Shunt Capacitor
Previous Next

A capacitor bank is very essential equipment of an electrical power system. The


power required to run all the electrical appliances is the load as useful power is
active power. The active power is expressed in KW or MW. The maximum load
connected to the electrical power system is mainly inductive in nature such as
electrical transformer, induction motors, synchronous motor, electric furnaces,
fluorescent lighting are all inductive in nature. In addition to these, inductance of
different lines also contributes inductance to the system.
Because of these inductances, the system current lags behind system voltage. As the
lagging angle between voltage and current increases, the power factor of the system
decreases. As the electrical power factor decreases, for same active power demand
the system draws more current from source. More current causes, more line losses.

Poor electrical power factor causes poor voltage regulation. So to avoid these
difficulties, the electrical power factor of the system to be improved. As a capacitor
causes current to lead the voltage, capacitive reactance can be used to cancel the
inductive reactance of the system. The capacito reactance can be used to cancel the
inductive reactance of the system.
The capacitor reactance is generally applied to the system by using static capacitor
in shut or series with system. Instead of using a single unit of capacitor per phase of
the system, it is quite effective to use a bank of capacitor units, in the view of
maintenance and erection. This group or bank of capacitor units is known as
capacitor bank.
There are mainly two categories of capacitor bank according to their connection
arrangements.
1. Shunt capacitor.
2. Series capacitor.
The Shunt capacitor is very commonly used.
How to determine Rating of Required Capacitor Bank
The size of the Capacitor bank can be determined by the following formula :

Where,
Q is required KVAR.
P is active power in KW.
cos is power factor before compensation.
cos' power factor after compensation.

Location of Capacitor Bank


Theoretically it is always desired to commission a capacitor bank nearer to reactive
load. This makes transmission of reactive KVARS is removed from a greater part of
the network. Moreover if capacitor and load are connected simultaneously, during
disconnection of load, capacitor is also disconnected from rest of the circuit. Hence,
there is no question of over compensation. But connecting capacitor with each
individual load is not practical in the economical point of view. As the size of loads
extremely differs for different consumers. So various size of capacitors are not
always readily available. Hence proper compensation can not be possible at each
loading point. Again each load is not connected with system for 24 7 hours. So the
capacitor connected to the load also can not be fully utilized.
Hence, capacitor, is not installed at small load but for medium and large loads,
capacitor bank can be installed at consumer own premises. Although the inductive
loads of medium and large bulk consumers are compensated, but still there would
be considerable amount of VAR demand originated from different uncompensated
small loads connected to the system. In addition to that, inductance of line and
transformer also contribute VAR to the system. On viewing of these difficulties,
instead of connecting capacitor to each load, large capacitor bank is installed at main
distribution sub-station or secondary grid sub-station.

Connection of Shunt Capacitor Bank
The capacitor bank can be connected to the system either in delta or in star. In star
connection, the neutral point may be grounded or not depending upon protection
scheme for capacitor bank adopted. In some cases the capacitor bank is formed by
double star formation.
Generally large capacitor bank in electrical substation is connected in star. The
grounded star connected bank has some specific advantages, such as,
1. Reduced recovery voltage on circuit breaker for normal repetitive capacitor
switching delay.
2. Better surge protection.
3. Comparatively reduced over voltage phenomenon.
4. Lesser cost of installation.
5. In a solidly grounded system the voltage of all 3-phases of a capacitor bank, are
fixed and remain unchanged even during 2 phase operation period.
Previous Next

Comments/Feedbacks
Write your Comment/Feedback here, before submission.

I'm not a robot


reCAPTCHA
Privacy - Terms

Submit your comment


AAC/AAAC/ACSR Cable Testing of Capacitor Belt Conveyor Capacitor Bank |
Conductor - 30yrs Bank Reactive Power
Manufacturer Supply Compensation

Ad lemeicable.com electrical4u.com Ad PK Machinery electrical4u.com

Closely Related Articles


Capacitor Bank | Reactive Power Compensation
Electric Cable Power Factor | Advantages of Three Electrical Bus System
Manufacturer - High Types of Capacitor Bank
Calculation and Power Phase System over and Electrical
Mechanical Strength. Factor Improvement Single Phase
Testing of Capacitor BankSystem Substation Layout
Specifications or Rating of Power Capacitor Bank
Ad rmjtcable.com electrical4u.com electrical4u.com electrical4u.com
Switchable Capacitor Bank or Switched Capacitor Bank
Location of Shunt Capacitors
More Related Articles
Electrical Power Cable
Types of Overhead Conductor
Testing of Electrical Power Cable | Type Test | Acceptance Test | Routine Test
Conductor Resistance Test of Electrical Power Cables
Test for Thickness of Insulation of Power Cable
Annealing Test for Wires and Conductors
Tensile Test of Conductors
Persulphate Test of Conductor
Wrapping Test for Conductors
Electrical Insulator | Insulating Material | Porcelain Glass Polymer Insulator
Types of Electrical Insulator | Overhead Insulator
Insulation Coordination in Power System
Electrical Insulator Testing | Cause of Insulator failure
Dielectric Properties of Insulation
Electrical Power Substation Engineering and Layout
Electrical Bus System and Electrical Substation Layout
Mobile Substation | Portable Substation | Mobile Transformer
Load Curve | Load Duration Curve | Daily Load Curve
High Voltage Direct Current Transmission | HVDC Transmission
Electrical Transmission Tower Types and Design
Methods of Transmission Tower Erection
Basic Concept of Transmission Tower Foundation
Design of Foundations of Transmission Towers in different Soils
Corona Effect in Power System
Ferranti Effect in Power System
Advantages of Three Phase System over Single Phase System
Inductance in Single Conductor Power Transmission Line
Inductance in Three Phase Transmission Line
Why Supply Frequency 50 or 60 Hz not Other Values than these?
Power System Stability
Load Flow or Power Flow Analysis
Transient Stability in Power System
Flexible AC Transmission Systems | FACTS
Tariff of Electricity in India
Power Factor | Calculation and Power Factor Improvement
Skin Effect in Transmission Lines
Inductance of Two Wire Single Phase Transmission Line
Auto Reclosing Scheme of Transmission System
Load Flow and Y Bus
Equal Area Criterion
Steady State Stability
Electrical Power Transmission System and Network
Transmission Line in Power System
Voltage in Power Electric Lines
Short Transmission Line
Medium Transmission Line
Long Transmission Line
Performance of Transmission Line
ABCD Parameters of Transmission Line
Sag in Overhead Conductor
Surge Impedance Loading or SIL
Admittance
Advantages of Bundled Conductors
Bundled Conductors Used in Transmission Line
Ground Clearance of Different Transmission Lines
New Articles
Collecting Oil Sample from Oil Immersed Electrical Equipment
Causes of Insulating Oil Deterioration
Acidity Test of Transformer Insulating Oil
Magnetic Flux
Ring Counter

2011-2017 electrical4u.The content is copyrighted to electrical4u and may not be reproduced


on other websites.

Você também pode gostar