Climax Company Starch Separation Process Failure Risk Analysis Example - Template created by
2 Analysis Method (Ver. 5) Created by: Matthew Warta, NJIT email: mw269@njit.edu
3
4
5
6
7 Product Name and Appearance Before Process Organic Plant Pulp Product
8 Name of Organization Responsible for the Process Climax Company
9 Other Organizations Involved in the Process
10 Subcontractors, process Plants Effected Chemical Vendors, Waste Management
11 Product Serial Number and Optional Image Map
12
19
Chemical transportation and storage. Store in a
2 location with restricted access and ensure Material Human hand and forklift
20
Safety Data Sheet procedures are followed
21
22
25
26 Tranfer of materials (Pulp & Chemical) for
4 Human hand and pallet jack equipment
processing
27
28
Chemical decomposition equipment, computer
Hazardous chemical transfer and pulp
5 controlled and hazardous waste storage
29 decomposition by-product capture and storage
containers.
30
31
Separation of usable starch material from chemical Starch seperation skimmer equipment,
6
32 slurry computer controlled.
33
34
Chemical drying equipment, computer
7 Chemical Drying Process
35 controlled.
36
37
38
Contaminated Chemical/hazardous waste collection Human hand, pallet jacks, fork lifts and
8
and storage. hazardous waste containers.
39
40
41 Automated, computer controlled power supplies
9 Baseline testing of finished insulation materials
and electronic test equipment
42
43
10 Transfer of insulation materials to packaging Automated, conveyor belts
44
45
46
Automated, computer controlled with robotic
11 Final Packaging of Insulation
sealing, conveyor belts
A B C D
Automated, computer controlled with robotic
47 11 Final Packaging of Insulation
sealing, conveyor belts
48
49
Hazardous chemical transfer to final Human hand, pallet jacks, fork lifts and
50 12
mitigation/reclaimation/storage facility hazardous waste containers.
51
52
53
54
55
E F G H I
1
alysis Example - Template created by Dr. Ranky's Component-oriented Process Failure Risk
2
mail: mw269@njit.edu
3
4
5
6
7 PFRA Study ID Number Warta-Climax-7291701 Process Code
Engineering Release Date of Process
8 Date of This Study (mm/dd/yy) 7/29/2017
Methodology
9 Orignal Date of This Study 7/29/2017 Type of Product Processed
10 Revision Number Rev. 1 Product Group Classifier
11 Comments PFRA - Assignment 4 Engineering Release Date of the Product
12
Process
13 Specify the Fixtures / Clamps Used in List / Identify the Parts / Components Process Accumulated
Cost
Each Process Step Retrieved in Each Process Step Time Process Cost
14 60.00
15 [sec] [USD] [USD]
16
17
Used Hands with gloves Chemicals received from vendor 300 5.00 5.00
18
19
Chemical storage room, limited access. Follow
Used Hands with gloves 1800 30.00 35.00
20 MSDS
21
22
Used hands with gloves Plant Pult from Vendor 1200 20.00 55.00
E F G H I
23
Used hands with gloves Plant Pult from Vendor 1200 20.00 55.00
24
25
26 Used Hands with gloves Plant pult and Chemicals 1800 30.00 85.00
27
28
Used hands with gloves, ceramic coated tools Plant pulp mixed with chemicals, hazardous by-
14400 240.00 325.00
29 for moving contaminated pulp materials product formed from decomposition process
30
31
Skimmers, hands with gloves Decomposed Plup and Chemical Materials 3600 60.00 385.00
32
33
34
Drying racks, hands with gloves starch material 600 10.00 395.00
35
36
37
38
Hazardous waste and hazardouswaste storage
Hands, hazmat equipment 1800 30.00 425.00
facility, limited access.
