 4-5 [3.365-(.4+1.025)] 1 1 1.94 0.53 0.15 0.15
Grid 2-3 [2.43-(.76+.76)] 1 1 0.91 0.53 0.15 0.07
Grid 5 [10.105-(1.025+.4+2.05+2.05)] 1 1 4.58 0.53 0.15 0.36
PB5
Grid 1-2[3.715-(.4+.115)] 1 1 3.20 0.53 0.15 0.25
Grid C4-C5[3.365-(1.0254+.4)] 1 1 1.94 0.53 0.15 0.15
PB6
GridA' 1-B'1[3.715-(.4+.115)] 1 1 3.20 0.53 0.15 0.25
Grid C'1-C'2[3.785-(.115+.115)] 1 1 3.56 0.53 0.15 0.28
12.02 CUM
Page 8 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
PB2, PB2-1
Grid E [6.145-(1.025+2.05+0.76)] 1 1 2.31 0.23 0.45 0.24
Grid F [7.895-(1.025+2.05+1.025)] 1 1 3.80 0.23 0.45 0.39
PB3
Grid D [8.825-(1.12+2.05+.4)] 1 1 5.26 0.23 0.45 0.54
Grid 4 [10.105-(.4+2.05+1.12)] 1 1 6.54 0.23 0.45 0.68
Grid 3- 4 [5.46-(1.12+1.025)] 1 1 3.32 0.23 0.45 0.34
Grid 1- 2[3.715-(.4+1.12)] 1 1 2.20 0.23 0.45 0.23
Grid A- E[7.785-(1.12+2.05+1.025)] 1 1 3.59 0.23 0.45 0.37
PB4
Grid F [3.18-(1.025+1.025)] 1 1 1.13 0.23 0.45 0.12
Grid 4-5 [3.365-(.4+1.025)] 1 1 1.94 0.23 0.45 0.20
Grid 2-3 [2.43-(.76+.76)] 1 1 0.91 0.23 0.45 0.09
Grid 5 [10.105-(1.025+.4+2.05+2.05)] 1 1 4.58 0.23 0.45 0.47
PB5
Grid 1-2[3.715-(.4+.115)] 1 1 3.20 0.23 0.45 0.33
Grid C4-C5[3.365-(1.0254+.4)] 1 1 1.94 0.23 0.45 0.20
PB6
GridA' 1-B'1[3.715-(.4+.115)] 1 1 3.20 0.23 0.45 0.33
Grid C'1-C'2[3.785-(.115+.115)] 1 1 3.56 0.23 0.45 0.37
6.29 CUM
4 (ii) M30 Grade
a Pile Cap
PC1 1 9 2.05 0.80 0.85 12.55
PC2 1 6 2.05 0.76 0.85 7.95
1 6 0.80 1.12 0.85 4.57
1 6 0.63 1.12 0.85 3.57
PC3 1 1 2.05 2.05 0.85 3.57
LIFT PIT 1 1 3.07 2.77 0.30 2.55
34.75 CUM
b Pedestals / column upto FFL
Pedestals 1 7 0.90 0.60 0.25 0.95
column upto FFL
C1 Type(D5,F5) 1 2 0.23 0.45 1.00 0.21
C2 Type(F4,A5.C5) 1 3 0.23 0.45 1.00 0.31
C2 Type(F2,F3) 1 2 0.23 0.45 1.95 0.40
C3 Type(A1,B1,A2) 1 3 0.30 0.45 0.75 0.30
C4 Type(A3,A4,D4) 1 3 0.30 0.60 0.75 0.41
C4 Type (E3) 1 1 0.30 0.60 1.95 0.35
Page 9 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Sl.No Description of work Nos L B D Qty Unit
C5 Type(E1) 1 1 0.30 0.60 0.75 0.14
C5 Type(E2) 1 1 0.30 0.60 1.95 0.35
Lift wall 1 2 0.23 1.90 1.95 1.70
Lift wall 1 2 0.23 2.21 1.95 1.98
7.10 CUM
c Column in super structure
C1 Type(D5,F5) 2 0.23 0.45 3.05 0.63
C2 Type(F4,A5.C5,F2,F3) 5 0.23 0.45 3.05 1.58
C3 Type(A1,B1,A2) 3 0.23 0.45 3.05 0.95
C4 Type(A3,A4,D4,E3) 4 0.30 0.45 3.05 1.65
C5 Type(E1,E2) 2 0.30 0.60 3.05 1.10
17.52 CUM
E Masonry work
1 Brick work masonry
Basement wall
Grid - A 1 1 13.79 0.23 0.90 2.85
Grid - B 1 1 3.49 0.23 0.90 0.72
Grid - C 1 1 3.17 0.23 0.90 0.66
Grid - D 1 1 3.10 0.23 0.90 0.64
Grid - E 1 1 3.42 0.23 0.90 0.71
Grid - F 1 1 7.74 0.23 0.90 1.60
Grid - 1 1 1 9.81 0.23 0.90 2.03
Grid - 2 1 1 9.17 0.23 0.90 1.90
Grid - 3 1 1 9.02 0.23 0.90 1.87
Grid - 4 1 1 9.02 0.23 0.90 1.87
Grid - 5 1 1 8.87 0.23 0.90 1.84
PB6 1 1 3.74 0.23 0.90 0.77
PB6 1 1 3.56 0.23 0.90 0.74
18.19 CUM
Page 10 of 21
7.71 3.61 0.49
Page 11 of 21
Project : Propsed Propsed Construction Building of Commerical Building For M/S NAC
JEWELLERY SHOW ROOM at T.Nagar,Chennai.
