GENERAL INFORMATION
Equipment Number : 25-CVR-07 Plant Area : Ores Preparation Plant (OPP)
Specific Equipment
: CVR-07 DOL Induction Motor Persons in Charge Rafi, Yudho, Arsyad
Affected
EVENT DESCRIPTION
CVR-07 was frequently tripped for several times due to over-load during normal running condition
MAIN EVENT
Drawn current of CVR-07 motor was too high during empty and normal load condition. The current reading in empty load condition was 28 A
(97% of its full-load ampere). Moreover, the current reading at flow rate of 732 TPH was 34A (117% of its full-load ampere). Noted that the
motor full-load ampere (FLA) is 29 A (Name-plate).
SECONDARY EVENT
Shutdown for all crushing section units if CVR-07 motor is stopped
Inspection found that there was intensive friction activity between the conveyor belt and the huge stack of harden mix of ores+cement at
the CVR-07 head-chute. This event led the CVR-07 motor to draw higher current even in no load condition.
CORRECTIVE ACTION
Operation cleaned half portion of the stacking harden mix of ores + cement at CVR-07 head-chute.
Hence, significant reduction of measured current was achieved. As comparison, the current reading in empty load condition reduced to 14A
(reading prior cleaning action was 28A) and during normal load condition (760TPH), the current reading significantly reduced to only 25A
(reading prior cleaning action was 34A @732 TPH load).
Adjusted the thermal overload (TOL) setting to 35A (120% x FLA)
Adjustment and parameters checks of the current tranducer could not be achieved since it was no access / unreachable. This parameter is
important to be used to verify motor's current reading range in SCADA since it is showed only in percentage.
NOTES
Unfortunately, cleaning action on the stacking harden mix of ores+cement was only carried out for half portion.
We should have had lower current reading when there is only negligible amount of hardened mix of ores+cement at the CVR-07 head-
chute (no friction with the belt conveyor).
Therefore, scheduled cleaning action on the stacking harden mix of ores+cement at CVR-07 head-chute is highly recommended for the
upcoming OPP shutdown.
Prior Cleaning Action of Stacking Harden Mix Upon Cleaning Action of Stacking Harden
of Ores + Cement (@ 732 TPH) Mix of Ores + Cement (@ 760 TPH)
Significant reduction
of current drawn by
CVR-07 motor is
observed