Você está na página 1de 64

ADVANCED WIRELESS NETWORK CO.

,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

PAT DOCUMENT
FOR

2015-3G2100 Radio Network


(Q3 Capacity Expansion)
PROVISIONAL ACCEPTANCE TEST

Contact Person : N/A

Address : . . .

Telephone No. : N/A

Fax No. : N/A

Date of on service :

Survey by : Gaushyang Telecommunication


ADVANCED WIRELESS NETWORK CO.,LTD
408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin
Samsen Nai Phayathai, Bangkok 10400 THAILAND

Document No. Cover and PATC 0

Date : Rev : A
B130-Dec-99
Information 1
1.1 General site information
1.2 Technical site information / Planning data (SLIM report)

Survey report: Scope of work , and Document checklist 2


2.1 Scope of work
2.2 Drawing
2.2.1 Drawing checklist
2.2.2 Shop drawing and As-built drawing
2.3 Photo
2.3.1 Photo checklist
2.3.2 Site photos
2.4 Material checklist
2.4.1 BOM
2.4.2 BOQ

Acceptance test 3

Installation test report


3.1 Site documentation check
3.2 Power system installation check
3.3 Antenna system installation check
3.4 Equipment installation check
3.5 Overall and Site environment check
3.6 Vendor verification report

SITE FOLDER Function test report 4


NODE B 4.1 NodeB Power System Acceptance Test Report
4.2 NodeB RF and Antenna system Acceptance test report
4.2.1 NodeB RF Test
4.2.1.1 DL Output Power
4.2.1.2 RSSI
4.2.2 CPRI BER
4.2.3 VSWR
4.2.4 Remote Electrical Tilt (RET)
4.3 NodeB Checklist and Alarm Acceptance test report
4.3.1 HW Power-up Checklist
4.3.2 Alarm Test Report
4.3.3 System Restart Check

Integration test report 5


5.1 Stationary service acceptance test report

Appendix 6
6.1 Power system specification, installation and accepatnce test guideline
6.2 Antenna system specification, installation and acceptance test guideline
6.3 NodeB specification and installation manual
6.4 Stationary service acceptance test guideline

Documents 7
7.1 Site folder hard copy 1 set
7.2 Site folder CD-ROM 2 sets
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

PROVISIONAL ACCEPTANCE CERTIFICATE


This is to certify that the nominated equipment has been
Installed, Commissioned and Integrated at the following site :
REGION : South
SITE CODE : BNJPO
SITE NAME : Ban Na Jak Pho Ming
DETAIL OF WORK : 2015-3G2100 Radio Network (Q3 Capacity Expansion)
REF. QUOTATION NO. :

( Mark with / whichever is applicable )


and is accepted on behalf of :
ADVANCED WIRELESS NETWORK CO.,LTD

Signature : Signature :

By [Name] : Priwan Sirisapnoppakun By [Name] : Pramote Chotiroj

Date : Date :
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Information

Contents
1.1 General Site Information
1.2 Technical Site Information/Planning Data(SLIM report)
1.1 General Site information
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN/PM AWN B130-Dec-99 A PAT Doc node B Pancake

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

1 Contact Information
1.1 Site Landlord : N/A
1.2 Address . .
: .
1.3 Phone Number : N/A
1.4 GPS Position : N 6.800611 E 101.545896
1.5 Site access condition : MC-YLA

2 Type of Site
2.1 Location : Greenfield dimension
Building Hight
Apartment dimension W x L x H
Commercial dimension W x L x H
Highrise/Hotel/Condo dimension W x L x H
Government dimension W x L x H
Other dimension W x L x H
2.2 Equipment room Type
Container Brand USW on beam on column on ground
Room rent Floor Number _____ Room Number______
Ceiling material : Steel
Wall material : Steel
Floor material : Steel
2.3 Tower Type : Self Support Type N
Height(Meter) : 45 m.
OB Light Brand AIS 400
Type LED Incandescent

3 Air conditioning
Fan Brand N/A Qty 4
Air Conditioner Brand BTU

4 Power Facility
4.1 AC
Source Building MEA/PEA
Phase 1 Phase 3 Phase Low voltage
Transformer/HV Brand KVA
Generator Brand KVA
UPS Brand KVA
4.2 DC
Rectifier Brand Eltek Qty 2
Battery Brand Ah 100

5 TRANSMISSION
ACC Type ATN 950B Brand Huawei
AGG Type CX600 Brand Huawei

Site plan, maintenance


Site Survey Report (GSM and UMTS Site)

