Você está na página 1de 178

Gerencia de Planificacin y Desarrollo

Departamento de Planificacin de Generacin y Transmisin

PLAN DE EXPANSIN DEL SISTEMA DE TRANSMISIN


PERODO 2006 2015

Responsables:
Coordinacin General: Ing. Enmanuel Alvarado
Planificacin de Transmisin: Ing. Alvaro Ros
Evaluacin Econmica y Ensamblaje: Ing. Adalys Rojas.

Septiembre 2005
INDICE

INTRODUCCION ................................................................................................................ 8
1. DETERMINACION DE ESCENARIOS. ............................................................ 11
La Lgica de los Escenarios ............................................................................................. 14
Aplicacin al sistema de transmisin ............................................................................... 15
2. DEFINICION DE CRITERIOS DE OPERACIN. ............................................ 16
2.1. Voltajes en Barra .............................................................................................. 16
2.2. Capacidad de las lneas de transmisin y subtransmisin. ............................... 16
2.3. Concepto de Capacidad Firme. ......................................................................... 16
2.4. Diseo del Sistema de Transmisin. ................................................................ 17
2.5. Carga simulada en el sistema. .......................................................................... 17
2.6. Generacin. ....................................................................................................... 18
2.7. Cortocircuito. .................................................................................................... 18
3. PRESENTACIN DE UNIFILARES DEL SISTEMA....................................... 19
4. RESULTADOS .................................................................................................... 31
4.1. Resumen de Obras ............................................................................................ 31
4.2. Estimacin de Costos ....................................................................................... 55
5. HISTORIA Y PRONSTICO DE DEMANDA Y ENERGA ........................... 62
6. ANLISIS TCNICO DEL SISTEMA ELECTRICO ENELBAR .................... 90
6.1. Sistema De Transmisin ................................................................................... 90
6.1.1. Escenario de expansin de generacin. ........................................................ 91
6.1.2. Escenario de expansin mediante nuevos puntos de interconexin. ............ 94
6.1.3. Necesidades de nuevas subestaciones de transmisin y distribucin. .......... 95
6.1.3.1. Municipio Iribarren................................................................................... 95
6.1.3.2. Municipio Palavecino. ............................................................................ 100
6.1.4. Expansin de la red de transmisin 115kV. ............................................... 100
6.1.4.1. Red de Transmisin 115 kV Barquisimeto y Cabudare ......................... 101
6.1.4.2. Red de Transmisin 115 kV, Sistema Regiones..................................... 103
6.2. Sistema Regiones ............................................................................................ 105
6.2.1. Anlisis Preliminar. .................................................................................... 105
6.2.2. Andrs Eloy Blanco .................................................................................... 107
6.2.3. Municipio Crespo ....................................................................................... 109
6.2.4. Municipio Jimnez. .................................................................................... 110
6.2.5. Municipio Morn. ....................................................................................... 112
6.2.6. Municipio Simn Planas............................................................................. 114
6.2.7. Municipio Torres. ....................................................................................... 119
6.2.8. Anlisis Final .............................................................................................. 122
7. REQUERIMIENTOS TCNICOS DE LAS NUEVAS INSTALACIONES Y
AMPLIACIONES ...................................................................................................... 124
7.1. Sistema Barquisimeto ..................................................................................... 124
7.1.1. S/E Manzano .............................................................................................. 124
7.1.2. S/E Centro .................................................................................................. 125
7.1.3. S/E Ujano.................................................................................................... 126
7.1.4. S/E Norte .................................................................................................... 128
7.1.5. S/E Oeste .................................................................................................... 132
7.1.6. S/E Palavecino ............................................................................................ 135
7.1.7. Dist. Morn ................................................................................................. 138
7.1.8. Planta Polgono, S/E Polgono ................................................................... 140
7.2. Sistema De Transmisin ................................................................................. 145
7.2.1. Sub-Sistema Regiones .................................................................................... 145
7.3. Sistema Regiones ............................................................................................ 152
7.3.1. S/E La Miel ................................................................................................. 152
7.3.2. S/E El Tocuyo ............................................................................................. 155
7.3.3. S/E Quibor .................................................................................................. 157
7.3.4. S/E Aguada Grande .................................................................................... 159
7.3.5. SS/EE Santa Ins y Siquisique ................................................................... 161
7.3.6. S/E Duaca ................................................................................................... 162
7.3.7. S/E Guarico ................................................................................................ 164
7.3.8. S/E Sanare .................................................................................................. 165
7.3.9. S/E El Roble ............................................................................................... 167
7.3.10. Dist. San Pablo ........................................................................................... 169
7.3.11. S/E La Pastora ............................................................................................ 170
8. NIVELES DE CORTOCIRCUITO .................................................................... 172
INDICE DE TABLAS

Tabla N 1
Evaluacin de las Fuerzas Motoras. ..................................................................................... 12
Tabla N 2
Capacidades (MVA) por Conductor en Lneas de Transmisin .......................................... 16
Tabla N 3
MW Generado por Subestacin .......................................................................................... 188
Tabla N 4
Resumen de Obras ................................................................................................................ 31
Tabla N 5
Estimacin de Costos
Inversin en Subestaciones ................................................................................................... 55
Tabla N 6
Estimacin de Costos
Inversin en Transformadores .............................................................................................. 57
Tabla N 7
Estimacin de Costos
Inversin en Lneas de Transmisin y Subtransmisin ........................................................ 59
Tabla N 8
Estimacin de Costos
Resumen de Inversiones ....................................................................................................... 61
Tabla N 9
Historia de Energa (MWh) y la Demanda (MW) del Sistema ENELBAR ......................... 67
Tabla N 10
Pronstico de Energa (MWh) y la Demanda (MW) del Sistema ENELBAR ..................... 71
Tabla N 11
Historia de Demanda Mxima no Coincidente (MW) Sistema Barquisimeto ..................... 74
Tabla N 12
Historia de Demanda Mxima No Coincidente (MW) Sistema Regiones ........................... 75
Tabla N 13
Historia de Demanda Mxima No Coincidente (MVA) Sistema Barquisimeto. ................. 76
Tabla N 14
Historia de Demanda Mxima No Coincidente (MVA) Sistema Regiones ......................... 77
Tabla N 15
Pronstico de Demanda Mxima No Coincidente (MW). Sistema Barquisimeto ............... 78
Tabla N 16
Pronstico de Demanda Mxima No Coincidente (MW). Sistema Regiones ...................... 79
Tabla N 17
Pronstico de Demanda Mxima No Coincidente (MVA). Sistema Barquisimeto-Carora . 80
Tabla N 18
Pronstico de Demanda Mxima No Coincidente (MVA). Sistema Regiones .................... 81
Tabla N 19
Pronstico de Demanda Mxima No Coincidente (MW). Con Nuevos Desarrollos. Sistema
Barquisimeto-Carora. ........................................................................................................... 82
Tabla N 20
Pronstico de Demanda Mxima No Coincidente (MW). Con Nuevos Desarrollos. Sistema
Regiones ............................................................................................................................... 83
Tabla N 21
Pronstico de Demanda Mxima No Coincidente (MVA). Con Nuevos Desarrollos.
Sistema Barquisimeto-Carora ............................................................................................... 84
Tabla N 22
Pronstico de Demanda Mxima No Coincidente (MVA). Con Nuevos Desarrollos.
Sistema Regiones .................................................................................................................. 85
Tabla N 23
Pronstico de Demanda Mxima Coincidente (MW). Con Nuevos Desarrollos (FC=0,9).
Sistema Barquisimeto-Carora. .............................................................................................. 86
Tabla N 24
Pronstico de Demanda Mxima Coincidente (MW). Con Nuevos Desarrollos (FC=0,9).
Sistema Regiones .................................................................................................................. 87
Tabla N 25
Pronstico de Demanda Mxima Coincidente (MVA). Con Nuevos Desarrollos (FC=0,9).
Sistema Barquisimeto-Carora. .............................................................................................. 88
Tabla N 26
Pronstico de Demanda Mxima Coincidente (MVA). Con Nuevos Desarrollos (FC=0,9).
Sistema Regiones .................................................................................................................. 89
Tabla N 27
Plan de Adquisicin de Nuevas Unidades de Generacin
Escenario Expansin de Generacin. ................................................................................... 91
Tabla N 28
Caractersticas Generales de los sistemas elctricos por Municipio. ................................. 106
Tabla N 29
Caractersticas Generales de los sistemas elctricos por Municipio al final del perodo de
Estudio y las obras planificadas implementadas. .............................................................. 122
Tabla N 30
Niveles de Cortocircuito.
Sistema Barquisimeto - Carora
Caso: Ao 2005 ................................................................................................................. 173
Tabla N 31
Niveles de Cortocircuito en MVA y kA
Reactancias instaladas en la salida de los circuitos de distribucin
Caso: Ao 2005 ................................................................................................................. 173
Tabla N 32
Niveles de Cortocircuito
Sistema Barquisimeto - Carora.Caso: Ao 2006 ............................................................... 174
Tabla N 33
Niveles de Cortocircuito en MVA y kA
Reactancias instaladas en la salida de los circuitos de distribucin.
Caso: Ao 2006 ................................................................................................................. 174
Tabla N 34
Niveles de Cortocircuito (MVA)
Sistema ENELBAR
Caso: Ao 2005 - 2015 ...................................................................................................... 175
Tabla N 35
Niveles de Cortocircuito (kAcc)
Sistema ENELBAR
Caso: Ao 2005 2015 ................................................................................................... 1776
INDICE DE FIGURAS

Figura N 1
Escenarios Posibles en el periodo de estudio. ...................................................................... 13
Figura N 2
Grfico Historia y Pronstico de Potencia (MVA). Sistema ENELBAR ............................ 63
Figura N 3
Grfico Historia y Pronstico de Potencia (MVA). Sistema Barquisimeto - Carora ........... 64
Figura N 4
Grfico Historia y Pronstico de Potencia (MVA). Sistema Regiones Sin SIDETUR ........ 65
Figura N 5
Grfico Historia y Pronstico de Potencia (MVA). Sistema Regiones Con SIDETUR ...... 66
Figura N 6
Aspecto de la estructura doble terna, con una sola terna Equipada. ................................... 101
Figura N 7
Aspecto de la estructura doble terna, cuando ya se han equipado ambas ternas por razones
de ampliaciones en el sistema. ............................................................................................ 103
INTRODUCCION

El presente trabajo contiene los lineamientos, obras e inversiones necesarias para la


Expansin del Sistema de Transmisin de la C.A. ENERGIA ELECTRICA DE
BARQUISIMETO en el periodo 2006 2015. Dicho trabajo es el producto de una serie de
actividades realizadas por la Gerencia de Planificacin y Desarrollo, especficamente por el
Departamento de Planificacin de Generacin y Transmisin siguiendo el objetivo
fundamental de darle una orientacin adecuada al desarrollo de obras necesarias por el
Sistema de Transmisin, producto del incremento que anualmente experimenta la demanda
elctrica en el Estado Lara.

Esta nueva versin est basada en los elementos que fueron planteados en los planes
anteriores, de manera de evaluar en que medida fue cumplindose, que obras se llevaron a
cabo, cuales sufrieron desplazamiento en el tiempo y finalmente establecer necesidades de
nuevas instalaciones.

En este nuevo volumen, se han tenido en cuenta nuevas actividades y escenarios que
han influido en la metodologa usada en planes anteriores, como por ejemplo, el manejo de
escenarios en los cuales se estudia la posibilidad de que la empresa ponga en marcha un
Plan de Expansin de Generacin. En planes anteriores, siempre se estableci la operacin
del sistema favoreciendo de alguna manera la importacin de potencia del sistema
interconectado nacional (SIN), manteniendo niveles mnimos en generacin interna, de
forma tal de aprovechar el concepto de energa por substitucin.

Hoy en da, estos conceptos han cambiado notablemente no solo por la problemtica
experimentada en aos anteriores por la generacin hidroelctrica, sino tambin por los
nuevos conceptos que han sido introducidos por la nueva Ley de Servicio Elctrico, en la
cual se propone la creacin de nuevas empresas en las reas de distribucin, transmisin y
generacin, producto de la reorganizacin del sector elctrico y cuyo propsito fundamental
es hacer la gestin de estas ms eficiente.

Es as como los conceptos manejados en tiempos pasados, han venido


experimentando cambios, lo que obliga a revisar las actividades de planificacin y
ajustarlas a los nuevos escenarios y nuevos retos. Esto es apenas incipiente, adaptarse a
nuevas formas de realizar estas actividades ser un proceso largo, que requerir de tiempo,
preparacin e integracin de todos los elementos influyentes en la elaboracin de los
planes.

En la actualidad la empresa cuenta con herramientas de simulacin que facilitan las


labores de estimacin de demanda y modelado del sistema elctrico, sin embargo esto es
solo parte del proceso de planificacin. En dicho proceso, la recoleccin y manejo de la
informacin es fundamental, ya que sta genera los diversos escenarios cuyo estudio
detallado da origen a las alternativas de expansin. La implantacin de cualquier alternativa
que se plantee depende entonces de cual escenario se va cristalizando.
8

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Por otra parte y siguiendo el anlisis anterior, un punto importante est representado
por los datos histricos de demanda manejados por la empresa. El tratamiento de esta
informacin permite determinar de forma inmediata la carga de los equipos del sistema.
Ello permite verificar el porcentaje de uso de los equipos de transformacin y lneas de
transmisin. De esta forma se lleva un registro de carga cuyo anlisis y procesamiento
proporciona la estimacin de carga futura. As, puntualmente se determina en que momento
deben ser descargados los equipos existentes en las diversas instalaciones. Obviamente el
proceso no es tan sencillo, sin embargo lo que se quiere destacar es la necesidad de
preservar, mantener y extender el sistema de medicin de la empresa, ya que actualmente
es el mecanismo de generacin de datos ms importante, debido a que stos permiten
facilitar la toma de decisiones. El tratamiento de los datos prcticamente da origen al
conjunto de obras que generalmente se proponen en los planes de expansin. Ciertamente
esto nos es el elemento de mayor peso, sin embargo su impacto es de gran magnitud.

