Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000.00 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

QUANTITY COMPUTATIONS
ITEM NO. 612 : PAVEMENT MARKINGS ( PCCP EDGE BOTH SIDES)

( WHITE SOLID LINE T = 100 mm. )


STATION LIMITS WIDTH
NO. LENGTH AREA LOCATION
FROM TO T = 100 mm. x 2

1 100+574.890 103+000.000 2425.110 0.20 485.02


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

SUB - TOTAL = 485.02

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Deputy Project Manager
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000.00 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

QUANTITY COMPUTATIONS
ITEM NO. 612 : PAVEMENT MARKINGS ( CENTERLINE )

( YELLOW SOLID LINE T = 150 mm. )


STATION LIMITS
NO. LENGTH WIDTH AREA LOCATION
FROM TO

1 100+931.890 101+011.785 79.895 0.15 11.98


2 101+359.785 101+380.785 21.000 0.15 3.15
3 101+467.785 101+620.785 153.000 0.15 22.95 SCHOOL ZONE
4 102+256.785 102+460.785 204.000 0.15 30.60 SCHOOL ZONE
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

SUB - TOTAL = 68.68

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Deputy Project Manager
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000.00 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER
QUANTITY COMPUTATIONS
ITEM NO. 612 : PAVEMENT MARKINGS ( CENTERLINE )
( WHITE BROKEN LINE T = 150 mm. )
STATION LIMITS
NO. LENGTH WIDTH AREA LOCATION
FROM TO

1 100+574.890 100+931.890 357.000 0.15 18.30


2 101+011.785 101+359.785 348.000 0.15 17.85
3 101+380.785 101+467.785 87.000 0.15 4.80
4 101+620.785 102+256.785 636.000 0.15 32.25
5 102+460.785 103+000.000 539.215 0.15 27.41
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

SUB-TOTAL = 100.61

TOTAL = 654.32

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Deputy Project Manager
CONSULTANT CONSULTANT
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SAUDI FUND FOR DEVELOPMENT
CONSTRUCTION/IMPROVEMENT OF BASILAN CIRCUMFERENTIAL ROAD
Contract Package 3B-Na
Construction/Improvement along Canas - Maluso - Isabela Section
Station 88 + 203.36 to Station 132 + 000.00 (with exceptions)

CONSULTANT : DESIGN SCIENCE INCORPORATED in association with


ENGINEERING BASES OFFICE FOR CIVIL ENGINEER

DETAILED QUANTITY CALCULATIONS


ITEM NO. 612 : PAVEMENT MARKINGS

AREA COMPUTATION OF PAVEMENT MARKINGS ( EDGE OF PCCP BOTH SIDES )

FOR EDGE OF PCCP, T = 100 mm.

AREA = 12,219.656m x 0.10m x 2 = 485.02 SQ. M.

AREA COMPUTATION OF PAVEMENT MARKINGS (CENTERLINE)

FOR CENTERLINE, T = 150 mm. ( WHITE BROKEN LINE )

AREA = (12.219.656m/9m + 1) x 3.0m x 0.15m) = 68.68 SQ. M.

PAVEMENT MARKINGS ( CURVES )

FOR CENTERLINE, T = 150 mm. ( YELLOW SOLID LINE )

AREA = 100.61 SQ. M.

TOTAL AREA OF PAVEMENT MARKINGS 654.32 SQ. M.

Prepared : Checked :

GINO C. GALICINAO LEONARDO R. ENRIQUEZ


Sr. Quantity Engineer Deputy Prpoject Engineer
CONSULTANT CONSULTANT