1.2 Technical Site Information/Planning Data(SLIM report)


1.2.1 Summary
1. Site Configuration is S2/2/2
2.This project add 1BBU, 4RRU, 4Antenna
Summary 3. Install new IP-RAN
4.BBU and RRU are supplied by DC power

1.2.2 Final solution


BBU Qty: 1 Power supply AC DC
Installation
Installation of W121 cabinet Wall-mount (attached against the wall)
Wall-mount (installing rack) Steel frame for 4 RRU Others: Enclosure
RRU Qty: 4 Power supply AC DC
Installation
Wall-mount Pole-mount Others: Pipe
Site
configuration information Linked-mount for 8RRU, ( Indoor Outdoor ) Qty:
(Swap stage) Steel frame for 6 RRU ( Indoor Outdoor ) Qty:
Steel frame for 6 RRU ( Indoor Outdoor ) Qty:
Structural stability Yes Future checking
DC outdoor LPB Qty:
Installation Wall-mount Steel frame Others:Pole-mount
DC indoor LPB Qty: No need
Installation Wall-mount Steel frame Others:
Indoor Grounding bar Qty: N/A Outdoor Grounding bar Qty: N/A
Power type Equipment Qty Installation type Position
DC H900 Wall-mount Steel frame Others: Indoor
H151 Wall-mount Steel frame Others: Indoor
ZXDU68T601 Ground Indoor
Power configuration information
(Swap stage) W121 Wall-mount Ground Others: Outdoor
Battery Ground Indoor
DC distribution box Wall-mount Steel frame Others: Indoor
AC Breaker
AC distribution box Wall-mount Indoor
Power BBU-DC PDB length: 1 m
cable DC power - MCB AC length: N/A m
Cable New DC PDB DC PDB length: 4 m
DC Indoor LPB GND cable length: 3 m
BBU GND cable length: 1 m
Cable type Dir1 Dir2 Dir3 Dir4
CPRI cable (BBU to RRU) (Qty*Length(m)) 60 60 60 60

DC Indoor LPB - DC outdoor LPB DC power cable


OUTDOOR - - - -
(Qty*Length(m))
DC outdoor LPB - RRU (Qty*Length(m)) 60 60 60 60

RRU GND cable length (m) 10 10 10 10


Transmission cable type: LAN Transmission cable connector: RJ45
Transmission cable length: 2 m Total E1 Qty:
Feeder length (RRU to Antenna)
Dir1: 3 m 2 set Feeder type: 1/2" 7/8" 5/4"
Dir2: 3 m 2 set Feeder type: 1/2" 7/8" 5/4"
Dir3: 3 m 2 set Feeder type: 1/2" 7/8" 5/4"
Dir4: 3 m 2 set Feeder type: 1/2" 7/8" 5/4"
Dir5: m set Feeder type: 1/2" 7/8" 5/4"
Dir6: m set Feeder type: 1/2" 7/8" 5/4"
Installation: NO need in this project.
GPS
Cable type 1/2" 7/8" Cable length:
Antenna type GSM900 GSM1800 WCDMA900 WCDMA2100
Ant. Model Azim Downti Ant. Height Jumper Fiber If use MHA
No. uth() lt() (m) length(m) length(m)
N1 HXHMDX0B0021065DXTHF 10 0 45 3 - Yes No
Antenna suggestion (Final stage) N2 HXHMDX0B0021065DXTHF 100 0 45 3 - Yes No
N3 HXHMDX0B0021065DXTHF 190 0 45 3 - Yes No
N4 HXHMDX0B0021065DXTHF 290 0 45 3 - Yes No
Yes No
Yes No

Remarks

All information contained herein the document is confidential! Page 4


ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Survey report: Scope of work , and Document checklist

Contents

2.1 Scope of work and site information

2.2 Drawing
2.2.1 Drawing Checklist

2.2.2 Shop Drawing and As-built Drawing


2.3 Photo

2.3.1 Photo Checklist


2.3.2 Site Photos

2.4 Material Checklist

2.4.1 BOM

2.4.2 BOQ

SITE NAME : Ban Na Jak Pho Ming


SITE CODE : BNJPO
hecklist
2.1 Scope of work
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J. Huawei
Doc respons/Approved Checked Date Rev. File
AWN/PM AWN B130-Dec-99 A PAT Doc node B Pancake