Respecto al sistema de transmisin, se tiene que ha venido evolucionando


efectivamente a pesar de todos los problemas de tipo econmico y financiero que ha
enfrentado la empresa y el sector elctrico en particular. Es as como obras fundamentales
propuestas en planes anteriores se han llevado a cabo satisfactoriamente y otras han sufrido
algunos retrasos en su entrada en servicio, sin embargo y a pesar de las circunstancias
actuales, la prestacin del servicio se ha visto afectada en forma reducida, debido
principalmente a que el sistema de transmisin fue y ser diseado en el futuro con criterio
de robustez pero a costos razonables, es decir, se debe cumplir con los requisitos de
equipamiento mnimo que garanticen la prestacin y la calidad del servicio elctrico
prestado por la empresa.

Esto ltimo es prcticamente la razn de ser de la actividad de planificacin, cuyo


resultado es presentado mediante una programacin en la que se establece el ingreso de
obras al sistema, el momento en el tiempo en que debe estar ejecutada y por ltimo los
costos asociados.

La forma en que se presenta este nuevo Plan de Expansin del Sistema de


Transmisin, tambin tiene ciertas variaciones. En este caso, la primera parte muestra una
breve introduccin, se definen los criterios de operacin y posteriormente se da paso a la
presentacin de unifilares, el resumen de obras y los costos asociados o desembolsos
anuales. La segunda parte corresponde al Anlisis Tcnico del Sistema de Transmisin, all
se evalan las simulaciones realizadas al sistema en cuanto a la distribucin del flujo de
carga y los niveles de cortocircuito que estarn presentes en el sistema en el corto, mediano
y largo plazo y finalmente se muestran los diseos parciales para cada instalacin nueva
que sea propuesta. En planes anteriores, la presentacin era prcticamente al contrario, sin
embargo hoy en da la tendencia es a presentar los resultados obtenidos al inicio para luego
presentar los elementos cuyo anlisis justifica todo lo descrito en los cuadros de
necesidades.

Finalmente se debe indicar que el periodo de estudio est definido para un mximo
de 10 aos, ello obedece a la gran incertidumbre no solo desde el punto de vista econmico,
9

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


sino desde el punto de vista del crecimiento y diversificacin de la demanda elctrica. Un
periodo de estudio mayor no sera funcional y puede ocasionar desviaciones de gran
magnitud al no definir con cierta precisin hacia donde y como debe crecer el sistema. De
esta forma se define la conveniencia de realizar el estudio para un mximo de 10 aos, sin
descuidar la visin que pueda tener el desarrollo regional en periodos mximos de 20 aos.
Es conveniente indicar que en un periodo mximo de 2 a 3 aos debe realizarse una
revisin exhaustiva de este compendio. Ello con el objeto de verificar las tendencias de
crecimiento, ubicarlas desde el punto de vista espacial, evaluar algn nuevo escenario,
tomar nota de las variaciones y acometer las modificaciones correspondientes.

10

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


1. DETERMINACION DE ESCENARIOS.

Para realizar una evaluacin que determine eficientemente los escenarios


que pueden cristalizarse a futuro, es necesario definir el Asunto Focal. Esto quiere
decir que se debe tener claridad de cual es el problema a ser enfrentado. Una vez
definido el Asunto Focal, deben establecerse los elementos influyentes o Fuerzas
Motoras. El anlisis de incertidumbre de estas fuerzas motoras originan los
escenarios en que pueden estarse definiendo los planes derivados del proceso de
planificacin.

Teniendo en cuenta lo descrito con anterioridad, se establece que el Asunto


Focal lo define precisamente la necesidad de elaborar un Plan de Expansin. El
cuadro a continuacin muestra el Asunto Focal y sus implicaciones.

Plan de Expansin del Sistema de Transmisin

(Asunto Focal)
- Determinacin de las inversiones de equipamiento del sistema elctrico para
garantizar la calidad y continuidad del servicio.

- Objetivo: Afrontar el crecimiento de la demanda de forma segura, flexible y


confiable con criterios de economa.

- Debe responder a:
Qu capacidad instalar?
Cmo combinarla con la existente?
Dnde localizarla?
Cundo es el momento apropiado para ingresarla?

Estando definido el Asunto Focal, el problema es ahora localizar las Fuerzas


Motoras o elementos influyentes. De acuerdo con estudios anteriores y en base a la
experiencia de algunas personas consultadas, se identificaron las siguientes Fuerzas
Motoras:

- Crecimiento de la demanda.
- Proyectos de otras empresas del sector.
- Usos de la tierra y planes locales.
- Recursos financieros.
- Criterios de planificacin y marco legal.
- Planes de expansin en generacin y redes de gas.
- Estado y proyectos de expansin del SIN. (Situacin en Guri)

11

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Mediante una metodologa muy sencilla se evala en una tabla tanto el
impacto como la incertidumbre de cada Fuerza Motora sobre el Asunto Focal. Esta
evaluacin queda definida al procesar el producto (Impacto X Incertidumbre), ya
que las Fuerzas Motoras que resulten en mayor peso son las que definen los
escenarios. La Tabla N 1 muestra el resultado de la evaluacin.

Tabla N 1
Evaluacin de las Fuerzas Motoras.

Fuerzas Motoras Impacto Incertidumbre Producto


Crecimiento de la demanda. 5 1 5
Proyectos de otras empresas. 1 1 1
Planes Locales. 3 1 3
Recursos Financieros. 3 3 9
Criterios de Planificacin. 3 1 3
Planes de generacin y gas. 5 5 25
Proyectos del SIN, Situac. Guri. 5 3 15

La forma de evaluar se caracteriza por establecer los valores 1, 3 y 5 para


cada fuerza motora. El valor asignado define el grado de impacto sobre el asunto
focal. En la medida en que ste sea grande, significa que mayor es su influencia. Por
ejemplo; para el caso del crecimiento de la demanda se le ha asignado un valor de
impacto de 5 y de incertidumbre 1. Esto significa que esa fuerza motora tiene un
fuerte impacto sobre los planes de expansin, pero en cuanto a la incertidumbre es
muy baja, el significado de esto es que generalmente y a pesar de la problemtica
econmica que experimenta el pas, la tendencia de la demanda es hacia el
crecimiento, luego la conclusin en cuanto a la incertidumbre, es que en el periodo
de estudio es algo que est perfectamente definido, es decir existe la certeza de que
la demanda experimentar crecimiento en dicho periodo. No as con los Recursos
Financieros o los Planes de Generacin los cuales tienen un elevado ndice de
incertidumbre, es decir, es sumamente difcil establecer si se tendrn o no, si se
llevaran a cabo o no.

De esta forma se obtienen dos Fuerzas Motoras en las cuales se concentran


la mayor cantidad de influencias sobre el asunto focal. Ahora bien, los escenarios
posibles sern determinados por la combinacin de estas fuerzas motoras. Es decir,
para cada Fuerza Motora existe la posibilidad de que se de o no se de, que se lleve a
cabo o que no. Si esta situacin es graficada en un eje coordenado, entonces cada
sector del eje representar un escenario. Obviamente, puede ocurrir otra situacin no
prevista en estos cuatro escenarios que se generan, sin embargo de forma general
uno de estos es el que puede en algn momento materializarse. De darse otra
situacin, se debe realizar una revisin del estudio para adaptarlo a los nuevos
hechos o situaciones. Tambin puede manejarse siempre un escenario alternativo
denominado por los americanos Wild Card o Carta Alternativa. Esto ltimo a veces

12

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


no es tan obvio. Como se observar a continuacin para el caso que nos emplea, es
decir, la expansin del sistema de transmisin, pareciera que los escenarios que se
derivan del anlisis anterior engloban todas las posibilidades. De no ser as, de
alguna manera se corregir el rumbo.

La figura N 1, muestra un grfico con el eje coordenado descrito


anteriormente. All quedan definidos los escenarios que pueden estarse presentando
y ante los cuales se deben tomar decisiones.

Figura N 1
Escenarios Posibles en el periodo de estudio.

Planes de Expansin en
Generacin y Redes de Gas.

(+) Se llevan a cabo

Restriccin Oportunidad

Estado y Proyectos
del SIN. Situacin
futura de Guri. (-) Empeora situacin Mejora Situacin (+)
en Guri en Guri

Colapso Viejo Paradigma

(-) No se llevan a cabo

De la combinacin expresada en la grfica mostrada anteriormente, surgen


cuatro escenarios:

- Restriccin
- Oportunidad
- Viejo Paradigma
- Colapso

13

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


La Lgica de los Escenarios

Restriccin

Este escenario se caracteriza por el hecho de que la situacin en Guri y en


general en el SIN no mejore en el mediano y largo plazo, es decir que la empresa se
ver en la necesidad de restringir la cantidad de energa que puede tomar del SIN,
sin embargo, con la posibilidad de generar internamente el posible dficit. Ahora
bien, como se analizar ms adelante, el problema de la calidad y confiabilidad del
servicio no se resuelve generando una cierta cantidad de potencia internamente, sino
que existen otros elementos de importancia que tienen que ver con la disponibilidad
de unidades de generacin y ubicacin geogrfica de los parques generadores.
Por esa razn, este escenario pudiera ser inestable, sin embargo puede ser el
que deba ser transitado, por lo que la empresa debe estar preparada para enfrentar
una expansin de generacin que puede verse acelerada en cualquier momento.

Oportunidad

Este escenario representa el ideal, es quizs en el que todos los integrantes


del sector elctrico quisieran transitar en el futuro. En este caso, la expansin del
sistema solo dependera de los recursos econmicos que sean asignados. Esto quiere
decir que la expansin estara orientada buscando la manera de combinar la
importacin de energa del SIN con la generada internamente, de manera tal que se
logre la optimizacin de los costos. Ello significa que las obras de envergadura
pueden ser una combinacin tanto de unidades de generacin como de instalaciones
de alta tensin para la importacin de potencia.

Viejo Paradigma

Justamente el nombre otorgado a este escenario, tiene que ver con la forma
como se desarrollaban y orientaban los planes en el pasado. En este escenario lo que
se plantea es generar internamente una cantidad mnima de energa y el resto
importarlo del SIN, la razn es econmica por naturaleza. Obviamente, los planes
generan necesidad de instalaciones de envergadura (Subestaciones 230/115 kV) en
un promedio de tiempo de 8 a 10 aos, ahora bien, si se tiene en cuenta que la
expansin de generacin tiene costos iniciales sumamente elevados, entonces este
escenario sigue siendo quizs el que pueda estarse materializando, sin embargo se
deben tener ciertas reservas, es decir, no se puede apostar todo a esto.

Colapso

Este es el escenario ms crtico, y aunque la palabra colapso no significa que


el sistema se va a caer y deteriorar, es el llamado a materializarse si no se llevan a
cabo las obras que garantizaran el suministro del servicio elctrico, al menos el
excedente producto del crecimiento. Esto quiere decir que de materializarse este
escenario, no se podran atender nuevas solicitudes de servicio, lo que puede
14

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


generar retroceso econmico en el estado y hasta penalizaciones hacia la empresa.
Obviamente es un escenario al que no se debe apostar, sin embargo est presente.

Usted est aqu

Se han revisado entonces las posibilidades en donde pudieran estarse


moviendo los hechos que influirn de manera directa sobre la expansin del sistema
de transmisin. En lneas generales se puede concluir parcialmente que los
escenarios favorables corresponden al lado derecho de la grfica que ha sido
analizada. Luego, las decisiones que se vayan tomando estaran sujetas a la
ocurrencia de cualquiera de los escenarios desarrollados. En todo caso, el plan
presenta una cierta cantidad de obras que se describen como necesarias, pero que
pueden entrar en una matriz de priorizacin de manera de hacer las inversiones de
mayor requerimiento, postergando en la medida de lo posible aquellas que sean
susceptible de desplazamiento por lo menos en el corto plazo. Esto ltimo debe ser
una labor general de los actores fundamentales de la empresa, es decir no slo de los
planificadores.

Aplicacin al sistema de transmisin

En lneas generales, se tienen entonces un grupo de cuatro escenarios que


engloban prcticamente lo que pueda estarse materializando en el futuro. En nuestro
caso, suponemos que las obras descritas en este plan las cuales han sido plenamente
justificadas, sern abordadas y su desplazamiento en el tiempo solo obedecer a
problemas netamente econmicos o de falta de capital para el momento de hacer las
inversiones respectivas. A nivel del sistema de transmisin, se analizar el caso de
dos escenarios a saber:

Con expansin de generacin.


Sin expansin de generacin.

