Você está na página 1de 9

Project Reference List

S.no Project Detail Project Work Description


01 Project :- Pipe Line:
Burj Dubai Development, The Chilled Water Line for District Cooling Plant.
Dubai Mall- DCPI Material:
Steel Pipe and GRP Jacket over PU foam Insulation
Client:
Emaar Properties.
Diameters: 1400mm, 1200mm, 500mm.
Consultant:
Allied Consultant Work Executed
Third Party
Bureau Veritas, Dubai.
Pre insulated Steel Pipe welded at jointing points and
tested.
Contractor: GRP Jacket fabricated and fixed over Steel welded joint
P.M Turner Construction and tested for no leak at
International PU foam filled in interstitial between Steel pipe and GRP
GDC
Jacket
Testing carried out for foaming density confirmation and
Installation of GRP Pipe lines
Spool/saddle fixing/ joint lamination pipe & fittings.
Assembly of flanged spools, valves and supporting
system.
Hydro pressure testing and commissioning of the system.

02 Project :- Pipe Line:


Mall of Emirate Al Barsha, GRP Pipe line for Cooling water.
Dubai
Material:
Client:
WSP Majid Al-Futtaim
GRP Pipe Line
Investments Dubai.
Diameters: 1200mm, 800mm, 600mm, 400mm, and
Consultant: 300mm
Third Party
Bureau Veritas, Dubai.
Work Executed
Contractor: Installation of GRP Pipe line above ground, Spool saddle
ETA fixing, joint lamination of pipe & fittings. Assembly of
flange spools, valves and supporting system.
Hydro pressure testing and commissioning of the system.
03 Project :- Pipe Line:
Central Utility Complex, DUBAI Fire water line for firefighting system.
AIRPORT Expansion.
Material:
Client:
Dubai Civil Aviation Authority.
GRP Pipe Line

Consultant: Diameters: 300mm, 250mm, 150mm, and 100mm


Dar Al Handasah
Work Executed
Contractor:
Installation of GRE fire water line with Rubber seal lock
BK Gulf joints (RSLJ) for underground Adhesive and Lamination
joints with Epoxy Resin System. including hydro Testing.

04 Project :- Pipe Line:


Emirates Engineering Centre Fire water line for Maintenance Facilities.
Client: Material:
Emirates Engineering
GRP & GRE Pipe line
Consultant:
ADPI Diameters:
300mm, 250mm, 150mm,100mm and 80mm
Contractor:
Thermo
Work Executed
Installation of GRP Spool saddle fixing, joint lamination
of GRP pipe & fittings. Assembly of flange spools, valves
And supporting system. Hydro pressure testing and
Commissioning of the system.

05 Project :- Pipe Line:


Sohar Fertilizer Project at Sohar Chilled Water Line for District Cooling Plant.
Port in Sultanate of Oman.
Material:
Client: GRP Pipeline
MHIFPCC EPC Contract Diameters:
Mitsubishi
Heavy Industries, JAPAN
1500mm & 500mm

Work Executed
Modification work for GRP Pipe line and spooling works.
Installation of GRP Spool saddle fixing, joint lamination
of GRP pipe & fittings. Repairing and rework for existing
GRP pipe lines. Hydro pressure testing of the system
06 Project :- Tank /Vessels:
Chemical process Tanks
Barka Power & Desalination
Plant, Oman. Material:
GRP Vertical Tanks
Client:
M/s Degremont Diameters:
2200mm & 1800mm
Contractor:
M/s Doosan
Work Executed
Inspection of tanks for cracks and defects, Submitted
proposal for repairing.
Defective portion of tanks repaired and tested.
Assembly of Piping works to the tanks.
Modification work for GRP Pipe line and spooling works.
Repairing and rework for existing GRP pipe lines.
The seawater desalination plant of Barka Phase II is
based on reverse osmosis technology to be supplied by
Degrmont

