Você está na página 1de 1

CONTROL DE PROYECTO Semana 46

IP MO
IP-RESERVORIOS
HH
GANADAS HH GAN Y
AVANCE HORAS HOMBRE PRODUCTIVIDAD (RATIO) Y PERD
PERDIDAS

T OT A L %
A C UM ULT IM A T OT A L ULT IM A
R EAL A A C UM U A C UM ULA D O A C UM ULA D O M ET A M ET A A C UM ULA D O LT IM A A C UM ULA R EAL
C D IG
PAO R T ID A S D E C O N T R
UNOD
L ULA D O SE M A N P R E V IS T O A SE M A N
EJ E C UT LA D O P R E VIS T O R EA L P / S A LD O G LO B A L R EA L S EM A N A D O R EA L S EM A N A L
R EA L A C O N S UM IR A
AR R EA L

M. ROMAN RAP-01 und 1 0.45 45% 0% 32,250 14,612 14,926 133 -314 21
C. MORALES RAP-02 und 1 0.68 68% 0% 24,045 16,261 16,033 - 227 0
C. MORALES RAP-03 und 1 0.60 60% 0% 26,524 15,905 15,384 - 521 0
M. ROMAN CR-15 und 1 0.99 99% 0% 12,629 12,469 13,814 - -1,345 -12
C. MORALES RAE-03 und 1 0.39 39% 0% 6,660 2,616 2,636 - -19 0
M. ROMAN RAE-04 und 1 - 0% 0% 8,993 - 29 - -29 0
M. ROMAN RAE-05 und 1 0.95 95% 0% 7,594 7,195 9,900 - -2,704 39
M. ROMAN RRE-05 und 1 0.17 17% 0% 11,009 1,819 2,164 - -345 0
M. ROMAN RRE-06 und 1 1.01 101% 0% 11,703 11,865 13,597 - -1,732 0
C. MORALES RAE-01 und 1 0.74 74% 0% 10,841 8,052 8,366 - -314 0
C. MORALES RRE-02 und 1 0.51 51% 0% 21,336 10,785 8,759 - 2,026 0
C. MORALES RAE-02 und 1 0.86 86% 0% 3,878 3,324 3,679 - -355 0
C. MORALES RRE-03 und 1 0.75 75% 0% 5,779 4,307 4,837 - -530 -18
C. MORALES RRE-04 und 1 0.74 74% 0% 13,525 10,011 7,905 - 2,106 0
C. MORALES RRE-01 und 1 0.63 63% 0% 12,096 7,628 5,505 - 2,123 0

208,861 126,846 127,531 -685 30

PREVISTAS PROYECTADAS Eficiencia


TOTAL HH 208,861 193,526 99.5%

ACUMULADO SEMANAL
% AVANCE 60.7% 0.0%