Sector in
Sri Lanka
OUR PROBLEMS
Costs of Generation
Absence of cost-reflective tariff
Liabilities
OUR ACHIEVEMENTS
THE FUTURE
Capacity enhancements
Encouraging Innovation
Mullaithivu 18%
75 %
59% Mannar
Vavuniya
75%
90 % Trincomalee
Puttalam 85 %
June 2012 96 % Polonnaruwa
64%
92% Matale
Batticoloa
Kurunegala
91 % 97 %
Target : Kandy
93 % Ampara
Electrification by end 2013 100%Gampaha91%
Kegalle
90% 87 %
Badulla
Nuwaraeliya
100%
Colombo
97 % Moneragala
100% Kalutara Ratnapura 76%
99% 86%
Galle Hambantota
Establishment of new
eCity consumer service
centres
Enhanced internet-
based facilities for
consumers for bill
payment
SMS-based facilities for
outage notification
Kilinochchi GSS
Vavuniya GSS
33kV Distribution Lines from Kilinochchi GSS
Kilinochchi
Grid Substation
June 2009
Kilinochchi
Grid Substation
September 2012
Upper Kotmale
150 MW
Enrich Life through Power
Installed Capacity
2010-2012
Small-scale
Renewables of
32 MW from 7
power plants
were also added
to the network
Non Conventional Renewable Energy
750 200
700 By August 2012, a total of 126
180
650 small private power producers
600 160
were connected to the Grid,
Gross Electricity Generation (GWh)
550
1997
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
Wind (GWh) Biomass (GWh) Hydro (GWh) Hydro (MW) Biomass (MW) Wind (MW)
11/03/2013 11
Transmission
25.0
20.0
15.0
Percentage (%)
10.0
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Enrich Life through Power
Unit cost of Generation
August 2012
50.00
Rs 23.30 /kWh
30.00
20.00
10.00
0.00
CEB Revenue and Total Expenditure
180,000
160,000
Other
140,000
120,000 Distribution
100,000
Rs Billion
Transmission
80,000
60,000 Generation
40,000
20,000
-
Expenditure Revenue Expenditure Revenue Expenditure Revenue
2010 2011 2012 upto August
Comparison of Revenue and Cost
24.00
23.04 22.66
22.85
22.00 21.45
20.00
17.87
18.00
16.69
Rs/kWh 16.01
16.00 15.74 15.53 16.20
15.70
14.00 Cost per unit
13.59
13.59 13.22
12.00
Revenue per
10.00 Unit
Budget Actual Budget Budget - Budget - Actual Budget
2011 2011 2012 Revised Revised 2012 2013
Tariff dispatch
Liabilities
70,000
60,000
Ceylon Petroleum
50,000 Corporation
Rs. Million
40,000 Independent
Power Producers
30,000
NCRE Producers
20,000
-
As at As at As at As at
01.01.2010 01.01.2011 01.01.2012 31.08.2012
4000
3500
3000
Private Small Hydro
2500
Private Renewable
2000
IPP
1500 CEB Wind
0
2010 2011 2012
Enrich Life through Power