Geology Department

Creating MineSight Materials


STANDARD OPERATING PROCEDURE

Creating and Editing Materials in MineSight


SOP-GEO-GC-021

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 0 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

Contents
1. Purpose .............................................................................................................................................. 2

2. Scope .................................................................................................................................................. 2

3. Responsibilities .................................................................................................................................. 2

4. Hazards............................................................................................................................................... 2

5. Recourses ........................................................................................................................................... 2

6. Reference ........................................................................................................................................... 2

7. Documents ......................................................................................................................................... 2

8. PPE ..................................................................................................................................................... 2

9. Procedure ........................................................................................................................................... 2

10. Revision Log ................................................................................................................................. 11

11. Appendix A: List of Symbols, Colors, and Materials.10

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 1 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

1. Purpose
1.1. This procedure describes how to change/update the mapping symbol database
2. Scope
2.1. This procedure applies to only to Mine Geology Personnel that are authorized to
create or modify material symbols in the mapping database.
3. Responsibilities
3.1. Authorized personnel are responsible for adding, changing, or updating the
materials mapping database on a regular basis and as need of new or
modification of symbols is required.
4. Hazards
4.1. Slips, trips, falls
4.2. Typical office hazards
5. Recourses
5.1. Data collected from pit mapping
5.2. Computer capable of running MineSight
5.3. MineSight dongle
6. Reference
6.1. None
7. Documents
7.1. Pit Mapping SOP (still in progress)
8. PPE
8.1. None
9. Procedure

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 2 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.1. Opening the Correct Folder and Layer


9.1.1. Start MineSight and select the appropriate folder from the drop down menu
9.1.2. Select appropriate license and start program

9.2. Navigate to the Material Folder


9.3. Right click on Materials in the file tree, select New>Material

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 3 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.4. A pop-up window will appear, in this window name the Material (e.g. Fault)

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 4 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.5. Select Okay


9.6. In the lower file tree window, navigate to and select the newly created
material.
9.7. In the Object Properties window on the right, select the desired colors,
patterns, line thicknesses, etc.

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 5 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.8. Navigate to GeoTools, select GeoMap Editor

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 6 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.9. Click on File>Open>geol_symbols_2016.gm>Okay

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 7 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.10. Under the symbols tab, make sure that the geol symbols file is open,
then select the symbol you would like to assign your new material to.

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 8 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.11. In the right hand column under Material click and select your newly
created material.

9.12. Click on File>Save As>geol_symbols_2016 to save, you will get a pop up


window asking if you want to replace the file, select yes then click OK
and close GeoMap Editor

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 9 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.13. You are now ready to begin on MineSight Mapping SOP.


9.14. If you would like to create a new material with the same symbol, select
the box next to the symbol you want to create a copy of, right click>copy
selected
9.15. You should have a copy of the same symbol, change the material to the
desired material and change the name under the Name column.

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 10 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

9.15.1. Hint: if the file will not save after copying materials, it is likely that you forgot to
change the name of a copied symbol. MineSight cannot save the same symbol
with the same name and two different assigned materials.

10. Revision Log


Rev. no. Date Description Affected areas

Appendix A
Materials list in geol_symbols_2016 and assigned MineSight colors
Material Name Assigned Color
ALB Pink
ALBBIO Red
AMP Green
BBAND Green
BIOSCHI Purple
GARAMPHORN Green
GARBIOS Sky Blue
HP Gray
TRANS Deep Sky
VEIN Yellow
FAULT Crimson
FOLD Dodger Blue

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 11 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

FRAC_FILLED Tomato
FRAC_UNFILLED Indian Red
JOINT_FILLED Royal Blue
JOINT_UNFILLED Blue
VEIN Yellow
ND Cyan

Symbols list in geol_symbols_2016

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 12 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 13 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 14 of 15
documents
GEOLOGY DEPARTMENT-
GRADE CONTROL
SOP
SOP-GEO-GC-020

MineSight Mapping

Document Number SOP-GEO-GC-020 Date Issued Next Revision Page


Hard copies are uncontrolled Draft 1 28-09-16 15 of 15
documents