LAMPETER ROADS SCENARIO

DAILY REPORT
PROJECT TITLE: Roads Scenario
CONTRACTOR: Group 1 REPORT BY: Group 1
DATE: 19.06.2017 DAY: Monday REPORT NO: 1

WEATHER
TEMPERATURE CONDITIONS A.M P.M
Low Temperature: Partly Cloudy .
High Temperature: 290 Cloudy
Windy
NOTES Rain
Snow
X Sunny X

WORKMEN/VISITORS
TOTAL TOTAL
Campus Staff 2 Field Staff 4 TOTALS: 6

TESTS/INSPECTIONS JONATHAN ILLIF

SAFETY
ALL TEAM MEMBER PRESENT IN THE FIELD WERE WEARING THEIR SAFETY BOOTS AND HIGHVEES, AND WERE MADE AWARE
ABOUT THE EVENTUAL RISKS IN THE FIELD

ACCIDENTS, INJURIES, OR UNUSUAL EVENTS


None

PROGRESS OF WORK
KEY ACTIVITIES:
TAKING MEASUREMENTS OF OUR CONTROL POINTS;
LEVELING OPERATION CARRIED OUT IN THE SITE;
DIFFERENT ROAD LAYOUTS, AND JUNCTIONS WERE TAKEN INTO CONSIDERATION;
BATTER RAILS WERE CALCULATED;

TASKS ACCOMPLISHED:
CONTROL POINTS MEASUREMENTS WERE TAKEN;
LEVELING THE CONTROL POINTS ON THE SITE;
DIFFERENT ROAD DESIGN AND JUNCTIONS WERE CALCULATED AND DISCUSSED BY THE TEAM MEMBERS;

MEETINGS AND SIGNIFICANT DECISIONS

UNRESOLVED ISSUES / FACTORS CONTRIBUTING TO DELAY

OTHER NOTES