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

SCOPE OF WORK
(
Site )
Item Task by Remark
1 Site RRU,BBU

1.1 BBU (132*482*330) mm 1 Unit 8.7
Kg. Rack Trs C-Node

2 RRU Tower and Antenna 3G 1. Use Existing Pipe on Tower

2.1 Antenna 3G Pipe 2" 3 Cell 2. Antenna 3G


EQUIPMENT INSTALLATION Drawing Pipe 4 sector

2.2 RRU 3 unit Frame Mounting Dirversity Cell1 3. RRU 4 Sector


, Cell2 ,Cell3 EQUIPMENT INSTALLATION pipe
Drawing

3 DC PDB and Circuit Breaker

3.1 CB 16 A. BBU 1 DC PDB 4

3.2 Indoor Ladder w-200,L=55 cm.


cable 1. Optic RRU
Indoor LPD 4 Unit Direction 60 m

2. DC RRU 4
Unit Direction 60 m

SCOPE OF WORK
(



Site)
Item Task by Remark
1

5
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Survey report: Scope of work , and Document checklist

Contents

2.2.1 Drawing Checklist


2.2.2 Shop Drawing and As-built Drawing
hecklist
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Photo

Contents

2.3.1 Photo Checklist


2.3.2 Site Photo
2.3.1 Photo Checklist
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc node B Pancake

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Item Detail Test Result Remark


Pass Fail
M16 Site Building Outdoor Front View Photo N/A Option




M17 Site Building Outdoor Side View Photo N/A Option




M18 Tower Outdoor View Photo 1-3 Picture



M19 360 Degree Panoramic View Photo N/A 12 Picture




30
M20 Antenna Installation All Sectors At Antenna Level View Photo 3 Picture
Antenna Sector
Antenna Sector Antenna

Cell ,
Direction/Tilt mounting/E-Tilt/M-Tilt
M21 Lightning Protection Outdoor View Photo N/A 1 Picture

M22

Grounding
Kit View Photo
1 Picture
Grounding Kit


M23 Feeder Inlet View Photo 1 Picture
Feed
N/A
M24 Node B Installation View Photo 4 Picture
Node B 3G
M25 NBTC Sticker View Photo 3 Picture
Serial number Sticker
1 1unit Cabinet Cell
M26 Ladder & Feeder Installation View Photo 2 Picture or more
Ladder Feed
M27 ,
Feeder Ladder
Outlet View Photo 1 Picture
cable BBU

M28 AC and DC Ground Bar View Photo 1 Picture
Ground Bar AC
DC ( )

M30 DDF View Photo N/A 3 Picture



BNC,FE,Ext.

M31 Watt Hour Meter and ACPDB Installation View Photo N/A 2 Picture
Watt Hour Meter
AC Power Distubltion Box
M32 Rectifier Installation View Photo 2 Picture
Rectifier

Module
M33 Batteries and DCPDB Installation View Photo 2 Picture
Battery
Cell DC Power Distubltion Box

2.3.2 Site Photo/M18
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

After : Tower Outdoor View Photo

After : Tower Outdoor View Photo

Remark :
2.3.2 SITE PHOTO/M20-Sector 1
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Cell A RRU1 : Direction10o After : Installation antenna position

N/A N/A

Cell A RRU2 : Direction 0o After : Installation antenna position

Remark :
2.3.2 SITE PHOTO/M20-Sector 1
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Cell B RRU 1 : Direction 100o After : Installation antenna position

N/A N/A

Cell B RRU 2 : Direction 0o After : Installation antenna position

Remark :
2.3.2 SITE PHOTO/M20-Sector 1
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Cell C RRU 1 : Direction 190o After : Installation antenna position

N/A N/A

Cell C RRU 2 : Direction0 o After : Installation antenna position

Remark :
2.3.2 SITE PHOTO/M20-Sector 1
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Cell D RRU 1 : Direction 290o After : Installation antenna position

N/A N/A

Cell D RRU 2 : Direction0 o After : Installation antenna position

Remark :
2.3.2 SITE PHOTO/M20-Sector 1
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Antenna Cell A:1 : Serial number View Photo Antenna Cell A:2 : Serial number View Photo

Antenna Cell B:1 : Serial number View Photo Antenna Cell B:2 : Serial number View Photo

Remark :
2.3.2 SITE PHOTO/M20-Sector 1
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Antenna Cell C:1 : Serial number View Photo Antenna Cell C:2 : Serial number View Photo

N/A N/A

Antenna Cell D:1 : Serial number View Photo Antenna Cell D:2 : Serial number View Photo