Estos escenarios solo influyen en la futura constitucin de la red de


transmisin 230 y 115 kV, es decir, la cristalizacin de uno u otro solo se ver
reflejado en el aspecto de las instalaciones de gran envergadura (Plantas
generadoras y/o puntos de interconexin 230/115 kV) las cuales son exclusivas para
el transporte o produccin de una gran cantidad potencia elctrica. No as para las
obras secundarias tanto para el Sistema Barquisimeto como Regiones. Estas ltimas
dependen bsicamente de las necesidades de cargas de cada subestacin.

15

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


2. DEFINICION DE CRITERIOS DE OPERACIN.

2.1. Voltajes en Barra

Los voltajes en las barras del sistema deben mantenerse dentro de un rango
mximo de variacin de 5% del valor nominal para las condiciones
normales de funcionamiento y hasta un 10% para el caso de una
contingencia simple u otras condiciones de emergencia.

Para el caso del Sistema Regiones se acepta hasta un 10% del valor
nominal en condiciones normales, siempre y cuando existan mecanismos
para corregir al menos hasta 5% aguas abajo del transformador principal.
Ejemplo, aplicacin de reguladores de tensin.

2.2. Capacidad de las lneas de transmisin y subtransmisin.

A continuacin se muestran las capacidades nominales y de emergencia de


las lneas presentes en el sistema.

Tabla N 2
Capacidades (MVA) por Conductor en Lneas de Transmisin

Lneas de Transmisin Condicin de Operacin (MVA)


y Subtransmisin Nominal Emergencia
Lneas a 230 kV
Conductor 1100 MCM Acar. 400 500
Lneas 115 kV
Conductor 900 MCM 160 200
Lneas 115 kV
Conductor 350 MCM 80 100
Expresos en 24 kV
Conductor 795 MCM 20 36

2.3. Concepto de Capacidad Firme.

Este concepto se aplica al arreglo de subestaciones con ms de una unidad de


transformacin y se establece como:

CF = 1.3 * (Total MVA con una unidad de transformacin fuera de


servicio)

Es decir, se permite hasta un 30% de sobrecarga en las unidades de


transformacin restantes, bajo la condicin de contingencia simple de una

16

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


unidad fuera de servicio por falla o por mantenimiento. Es importante
destacar que esto es posible si el transformador o los transformadores
restantes estn cargados igual o menor al 50% de su capacidad nominal y la
condicin de sobrecarga del 30% no exceda de 8 horas. De violarse lo
anterior, se incurre en prdida de la vida til de los transformadores en un
porcentaje que puede superar el 1% dependiendo en cuanto se exceda el
tiempo de sobrecarga.

En el caso de subestaciones que tienen una sola unidad de transformacin,


pero que tienen la posibilidad de transferir carga mediante la conexin de
expresos en 24 kV, la capacidad firme queda establecida por la carga
mxima de dicho expreso. (Ver punto 2.2 anterior.)

Para el caso de subestaciones que poseen generacin, la capacidad firme


queda definida por el nmero mnimo de mquinas disponibles en un
momento determinado ms la capacidad nominal del expreso de cierre para
el mantenimiento del sincronsmo. Casos especficos: Subestaciones Planta
II y Zona Industrial.

Esto es:
CF = (Mnimo nmero de mquinas disponibles + 36 MVAexpreso)

2.4. Diseo del Sistema de Transmisin.

El diseo del sistema se realiza considerando solo la aplicacin de una


contingencia simple, una a la vez. Para cada una de estas contingencias el
sistema debe operar conforme a los criterios establecidos para las
condiciones de emergencia; es decir, los valores de cargabilidad de las
lneas, voltajes en las barras y capacidad firme establecidos en los puntos
anteriores no deben ser superados.

2.5. Carga simulada en el sistema.

Las cargas modeladas en el sistema corresponden a los valores coincidentes


con un factor de coincidencia del 90%. Dichos valores son obtenidos
mediante las proyecciones de demanda.

Por otra parte, el factor de potencia para la totalidad de las cargas ha sido
aplicado en 0.90 en retraso.

17

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


2.6. Generacin.

Para el caso del escenario en que no se da la expansin de generacin


prevista, el sistema ha sido simulado de acuerdo con el nmero de unidades
que se describen a continuacin:

Tabla N 3
MW Generado por Subestacin

MW totales
Subestacin N de Unidades
Aproximados
Planta II 4 64
Zona Industrial 2 36
Total 6 100

Para el caso del desarrollo del plan de expansin de generacin, la cantidad


de unidades de generacin ha sido simulada en base a la informacin
suministrada por la Vicepresidencia de Ingeniera, siguiendo el
planteamiento del trabajo realizado por la firma TECNOCONSULT. En las
siguientes secciones esto es abordado detalladamente.

Nota: Para el anlisis de flujo de carga realizado en el escenario donde la


expansin de generacin no se lleva a cabo, se requiere disponibilidad de al
menos 5 unidades de generacin. Es decir, si en alguna subestacin no se
dispone de una unidad del total de 6, el sistema no debe experimentar
ninguna condicin que viole los criterios establecidos.

2.7. Cortocircuito.

Para estudios de cortocircuito, los clculos y simulaciones son realizadas con


el mximo de unidades de generacin disponibles.

18

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


3. PRESENTACIN DE UNIFILARES DEL SISTEMA

Falta tabla explicativa Alvaro.

19

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


S/E Planta I Carora 24 kV
Esquema de Transmisin Actual 115 kV
230 kV
ao 2005 34.5 kV
S/E Planta II 13.8 kV
Carora
30 MVA 30 MVA

2 X 6.25 MVA
S/E Barquisimeto Dist. Norte
S/E Duaca
3 X 100
MVA S/E Yaracuy
S/E Ujano
Turbinas 230 kV
2-6 S/E Planta II
3 X 42
83 MVA 83 MVA
MVA
S/E La Pastora
83 MVA S/E Este
S/E Zona
5 MVA Industrial SIDETUR
83 MVA
S/E Planta I Dist. 3 X 100 MVA
S/E Hidrolara Carabali
T7
T8
S/E Barreto S/E Poleo
Dist. Agua Viva
S/E Sabaneta S/E Tocuyo

20MVA S/E Centro


10MVA
2.5MVA 2 X 42 MVA S/E Cabudare
16MVA
CADAFE
2 X 83 MVA
S/E 5MVA
Humocaro
S/E Qubor

20MVA 30MVA 2 X 100 MVA


S/E La Miel
S/E 5 MVA
Manzano

5MVA
S/E
Sanare

20

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


24 kV
S/E Planta I Carora Esquema de Transmisin 115 kV
230 kV
Requerido en el ao 2007-2008 34.5 kV
S/E Planta II 13.8 kV
Carora

2x30 MVA

2X30 MVA
S/E Barquisimeto
S/E Norte S/E Duaca

S/E La Pastora 3 X 100 MVA S/E Ujano 2X6.25MVA S/E Yaracuy


230 kV

83 MVA
83 MVA
15/20 MVA
3 X 42 MVA Turbinas 2-6
S/E Sabaneta 83 MVA
5 MVA

83 MVA
S/E Planta II
2.5MVA S/E Zona Industrial S/E Este
Sidetur S/E Planta I
S/E Hidrolara 83 MVA 3 X 100 MVA

Turbinas 7-8
S/E Barreto Dist. Carabali
S/E Oeste
S/E Tocuyo S/E Poleo
Dist. Agua Viva

10MVA 3x42 MVA S/E Cabudare


S/E Centro
CADAFE
3 X 42 MVA 2 X 42 MVA S/E Palavecino
5MVA 2 X 83 MVA

S/E Humocaro S/E Qubor


20MVA 30MVA 3 X 100 MVA 2 X 40 MW
S/E Manzano

Nuevas Instalaciones

S/E 5MVA
Sanare 21

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


24 kV
Esquema de Transmisin 115 kV
230 kV
S/E Planta I Requerido en el ao 2010 34.5 kV
13.8 kV
Carora S/E El Roble
Carora

2x30 2x30 MVA


MVA
S/E Planta II 2X30 MVA
Carora S/E Barquisimeto S/E Norte S/E Duaca

3 X 100 MVA S/E Ujano 2X6.25MVA S/E Yaracuy


230 kV

83 MVA
83 MVA
S/E La Pastora
3 X 42 MVA Turbinas 2-6
83 MVA
15/20MVA

83 MVA
2.5MVA S/E Zona Industrial S/E Planta II
5MVA
83 MVA
S/E Sabaneta Sidetur S/E Este
S/E Planta I
S/E Hidrolara 3 X 100 MVA

Turbinas 7-8
S/E Barreto Dist. Carabali
S/E Tocuyo 2x83MVA S/E Poleo
Dist. Agua Viva
10MVA
S/E Centro S/E Cabudare
CADAFE
S/E Oeste
3 X 42 MVA
5MVA 3 X 42 MVA 2 X 83 MVA
S/E Palavecino
S/E Humocaro

3 X 100 MVA 3 X 40 MW
S/E Qubor S/E Manzano
20MVA 30MVA
Nuevas Instalaciones

5MVA

22

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


24 kV
115 kV
S/E Planta I
Esquema de Transmisin 230 kV
Requerido en el ao 2012 34.5 kV
Carora 13.8 kV

S/E El Roble Carora


S/E Planta II
Carora

S/E Barquisimeto 2X30 MVA


S/E Norte S/E Duaca

3 X 100 MVA S/E Ujano 2X6.25MVA S/E Yaracuy


230 kV

83 MVA
83 MVA
S/E La
Pastora 3 X 42 MVA Turbinas 2-6
83 MVA
15/20MVA
S/E Sabaneta

83 MVA
S/E Planta II
5MVA S/E Zona Industrial

2.5MVA Distribuidor de Sidetur S/E Este


83 MVA Distribuidor Morn
Transmisin115 kV S/E Planta I 3 X 100 MVA
San Pablo

Turbinas 7-8
S/E Barreto Dist. Carabali

S/E Tocuyo S/E Poleo


2 X 42 MVA
Dist. Agua Viva
S/E Hidrolara
10MVA
S/E Centro S/E Cabudare
CADAFE
S/E Oeste
2 X 83 MVA 3 X 42 MVA
3 X 42 MVA
S/E Palavecino
S/E Humocaro
3 X 100 MVA 3 X 40 MW
S/E Qubor S/E Manzano
20MVA 30MVA
Nuevas Instalaciones

S/E Sanare 5MVA

23

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Escenario: Expansin de Generacin
Modalidad I: Expansin en dos fases.

Fase I: Expansin de Generacin en la S/E Zona Industrial.

Fase II: Expansin siguiente hacia la zona Norte-Este de Barquisimeto.


Desarrollo del Centro Generador Polgono.

Nota: Se ha supuesto que el proyecto de expansin de generacin


Planta Palavecino se ha llevado a cabo en su totalidad.

24

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Esquema de Transmisin Requerido periodo 24 kV
115 kV
2012-2015 230 kV
34.5 kV
S/E Planta I 2 X 150 MW 13.8 kV
Carora

S/E Aguada GrandeS/E Norte Centro Generador Polgono CGP


S/E Planta II S/E El Roble Carora
Carora
2x30 MVA 2x30 MVA
S/E Barquisimeto

S/E Ujano
S/E Yaracuy
Expansin de 230 kV

83 MVA
83 MVA
Generacin
3 X 42 MVA 83 MVA Turbinas 2-6
S/E La Pastora Fase II (2012-2015)

83 MVA
S/E Planta II
S/E Zona Industrial

Distribuidor de Sidetur
Transmisin115 kV 83 MVA Distribuidor Morn S/E Este
S/E Planta I 3 X 100 MVA
San Pablo

Turbinas 7-8
Dist. Carabali
S/E Barreto
2X100 MW Mximo S/E Poleo
Dist. Agua Viva
S/E Hidrolara S/E Tocuyo 2 X 42 MVA
S/E Oeste S/E Centro S/E Cabudare
CADAFE
3 X 42 MVA
Expansin de Generacin 2 X 83 MVA
3 X 42 MVA
Fase I (2010) S/E Palavecino

3 X 100 MVA 3 X 40 MW
S/E Manzano
S/E Qubor

Modalidad I: Expansin de Generacin en dos fases. Nuevas Instalaciones

25

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Escenario: Expansin de Generacin

Modalidad II: Expansin en varias fases pero en un mismo sitio. (CGP)

Fase I: Expansin de Generacin en CGP. (2 X 150 MW)

Fase II: Expansin del CGP en una unidad adicional. ( 1 X 150 MW)

Nota: Se ha supuesto que el proyecto de expansin de generacin Planta Palavecino


se ha llevado a cabo en su totalidad.

26

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


24 kV
Esquema de Transmisin Requerido periodo 115 kV
230 kV
2012-2015 34.5 kV
2 X 150 MW + 1 X 150 MW 13.8 kV

S/E Planta I Carora


S/E Aguada Grande S/E Norte Centro Generador Polgono CGP
S/E Planta II S/E El Roble Carora
Carora
2x30 2x30 MVA
MVA
S/E Barquisimeto

S/E Ujano
S/E Yaracuy
Expansin de 230 kV

83 MVA
83 MVA
Turbinas 2-6 Generacin
S/E La Pastora 3 X 42 MVA 83 MVA
Fase I y II
(2010-2015)

83 MVA
S/E Planta II
S/E Zona Industrial
83 MVA
Distribuidor de
Sidetur S/E Planta I Distribuidor Morn
Transmisin115 kV S/E Este
San Pablo 3 X 100 MVA

Turbinas 7-8
Dist. Carabali
S/E Barreto
S/E Poleo
Dist. Agua Viva
S/E Hidrolara S/E Tocuyo 2 X 42 MVA
S/E Oeste S/E Centro S/E Cabudare
CADAFE
2 X 83 MVA 3 X 42 MVA
3 X 42 MVA
S/E Palavecino

3 X 100 MVA 3 X 40 MW
S/E Qubor S/E Manzano

Modalidad II: Expansin de Generacin en dos fases Nuevas Instalaciones

pero en una sola planta. (CGP)

27

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Escenario: Expansin del Sistema de Transmisin.