ABSTRACT [RA BILL :- 01]
Sl.No Description of item Qty Unit Rate Amount
1 Providing, driving and installing driven cast-in-
situ reinforced cement concrete piles of grade
M 30 of specified diameter upto the hard
strata and length below the pile cap,as
specified in Tender Document and as shown
in tender drawings to carry safe working load
not less than specified, including the cost of
steel reinforcement,and including trimming
the pile concrete above cutoff level, growing of
piles if needed, cleaning the debris and
levelling the site, the cost of shoe and length
of pile to be embedded in the pile cap etc
complete.(length of pile for payment shall be
measured from top of shoe to bottom of pile
cap) Rate shall include for cutting, bending,
tying in position with 18 gauge G.I. annealed
with double folded binding wire. The quoted
rate shall include the cost of Mobilisation of
equipment at site consisting of bringing into
site of all plant and machinery along with
accessories for installing Driven cast-in-situ
RCC Piles and assembling and erecting the
equipment and dismantling and removal of
plant and machinery from site after completion
of work. The cost should also include the
empty boring up to natural GL , including filling
with clean river sand.
Page 12 of 21
Project : Propsed Propsed Construction Building of Commerical Building For M/S NAC
JEWELLERY SHOW ROOM at T.Nagar,Chennai.
5 Conducting SPT at founding depth in bores
selected by the Engineer and furnishing N
values at founding depth conforming to IS
4968 and taking undisturbed samples at 1 Each 4350.00 4350.00
founding depth at locations selected by the
Engineer etc. complete all as directed.
Page 13 of 21
Project : Propsed Propsed Construction Building of Commerical Building For M/S NAC
JEWELLERY SHOW ROOM at T.Nagar,Chennai.
2 Providing and laying required thickness of
controlled plain cement concrete of M10
grade using 20 mm and down size coarse
graded hard stone aggregate for levelling
course in foundation at any mass concrete
and other similar works at all levels and
heights, elevations, mechanical controlled
mixing, transporting and placing, pumping at 12.02 CUM 2600 31248.86
all lifts, vibrating, compacting, levelling, curing,
shuttering, dewatering wherever necessary,
the cost of all materials, labour, leads and lifts,
tools and plant, machineries etc., complete as
per specifications.
Page 14 of 21
Project : Propsed Propsed Construction Building of Commerical Building For M/S NAC
JEWELLERY SHOW ROOM at T.Nagar,Chennai.
b Pedestals / Columns upto FFL 7.10 CUM 5950 42236.49
c Columns in super structure 17.52 CUM 6150 107772.54
E Masonary Works:
1 Providing and constructing brick work with
best quality well chamber table moulded
bricks with minimum compressive strength
of 50 Kg per Sqcm. in cement mortar 1:5 18.19 CUM 3225 58659.82
in substructure and super structure at all
levels etc. complete, all as directed.
Total 2349084.295549
Page 15 of 21
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Dia (mm)
Sl.no Description of item Dia Nos L
8 10 12 16 20 25
D Steel Reinforcement
1 Providing & Fixing Reinforcement for
Rcc work.