07 Project :- Pipe Line:


Hotlink / HBI Combo Plant at Back wash System water line.
Sohar Port
In Sultanate of Oman. Material:
GRP
Client:
M/s Shadeed Iron & Steel Diameters:
1500mm, 600mm, 500mm, 350mm, 150mm and
Consultant: 100mm
M/s MIDREX Technologies
INC, USA.
Work Executed
Contractor: Installation of Under Ground and above ground GRP Pipe
M/s KOBE Steel (KOBELCO) lines,
GRP lamination jointing work including fit up and
M/s Jurong Engineering LLC
(JELLC)
alignment.
Prefabricated Spool assembly, saddle fixing, Joint
lamination of pipe & fittings.
Assembly of flanged spools, valves and supporting
system.
Hydro pressure testing and commissioning of the system.
08 Project : Pipe Line:
Complete Water System for
SHADEED PLANT at Sohar
Sea water System pipeline.
Port in Sultanate of Oman.
Material:
GRP
Client:
M/s Shadeed Iron & Steel
Diameters:
Consultant: 1700mm, 1500mm, 1200mm and 600mm
M/s MIDREX Technologies
INC, USA. Work Executed
Contractor:
M/s Towell Al Zawara
Installation of Under Ground and above ground
Engineering Services Co GRP Pipe lines,
GRP lamination jointing work including fit up and
alignment.
Prefabricated Spool assembly, saddle fixing,
joint lamination of pipe & fittings.
Assembly of flanged spools, valves and supporting
system.
Hydro pressure testing and commissioning of the system.

09 Project :- Pipe Line:


Air Liquide Extension & Cooling water System pipeline.
Modification Works at Sohar
Port in Sultanate of Oman. Material:
GRP
Client:
M/s Air Liquide Sohar Diameters:
Industries Gases LLC 600mm, 400mm and 300mm

Work Executed
Installation of Under Ground and above ground
GRP Pipe lines,
GRP lamination jointing work including fit up and
alignment.
Prefabricated Spool assembly, saddle fixing,
Assembly of flanged spools, valves and supporting
system.
Hydro pressure testing and commissioning of the system
10 Project :- Pipe Line:
Sohar Fertilizer Project at Sohar Rubber lining for pipelines
Port in Sultanate of Oman.
Material:
Steel pipe with rubber lining
Client:
MHIFPCC EPC Contract
Mitsubishi Diameters:
Heavy Industries, JAPAN 600mm and 500mm

Work Executed
Inspected the pipeline for visual inspection of lining
Marked the defective portion
Submitted the proposal for relining
Carried out rubber lining work. Tested for adhesion.

11 Project :- Pipe Line:


Dubai Airport Free zone Fire water pipelines
2B+G+8 OFFICE Building
Material:
Client: GRE Pipe and Fittings
M/s Dubai Airport Free Zone
Authority(DAFZA)
Dubai, UAE Diameters:
250mm, 150mm
Consultant:
Work Executed
Contractor:
M/s ETA MNE DIV
Installation of GRE fire water line
with Rubber seal lock joints (RSLJ) for under ground
Adhesive and lamination joints with Epoxy
Resin System for above ground applications.
Installation of fittings tees, elbows, flanged jointing with
fire hydrants and other accessories.
Underground & Above ground piping including hydro
Testing.
Project :- Pipe Line:
12 Salalah IWPP Project, GRP Pipeline
Salalah, Sultanate of Oman Seawater intake line
and Sea Outfall pipe line
Client:
SEPCO III Construction LLC,
China.
Material:
(EPC Contract) GRP Pipe, Fittings and GRP Spools

SembCorp Salalah Power & Diameters:


Water Company SAOC. 1600mm, pressure class 6 Bar - Sea Outfall pipe line -
Contractor:
M/s SEPCOlll Electric Power 900mm, 600mm, 500mm and 450mm pressure class 16
Constriction Corporation. Bar.

Work Executed

Installation, laying, leveling, alignment and jointing works


of GRP Pipes, and fittings.

Hydro pressure testing and commissioning of the system.

13 Project :- Pipe Lining works:


Sohar Sewage network Phase- I, GRP Lining work for Sewage Pumping Stations.
Sohar, Sultanate of Oman. GRP Prefabricated sheets with lugs (Anchors)
GRP Insitue lamination for Pumping Station Base.
Client:
Sultanate of Oman Royal Court, Material:
Sohar Development Office. Chemical Resistance Liner : Vinylester Resin system
Structural layers: Isophithalic resin system
Consultant:
M/s NJS Consultant Oman, LLC

Contractor: Work Executed


M/s Desert Line Projects, LLC Manufactured GRP Prefabricated liner with lugs (anchors)
for vertical surfaces (walls).
Manufactured GRP Prefabricated liner with lugs for cover
slabs.

