A
9'-5"
2"
LOWER A-0'-0"
TERRACE TERRACE B B-0'-2" (1). THE PROPER SOIL INVESTIGATION HAS BEEN CARRIED
15'-1"
OUT FOR DETERMINING THE SAFE BEARING CAPACITY.
(2). THE SOIL SHOULD NOT LIABLE TO LIQUEFACTION DUE
DUE TO EARTHQUAKES.
(3). THE SOIL SHOULD NOT LIABLE TO LANDSLIDE HAZARD.
7'-5"
9'-3"
P1. IT IS MANDATORY TO REMOVE ALL LOOSE SOIL TILL
THE FIRM SOIL IS REACHED.
P2. BACK FILLING AROUND THE FOUNDATIONS SHALL BE
CARRIED OUT USING SOIL,SAND WITHOUT GRAVEL AND
PEBBLES.
D-9'-5"
2'
2' A
D P3. IT IS ADVISABLE TO ALLOW STANDING WATER IN THE
EXCAVATION TRENCHES FOR 24 HOURS. WHEN THE
SURFACE IS SEMIDRY, HAND RAMMING SHALL BE CARRIED
4'-0"
OUT WITH AT LEAST 6 TO 8 PASSES.
10'-10"
5"
ONLY AFTER THE ROOF SLAB HAS BEEN DEPROPPED.
3'-10" 10'-2"
2'
E-13'-5" P5. IN NORMAL CIRCUMSTANCES AND WHERE ORDINARY
3'-3"
E
RISER = 6.5"
TREAD= 10"
9
8
2
3
5
6
7
6'-6"
1
UP
32'-2"
FACES OF ALL MEMBERS 36 TO 48 HOURS
4'
W3
6'-10"
* SLABS (PROPS LEFT UNDER) 3 DAYS
18
17
16
15
14
13
12
11
10 * BEAM SOFFITS (PROPS LEFT UNDER) 7 DAYS
3'-3"
* REMOVAL OF PROPS UNDER SLABS
D1
3'
DN
5"
-SPANNING UP TO 4500 7 DAYS
3'
1'-3"
G-20'-3"
-SPANNING OVER 4500 14 DAYS
1'
G
4"
* REMOVAL OF PROPS UNDER BEAMS
2"
J J-20'-9"
2'
A
6'-9"
11'-5"
TERRACE
13'-7"
7'-5"
K7
K K1 K4 K-32'-2"
6'-6"
x
10'
2"
26'-2" 2"
6"
6"
6"
6"
6'
1'-6" 8'-7" 1'-6" 2' 2"
3'-0" 8'-4" 4'-3" 10'-1"
3'-6"
LOWER
6-15'-11"
1-0'-0"
2-3'-0"
7-26'-0"
TERRACE
8-26'-2"
3-11'-4"
5-15'-9"
4-11'-6"
19' x