Ground floor Roof beam
FB1
Bottom Rod 20 1 2 54.83 109.66
Top Rod 20 1 2 54.83 109.66
Bottom Extra Rod 20 1 1 10.00 10.00
Bottom Extra Rod 20 1 2 15.00 30.00
Bottom Extra Rod 20 1 1 9.00 9.00
Top Rod extra 20 1 2 6.50 13.00
Top Rod extra 20 1 1 5.50 5.50
Top Rod extra 20 1 1 7.50 7.50
Top Rod extra 20 1 1 8.50 8.50
Top Rod extra 20 1 1 6.25 6.25
Stirrups 5'' c/c 8 2 8 4.16 66.56
Stirrups 6'' c/c 8 1 11 4.16 45.76
Stirrups 4'' c/c 8 1 22 4.16 91.52
Stirrups 5'' c/c 8 12 2 4.16 99.84
Stirrups 6'' c/c 8 1 16 4.16 66.56
Stirrups 5'' c/c 8 2 8 4.16 66.56
Stirrups 6'' c/c 8 1 9 4.16 37.44
Lap 20 4 3 3.33 39.96
FB2
Bottom Rod 20 1 2 54.83 109.66
Top Rod 20 1 2 54.83 109.66
Bottom Extra Rod 20 1 1 17.00 17.00
Bottom Extra Rod 20 1 2 15.00 30.00
Bottom Extra Rod 20 1 1 9.00 9.00
Top Rod extra 25 1 2 20.00 40.00
Top Rod extra 20 1 2 9.00 18.00
Top Rod extra 20 1 2 7.00 14.00
Stirrups 5'' c/c 10 1 29 4.16 120.64
Stirrups 4'' c/c 8 1 22 4.16 91.52
Stirrups 5'' c/c 8 12 2 4.16 99.84
Stirrups 6'' c/c 8 1 16 4.16 66.56
Stirrups 5'' c/c 8 2 8 4.16 66.56
Stirrups 6'' c/c 8 1 9 4.16 37.44
Lap 20 4 3 3.33 39.96
FB3
Bottom Rod 20 1 2 39.08 78.16
Top Rod 20 1 2 39.08 78.16
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Dia (mm)
Sl.no Description of item Dia Nos L
8 10 12 16 20 25
Bottom Extra Rod 20 1 1 9.08 9.08
Bottom Extra Rod 20 1 1 11.08 11.08
Top Rod extra 25 1 1 5.00 5.00
Top Rod extra 20 1 1 7.33 7.33
Top Rod extra 20 1 1 8.00 8.00
Stirrups 6'' c/c 8 1 16 4.16 66.56
Stirrups 5'' c/c 8 2 8 4.16 66.56
Stirrups 6'' c/c 8 1 12 4.16 49.92
Stirrups 5'' c/c 8 2 10 4.16 83.20
Stirrups 6'' c/c 8 1 14 4.16 58.24
Lap 20 2 2 3.33 13.32
FB4
Bottom Rod 20 1 2 39.08 78.16
Top Rod 25 1 2 39.08 78.16
Bottom Extra Rod 20 1 2 12.00 24.00
Bottom Extra Rod 20 1 1 9.25 9.25
Top Rod extra 25 1 1 9.25 9.25
Crank Rod extra 12 1 2 4.00 8.00
Stirrups 5'' c/c 10 1 16 4.16 66.56
Stirrups 5'' c/c 8 2 10 4.16
Stirrups 6'' c/c 8 2 10 4.16 83.20
Stirrups 5'' c/c 8 2 8 4.16 66.56
Stirrups 6'' c/c 8 1 10 4.16 41.60
Lap 20 2 2 3.33 13.32
FB5
Bottom Rod 20 1 2 34.66 69.32
Top Rod 20 1 2 34.66 69.32
Bottom Extra Rod 20 1 2 14.50 29.00
Top Rod extra 20 1 2 6.50 13.00
Top Rod extra 20 1 2 8.50 17.00
Stirrups 5'' c/c 8 2 12 4.16 99.84
Stirrups 6'' c/c 8 1 18 4.16 74.88
Stirrups 6'' c/c 8 1 22 4.16 91.52
Lap 20 2 2 3.33 13.32
FB6
Bottom Rod 20 1 2 26.00 52.00
Top Rod 20 1 2 26.00 52.00
Bottom Extra Rod 20 1 2 10.00 20.00
Top Rod extra 20 1 3 6.63 19.88
Top Rod extra 20 1 3 14.50
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Dia (mm)
Sl.no Description of item Dia Nos L
8 10 12 16 20 25
