Você está na página 1de 4

Curriculum Vitae

-
Objective
MUHAMMAD .
NAVEED
To use my skills and potentials to assist to Institution to achieve its
MUSSARAT
Fathers Name: goal while seeking long term career with optimum Growth.
To become a challenging employee in the atmosphere where skills and
Muhammad confidence can be adopted and positive experience is gained. Being a
Haneef committed person, high level of devotion and satisfaction will be returned.
Date of Birth:

01-02-1986 Education History


ADDRESS:
Degree University/Board
Village& P/O
Vijh Teh.
Metric B.I.S.E(Sgd)

Sahiwal , Distt. D.A.E.(Electronics) P.B.T.E(Lhr)


Sargodha
CONTACTS:
+92-303-7982656
+92-300-6004452 Course Detail:
00966508987625 1. WELL SHARP
CONTACT E- ID NO:00191671
MAIL ISHUE DATE:16-SEP-2016
EXPIRE DATE:16-SEP-2018
ADDRESS: 2. IWCF Course
naveed_210_rana@ Certificate number_D69806/pk550/1168
yahoo.com Issue Date-sep/19/2013
Nationality: Expiry Date-sep/18/2015
Pakistani 3. Well Cap
Reference no_1547940 Mm128577
C.N.I.C NO: 4. Safety Leader Ship
38402-8448766-3 5. Rig Pass Course
Religion: 6. Cap Course (training center-pci Bahrain)
Islam Serial no_A441387
Date Of Birth: Completion Date-oct/01/2014
Expiry Date-oct/01/2016
01-02-1986
Material Status:
Safety Training & Module:
Married First aid training
Fire fighting
Passport no:
H2s training
AA0827661 Breathing operator
Rigging & slinging
Working at height
Stop training
Confined space safety course
Authorized gas tester

Module:

Rest about module


Floor man module
Derrick man module
Assistant driller
H.S.E module
Introductory module

Computer Course:
Microsoft office
Window
Nett working
Microsoft world

Languages:
Urdu
English
Punjabi
Arabic (know how)

Hobbies:
Book reading
Playing cricket
Reading blogs

Working Experience:
Now I do the job as a driller last 10 years in saipem
drilling company RIG 101 in Saudi Arabia.
I know about rotary drill and oprate and tarque
I know draw works drilling and sett albagoo and sett margen
level
TOP DRIVE sett drilling tarque and make up tarque and tap
drive drilling
Prepare trip sheet and drilling time follow instructions of
company man and follow the game plan.
I know about hole problem and know how to handle it.
I follow instruction company man and game plan
I know about bop and choke test
I done job lay down and pick up process BOTTOM HOLE
ASSEMBLY
During drilling I take care about drilling parameters
I know about fill iadc report
I have done the job the job derrick man in rig
812.EXPRIENCE 05/03/20o7 to 02/02/20112008
I have done the job in WDI RIG 811 as floor man.

EXPRIENCE 07/11/2005 to 05/03/2007


I have done the job WDI RIG 812 as a roust about
.02/07/2004 THEN 07/11/2005
Working with MADI gas drilling rig 30 as a rig electrician
for three month
Working with Pakistan oil limited drilling rig khour 1 as rig
electrician since 17-03-2003 to 11-03-2004
Fahad Javeed power house ltd.pak. since 01_08_2003as a
control room operator

Rules & Responsibility:


Using proper personal protective equipment at all the times.
Following company policies and safety procedures.
Keeping good communication
Always thinking safety and betterment of the job.
Taking all safety precautions during the job

Rig introduction:

SAIPEM RIG 101


SAIPEM RIG 46 : 2000 HP
MUD PUMP : 1600 HP (F 1600)
TDS : VARCO TOP DRIVE (11sa)
BRAKE : MANUAL
SAIPEM RIG 68
SAIPEM RIG 68 : 2000 HP
MUD PUMP : NATIONAL 12-p-160
NATIONAL : 1600 HP
TDS : VARCO TOP DRIVE (9sa)
BRAKE : MANUAL
WDI RIG 811
WDI RIG 811 : 2000 HP
MUD PUMP : 1600 HP (F 1600)
TDS : VARCO TOP DRIVE (11sa)
BRAKE : CYBER CHAIR
WDI RIG 812
WDI RIG 812 : 2000 HP
MUD PUMP : 1600 HP(F1600)
TDS : VARCO TOP DRIVE (11 SA)
BRAKE : cyber chair (JOY STICK)
ELECTRICAL INFORMATION
ENGINES : 3512 B
GENRATOR : 1400 KVA OR 980 KW
VFD : AC POWER
DRILLING EQUIPMENT

1-ROUGHNECK
Type - st 80c
2-Genie man lift
Type -966g
TYPE OF CRANE
TYPE -Link belt
Capacity -45 ton
FORK LIFT
TYPE -CAT
CAPACTY 5 TON

Job Descriptions:
I operate brake during running and pulling out and I know about well
problem and how can handle it.
I know how to make the TRIP SHEET and also know how to make
Proper FLOW CHECK
CHANGE the bit and different part of BHA
WORKED and maintained circulation on mud tanks.
Mixed the mud as per mud engineer recommendation.
Maintained pumps and performed preventative maintenance.
Worked at height (monkey board) while relieve derrick man.
Change the rams of bop
Prepare the bah as like different type drill collars and drill pipes and
slips and elevators etc.
Change the DSA and its gas kits
Tested the bop and chock

Reference:
Mr.Khalid Awan(Rig Superintendent)
Mr.Rana Javed(P.M.S off Shore Rig A.D.C)

Você também pode gostar