Escolar Documentos
Profissional Documentos
Cultura Documentos
ESH GANDHI
SLAB DESIGN :
Read following Instructions carefully :
1. Give slab parameters such as span in X direction and Y direction and support conditions.
2. Give Eff.cover, Overall slab th. and load data
3. Use Ctrl + Shift + S to copy format in worksheet SLAB FORMAT once only to start with.
4. Use Ctrl + Shift + A to copy design results in worksheet SLAB FORMAT.
5. Use Ctrl + Shift + P to get format for Print in worksheet SLAB FORMAT.
6. Sequence of above commands must be maintained.
7. All other worksheets must be closed while operating macros.
8. Entire worksheet is protected so do not attempt to make any changes.
9. Once the slab design is completed, take out the print and exit the worksheet i.e. DO NOT SAVE.
This way every time the worksheet is opened, fresh copy area will be available. If necessary copy
data of worksheet SLAB FORMAT in new file.
10. For Calculation of span/depth ratios ref. NOTE at end of worksheet.
TBL2 ========================================================================
Beam L Lx/2 Ly- Short span Long span
SLAB w.Lx/2 Lx/2 South Centre North West Centre
T/m m m OR West Centre East South Centre
------------------------------------------------------------------------------------------------------------------------------------------
S1 10.14 2.07 5.67 Coeff. 0.000 0.071 0.094 0.000 0.043
Eff. B.M. 0.00 5.94 7.87 0.00 3.60
Case No 7 Cover = 2 Ast 0.00 1.39 1.84 0.00 0.84
================================================================================
Steel grade
500
===============
Min. Check
Slab for
Th. Th.
Reqd.
--------------------------
9.94 O.K.
================
===============
Long span
East
North
--------------------------
0.000
0.00
0.00
================
0.032
0.037
0.037
0.047
0
0.045
0
0.057
0
0.024
0.028
0.028
0.035
0.035
0.035
0.043
0.043
0.056
Project 0702, Pump house at Bhatiya (Terrace level slab) Date : 10/6/2008
TBL1 ====================================================================
Slab Short Long Span Overall Finish Filling Live Total Support Min.
No. Span Span Ratio Slab Load Load Load Load Cond. Slab
Ly/Lx Th. (work) (work) (work) (Lim) Cont.2 Th.
m. m. cm. Kg/sqm. Kg/sqm. Kg/sqm. T/sqm. Dis. 1 Reqd.
Lx Ly R T FF Fil LL Wlim
END1
TBL2 ====================================================================
Beam L Lx/2 Ly- Short span Long span
SLAB w.Lx/2 Lx/2 South Centre North West Centre East
T/m m m OR West Centre East South Centre North
TS1 1.33 1.27 6.81 Coeff. 0.103 0.088 0.000 0.000 0.000 0.000
Eff. B.M. 0.70 0.60 0.00 0.00 0.00 0.00
ase No 7 Cover = 2 Ast 2.78 2.37 0.00 0.00 0.00 0.00
TS2 1.33 1.27 6.81 Coeff. 0.091 0.054 0.091 0.000 0.000 0.000
Eff. B.M. 0.62 0.36 0.62 0.00 0.00 0.00
ase No 5 Cover = 2 Ast 2.46 1.44 2.46 0.00 0.00 0.00
END2