Fase I: Expansin de Transmisin tercer punto de Interconexin


S/E Polgono 2 X 100 MVA, 230/115/24 kV. Periodo 2010-2012.

Fase II: Ampliacin de la capacidad de autotransformacin S/E Polgono


en 100 MVA. (2015)

Fase III: Expansin Subestacin Oeste a nivel de 230 kV con dos unidades
autotransformadoras de 100 MVA cada una. (Periodo 2015-2020)

Fase IV: Ampliacin de la capacidad de autotransformacin S/E Oeste


en 100 MVA. (2020)

28

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


24 kV
Esquema de Transmisin Requerido periodo 115 kV
230 kV
2012-2020 34.5 kV
13.8 kV
S/E Planta I Carora

S/E El Roble Carora S/E Aguada Grande S/E Norte


S/E Planta II
Carora
2x30 2x30 MVA
MVA S/E Barquisimeto

S/E Ujano Expansin de


Transmisin 230 kV S/E Yaracuy

83 MVA
83 MVA
Fases I y II 230 kV
3 X 42 MVA Turbinas 2-6
S/E La Pastora 83 MVA
S/E Polgono
230/115/24 kV

83 MVA
S/E Zona Industrial S/E Planta II
83 MVA
Distribuidor de Sidetur
Distribuidor Morn S/E Este
Transmisin115 kV S/E Planta I 3 X 100
San Pablo MVA
Turbinas 7-8
3 X 42 MVA Dist. Carabali
S/E Barreto
S/E Poleo
Dist. Agua Viva
S/E Hidrolara S/E Tocuyo S/E Oeste

S/E Centro S/E Cabudare


CADAFE
3 X 42 MVA 2 X 83 MVA 3 X 42 MVA

S/E Palavecino

3 X 100 MVA 3 X 40 MW
S/E
S/E Qubor Manzano

Nuevas Instalaciones
Expansin de Transmisin 230 kV
Fases III y IV Escenario: Expansin del Sistema de Transmisin 230 kV.
Expansin a 230kV S/E Oeste.
29

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


S
SU
SUB
UB
B -S
-S
-S IS
IS
ISTT
E
TE
EM
MMAA
ARR
RE
EG
E GIO
IO
GIO N
NE
NE
ESS
SEE
N
ENE
NE
E LB
LB
LBAA
AR
RR
SUB-S
S
SMIS
UUTE
B
B M
-S
-SISA
IS T
T
unicipiosRE
E
ME
M
MG
TA
AIOR
RN
E
E
orresE
GGS
IO
y E
IO
AN
N N
EE
ES
SLB
E
ndrsEA
N
NE
ER
ELB
LB
loy A
BAR
R AO 2005
lanco
Municipios
SUBM -S ISTunicipio
Torres
EM
Sunicipio
U B-S A
IS
yG
Rim
E U
Ardaneta
ndrs
IO
Tunicipio
EM A RPEGESE
Nlanas
Eloy
NNEE
SLB
Blanco
AER A
AO
R 2005
13.8 kV kV
13.8
Desarrollos
Desarrollos M S n CIO
respo EN LB 13.8
24
kV 13.8 kV
kV
13.8kV
13.8
24 13.8
24
kV kVkVkV
13.8
M
SUunicipios
B-SISTEM Jim
Anez
REGIO -M Norn
ES EN -E
ALB
ndrs
AR AEloy
OB lanco
2005 kV 24 kV
34.524kV
34.5kV
24kVkVkV
24
34.5
24 kV
kV 34.5 kV
13.8 kV
Fase 2 134.5
15 kV
115115
34.5 kV
24
kV
34.5
kVkVkVkV
34.5
kV1 15 kV
Fase 1 230
115
230
1 15
kV
230kV
1
kV
34.5
15
kVkVkVkV
1230
kV
15 kV
S/E Aroa (CADAFE) 230230kV230kVkV
S/E Oeste S/E Manzano 230 kV
115 kV
ENELCO S/E Norte
S/E Planta II - Carora S/EC
Eronogram
l Roble - Carora
a de Obras230 kV
(ESTADOZULIA)
ELEOCCS /E
IDE P
LE
EN lanta
TEOCCID D
II -EC
Nerivacin
arora
TE T-OFF
(Lnea
La S/E La Pastora es una obra actualmente en proceso.
Zona Industrial - Carora)
(ESTADO(EYSAR
TAAC
DO UY
P )ORTU GUESA)
SH
/E HG
idrolara Posible fecha de entrada en servicio: Primer trimestre de 2006
Desmantelamiento tramo
S/E MAC AN O Distribuidor Norte S/E Manzano
Comprende: Construccin
de lnea. Aproximadamente Derivacin T-O
C FF de aproxim
onstruccin en
adamente 5 kms
el periodo249 MCMpara
S/E AroaACARIGUA I S/E de LA MIEen
lnea LA 1o
15 2007
kV , conductor
5 kms. (Lnea Zona
1. Ampliacin barra Industrial
12010-2015
15entar
kV Pla -
lanta
realim
Carora) S/EIILa -ELEO
CParora
astora
CCIDdesdeENTE la nueva
2. Construccin lnea S /E Ede
l R transm
oble enisin
(ESTAD
la 115O
ciudad kV PO, conductor
de RCTU GUESA)
arora. E246
sto
Viene del Distribuidor S/E Hidrolara aproximadamente 38 km s de longitud.
Hacia
perm itir Sla/E Yaritagua
norm alizacin en la H acia
operacin S/E
deA lacarigua II
Agua Viva 3. Subestacin
S/E El Tocuyo S/Eequipada
QSubor
/E Planta con II01
- CTransform
arora,
ACARIG yaUA ador
I la1alim
que 15/34.5 kV
entacin
S/E Aguada Grande 7.5 MVA S/E LA MIEL Ao 2005de 20 MVA y 02 Transform
hacia la S/E La adores
PS /E34.5/13.8
astora Norte kV
(Enelbar)
se har dede 5M
form aVA c/u.
16 MVA 30 MVA 30 MVA
S/E Humocaro S/E A guada Grande
10 MVA 20 MVA
S/E PURICAURE S/E Duaca provisional desde la S /E P lanta II - C arora
Viene del Distribuidor
S/E hasta que entre en servicio la S/E El Roble
S/E 5 MVA
10
Sabaneta MVA 10 MV A Nota: El A guaoV
tram S
ivalnea en 34.5 kV Humocaro-La Pastora, permanecer
de/E Duaca
para el ao 2010.
5 MVA
S /E El Tocuyo
La Pastora 2X35XM V
5A
10 M
MVA
VA 10 MVA 10 MVA energizado en punta desde la S/E La PS /E Qubor
astora y abierto en la
SM/E Sanare 2 X 15/20 MVA 2X5 MVA
S/E S /E H um ocaro. Su cierre30 M V A solo es perm 20 Mitido
VA en caso de emergencia.
S/E La Pastora Humocaro
10 M
2X5 MVA
VA 20 MVA 16 VA Cronograma de Obras
10 MVA S/E LA MIEL
115/34.5/13.8
S/E La Pastora kV 15/20 MVA S/E Guarico S /E H um ocaro
1. Ampliacin Aguada Grande 2007
5 M1
V15/34.5/13.8
A kV 2.5 MVA 5 MVA S/E
S/E Sabaneta
PALMARITO
Sabaneta 5 M V A 2X 5 M V A
S/E Hum CSubestacin
ronogram
ocaro
2. Construccin Ca de Obras
lneas
ronogram
Duaca dea subtransm
de Obras isin 34.5 kV. 2007
Sistema Aguada 5 MVA Grande 3. Construccin deS las S ubestaciones 34.5/13.8 kV
2.5 MVA /ES S anare
S /E Tocuyo
/E Tocuyo
1. Ampliacin S/E Duaca para colocar
Siquisique yS anta un
VA tercercer
Ins. 2007 transformador
C ronogram a de 2XO5M bras
1. Construccin segundo expreso en 24 kV. Qubor-Sanare. Ao 2008
5 MVA S/E Siquisiqu
Transform
5 MVA e a ser 2.5
adores reutilizados
MVA
deS/E
en las 5M SanVA,
futuras 24/13.8 kV. Ao 2007
ta Ins
5 MVA 5 MVA 2.5 MVA 5 MVA 5 MVA
Sistema subestaciones
Eje Qubor-Sanare-Tocuyo-H
Siquisique y Santa Ins umocaro-La2. Pastora 4. Tramo de lnea 115kV Norte - Intercepcin 2010-2015
1.CC onstruccin
onstruccinSistem SB /Earra 115
Guarico kV
5 ,M S V/EA,La Miel. Ao
34.5/13.8 kV.2007
Ao 2008
(D istanciaa La
aproxim M iel
ada: 30 kms)
S/E LA MAMITA
Transform ador a ser reutilizado para la
S/E QU5 MVA
EBR AD A AR R IBA2. C onstruccin
5 M VA segundo expreso en 24 kV. N orte-D uaca. Ao 2007
2.CC
3. olocacin de
onstruccin dos (2)
expreso enunidades
34.5 kV .de transform
Tocuyo-G acinA
uarico. de
o15/20
2008 MVA
ampliacin deM
2.65 laVS
A/E Duaca. 2.5 MVA Nota: Posiblemente, las unidades de transformacin a ser
115/13.8 kV. Ao 2007.
usadas pueden recuperarse del desmatelamiento a
4. Sustitucin de transformador de 20 MVA por uno de 30 MVA
realizar en la S/E La Miel, en caso de que esta ltima
3. 1A15/24
decuacin
kV enyla reutilizacin
S/E Qubor. barra Ao existente
2008 en 13.8 kV.
se ample a 115 kV.
Sistema Puricaure 5. Construccin Lnea 115 kV. Oeste- Quibor. Ao 2009

30

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


4. RESULTADOS

4.1. Resumen de Obras

Tabla N 4
Resumen de Obras
Subestaciones
(Sistema Barquisimeto)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Alimentar la nueva unidad de transformacin de 42 MVA, 115/24kV.
Con esta unidad se logra aumentar la capacidad instalada a 3 X 42 MVA,
Ampliacin tanto de la permitiendo la construccin de al menos 3 nuevos circuitos y mejorar la
Ampliacin
barra en 115 kV como confiabilidad y flexibilidad de la subestacin, ya que la demanda en la
2006
S/E Centro el switchgear asociado
en 24 kV. actualidad supera la capacidad firme.
Mejorar el servicio a una poblacin de 150.000 hab. y contribuye con el
polo de desarrollo endgeno Barquisimeto-Cabudare-San Jos de Tintin.
Obtener una salida en 115kV para alimentar la futura lnea de transmisin
115kV, S/E Ujano S/E Norte.
Obtener una salida adicional en 115kV para alimentar una segunda
unidad de transformacin de 83MVA, 115/24kV. Esta unidad permite dotar
Ampliacin de la Ampliacin de dicha de capacidad firme a la S/E Ujano, adems de mejorar las condiciones
2006 barra 115 kV, barra de 4 hasta un total operativas de la misma, as como tambin, permitir la satisfaccin del
de 6 celdas. Esquema
S/E Ujano en anillo. crecimiento de la demanda a mediano y largo plazo en la zona este de
Barquisimeto.
Mejorar el servicio a una poblacin de: 290.000 habitantes y contribuye
con los polos de desarrollo endgeno Barquisimeto-Cabudare-San Jos de
Tintin y Tamaca-Duaca-Santa Ines-Moroturo.

31

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Barquisimeto)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Mejorar las condiciones operativas y de cadas de tensin tanto en la zona
norte de Barquisimeto (Cuj-Tamaca) como en la poblacin de Duaca,
Municipio Crespo.
Absorber el crecimiento de la demanda en la zona norte del Municipio
Iribarren y en el Municipio Crespo
Construccin patio Construccin de un
patio 115 kV, esquema Permitir a futuro independizar la alimentacin del Municipio Urdaneta, la
115 kV, S/E Norte
inicial en anillo 4 cual es atendida por el Sistema Cadafe, ya que la expansin del anillo a
2007
y ampliacin patio celdas expansible a 6 y
adecuacin barra construir en la S/E Norte debe prever una salida en 115 kV para interceptar la
24kV
existente en 24 kV lnea Aroa Aguada Grande 115 kV. De esta forma la alimentacin del
Municipio Urdaneta sera a travs del Sistema de Transmisin de ENELBAR.
Mejorar el servicio a una poblacin de: 95.000 habitantes y contribuye
con los polos de desarrollo endgeno Tamaca-Duaca-Santa Ines-Moroturo
y Tocuyo Medio.
Construccin de una Absorber el crecimiento de la demanda en la zona oeste de la ciudad de
Subestacin en el oeste Barquisimeto. Permitiendo alimentar la futura Zona Industrial N4 y nuevo
de la ciudad de
Barquisimeto con una terminal, contemplados en los planes urbansticos de la ciudad.
Construccin
capacidad inicial de Descargar la S/E Zona Industrial, la cual se encuentra operando sobre sus
2008 S/E Oeste 2X42 MVA,
lmites de carga.
115/24 kV expandible a 3X42
MVA y en la cual a Mejorar el servicio a una poblacin de: 160.000 habitantes y contribuye
futuro se pueda con el polo de desarrollo endgeno Barquisimeto-Cabudare-San Jos de
desarrollar un patio de
230 kV. Tintin.