Remark :
2.3.2 SITE PHOTO/M25
Prepared (also subject responsible if other) Project Manager name
Anucha J/Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Digital Tilt Antenna A,B Sector 1 Digital Tilt Antenna A,B Sector 2

N/A

Digital Tilt Antenna A,B Sector 3 Digital Tilt Antenna A,B Sector 4

Remark :
2.3.2 SITE PHOTO/M22
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

N/A

After : Ground RRU View Photo After : Ground RRU View Photo

Connector Out side POE View Photo Connector In side POE View Photo

After : Grounding Kit View Photo After : Grounding Kit View Photo

Remark :
2.3.2 SITE PHOTO/M24
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

After : BBU 1 Installation View Photo After : BBU 2 Installation View Photo

After : RRU-A1 Installation View Photo After : RRU-A2 Installation View Photo

Remark :
2.3.2 SITE PHOTO/M24
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

After : RRU-B1 Installation View Photo After : RRU-B1 Installation View Photo

After : RRU-C1 Installation View Photo After : RRU-C2 Installation View Photo

Remark :
2.3.2 SITE PHOTO/M24
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

After : RRU-D1 Installation View Photo After : RRU-D1 Installation View Photo

Remark :
2.3.2 SITE PHOTO/M25
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

BBU1 : Serial number View Photo BBU2: Serial number View Photo

RRU Cell A RRU1 : NTC Sticker View Photo RRU Cell A RRU2 : NTC Sticker View Photo

Remark :
2.3.2 SITE PHOTO/M25
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

RRU Cell B RRU1 : NTC Sticker View Photo RRU Cell B RRU2 : NTC Sticker View Photo

RRU Cell C RRU1 : NTC Sticker View Photo RRU Cell C RRU2 : NTC Sticker View Photo

Remark :
2.3.2 SITE PHOTO/M25
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

RRU Cell D RRU1 : NTC Sticker View Photo RRU Cell D RRU2 : NTC Sticker View Photo

Remark :
2.3.2 Site Photo/M26
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

N/A

indoor Ladder & Cable Installation View Photo

Outdoor Ladder & Cable Installation View Photo

Remark :
2.3.2 SITE PHOTO/M25
Prepared (also subject responsible if other) Project Manager name
Anucha J/Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Label Outdoor Label Outdoor

Label Indoor Label Indoor

Remark :
2.3.2 SITE PHOTO/M30
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

N/A N/A

Before : DDF BNC Position After : DDF BNC Position

N/A N/A

Before : DDF FE Position After : DDF FE Position

N/A

Before : DDF Ext.Alm Position After : DDF Ext.Alm Position

Remark :
2.3.2 SITE PHOTO/M32
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

N/A

Before : Rectifier View Photo After : Rectifier View Photo

N/A

Before : DCDU1 After : DCDU1

N/A N/A

Before : DCDU2 After : DCDU2

Remark :
2.3.2 SITE PHOTO/M34
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Installation View Photo Loop Cable CPRI Installation View Photo Sub Bar Ground

N/A

Before : DC Load Current View Photo After : DC Load Current View Photo

Remark :
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Material Checklist

Contents

2.4.1 BOM
2.4.2 BOQ
Bill Of Material for Addition Project YLA Site Name : Ban Na Jak Pho Ming
Site Preparation Site Code : BNJPO
NODEB : HSPA Area : MC-YLA