39
40
41 Hands, pallets, conveyor belt Processed starch materials (insulation) 600 10.00 435.00
42
43
hands with gloves, conveyor belt approved inspected insulation materials 21600 360.00 795.00
44
45
46
Robotics, conveyor belt isulation materials 300 5.00 800.00
E F G H I
47 Robotics, conveyor belt isulation materials 300 5.00 800.00
48
49
50 Hands with gloves, pallets, metal straps Hazardous waste by-product 600 10.00 810.00
51
52
53
54
55
J K L M N O P
1
3
4
5
6
7 This PFRA Study was Prepared By Matthew Warta
e Date of Process
8 7/29/2017 PFRA Team Matthew Warta / Dr. Ranky
ocessed 9 Starch based insulation product Responsible Organization/ Department Climax, Project Management Team
Green and Sustainable Focus Oriented R
sifier 10 Climax Manufactured Product (CMP) Comments
Analysis
11
e Date of the Product 29-Jul-17
12
The PFRA Team Describes / Illustrates the Potential Process RPN (Risk
13
Failure Mode and the Effect; the Risk of Failure Severity RatingDetection Rating
Occurrence Rating
Priority Max. RPN
Number)
14 Proc.ID Failure Mode(s) and Effect(s)
15 (1-10) (1-10) (1-10)
16 ID 1.1 Products not received - no production 8 10 2 160
17 ID 1.2 Incorrect products - no production 8 10 2 160
160
18 ID 1.3 10 8 1 80
Damaged, leaking, contaminated products - health hazard
180
20 ID 2.2 Misplaced items - loss of productivity, decreased efficiency 6 5 3 90
192
J K L M N O P
23 ID 3.2 Incorrect products - no production 8 8 3 192
192
24 ID 3.3 8 7 2 112
Damaged incoming product - no production
Spill chemicals - production halted, hazardous chemical clean
25 ID 4.1 10 8 3 240
up
26 ID 4.2 Damage Pulp Containers - loss of productivity 5 5 7 175 240
27 ID 4.3 0
3
4
5
6
Matthew Warta 7
8
Matthew Warta / Dr. Ranky
9
Climax, Project Management Team
Green and Sustainable Focus Oriented Risk
10
Analysis
11
12
19
Safety issues
1.00 1.00 1.00 1.00 180.00 Low
20 Production Process delayed
21
Safety issues and loss of productivity
22 Production Process delayed
28
Schedule and cost
1.00 1.00 1.00 1.00 280.00 HIGH
29
Safety issues
30
31
Schedule and cost
1.00 1.00 1.00 1.00 180.00 Low
32 Safety issues and loss of productivity
33
34
Schedule and cost
1.00 1.00 1.00 1.00 120.00 Low
35 Un-met production schedule
36 Safety issues
37 Safety, shcedule, major cost
38 Safety and major cost
1.00 1.00 1.00 1.00 180.00 Low
39
Safety issues
40 Schedule and major cost impact
41 1.00 1.00 1.00 1.00 210.00 HIGH Schedule and cost
42
43
Schedule and cost
1.00 1.00 1.00 1.00 336.00 HIGH
44 Schedule and cost
45 Safety issues
46 Schedule and major cost impact
1.00 1.00 1.00 1.00 245.00 HIGH
Q R S T U V W
47 1.00 1.00 1.00 1.00 245.00 HIGH Schedule and cost
48
49 Schedule, time, major cost, customers
50 1.00 1.00 1.00 1.00 180.00 Low Schedule, time, major cost, customers
51 Schedule, time, major cost, customers
52
53
54
55
X Y Z
1
3
4
5
6
7
8
9
10
11
12
3
4
5
6
7
8
9
10
11
12
14 ID 1.2
15 ID 1.3
16 Phone Call to Vendor
ID 2.1
17 Phone Call to Vendor
ID 2.2
18
ID 2.3
19 ID 3.1
ID 3.2
20
ID 3.3
21
Immediate action needed ID 4.1
22 Phone Call to Vendor
ID 4.2
ID 4.3
ID 5.1
ID 5.2
ID 3.1
ID 3.2
ID 3.3
ID 4.1
AA AB AC
ID 4.2
23 Phone Call to Vendor
ID 4.3
24
ID 5.1
25 Immediate action needed
26 Immediate action needed ID 5.2
27 ID 5.3
28 ID 6.1
Immediate action needed
ID 6.2
29
Immediate action needed
ID 6.3
30
ID 7.1
31
ID 7.2
32 Immediate action needed
33 ID 7.3
34 ID 8.1
immediate action needed
35 immediate action needed ID 8.2
36 Immediate action needed ID 8.3
37
ID 9.1
38 Immediate action needed
ID 9.2
39
ID 9.3
Immediate action needed
40 ID 10.1
41
ID 10.2
42
ID 10.3
43
ID 11.1
44
ID 11.2
45 Immediate action needed
46 Immediate action needed ID 11.3
ID 12.1
ID 12.2
ID 12.3
ID 8.1
ID 8.2
ID 8.3
ID 9.1
ID 9.2
ID 9.3
ID 10.1
ID 10.2
ID 10.3
ID 11.1
ID 11.2
AA ID 11.3 AB AC
47 ID 12.1
48
ID 12.2
49 Immediate action needed
50 Immediate action needed ID 12.3
51 Immediate action needed
52
53
54
55
AD AE
1
3
4
5
6
7
8
9
10
11
12
0 50 Accumulated
100 RPN
150 for Each Failure
200 250 Mode
300 350 400
13
1
14
15
16
2
17
18
19 3
20
21
4
22
5
3
4
AD AE
23
24
5
25
26
27
28 6
29
30
7
31
32
33
34 8
35
36
37
38 9
39
40 10
41
42
43
11
44
45
46
12
8
10
11
AD AE
47 12
48
49
50
51
52
53
54
55