32

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Barquisimeto)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Ampliacin necesaria para lograr la alimentacin de la tercera unidad de
Ampliacin S/E Equipamiento de bahas transformacin de 42 MVA, 115/24 kV.
2010 tanto en 115 como en
Palavecino Mejorar el servicio a una poblacin de 170.000 hab. y ayuda al polo de
24 kV
desarrollo endgeno Barquisimeto-Cabudare-San Jos de Tintin.
Redistribuir la demanda del centro-este de la ciudad de Barquisimeto
entre los distribuidores Poleo, Planta I y el nuevo Distribuidor Morn.
Distribuidor en 24 kV
barra principal y Mejorar la operatividad y disminuir las prdidas elctricas asociadas a
Construccin
2012 transferencia el cual todas las redes comprendidas en la zona mencionada anteriormente.
- Distribuidor Morn ser alimentado
2015 Descargar la S/E Este, la cual por razones operativas, debe estar limitada
24 kV. mediante dos expresos
en 24 kV desde la S/E a 40 MVA de carga.
Ujano. Mejorar el servicio a una poblacin de: 40.000 hab. y ayuda al polo de
desarrollo endgeno Barquisimeto-Cabudare-San Jos de Tintin.

33

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Barquisimeto)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Satisfacer el crecimiento de la demanda esperada para los aos
posteriores al 2012 de forma confiable y segura.
Subestacin De acuerdo a lo anterior, se debe proyectar una instalacin, bien sea
230/115/24kV con 2
Subestacin de transmisin 230/115kV o su equivalente en Planta de
Construccin S/E Auto trasformadores de
100MVA 230/115kV, y Generacin que incremente la capacidad del sistema en aproximadamente
2012 Polgono o Planta
2 transformadores 150MW en el largo plazo.
-
de Generacin 115/24kV de 42MVA
2015
El Incremento de la Capacidad instalada satisfacer la demanda en todo
Polgono
Planta de generacin el perodo de estudio e incluso aos mas all del horizonte, es decir 2015.
con dos generadores de
Mejorar el servicio a una poblacin de: 2.000.000 hab. y
100MW cada uno
contribuye con todos los polos de desarrollo endgeno del Estado
Lara.
Dar respaldo a la S/E Planta II ya que se eliminar la Generacin
Equipar llegada de
2012 Ampliacin S/E existente por obsolescencia de los equipos.
Lnea 115kV
-
Planta II proveniente de S/E Mejorar el servicio a una poblacin de: 120.000 hab. y ayuda al polo de
2015
Polgono desarrollo endgeno Barquisimeto-Cabudare-San Jos de Tintin.

34

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Regiones)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Ampliacin necesaria para mejorar la calidad y confiabilidad del servicio
elctrico prestado al Municipio Simn Planas.
Eliminar problemas existentes en la actualidad, los cuales se resumen en:
Construccin patio 115 grandes cadas de tensin, limitacin en la transmisin de potencia,
kV en la S/E La Miel. disponibilidad de capacidad para nuevas cargas limitada, etc.
Ampliacin
Esquema en anillo 4
2006 Absorber los futuros crecimientos que son inminentes tales como:
S/E La Miel puntas expandible a 6 y
ampliacin barra Nuevo hospital, desarrollo de estacin ferroviaria, futura zona
13.8kV industrial, etc.
Reducir prdidas elctricas.
Mejorar el servicio a una poblacin de: 30.000 hab. y ayuda al polo de
desarrollo endgeno Ferrovario Bura.
Sustituir equipamiento obsoleto. Actualmente se corre el riesgo de que las
celdas de media tensin se quemen y ocasionen accidentes adems de
Ampliacin
Reconstruccin Barra interrumpir el servicio elctrico en la zona.
2006
S/E El Tocuyo 13.8kV
Mejorar el servicio a una poblacin de: 90.000 hab. y ayuda al polo de
desarrollo endgeno Eje Cafetalero.
Lograr selectividad en las protecciones de la lnea de transmisin,
Ampliacin Equipamiento Llegada aumentando la confiabilidad de la Subestacin.
2006 de lnea Manzano
S/E Quibor Mejorar el servicio a una poblacin de: 123.500 hab. y ayuda a los polos
Quibor
de desarrollo endgeno Valle de Quibor y Eje Cafetalero.

35

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Regiones)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Esta ampliacin es necesaria para obtener 02 salidas en 34.5 kV mediante
la instalacin de una unidad de transformacin de 10MVA, 115/34.5kV.
Dichas salidas sern destinadas a la alimentacin de las futuras subestaciones
Ampliacin Equipamiento de bahas
2007 existentes tanto en 115 Siquisique y Santa Ins ambas ubicadas en el Municipio Urdaneta.
S/E Aguada Grande
como en 34.5 kV. Mejorar el servicio a una poblacin de: 55.000 hab. y ayuda a los polos
de desarrollo endgeno Tocuyo Medio y Tamaca-Duaca-Sta Ins
Moroturo.
Mejorar la calidad y continuidad del servicio elctrico en el Municipio
Urdaneta, especficamente en Santa Ins.
Construccin de una Mejorar la operatividad y flexibilidad de las redes de distribucin
subestacin
Construccin existentes, ya que sus extensas longitudes no hacen prctico los
2007 convencional barras
S/E Santa Ins simples en 34.5/13.8 mantenimientos y localizacin de fallas respectivas.
kV con una capacidad Disminuir las prdidas asociadas al sistema existente.
instalada de 5 MVA.
Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
desarrollo endgeno Tamaca-Duaca-Sta Ins Moroturo.
Mejorar la calidad y continuidad del servicio elctrico en el Municipio
Construccin de una Urdaneta, especficamente en Siquisique.
subestacin
Construccin Mejorar la operatividad y flexibilidad de las redes de distribucin.
convencional barras
2007 Disminuir las prdidas asociadas al sistema existente.
S/E Siquisique simples en 34.5/13.8
kV con una capacidad Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
instalada de 5 MVA.
desarrollo endgeno Tocuyo Medio.

36

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Regiones)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Incrementar la capacidad Firme de la Subestacin, agregando un tercer
transformador y un segundo expreso.
Construccin de Patio Aumentar la capacidad de distribucin en la zona incluyendo dos
24kV y ampliacin de
Ampliacin circuitos adicionales en 13.8kV.
barra 13.8kV e
2007 Mejorar la confiabilidad de la subestacin y de este modo la calidad del
S/E Duaca instalacin de tercer
transformador servicio en la zona.
24/13.8kV
Mejorar el servicio a una poblacin de: 45.000 hab. y ayuda al polo de
desarrollo endgeno Tamaca-Duaca-Sta Ins Moroturo.
Mejorar la calidad y continuidad del servicio elctrico en el Municipio
Morn, especficamente en las poblaciones de Guarico y Anzoategui.
Construccin de una Mejorar la operatividad y flexibilidad de las redes de distribucin
subestacin
Construccin existentes, ya que sus extensas longitudes no hacen prctico los
2008 convencional barras
S/E Guarico simples en 34.5/13.8 mantenimientos y localizacin de fallas en dichas redes.
kV con una capacidad Disminuir las prdidas asociadas al sistema existente.
instalada de 5 MVA.
Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
desarrollo endgeno Eje Cafetalero.
Obtener una salida de lnea en 34.5 kV para alimentar la futura S/E

Equipamiento de baha Guarico 34.5 / 13.8 kV.


Ampliacin
2008
existente en 34.5 kV Descargar el sistema 13.8 kV de la S/E El Tocuyo.
S/E El Tocuyo para lograr una salida
de lnea. Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
desarrollo endgeno Eje Cafetalero.

37

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Regiones)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Adecuar el barraje existente para conectar el transformador N 3 y el
expreso N 2 dando confiabilidad y mayor capacidad de distribucin de
Ampliacin Adecuacin para
2008 instalar transformador energa a la subestacin y.
S/E Sanare
N3 y expreso N 2 Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
desarrollo endgeno Eje Cafetalero.
Obtener una llegada para conectar la futura lnea de transmisin Oeste
Quibor 115 kV, lo cual permitir reforzar el sistema de transmisin Quibor
Ampliacin
2009 Ampliacin del barraje Tocuyo y subsistemas asociados a estos.
S/E Qubor existente en 115 kV.
Mejorar el servicio a una poblacin de: 123.500 hab. y ayuda a los polos
de desarrollo endgeno Valle de Quibor y Eje Cafetalero.
Mejorar la operatividad y flexibilidad del sistema elctrico existente.
Incrementar la capacidad instalada en el Municipio Torres para absorber
los futuros crecimientos de demanda, los cuales estn orientados hacia la
zona este de la ciudad de Carora.
Construccin de una
subestacin 115/24 kV, Redistribuir la demanda actual ya que la S/E Planta II Carora est
Construccin
2 X 30 MVA en el llegando actualmente a sus lmites de capacidad firme.
2009
S/E El Roble sector este, cercano al
Hospital Carora, Permitir el desvo de la lnea Planta II La Pastora 115 kV, la cual ser
Municipio Torres. energizada desde la S/E Planta II de manera provisional.
Mejorar el servicio a una poblacin de: 200.000 hab. y ayuda a los polos
de desarrollo endgeno Tocuyo Medio y San Francisco-Quebrada Arriba-
Palmarito.

38

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Subestaciones
(Sistema Regiones)
AO OBRA DETALLE PROPSITO Y NECESIDAD
Satisfacer la demanda futura del sector aumentando la capacidad de
2012 Ampliacin S/E Equipar la subestacin distribucin de energa de la Subestacin.
- para incluir el
2015 La Pastora Mejorar el servicio a una poblacin de: 12.500 hab. y ayuda al polo de
Transformador N3
desarrollo endgeno Eje Cafetalero.
Reforzar y mejorar el sistema de transmisin en 115 kV, para garantizar
la transmisin de potencia hacia Carora, el Tocuyo y La Pastora.
Garantizar la selectividad y la correcta operacin del sistema de
Construccin de un
Construccin distribuidor en 115 kV proteccin asociado, ya que el distribuidor a construir elimina el t-off
2012
- Distribuidor en las cercanas del provisional mediante el cual se est dando servicio en la actualidad a la lnea
2015 sector San Pablo,
San Pablo 115 kV Carretera Barquisimeto San Pablo Tocuyo en 115 kV.
- Carora Mejorar el servicio a una poblacin de: 500.000 hab. y ayuda a los polos
de desarrollo endgeno Eje Cafetalero, Valle de Quibor, San Francisco-
Quebrada Arriba-Palmarito y Tocuyo Medio.

39

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Barquisimeto)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Para el ao 2006, bajo la contingencia de prdida de un auto en la S/E
Manzano, se excede el nivel de Sobrecarga permitido para el equipo restante.
(130MVA).
Con este equipo se logra incrementar la capacidad de suministro elctrico
01 Autotransformador de 100 MVA, asegurando la calidad y confiabilidad del servicio hasta aproximadamente los
2006
230/115 kV a instalar en la S/E Manzano.
aos 2008-2009, perodo en el cual se excede el nuevo valor de capacidad
firme. (260MVA)
Mejorar el servicio a una poblacin de: 2.000.000 hab. y contribuye con
todos los polos de desarrollo endgeno del Estado Lara.
En la actualidad la demanda de la S/E Centro asciende a 64.92 MVA,
siendo su capacidad firme actual de 54.6 MVA. La superacin del nivel de
capacidad firme dificulta la operatividad de la S/E Centro, por tanto esta
unidad de transformacin adicional permitir:
1. Adicionar nuevos circuitos para absorber la demanda producto del
crecimiento del centro oeste de la ciudad de Barquisimeto.
01 Transformador de 42 MVA,
2006
115/24 kV a instalar en la S/E Centro. 2. Aumentar la capacidad de suministro elctrico y mejorar las
condiciones operativas de la S/E Centro tanto en emergencia como para
mantenimientos programados.
3. Mejorar el servicio a una poblacin de 150.000 hab. y contribuye
con el polo de desarrollo endgeno Barquisimeto-Cabudare-San Jos de
Tintin.

40

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Barquisimeto)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Dotar de capacidad firme a la S/E Ujano.
Aumentar la capacidad de suministro de energa hacia las zonas Este y
Norte de la ciudad de Barquisimeto.
2006 01 Transformador de 83 MVA,
115/24 kV a instalar en la S/E Ujano. Mejorar el servicio a una poblacin de: 290.000 habitantes y contribuye
con los polos de desarrollo endgeno Barquisimeto-Cabudare-San Jos de
Tintin y Tamaca-Duaca-Santa Ines-Moroturo.
Estas unidades permitirn alimentar la carga de la zona norte de
Barquisimeto as como tambin la carga del Municipio Crespo tanto a
mediano como a largo plazo. Ello libera dos (2) salidas en 24 kV en la S/E
Ujano las cuales sern usadas para la alimentacin del futuro Distribuidor
02 Transformadores de 30 MVA, 115/24 kV a
2007 instalar en la S/E Norte. Morn.
Mejorar el servicio a una poblacin de: 95.000 habitantes y contribuye
con los polos de desarrollo endgeno Tamaca-Duaca-Santa Ines-Moroturo y
Tocuyo Medio.