No. Description. Unit. Quantity Remarks


1 Circuit Breaker
1.1 CB 1P 32AT "ABB" pcs. -
1.2 CB 1P 63AT "schneider" pcs. -
1.3 CB 1P 16AT "Siemens" pcs. -
2 Power Cable
2.1 VCT 1x25 sq.mm + Accessories + Labour m 4
2.2 THW 1x25 sq.mm + Accessories + Labour m 3
2.3 THW 1x16 sq.mm + Accessories + Labour m -
3 ANTENNA MOUNTING FOR 3 ANTENNA(T-MOUNT150 CM) SECTOR -
4 PIPE 2"x 3 M HDG pcs. -
5 U-BOLT LOCAL 2-1/2" SET -
6 CLAM 1/2"6 HOLE FOR DC CABLE 4 SQMM AND OPTIC CABLE(WITH ROBBER 7MM) SET -
7 CLAMP 1/2" 2 HOLD FOR OUTDOOR JUMPER SET -
8 CABLE GRANT STEEL 2" DC ILP TO RRU (WINDOW CONTAINER) pcs. -
9 CABLE GRANT PLASTIC 14-18 MM FOR OPTIC(WINDOW CONTAINER) pcs. -
10 INDOOR LADDER W=200 WITH ACCESSORIES M. -
11 STAINLESS STEEL NAMEPLATE pcs. 50
12 TAPE 3M BLACK (OUTDOOR)#33 ROLL 2
13 TAPE 3M WATER PROOF BLACK (OUTDOOR)#23 ROLL 2
14 GROUND STAND WIRE CABLE 25 SQ,MM M 40
15 CABLE TIE12"(BLACK) pcs. 100
16 CABLE TIE12"(WHITE) pcs. 100
17 SILICONE pcs. 1
18 CRIMPING TERMINAL 25 SQ.MM pcs. -
19 CRIMPING TERMINAL 25 SQ.MM(2 HOLD) pcs. 16
20 CRIMPING TERMINAL () 10 SQ.MM pcs. -
21 BOLT M8x25 MM(STAINLESS) SET 10
22 VINYL INSULATED 16 SQ.MM GREEN EA -
23 VINYL INSULATED 25 SQ.MM GREEN EA 10
24 VINYL INSULATED 25 SQ.MM RED EA 2
25 VINYL INSULATED 25 SQ.MM BLUE EA 2
26 BBU BRACKED SUPPORT RACK 21" SET -
27 FLEX CONDUIT 1" (INDOOR) M -
28 STELL BELT FOR RF FILLER ( 3 SECTOR) pcs. -
29 TAPE 3M MARK SECTOR WHITE,RED,BLUE,YELLOW ROLL 4
ADDITIONAL MATERIAL
1 CABLE TIE 4"(BLACK) pcs. 100
2 SPRAY PAINT pcs. -
3 MARKER TIE PAD SIZE 25x8 MM (WHITE) pcs. -
4 SPIRAL WRAPPING BAND 4 MM (WHITE) M 5
5 SPIRAL WRAPPING BAND 25 MM (BLACK) M 10
6 CONNECTOR7/16"FEMALE FOR JUMPER SUPERFLEX 1/2" M -
7 VINYL INSULATED 16 SQ.MM RED pcs. -
8 VINYL INSULATED 16 SQ.MM BLUE pcs. -
9 CRIMPING TERMINAL 10 SQ.MM pcs. -
10 CRIMPING TERMINAL () 25 SQ.MM pcs. 2
11 CHANNEL STRUCTURE C-45 L:3000 MM M -

Subcontrctor AWN Inspector AWN MC Manager


Signature _____________________________ Signature ____________________________ Signature _____________________
( _________________________________ ) ( __________________________________ ) ( _______________________________ )
Date _____/_____/_____ Date _____/_____/_____ Date _____/_____/_____
Bill Of Quantity for AWN 2015 Q3 Capacity Expansion (New site) Project

Equipment Checklist

SITE NAME : Ban Na Jak Pho Ming SITE CODE: BNJPO DATE : B130-Dec-99

Equipment Detail Unit Q'ty Serial Number Remark


Indoor Equipment
BBU3900 Main Equipment pcs 1
-BBU3900 Box pcs 1
-UMPT pcs 1
-WBBPd2 (03020QYR) pcs -
-WBBPf3 (03021VHD) pcs -
-WBBPf4 (03021HPR) pcs -
-UBBPD5 (03022HEL) pcs 2 022HEL4MF9016451,022HEL4MF9017484
-UFLP pcs 1
-UEIU pcs -
-UPEU pcs 2
-FAN pcs 1
DCDU03B pcs 1
Cable Management pcs 1
Open Rack 19" pcs -
Alarm DDF Box pcs -
Outdoor Equipment
Agisson Antenna pcs -
Mobi Antenna pcs -
ACE Antenna pcs -
Fiberhome Antenna pcs 4 HXHMDX0B0021065DXTHF
COMBA Antenna pcs -
2102310TQF6TF9406584,
2102310TQF6TF9406066,
RRU 3839 pcs 4 2102310TQF6TF9406236,
B36020-13-0008
2102310TQF6TF9405078
RRU 3826 pcs -
Easy Macro (Micro BTS3911E UMTS/LTE) pcs -
AC/DC Power Module pcs -
SPD for AC/DC Power Module pcs -
Jumper Feeder 1/2" (Connector---->DIN_Male - DIN_Female) pcs -
Jumper Feeder 1/2" (Connector---->DIN_Male - N type_Male) pcs -
Jumper Feeder 1/2" (Connector---->DIN_Male - DIN_Male) pcs 8
7/8 Feeder Cable m -
Smart Bias Tee pcs -
AISG pcs 4
Optical Cable m 4 60 m x 4
DC Power cable for RRU (4sqmm) m 240 60 m x 4
DC Power cable for RRU (10sqmm) m -
RCU pcs 4
Optical Cable & RRU Power Cable Clamp (Feeder Clamp 3/4" 6x) pcs 120
Optical Cable & RRU Power Cable Clamp (Feeder Clamp 3/4" 2x) pcs -
Ground Bar pcs -
RRU Power Cable Grounding Kit pcs 4