Crank Rod extra 12 2 2 4.00 16.00
Stirrups 5'' c/c 10 1 29 4.16 120.64
Stirrups 5'' c/c 8 2 18 4.16 149.76
Lap 20 2 2 3.33 13.32
FB7 - 3 nos
Bottom Rod 25 3 2 32.08 192.48
Top Rod 25 3 2 32.08 192.48
Bottom Extra Rod 25 3 2 21.25 127.50
Top Rod extra 25 3 2 11.25 67.50
Crank Rod extra 12 3 2 4.00 24.00
Stirrups 5'' c/c 10 3 17 5.66 288.66
Stirrups 6'' c/c 8 3 24 5.66 407.52
Lap 25 2 2 3.33 13.32
FB7 -1 = 3 nos
Bottom Rod 20 3 2 18.50 111.00
Top Rod 25 3 2 18.50 111.00
Top Rod extra 25 3 2 11.25 67.50
Stirrups 4'' c/c 10 3 17 4.16 212.16
FB8 (C4-C5)
Bottom Rod 20 1 2 16.00 32.00
Top Rod 20 1 2 16.00 32.00
Top Rod extra 20 1 2 6.33 12.66
Stirrups 6'' c/c 8 1 22 4.16 91.52
FB9 2nos
Bottom Rod 20 2 2 17.00 68.00
Top Rod 20 2 2 17.00 68.00
Bottom Extra Rod 20 2 3 10.00 60.00
Stirrups 5'' c/c 8 2 30 4.16 249.60
FB9
Bottom Rod 20 1 2 13.00 26.00
Top Rod 20 1 2 13.00 26.00
Bottom Extra Rod 20 1 3 7.25 21.75
Stirrups 5'' c/c 8 1 22 4.16 91.52
FB10 -2 nos
Bottom Rod 20 2 2 12.00 48.00
Top Rod 20 2 2 12.00 48.00
Bottom Extra Rod 20 2 1 6.50 13.00
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Dia (mm)
Sl.no Description of item Dia Nos L
8 10 12 16 20 25
Stirrups 5'' c/c 8 2 16 4.16 133.12
Slab Reinforcement
[A1-A2]-[B1-B2] 10 1 11 13.16 144.76
10 1 12 15.50 186.00
10 1 12 12.25 147.00
10 1 13 13.25 172.25
Top extra rod 10 4 3 12.00 144.00
one way slab 10 1 27 3.50 94.50
10 1 7 13.00 91.00
Rooms 10 1 5 11.50 57.50
10 1 6 10.50 63.00
10 1 9 7.58 68.22
10 1 10 9.16 91.60
Top extra rod 10 1 2 12.00 24.00
Top extra rod 10 1 2 7.50 15.00
Rooms 10 1 5 8.75 43.75
10 1 6 9.33 55.98
10 1 10 11.50 115.00
10 1 9 10.50 94.50
Top extra rod 10 1 2 12.00 24.00
Top extra rod 10 1 2 7.50 15.00
sunken 10 1 7 7.75 54.25
10 1 7 5.50 38.50
10 1 8 8.75 70.00
Top extra rod 10 1 2 5.50 11.00
Top extra rod 10 1 2 8.75 17.50
sunken 10 1 7 8.42 58.94
10 1 8 9.42 75.36
10 1 17 8.75 148.75
Top extra rod 10 1 2 7.75 15.50
Top extra rod 10 1 2 8.75 17.50
Staircase
plinth beam 20 1 6 11.00 66.00
Stirrups 6'' c/c 8 1 16 4.16 66.56
wall rod 12 1 10 5.50 55.00
10 1 10 5.50 55.00
Flight 1 12 1 10 18.00 180.00
12 1 10 8.00 80.00
12 1 10 3.00 30.00
10 1 35 3.58 125.30
mid landing beam 20 1 6 11.00 66.00
Stirrups 6'' c/c 8 1 16 4.16 66.56
Flight 2 12 1 10 19.00 190.00
12 1 10 8.00 80.00
12 1 10 3.00 30.00
10 1 37 3.58 132.46
Top landing slab
10 2 7 9.00 126.00
PROJECT : Propsed Construction Building of Commerical Building
For M/S NAC JEWELLERY SHOW ROOM at T.Nagar,Chennai.
RA BILL NO - 01 Date :
Dia (mm)
Sl.no Description of item Dia Nos L
8 10 12 16 20 25
12 1 9 7.00 63.00