41

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Barquisimeto)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Estas unidades forman parte del proyecto S/E Oeste 115/24 kV y
permitirn la alimentacin de gran parte de la carga actual de la zona oeste de
la ciudad de Barquisimeto as como los crecimientos que se prevn a futuro
los cuales podemos citar:
1. Zona Industrial IV.
2008 02 Transformadores de 42 MVA, 115/24 kV a 2. Instalaciones futuras del proyecto de transporte masivo de
instalar en la S/E Oeste.
Barquisimeto.
3. Expansiones residenciales y comerciales de alto potencial.
4. Mejorar el servicio a una poblacin de: 160.000 habitantes y
contribuye con el polo de desarrollo endgeno Barquisimeto-Cabudare-
San Jos de Tintin.
Para el periodo 2010-2015, la capacidad firme de la S/E Palavecino
deber estar llegando a su valor de capacidad firme (54.6 MVA), por lo que
esta tercera unidad aumentar la capacidad firme hasta un valor de 109.20
MVA. Dicha cantidad es suficiente para facilitar tanto la operacin y
01 Transformadores de 42 MVA, 115/24 kV a flexibilidad de la subestacin as como tambin la construccin de nuevos
2010
instalar en la S/E Palavecino.
circuitos de distribucin necesarios para satisfacer el crecimiento de la
demanda en el Municipio Palavecino en el largo plazo.
Mejorar el servicio a una poblacin de 170.000 hab. y ayuda al polo de
desarrollo endgeno Barquisimeto-Cabudare-San Jos de Tintin.

42

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Barquisimeto)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Instalar 200 MVA para transferir esta potencia desde el Sistema
2012 Interconectado Nacional (SIN) hacia el Sistema ENELBAR a travs del tercer
02 Autotransformadores de 100 MVA, 230/115
- kV a instalar en la S/E Polgono. punto de interconexin. (S/E Polgono).
2015 (*) Mejorar el servicio a una poblacin de: 2.000.000 hab. y contribuye con
todos los polos de desarrollo endgeno del Estado Lara.
De llevarse a cabo el desarrollo Polgono 230/115 kV, se puede
aprovechar dicha instalacin para construir un patio 24 kV que alimente las
cargas siguientes:
2012 1. Fbrica de Cemento. (Circuito Expreso)
- 02 Transformadores de 42 MVA, 115/24 kV a 2. Barrios El Jebe, San Lorenzo y zonas adyacentes al polgono de
instalar en la S/E Polgono.
2015 tiro y la Circunvalacin Norte.
3. Mejorar el servicio a una poblacin de: 2.000.000 hab. y
contribuye con todos los polos de desarrollo endgeno del Estado
Lara.

( * ) Sujeto a que el Plan de Expansin de Generacin no se lleve a cabo.


( ** ) Sujeto a que se elimine la Generacin en Planta II por obsolescencia de los equipos actuales.

43

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Regiones)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
En la actualidad la S/E La Miel tiene niveles de tensin (34.5/13.8 kV 2 X
5 MVA) y (24/13.8 kV 5 MVA). Dicho sistema tiene serios problemas de
transmisin de potencia y bajo voltaje, siendo el tramo alimentado desde el
Distribuidor Agua Viva el ms crtico. Estas unidades de transformacin son
requeridas para:
1. Dotar de capacidad suficiente a la S/E La Miel.
2. Permitir la alimentacin de la subestacin en un nivel de tensin de
02 Transformadores de 15/20 MVA, 115 kV producto del desvo de la lnea de transmisin Yaritagua-Acarigua
2006
115/13.8 kV a instalar en la S/E La Miel.
II la cual pasa a escasos 300 m de dicha instalacin y a la construccin de
un patio 115 kV futuro.
3. Liberar 02 unidades de transformacin de 5 MVA, 34.5/13.8 kV las
cuales pueden recuperarse y ser usadas en los desarrollos futuros para el
Municipio Urdaneta. (Subestaciones Siquisique y Santa Ins)
4. Mejorar el servicio a una poblacin de: 30.000 hab. y ayuda al polo
de desarrollo endgeno Ferrovario Bura.

44

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Regiones)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Esta unidad es requerida para obtener las alimentaciones principales en
34.5 kV para las futuras Subestaciones Siquisique y Santa Ins, Municipio
01 Transformador de 10 MVA, Urdaneta.
2007
115/34.5 kV a instalar en la S/E Aguada Grande.
Mejorar el servicio a una poblacin de: 55.000 hab. y ayuda a los polos de
desarrollo endgeno Tocuyo Medio y Tamaca-Duaca-Sta Ins Moroturo.
01 Transformador de 5 MVA, Instalar 5 MVA de capacidad para alimentar a la poblacin de Santa Ins.
2007 34.5/13.8 kV a instalar en la S/E Santa Ins. Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
(*) desarrollo endgeno Tamaca-Duaca-Sta Ins Moroturo.

01 Transformador de 5 MVA, Instalar 5 MVA de capacidad para alimentar a la poblacin de Siquisique.


2007 34.5/13.8 kV a instalar en la S/E Siquisique. Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
(*) desarrollo endgeno Tocuyo Medio.
Aumentar la capacidad firme de la subestacin para cubrir futuros
crecimientos en la regin.
2007 01 Transformador 5/6.25MVA, 24/13.8kV a
instalar en la S/E Duaca Mejorar el servicio a una poblacin de: 45.000 hab. y ayuda al polo de
desarrollo endgeno Tamaca-Duaca-Sta Ins Moroturo.

( * ) Es posible destinar los equipos de transformacin de 5 MVA, 34.5/13.8 kV existentes en la S/E La Miel una vez ampliada esta ltima.

45

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Regiones)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Sustituir el transformador existente de 20 MVA.
Aumentar la capacidad instalada a 2 X 30 MVA, con una capacidad firme
asociada de 39 MVA. Ello permite mayor flexibilidad y confiabilidad en la
01 Transformador de 30 MVA,
2008 operacin de la subestacin ante falla y/o mantenimiento de uno de los
115/24 kV a instalar en la S/E Qubor.
equipos de transformacin.
Mejorar el servicio a una poblacin de: 123.500 hab. y ayuda a los polos
de desarrollo endgeno Valle de Quibor y Eje Cafetalero.
Instalar 5 MVA de capacidad para alimentar a la poblacin de Guarico.

2008
01 Transformador de 5 MVA, Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
34.5/13.8 kV a instalar en la S/E Guarico.
desarrollo endgeno Eje Cafetalero.
Aumentar la capacidad instalada en la S/E Sanare para futuros
crecimientos del Municipio
Dar mayor capacidad a nivel de subestacin para construir nuevos
2008 01 Transformador de 5/6.25MVA 24/13.8kV a
instalar en la S/E Sanare circuitos de distribucin en la zona.
Mejorar el servicio a una poblacin de: 22.000 hab. y ayuda al polo de
desarrollo endgeno Eje Cafetalero.
Unidades necesarias para dotar de una capacidad inicial de 2 X30 MVA a
la futura S/E El Roble en la ciudad de Carora.
02 Transformadores de 30 MVA,
2009 Mejorar el servicio a una poblacin de: 200.000 hab. y ayuda a los polos
115/24 kV a instalar en la S/E El Roble.
de desarrollo endgeno Tocuyo Medio y San Francisco-Quebrada Arriba-
Palmarito.

46

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Transformadores de Potencia
(Sistema Regiones)
AO EQUIPO A INSTALAR PROPSITO Y NECESIDAD
Aumentar la capacidad instalada en la S/E La Pastora para futuros
crecimientos del Municipio
2012 01 Transformador de 5/6.25MVA Dar mayor capacidad a nivel de subestacin para construir nuevos
-
2015 34.5/13.8kV a instalar en la S/E La Pastora circuitos de distribucin en la zona.
Mejorar el servicio a una poblacin de: 12.500 hab. y ayuda al polo de
desarrollo endgeno Eje Cafetalero.

47

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Llevar a cabo el desarrollo de la ingeniera para la
construccin de la lnea de transmisin.

S/E Ujano S/E Norte Mejorar el servicio a una poblacin de: 95.000
2006 115 900 20
(Ingeniera) habitantes y contribuye con los polos de desarrollo
endgeno Tamaca-Duaca-Santa Ines-Moroturo y
Tocuyo Medio.
Sustituir conductor por tener mas de 30aos en
servicio.
Reparacin de algunos apoyos y sustitucin de
otros.
Reconstruccin Lnea de
2006 Transmisin S/E Manzano S/E 115 350 70 Dar confiabilidad a la lnea para garantizar la
Quibor S/E Tocuyo continuidad del servicio en las zonas afectadas
Mejorar el servicio a una poblacin de: 250.000
habitantes y contribuye con los polos de desarrollo
endgeno Valle de Quibor y Eje Cafetalero.
Alimentar el futuro desarrollo ampliacin
Distribuidor Norte a 115 kV.
Mejorar el servicio a una poblacin de: 95.000
2007 S/E Ujano S/E Norte (DT) 115 900 20
habitantes y contribuye con los polos de desarrollo
endgeno Tamaca-Duaca-Santa Ines-Moroturo y
Tocuyo Medio.

48

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Este tramo de lnea es requerido para la alimentacin
de la nueva S/E Siquisique en el Municipio Urdaneta.
S/E Aguada Grande
2007
S/E Siquisique
34.5 336 40 Mejorar el servicio a una poblacin de: 22.000 hab. y
ayuda al polo de desarrollo endgeno Tocuyo Medio.

Este tramo de lnea es requerido para la alimentacin


de la nueva S/E Santa Ins en el Municipio Urdaneta.
S/E Aguada Grande Mejorar el servicio a una poblacin de: 22.000 hab. y
2007 34.5 336 30
S/E Santa Ins
ayuda al polo de desarrollo endgeno Tamaca-Duaca-Sta
Ins Moroturo.
Aumentar la capacidad de transmisin de energa para
la S/E Duaca, la cual es la encargada de alimentar al
Municipio Crespo.
Expreso N 2 S/E Norte S/E Dar confiabilidad al sistema del Municipio.
2007 24 795 17
Duaca
Mejorar el servicio a una poblacin de: 45.000 hab. y
ayuda al polo de desarrollo endgeno Tamaca-Duaca-Sta
Ins Moroturo.

49

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Reforzar la alimentacin de la S/E Sanare para mejorar la
confiabilidad y calidad del servicio elctrico en la zona.
Expreso No. 2. S/E Quibor S/E
2007
Sanare
24 336 25 Mejorar el servicio a una poblacin de: 22.000 hab. y
ayuda al polo de desarrollo endgeno Eje Cafetalero.

Desviar la lnea existente Zona Industrial Centro 115 kV,


en un punto cercano a la Circunvalacin Norte para ir en DT
hasta el patio 115 kV de la nueva S/E Oeste. Esto permitir la
Tramo de lnea para alimentar a la alimentacin de esta ltima en su primera fase
2008 115 900 5
S/E Oeste (DT)
Mejorar el servicio a una poblacin de: 160.000 habitantes
y contribuye con el polo de desarrollo endgeno
Barquisimeto-Cabudare-San Jos de Tintin.
Este tramo de lnea es requerido para la alimentacin de la
nueva S/E Guarico en el Municipio Morn.
2008 S/E Tocuyo S/E Guarico 34.5 336 30 Mejorar el servicio a una poblacin de: 22.000 hab. Y
ayuda al polo de desarrollo endgeno Eje Cafetalero.

50

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Alimentar la futura S/E El Roble mediante el desvo
en DT de la lnea existente Barquisimeto Planta II
Carora 115 kV.
Tramo de lnea para alimentar a la
2009 S/E El Roble en la Ciudad de 115 350 5 Mejorar el servicio a una poblacin de: 200.000
Carora. hab. Y ayuda a los polos de desarrollo endgeno
Tocuyo Medio y San Francisco-Quebrada Arriba-
Palmarito.
Alimentar futura S/E El Roble mediante el desvo
de la lnea Planta II Carora La Pastora.
Desvo de la lnea Planta II Carora
2009 La Pastora Hacia S/E El Roble 115 350 5 Mejorar el servicio a una poblacin de: 12.500 hab.
(ST) Y ayuda al polo de desarrollo endgeno Eje
Cafetalero.
Reforzar el sistema de transmisin y darle
confiabilidad al sistema Quibor-Tocuyo en el mediano
y largo plazo, ya que para esta poca la alimentacin

2009 S/E Oeste S/E Quibor (ST) 115 350 30 mediante dos lneas es insuficiente.
Mejorar el servicio a una poblacin de: 250.000
habitantes y contribuye con los polos de desarrollo
endgeno Valle de Quibor y Eje Cafetalero.