Sign: For AWN Sign: For AWN

Sign:
For Huawei Sign:
For Huawei

Sign: For Subcon Sign: For Subcon

Date: Date:
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Function Test Report For Node B

Contents

4.1 NodeB Power System Acceptance Test Report

4.2 NodeB RF and Antenna system Acceptance test report

4.3 NodeB Checklist and Alarm Acceptance test report

SITE NAME : Ban Na Jak Pho Ming

SITE CODE : BNJPO


est report
Function Test Report
For Node B

SITE NAME: Ban Na Jak Pho Ming CONFIG: 2+2+2+2 SITE CODE:
Node B BRAND: HUAWEI Node B MODEL: BBU3900

4.1 Power System Acceptance Test Report


No Procedure Pass

4.1.1 BBU or RRU circuit breakers are connected to correct equipments and cells.


Circuit breaker BBU RRU on/off breaker label P
A Cell A /RRU A on/off

4.1.2 Check current @ max power not exceed equipment spec.


P
Spec
4.1.3 Check the BBU-RRU optic cables and RRU power cable must be properly connected to

right ports of BBU and RRU. P



optic DC
port sector
4.1.4 Check RRU serial numbers are matching with NAS record every cells.
P
RRU serial number
NAS cell
Function Test Report
For Node B

BNJPO
Node B MODEL: BBU3900

ower System Acceptance Test Report


Fail Note

C
SITE FOLDER

Project : Addition

Site name : Ban Na Jak Pho Ming Site code : BNJPO

4.2 NodeB RF and Antenna system acceptance test report

4.2.1 NodeB RF Test

4.2.1.1 DL Output Power

4.2.1.2 RSSI

4.2.2 CPRI BER

4.2.3 VSWR

4.2.4 Remote Electrical Tilt (RET)


4.2.1.1 NodeB DL Output Power , 4.2.1.2 RSSI
Prepared (also subject responsible if other) Project Manager name

Anucha J/Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Test Result
Carrier 1 Carrier 2 Carrier 3
f2_AIS f2_Huawei f4_AIS f4_Huawei f6_AIS f6_Huawei Pass Fail Note
DL power (dBm) P 2102310KKQ10D1004258

Sector A RTWP (dBm) P


RTWP (for Audit)*
DL power (dBm) P 2102310KKQ10D1004248

Sector B RTWP (dBm) P


RTWP (for Audit)*
DL power (dBm) P 2102310KKQ10D1004229

Sector C RTWP (dBm) P


RTWP (for Audit)*
* Space Row for Auditing Test result with AIS staff by Spectrum Analyzer Measurement
* AIS RSSI Spectrum Analyzer

Test Note :

Remark :
1. Frequency Location f1 ,f2 ,f3 ,f4 , ,f7 , see picture below

2. Condition & Criteria


2.1 Measurement Condition :
DL Output Power ,VSWR ,RSSI(RTWP) ,CPRI BER must be test under condition DL
Output Power 20W (43dBm)

2.2 Parameter Criteria

Remark: RSSI also refers to RTWP in Huawei equipment.


4.2.4 CPRI BER
Prepared (also subject responsible if other) Project Manager name
Anucha J/Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File

AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Vendor Criteria CPRI BER value Pass Fail Note


Sector A 10 -12' 0.00E+00 P
Sector B 10 -12' 0.00E+00 P
Sector C 10 -12' 0.00E+00 P

Test Note :

Remark :
2.1 Parameter Criteria
4.2.1 NodeB DL Output Power ,4.2.2 VSWR ,4.2.3 RSSI
Prepared (also subject responsible if other) Project Manager name
Vender/Sub Vender/Sub
Doc respons/Approved Checked Date Rev. File

