Você está na página 1de 9

PROYECTO :

RECUPERACION DEL FACTOR DE DISPONIBILIDADUNIDAD


TOPPING 150
CLIENTE:
ECOPETROL - GCB- COLOMBIA

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

1165 U150 MTO 1311.02 0 1 DE 8

PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error: Error: Error


Reference Referen Referenc Reference : 2 DE 9
source not ce e source source not Refer
Error: Reference source not found

TABLA DE DERIVACIONES DE TUBERIA

PARA LA INGENIERA DE DETALLE Y GESTION DE COMPRAS


PARA LA RECUPERACION DEL FACTOR DE DISPONIBILIDAD DE LAS
UNIDADES 150/130

NOTA:
ESTE DOCUMENTO REEMPLAZA AL 1165 EC-1301.01 REV. A POR CAMBIO INTERNO EN NUMERACION
PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 3 DE
r:
e source source not Refer Refe
Error: Reference source not found

0 31-08-2001 EMITIDO PARA INGENIERIA DE DETALLE


M.P A.R J.A / J.O

A 09-07-2001 EMISION PARA COMENTARIOS


M.P A.R J.A / J.O
REV FECHA DESCRIPCION PREPAR CHEQUE AUTORIZ

A) Tipo de material y componentes son de acuerdo a la especificaciones


De tubera concernientes.

B) Instalaciones tipicas anexas son referidas a todas las clases de tubera

C) Las derivaciones no previstas sobre los tipicos anexos debern pedirse


En forma separada.

D) Ruana de refuerzo, cuando se requieran, debern definirse en campo


Con materiales equivalentes a las especificaciones aplicables.(solo
Con la autorizacin de ECOPETROL.)de acuerdo al ANSI/ASME B31.3
Ver hoja 6.

E) Todas las conexiones roscadas en bridas de orificio deben tener soldadura


De sello.

F) Los simbolos son validos para conteo de materiales.


Posiciones y orientacin sern realizados de acuerdo a los isometricos.
PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 4 DE
r:
e source source not Refer Refe
Error: Reference source not found
PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 5 DE
r:
e source source not Refer Refe
Error: Reference source not found

H
S

H
PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 6 DE
r:
e source source not Refer Refe
Error: Reference source not found
PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 7 DE
r:
e source source not Refer Refe
Error: Reference source not found
PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 8 DE
r:
e source source not Refer Refe
Error: Reference source not found

NOTAS:

1) TIPO 1: A ser usado cuando la derivacin es menor que la linea principal

2) TIPO 2: A ser usado cuando la derivacin es igual a la linea principal

3) La platina de refuerzo debe ser obtenida de un niple del mismo espesor de pared y
dimetro del tubo principal.

4) Longitud L y L1 de la platina es mostrada en la hoja 6

5) Preveer un agujero de 8mm. Para venteo el cual sera taponado con un tapon de cabeza cua-
Drada despues de la prueba.

6) El calculo de la platina de refuerzo debe ser hecho con ANSI.B 31.3

7) La platina de refuerzo sera indicada en el isometrico con los siguientes simbolos


PROYECTO :
Error: Reference source not found
CLIENTE:
Error: Reference source not found

TIPO DE CLASIFICACION
PROYECTO No. UNIDAD DOCUMENT0 Y PROGRESIVO REV. HOJA

Error: Error: Error Erro


Referenc Reference : 9 DE
r:
e source source not Refer Refe
Error: Reference source not found

CONFIGURACION PARA IDENTIFICACION DE CODIGOS DE DESTINO SOBRE LINEAS DE


PROCESO Y SERVICIOS

Destino en pipe rack: 4


Destino en durmiente: 5

Destino en prefabricacin: 1
Destino Montaje: 2/3

Você também pode gostar