51

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Reforzar el sistema de transmisin, especficamente
la barra 115kV del Distribuidor San Pablo.
Mejorar el servicio a una poblacin de: 500.000
2010 S/E Oeste Dist. San Pablo. (ST) 115 350 10
hab. y ayuda a los polos de desarrollo endgeno Eje
Cafetalero, Valle de Quibor, San Francisco-Quebrada
Arriba-Palmarito y Tocuyo Medio.
El Distribuidor San Pablo ser un subestacin de
suicheo que permitir mejorar las condiciones
operativas del sistema de transmisin asociado al
sistema regiones. Dependiendo del sitio donde sea
construido, se estima que alrededor de 10 kms de lnea
tanto DT como ST sern necesarios para desviar las
Desvo de lneas Barquisimeto -
2010 Carora y Zona Industrial-Carora 115 350 10 lneas Barquisimeto-Carora, Zona Industrial Carora y
hacia S/E San Pablo San Pablo T_off- Tocuyo hacia el nuevo Distribuidor
San Pablo.
Mejorar el servicio a una poblacin de: 500.000
hab. y ayuda a los polos de desarrollo endgeno Eje
Cafetalero, Valle de Quibor, San Francisco-Quebrada
Arriba-Palmarito y Tocuyo Medio.

52

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Este tramo de lnea es requerido para independizar
el servicio elctrico prestado al Municipio Urdaneta, el
S/E Norte Intercepcin Lnea cual actualmente es realizado por la empresa CADAFE.
2010 existente Aroa Aguada Grande 115 350 30
Mejorar el servicio a una poblacin de: 65.000 hab. y
(ST)
ayuda a los polos de desarrollo endgeno Tocuyo
Medio y Tamaca-Duaca-Sta Ins Moroturo.
Cambiar actual conductor para aumentar la
capacidad de trasmisin del expreso
2012 Dar mayor confiabilidad a la S/E Sanare.
Reconstruccin de Expreso
- 24 336 25
Quibor Sanare Mejorar el servicio a una poblacin de: 22.000 hab.
2015
Y ayuda al polo de desarrollo endgeno Eje
Cafetalero.

Dar respaldo a la S/E Planta II ya que se eliminar


2012
- S/E Polgono Planta II (*) 115 900 10 la Generacin existente por obsolescencia de los
2015 equipos.
En caso de llevarse a construirse el centro de
Generacin Polgono, estas lneas sern necesarias para
2012 el transporte de energa para los sitios requeridos.
Lneas de transmisin asociadas al
- 115 900 55
CGP (**) Mejorar el servicio a una poblacin de: 2.000.000
2015
hab. Y contribuye con todos los polos de desarrollo
endgeno del Estado Lara.

53

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 4
Resumen de Obras (Continuacin)
Lneas de Transmisin
(Sistema de Transmisin Global)
AO LNEA kV CALIBRE Kms PROPSITO Y NECESIDAD
Adecuar el Sistema de Transmisin en 115 kV para
Tramo de lnea para desviar la lnea permitir la 54nterconexin de la nueva S/E Polgono.
2012
existente Ujano Norte 115 kV Mejorar el servicio a una poblacin de: 2.000.000
- 115 900 3
hacia la nueva S/E Polgono o CGP
2015 hab. Y contribuye con todos los polos de desarrollo
54nter sea el caso (DT)
endgeno del Estado Lara..
Alimentacin de la futura S/E Polgono
230/115/24 kV.
2012 Tramo de lnea para alimentar futura
- S/E Polgono. (DT) 230 2X1100 3 Mejorar el servicio a una poblacin de: 2.000.000
2015 (*) hab. y contribuye con todos los polos de desarrollo
endgeno del Estado Lara.
Alimentacin del futuro distribuidor Morn, desde
la S/E Ujano.
2012
- Expresos Distribuidor Moran 24 795 10 Mejorar el servicio a una poblacin de: 40.000 hab.
2015 y ayuda al polo de desarrollo endgeno Barquisimeto-
Cabudare-San Jos de Tintin.
(*) Sujeto a que no se lleve a cabo el Plan de Expansin de Generacin.
(**) Sujeto a que se lleve a cabo el Plan de Expansin de Generacin.

54

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


4.2. Estimacin de Costos

Tabla N 5
Estimacin de Costos
Inversin en Subestaciones
Subestaciones
(Sistema Barquisimeto)
No Subestacin Obras y equipos a instalar Componente 2006 2007 2008 2009 2010 2012-2015
Ampliacin del barraje en 115 kV asi como tambin el scwchgear MMBs
517.20
1 S/E Centro asociado en 24 kV para colocar en funcionamiento la tercera unidad de
transformacin de 42 MVA. MM$ 0.22
Ampliacin de la barra en 115 kV desde 4 celdas hasta un total de 6 MMBs 218.03
2 S/E Ujano
celdas para lograr dos (2) salidas adicionales. MM$ 0.17
Construccin de un patio en 115 kV, esquema en anillo con un MMBs 3,614.34
3 S/E Norte mximo de seis (6) celdas y adecuacin de la barra existente en 24
kV. MM$ 0.60
MMBs 6,226.94
4 S/E Oeste Construccin
MM$ 1.56
Ampliacin de las barras tanto en 115 kV como en 24 kV para colocar MMBs 15.77
5 S/E Palavecino
en funcionamiento la tercera unidad de transformacin de 42 MVA.
MM$ 0
MMBs 1,090.45
6 Distribuidor Morn Construccin
MM$ 0.19
MMBs 94.79
7 S/E Planta II Ampliacin
MM$ 0.10
MMBs 9,559.42
8 S/E Polgono (*) Construccin
MM$ 3.42
MMBs 4,545.49
9 CG Polgono (**) Construccin
MM$ 1.31
MMBs 735.23 3,614.34 6,226.94 0.00 15.77 15,290.14
Total por Ao Sistema Barquisimeto
MM$ 0.39 0.60 1.56 0.00 0.00 5.02
(*) En caso de no llevarse a cabo el plan de Expansin de Generacin
(**) En caso de llevarse a cabo el plan de Expansin de Generacin/ Costos no incluye Generadores

Tabla N 5
Estimacin de Costos
55
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Inversin en Subestaciones (Continuacin)
Subestaciones
(Sistema Regiones)
No Subestacin Obras y equipos a instalar Componente 2006 2007 2008 2009 2010 2012-2015
Construccin de barra en 115 kV y adecuacin del barraje existente en MMBs 2,091.59
1 S/E La Miel
13.8 kV MM$ 0.57
MMBs 800.00
2 S/E El Tocuyo Reconstruccin Barra 13.8kV
MM$
MMBs 91.55
3 S/E Qubor Equipar llegada de lnea Manzano 115kV
MM$ 0.08
Equipamiento de bahas tanto en 115 como en 34.5 kV para lograr MMBs 476.00
4 S/E Aguada Grande
instalar una unidad de transformacin de 10 MVA. MM$ 0.12
MMBs 124.07
5 S/E Santa Ins Construccin
MM$ 0.06
MMBs 124.07
6 S/E Siquisique Construccin
MM$ 0.06
MMBs 305.09
7 S/E Duaca Ampliacin barra 13.8kV, Construccin de patio 24kV
MM$ 0.16
MMBs 354.09
8 S/E Guarico Construccin
MM$ 0.09
Equipamiento de baha en 34.5 kV para lograr la salida de una lnea de MMBs 62.73
9 S/E El Tocuyo
subtransmisin en 34.5 kV para alimentar la S/E Guarico 34.5/13.8 kV
MM$ 0.07
Ampliacin para tercer transformador y equipamiento para llegada MMBs 296.81
10 S/E Sanare
Expreso N 2 MM$ 0.15
Ampliacin barra 115 kV para la llegada de una lnea de transmisin MMBs 102.97
11 S/E Qubor
desde la S/E Oeste. MM$ 0.08
MMBs 3,561.62
12 S/E El Roble Construccin
MM$ 0.62
MMBs 2,568.56
13 S/E San Pablo (***) Construccin
MM$ 0.97
MMBs 149.95
14 S/E La Pastora Ampliacin, tercer transformador
MM$ 0.16
MMBs 2,983.13 1,029.22 713.62 3,664.58 2,568.56 14,254.86
Total por Ao Sistema Regiones
MM$ 0.65 0.41 0.31 0.70 0.97 4.89

MMBs 3,718.36 4,643.56 6,940.57 3,664.58 2,584.33 29,545.00


Total por Ao Sistema ENELBAR
MM$ 1.04 1.01 1.87 0.70 0.97 9.91

(***) Sujeto a estudio Topogrfico que podra modificar el alcance del proyecto.

56
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 6
Estimacin de Costos
Inversin en Transformadores
Transformadores de Potencia
(Sistema Barquisimeto)
No Subestacin Cantidad MVA RT / kV Componente 2006 2007 2008 2009 2010 2012-2015
MMBs 776.03
1 S/E Manzano 1 100 230/115
MM$ 0.60
MMBs 70.37
2 S/E Centro 1 42 115/24
MM$ 0.38
MMBs 109.21
3 S/E Ujano 1 83 115/24
MM$ 0.64
MMBs 118.01
4 S/E Norte 2 30 115/24
MM$ 0.66
MMBs 140.74
5 S/E Oeste 2 42 115/24
MM$ 0.75
MMBs 70.37
6 S/E Palavecino 1 42 115/24
MM$ 0.38
MMBs 1,552.06
7 S/E Polgono** 2 100 230/115
MM$ 1.19
MMBs 140.74
8 S/E Polgono** 2 42 115/24
MM$ 0.75
MMBs 1,073.62 0.00 140.74 0.00 70.37 1,692.80
Total por Ao Sistema Barquisimeto
MM$ 2.27 0.00 0.75 0.00 0.38 1.94
** En caso de no llevarse a cabo el plan de Expansin de Generacin

57
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Transformadores de Potencia
(Sistema Regiones)
No Equipo Cantidad MVA RT / kV Componente 2006 2007 2008 2009 2010 2012-2015
MMBs 63.14
9 S/E La Miel 2 15/20 115/13.8
MM$ 0.52
MMBs 49.59
10 S/E Aguada Grande 1 10 115/34.5
MM$ 0.15
MMBs 59.66
11 S/E Santa Ins (1) 1 5 34.5/13.8
MM$ 0.09
MMBs 59.66
12 S/E Siquisique (1) 1 5 34.5/13.8
MM$ 0.09
MMBs 41.50
13 S/E Duaca 1 5/6.25 24/13.8
MM$ 0.06
MMBs 59.01
14 S/E Qubor 1 30 115/24
MM$ 0.33
MMBs 59.66
15 S/E Guarico 1 5 34.5/13.8
MM$ 0.09
MMBs 41.50
16 S/E Sanare 1 5/6.25 24/13.8
MM$ 0.06
MMBs 118.01
17 S/E El Roble 2 30 115/24
MM$ 0.66
MMBs 59.66
18 S/E La Pastora 1 5/6.25 34.5/13.8
MM$ 0.09
MMBs 63.14 210.40 160.16 118.01 0.00 59.66
Total por Ao Sistema Regiones
MM$ 0.52 0.39 0.48 0.66 0.00 0.09

MMBs 1,136.76 210.40 300.90 118.01 70.37 1,752.46


Total por Ao Sistema ENELBAR
MM$ 2.79 0.39 1.23 0.66 0.38 2.03

(1) Pueden usarse los equipos disponibles en la S/E La Miel, si esta es ampliada.

58
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 7
Estimacin de Costos
Inversin en Lneas de Transmisin y Subtransmisin
Lineas de Transmisin y Subtransmisin
(Sistema de Transmisin Global)
No Lnea kV Calibre kms Componente 2006 2007 2008 2009 2010 2012-2015
MMBs 150.00
1 Proyecto de Ingeniera Lnea Ujano-Norte 115 900 20
MM$ 0.00
Reconstruccin de la Lnea de Tansmisin Manzano- MMBs 0.00
2 115 350 70
Quibor-Tocuyo MM$ 2.08
MMBs 921.60
3 S/E Ujano - S/E Norte 115 900 20
MM$ 2.40
MMBs 1,003.12
4 S/E Aguada Grande - S/E Siquisique 34.5 336 40
MM$ 0.00
MMBs 752.34
5 S/E Aguada Grande - S/E Santa Ins 34.5 336 30
MM$ 0.00
MMBs 644.60
6 Expreso No. 2. S/E Norte - S/E Duaca 24 795 17
MM$ 0.00
MMBs 947.94
7 Expreso No. 2. S/E Qubor - S/E Sanare 24 795 25
MM$ 0.00
Tramo de lnea DT para la alimentacin de la S/E MMBs 268.80
8 115 900 5
Oeste. MM$ 0.70
MMBs 752.34
9 S/E Tocuyo - S/E Guarico 34.5 336 30
MM$ 0.00

Tramo de lnea DT para la alimentacin de la S/E El MMBs 138.40


10 115 350 5
Roble en la ciudad de Carora. MM$ 0.43
Desvo de la lnea Planta II Carora - La Pastora - MMBs 120.35
11 115 350 5
Hacia S/E El Roble (ST) MM$ 0.37
MMBs 722.08
12 S/E Oeste - S/E Qubor. 115 350 30
MM$ 2.24
MMBs 962.77
13 S/E Oeste - S/E San Pablo. 115 350 40
MM$ 2.98
Desvio de las lneas Barquisimeto - El Roble y Zona MMBs 240.69
14 Industrial - Planta II Carora, hacia la nueva S/E San 115 350 10
Pablo. MM$ 0.75
S/E Norte - hasta interceptar la lnea Aroa - Aguada MMBs 722.08
15 115 350 30
Grande. MM$ 2.24

59
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Lineas de Transmisin y Subtransmisin
(Sistema de Transmisin Global) Continuacin
No Lnea kV Calibre kms Componente 2006 2007 2008 2009 2010 2012-2015
MMBs 203.10
16 Reconstruccin Expreso Quibor/Sanare 24 336 25
MM$ 0.00
MMBs 460.80
17 S/E Polgono - Planta II (*) 115 900 10
MM$ 1.20
MMBs 2,534.40
18 Lneas de transmisin asociadas al CGP (**) 115 900 55
MM$ 6.60
Desvio de la lnea Ujano - Norte 115 kV hacia el MMBs 161.28
19 115 900 3
CGP o S/E Polgono. (*) MM$ 0.42
Tramo de lnea DT para alimentar la futura S/E MMBs 193.54
20 230 2*1100 3
Polgono. (*) MM$ 0.50
MMBs 379.18
21 Expresos Distribuidor Morn 24 795 10
MM$ 0.00
MMBs 150.00 4,269.59 1,021.14 980.82 1,925.54 3,471.49
Total por Ao Sistema ENELBAR
MM$ 2.08 2.40 0.70 3.04 5.96 7.52

(*) Sujeto a que no se lleve a cabo el Plan de Expansin de Generacin.