AWN AWN B130-Dec-99 B PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

VSWR Test Result


Carrier 1 Carrier 2 Carrier 3
f1 f2 f3 f4 f5 f6 f7 Pass Fail Note
Sector A P
Sector B P
Sector C P

Test Note :

Remark :
1. Frequency Location f1 ,f2 ,f3 ,f4 , ,f7 , see picture below

2. Condition & Criteria


2.1 Measurement Condition :
DL Output Power ,VSWR ,RSSI ,CPRI BER must be test under condition DL Output Power 60W (47.7dBm)

2.2 Parameter Criteria


4.2.5 Remote Electrical Tilt (RET)
Prepared (also subject responsible if other) Project Manager name
Anucha J/Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File

AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Test Result
Antenna Antenna RET RET Tilt Min. Middle Max.
Calibration Pass Fail
Brand Model Model Firmware range Tilt Tilt Tilt
A19451811- Tilt 0 Tilt 5 Tilt 10
RET A Agisson 31043744 A19451811
1710-C(08)
0-10 OK
OK OK OK
P

A19451811- Tilt 0 Tilt 5 Tilt 10


RET B Agisson 31043744 A19451811
1710-C(08)
0-10 OK
OK OK OK
P

A19451811- Tilt 0 Tilt 5 Tilt 10


RET C Agisson 31043744 A19451811
1710-C(08)
0-10 OK
OK OK OK
P

Test Note :

Remark :
1. Objective
1.1 Verify that electrical tilt of antenna can be set by NodeB and OMC by changing the tilt and it will be changed to
the set value. After tilting finish, there is no alarm occur.
1.2 Verify that electrical tilt of antenna can be calibrated by NodeB and OMC without any alarm occur.

2. Example for Tilt Test ; (Min. Tilt ,Middle Tilt ,Max.Tilt depend on Antenna Specification)
ADVANCED WIRELESS NETWORK CO.,LTD
408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin
Samsen Nai Phayathai, Bangkok 10400 THAILAND

4.3 NodeB Checklist and Alarm acceptance test report

4.3.1 HW Power-up Checklist

4.3.2 Alarm Test Report

4.3.3 System Restart Check


4.3.1 : Hardware Power-up Checklist
Prepared (also subject responsible if other) Project Manager name
Anucha J. Huawei Anucha J/PM
Doc respons/Approved Checked Date Rev. File
AWN AWN B130-Dec-99 A PAT Doc for Node B

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

Checklist Item/Criteria Result Remark


Check whether the number of boards accords to the Pass Fail
site configuration plan.
Boards
Check whether all the boards are inserted to the correct Pass Fail
slots.
Check the polarities of BBU/RRU power supply. Pass Fail
The DC voltage should be between -57VDC to -40VDC Pass Fail
Input power
supply If RRU3826 is supplied with single-phase 220 V,
check whether the voltage range is 200V AC--240V Pass Fail
AC, the frequency range is 47 Hz-- 53 Hz.

Check whether the connection between WBBP board


Rack connection Pass Fail
and RRU is correct.
Iub interface check whether LAN cable and UMPT board is Pass Fail
connection correctly connected.
All boards should be unplugged. Pass Fail
Power-up
Status of the boards after the power-up Pass Fail
Power-up Result Is the result is normal Pass Fail
Notes :
4.3.3 Alarm Test Report
Prepared (also subject responsible if other) Project Manager name

Anucha J. Huawei Anucha J/PM


Doc respons/Approved Checked Date Rev. File

AWN AWN B130-Dec-99 A PAT Doc node B Pancake

Project : 2015-3G2100 Radio Network (Q3 Capacity Expansion)


Site name : Ban Na Jak Pho Ming Site code : BNJPO

No. Procedure Pass Fail Note

Part I_Internal alarm test


1 CPRI Cable BBU RRU ( BBU) P
Disconnect CPRI cable between BBU and RRU
Part II_Enternal alarm test
2 External alarm port 1 P AC MAIN FAIL
External alarm port 2 P BATT DISCHARGE
External alarm port 3 P BATT LOW VOLT
External alarm port 4 P RECT MODULE FAIL
External alarm port 5 P HIGH TEMP/FAN FAIL
External alarm port 6 P AIR FAIL
External alarm port 7 P OB LIGHT FAIL
External alarm port 8 P DOOR OPEN