Carried out GRP Insitu lamination work for Pumping


Station base.
14 Project :- Pipe Lining works:
Jabal Ali Air Port, GRP Lining work for Sewage Pumping Stations.
Dubai, UAE. GRP Prefabricated sheets with lugs (Anchors)
GRP Insitue lamination for Pumping Station Base.
Client:
GRP Insitue lamination for manhole shafts, benching and
Dubai Civil Aviation Authority. coverslabs.

Consultant: Material:
M/s Dar Al Handsah Chemical Resistance Liner : Vinylester Resin system
Contractor:
Structural layers: Isophithalic resin system
M/s Kharafi International

Work Executed
Manufactured GRP Prefabricated liner with lugs (anchors)
for vertical surfaces (walls).
Manufactured GRP Prefabricated liner with lugs for cover
slabs.
Carried out GRP Insitu lamination work for Pumping
Station base.
Carried out GRP insitu lamination lining for Benching,
shaft, coverslab and at adjustment rings.

15 Project :- Work Executed

Salalah IWPP Project, Material:


Salalah, Sultanate of Oman. GRP Pipe, Fittings and GRP Spools

Diameters:
Client:
Oman Power & Water
500mm, pressure class 6 Bar - Sea Outfall pipe line -
Procurement.
900mm, 600mm, 500mm and 350mm pressure class 16
SembCorp Salalah Power & Bar.
Water Company SAOC.

Contractor:
Work Executed
M/s Al Musharfi Corporation
L.L.C. Installation, laying, leveling, alignment and jointing works
of GRP Pipes, fittings and factory fabricated spools.
Hydro pressure testing and commissioning of the system.
16 Project :- Work Executed
Barkha II Power Plant
Material:
GRE Pipe, Fittings and GRE Spools
Client/Contractor:
M/s STOMO Diameters:
SUEZ TRACTEBEL 350mm, 250mm, 150mm, 100mm, pressure class 12 Bar
OPERATION AND Fire Fiting GRE pipe line -
MAINTENANCE OMAN LLC
BARKA, SULTANATE OF
OMAN.
Work Executed

Installation, laying, leveling, alignment and jointing works


of GRP Pipes, fittings and factory fabricated spools.

17 Project :- Pipe Lining works:


GRP Lining work for Sewage Pumping Stations.
Al Duqm International Air Port GRP Prefabricated sheets with lugs (Anchors)
Project. Package 1 GRP Insitue lamination for Pumping Station Base.
Duqm, Sultanate of Oman.

Material:
Client: Chemical Resistance Liner : Vinylester Resin system
Ministry Of Transport & Structural layers: Isophithalic resin system
Communication.

Consultant:
M/s IBN Khaldun-Almadaen Work Executed
Engineering Consultants
Manufactured GRP Prefabricated liner with lugs (anchors)
Contractor: for vertical surfaces (walls).
M/s Desert Line Projects, LLC
Manufactured GRP Prefabricated liner with lugs for cover
slabs.

Carried out GRP Insitu lamination work for Pumping


Station base.
18 Project :- Pipe Line work:

GRE RO Inlet line.


R.O. Plant Project. GRE Reject Line.
Yibal, Sultanate of Oman.
GRE Permeate Line.

Client: Material:-
PDO. GRE
(Petroleum Development Oman)
Diameters:
Contractor: 100mm, 80mm.
M/s Lalbuksh Voltas Engineering
Services & Trading LLC. Work Executed
Installation of above ground GRE Pipe lines,
GRE Epoxy lamination jointing work including fit up and
alignment.

GRE Pipe & Fittings Installation & GRE Adhesive


Bonded / Cement joints work.

Spools assembly, GRE adhesive bonded joints and


lamination joints of pipes & fittings.
Assembly of flanged spools, valves and supporting
system.

Hydro pressure testing and commissioning of the system