Remarks
1. Contact Breaking set closing
2. New Site
Breaking
Define BTS Alarm
3. Expansion Re-config Define Pattern Define Contact
Define Closing closing
1)
Contact : Breaking(normal closed) or Closing (normal open)
Pass : Created alarm sent to OMC
Failed : Created alarm not sent to OMC
Example
BOOSTER FAIL-Brand_Cell name- REPEATER FAIL-Brand_cell name-
BOOSTER FAIL-MCPA-WSPS3- REPEATER FAIL-Xinmin_CPKTP-(Target cell)
Part III_System restart
No. Procedure Pass Fail Note

1 System restart

Remarks
off breaker Node B 5 on breaker Node B

On Service Alarm OMC Alarm recovery
Function Test Report
For Node B

SITE NAME: Ban Na Jak Pho Ming CONFIG: 2+2+2+2 SITE CODE:
Node B BRAND: HUAWEI Node B MODEL: BBU3900

Site Deficiency Report


Def. Failed Failed
Type Deficiency Category 1st Insp 2nd Insp

4.1 Power System Acceptance Test

4.2 Antenna System Acceptance Test

4.3 Node B Acceptance Test

No Description of Deficiency Report Date

No Material of Deficiency Report Date

Remark : NIR01 or NIR03 YES NO

Site Deficiency Clearance

S : Standard on service 7

C : Critical on service

First Inspection Result Second Inspection Result Verification Result

Pass Fail Pass Fail The work was verified and


accepted by:

Signature: ______________________ Signature: ______________________


Supervisor Supervisor

Signature: ______________________ Signature: ______________________ ____________________________


Installation team leader Installation team leader Authorized AIS field engineer
Function Test Report
For Node B

SITE NAME: Ban Na Jak Pho Ming CONFIG: 2+2+2+2 SITE CODE:
Node B BRAND: HUAWEI Node B MODEL: BBU3900

Date:_____/_______/_______ Date:_____/_______/_______ Date:_____/_______/____


Function Test Report
For Node B

BNJPO
Node B MODEL: BBU3900

Site Deficiency Report


Clear of
Deficiencies

Clear Date

Clear Date

Verification Result

The work was verified and


accepted by:

________________________________
Authorized AIS field engineer
Function Test Report
For Node B

BNJPO
Node B MODEL: BBU3900

Date:_____/_______/_______
ADVANCED WIRELESS NETWORK CO.,LTD

408/60 Phaholyothin Place bldg.,15thFl.,Phaholyothin

Samsen Nai Phayathai, Bangkok 10400 THAILAND

Stationary service acceptance test report

Contents

5.1.1 RNC_Feature Activation List

5.1.2 NodeB_Service Activation list

5.1.3 3G NodeB_PAT_CS_PS Basic testt

5.1.4 3G NodeB_PAT_CS_PS Services

SITE NAME Ban Na Jak Pho Ming

SITE CODE BNJPO


ort
Feature lists print out from RNC ("mapping with BOQ")

RNC Name: 3RNCSNI1H


Total Feature L100.00%

Feature Name Parameter name Indecators & Activation Capture(only parmeter MML Command BoQ Items
Ex. Yes, Activated requirment)
CFG_MULTI_RAB_SWITCH ON P1.1 LST UCORRMALGOSWITCH
Multiple RAB Package (PS RAB >=2) 88034997 QW1S0MRABV00 Multiple RAB Package (PS RAB >=2) (per Erl) 1625
Cell Broadcast service CBS State CBS Enabled P1.2 DSP UCELL 88031715 QW1S00CBSV00 Cell Broadcast service (per Erl) 1625
Preempt algorithm switch ON P1.3 LST UQUEUEPREEMPT
Queuing and Pre-Emption 88032085 QW1SQUEUEV00 Queuing and Pre-Emption (per Erl) 82
Queue algorithm switch ON P1.3 LST UQUEUEPREEMPT
Cell L2ENHANCED Function Switch ON P1.4 LST UCORRMALGOSWITCH
Downlink Enhanced L2 88030AAH QW1S0DEL2M00 Downlink Enhanced L2 (Per Mbps) 336

Type of Channel Preferably Carrying Signaling UL_EDCH,DL_DCH or P1.5 LST UFRCCHLTYPEPARA


SRB over HSUPA 88037254 QW1S0USRBP00 SRB over HSUPA (per Mbps) 86
RB UL_EDCH,DL_HSDSCH

P1.1 P1.2

P1.3 P1.4

P1.5
361759987.xlsx

07/28/2017 , 5764
361759987.xlsx

07/28/2017 , 5864
361759987.xlsx

07/28/2017 , 5964
361759987.xlsx

07/28/2017 , 6064

Você também pode gostar