(**) Sujeto a que se lleve a cabo el Plan de Expansin de Generacin.

60
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 8
Estimacin de Costos
Resumen de Inversiones

Resumen de Inversiones por Ao, Sistema ENELBAR


Inversiones Componente 2006 2007 2008 2009 2010 2012-2015
MMBs 1,136.76 210.40 300.90 118.01 70.37 1,752.46
Transformadores
MM$ 2.79 0.39 1.23 0.66 0.38 2.03
MMBs 150.00 4,269.59 1,021.14 980.82 1,925.54 3,471.49
Lneas
MM$ 2.08 2.40 0.70 3.04 5.96 7.52
MMBs 3,718.36 4,643.56 6,940.57 3,664.58 2,584.33 29,545.00
Subestaciones
MM$ 1.04 1.01 1.87 0.70 0.97 9.91
Total por Ao Sistema MMBs 5,005.12 9,123.55 8,262.61 4,763.42 4,580.24 34,768.95
ENELBAR MM$ 5.91 3.80 3.81 4.39 7.30 19.47
Equivalente
Equivalenteen
enMillones
Millones de
de Bolvares
Bolvares (2.150 Bs./$) (2150
Bs/$) 17,711.52 17,283.28 16,447.62 14,212.37 20,276.89 76,619.55

61
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
5. HISTORIA Y PRONSTICO DE DEMANDA Y ENERGA

En todo proceso de Planificacin de Sistemas Elctricos de Potencia, en sus


primeras fases se desarrollan proyecciones de las variables que directamente definen
la estructura del mismo sistema; el buen resultado en esta fase del proceso es
primordial para el cumplimiento de los objetivos definidos. En el caso de los
Sistemas Elctricos, las variables comnmente utilizadas son la Energa y Potencia
Elctrica.

Con las proyecciones de energa elctrica se detectan y se cuantifican los


requerimientos futuros del sistema, permitiendo desarrollar los planes de expansin
de generacin que buscan definir la cantidad, oportunidad y composicin de dicha
expansin de generacin o de los puntos de interconexin requeridos.

Por otro lado, las proyecciones de potencia elctrica son utilizadas como
insumos principales de los planes de Transmisin de los Sistemas Elctricos, ya que
estos planes tienen definido como objetivo bsico, determinar las obras requeridas
por el sistema, principalmente lneas de transmisin, subestaciones de transmisin y
ampliacin de las subestaciones existentes mediante la incorporacin de unidades
adicionales de transformacin, garantizando as la operatividad tcnica de dichos
sistemas.

Dentro de este captulo se el tiene por objeto presentar las proyecciones


mensuales de la evolucin de la Potencia y Energa Elctrica de todo el Sistema de
ENELBAR, adicionalmente las proyecciones de la potencia mxima anual de cada
una de las Subestaciones y de los Subsistemas definidos dentro del Sistema
Elctrico de ENELBAR, considerando a los nuevos desarrollos que son
determinados en este trabajo.

Para la elaboracin de las proyecciones se utilizaron modelos de series de


tiempo, donde la historia de la variable a proyectar es el principal insumo en el
desarrollo de este trabajo. Estos modelos permiten captar y reproducir el patrn
estadstico de las series temporales analizadas.

Existen diversos mtodos para estudiar y elaborar proyecciones a partir de


las series de tiempo. En este trabajo se utilizaron dos metodologas: una de ellas
consiste en modelos tendenciales, desestacionalizando la serie previa a la
proyeccin, y estacionalizndola una vez obtenido el resultado del modelo
seleccionado; el otro modelo utilizado fu el de suavizacin exponencial, debido a
que se tienen series de las que no se dispone con datos suficientes para elaborar los
modelos tendenciales.

62
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Figura N 2
Grfico de Historia y Pronstico de Potencia (MVA)
Sistema ENELBAR
Historia y Pronstico de Potencia (MVA) Sistema ENELBAR
800.0

751.76
700.0 732.22
712.68
693.14
673.60
654.07
634.53
600.0 614.99
595.45
575.92
556.38

500.0 503.9
495.2
485.9 486.0
440.0
415.7
400.0 370.6 384.1

300.0

200.0

100.0

0.0
1997 1998
1999 2000
2001 2002
2003 2004
2005 2006
2007 2008
AOS 2009 2010 2011 2012 2013 2014
His-MW-ENELBAR Pro-MW-ENELBAR 2015

63
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Figura N 3
Grfico de Historia y Pronstico de Potencia (MVA)
Sistema Barquisimeto - Carora

Historia y Pronstico de Potencia (MVA) Sistema Barquisimeto - Carora


600.00

547.18
534.26
500.00 508.41 521.33
482.56 495.49
469.64
456.72
430.90 443.80
403.08 409.78 418.01
400.00 384.98
393.34
364.77 384.82
339.95 351.40

300.00

200.00

100.00

0.00
1997 1998
1999 2000
2001 2002
2003 2004
2005 2006
2007 2008
AO 2009 2010
2011 2012
2013 2014
His-MVA-(Barquisimeto-Carora) Pro-MVA-(Barquisimeto-Carora) 2015

64
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Figura N4
Grfico de Historia y Pronstico de Potencia (MVA)
Sistema Regiones sin SIDETUR

Historia y Pronstico de Potencia (MVA) Sistema Regiones sin SIDETUR


120.00

104.94
100.00 102.31
99.67
94.37 97.02
91.75
86.61 89.17
84.00
81.28
80.00
72.18 75.24 76.56
70.42 72.53
67.30
64.56 67.15

60.00

40.00

20.00

0.00
1998 1999
2000 2001 2002 2003 2004 2005 2006 2007
AO 2008 2009 2010 2011 2012 2013 2014
His-MVA-Reg Pro-MVA-Reg 2015

65
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Figura N 5
Grfico de Historia y Pronstico de Potencia (MVA)
Sistema Regiones con SIDETUR

Historia y Pronstico de Potencia (MVA) Sistema Regiones con Sidetur


240.00

220.00
217.56
211.52
200.00 205.47
199.42
193.38
180.00 181.28 187.33

169.19 175.24
160.00 163.15
157.10
148.10
142.32
140.00 138.73
128.91 134.41
120.43
120.00 112.98
106.04

100.00

80.00

60.00

40.00

20.00

0.00
1997 1998
1999 2000
2001 2002
2003 2004
2005 2006
2007 2008
AO 2009 2010
2011 2012 2013 2014
Historia-MVA-(Reg+Sidetur) Pronstico-MVA-(Reg+Sidetur) 2015

66
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 9
Historia de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR

DEMANDA MAX. ENERGA DEMANDA (MW) ENERGA % CRECIMIENTO ANUAL


AO MES FC
MW GWh MAX ANUAL ACUMULADA DEMANDA MAX ENERGA
1991 Ene 184.00 100.55 0.73
Feb 184.50 101.75 0.82
Mar 190.00 107.57 0.76
Abr 205.00 103.65 0.70
May 221.00 111.82 0.68
Jun 197.00 102.88 0.73
Jul 191.00 110.06 0.77
Ago 195.00 108.96 0.75
Sep 208.00 113.31 0.76
Oct 213.00 116.32 0.73
Nov 220.50 113.38 0.71
Dic 217.00 110.50 0.68 221.00 1300.76
1992 Ene 219.50 106.07 0.65
Feb 225.25 113.68 0.73
Mar 227.00 122.81 0.73
Abr 240.00 118.15 0.68
May 221.25 120.27 0.73
Jun 221.25 115.14 0.72
Jul 220.00 119.92 0.73
Ago 225.00 120.98 0.72
Sep 235.75 121.22 0.71
Oct 240.75 131.55 0.73
Nov 239.00 126.25 0.73
Dic 232.50 121.73 0.70 240.75 1437.77 8.94% 10.53%
1993 Ene 235.25 119.99 0.69
Feb 240.75 116.17 0.72
Mar 244.50 134.53 0.74
Abr 243.25 124.22 0.71
May 235.00 128.80 0.74
Jun 237.75 124.90 0.73
Jul 241.00 129.34 0.72
Ago 239.25 129.98 0.73
Sep 241.75 128.30 0.74
Oct 253.25 140.88 0.75
Nov 251.00 128.02 0.71
Dic 253.75 126.25 0.67 253.75 1531.39 5.40% 6.51%
1994 Ene 242.25 125.03 0.69
Feb 248.50 118.99 0.71
Mar 250.50 134.52 0.72
Abr 255.50 126.95 0.69
May 255.25 138.13 0.73
Jun 242.00 130.99 0.75
Jul 238.00 134.05 0.76
Ago 235.50 128.14 0.73
Sep 247.50 130.07 0.73
Oct 249.50 132.78 0.72
Nov 253.50 133.97 0.73
Dic 258.00 131.59 0.69 258.00 1565.20 1.67% 2.21%

67

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 9
Historia de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR
(Continuacin)
DEMANDA MAX. ENERGA DEMANDA (MW) ENERGA % CRECIMIENTO ANUAL
AO MES FC
MW GWh MAX ANUAL ACUMULADA DEMANDA MAX ENERGA
1995 Ene 247.50 134.23 0.73
Feb 248.00 121.34 0.73
Mar 252.00 140.04 0.75
Abr 253.00 128.39 0.70
May 254.00 142.02 0.75
Jun 247.50 135.51 0.76
Jul 246.00 135.60 0.74
Ago 246.50 139.88 0.76
Sep 261.50 136.90 0.73
Oct 260.00 145.77 0.75
Nov 266.50 141.37 0.74
Dic 267.00 129.35 0.65 267.00 1630.41 3.49% 4.17%
1996 Ene 259.50 139.29 0.72
Feb 257.00 130.55 0.73
Mar 267.00 138.72 0.70
Abr 262.00 132.03 0.70
May 254.50 138.79 0.73
Jun 245.50 126.84 0.72
Jul 245.50 137.28 0.75
Ago 247.00 133.47 0.73
Sep 256.30 144.55 0.78
Oct 260.50 143.21 0.74
Nov 263.30 133.75 0.71
Dic 267.20 135.13 0.68 267.20 1633.60 0.07% 0.20%
1997 Ene 256.00 139.60 0.73
Feb 258.84 125.55 0.72
Mar 258.58 135.12 0.70
Abr 267.06 143.59 0.75
May 269.20 143.42 0.72
Jun 331.55 183.71 0.77
Jul 325.96 185.54 0.77
Ago 332.11 189.18 0.77
Sep 346.72 190.08 0.76
Oct 354.46 201.28 0.76
Nov 357.14 195.72 0.76
Dic 370.60 197.23 0.72 370.60 2030.01 38.70% 24.27%
1998 Ene 362.22 196.92 0.73
Feb 371.78 185.79 0.74
Mar 371.85 210.35 0.76
Abr 365.04 195.08 0.74
May 368.40 200.82 0.73
Jun 335.68 183.78 0.76
Jul 337.57 190.61 0.76
Ago 360.16 199.81 0.75
Sep 375.92 200.21 0.74
Oct 380.96 208.29 0.73
Nov 384.13 203.97 0.74
Dic 383.42 203.22 0.71 384.13 2378.85 3.65% 17.18%

68

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 9
Historia de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR
(Continuacin)
DEMANDA MAX. ENERGA DEMANDA (MW) ENERGA % CRECIMIENTO ANUAL
AO MES FC
MW GWh MAX ANUAL ACUMULADA DEMANDA MAX ENERGA
1999 Ene 374.45 197.49 0.71
Feb 376.60 185.68 0.73
Mar 374.89 212.55 0.76
Abr 380.61 191.50 0.70
May 385.20 209.05 0.73
Jun 380.74 205.98 0.75
Jul 371.38 206.07 0.75
Ago 375.61 206.64 0.74
Sep 386.31 203.52 0.73
Oct 391.00 207.20 0.71
Nov 404.53 208.69 0.72
Dic 415.67 208.24 0.67 415.67 2442.61 8.21% 2.68%
2000 Ene 395.21 195.79 0.67
Feb 391.82 197.98 0.73
Mar 400.00 214.00 0.72
Abr 406.49 203.83 0.70
May 411.12 222.16 0.73
Jun 405.27 210.59 0.72
Jul 405.46 212.75 0.71
Ago 409.52 223.59 0.73
Sep 414.80 212.63 0.71
Oct 424.55 222.75 0.71
Nov 430.99 219.62 0.71
Dic 439.95 224.01 0.68 439.95 2559.70 5.84% 4.79%
2001 Ene 446.67 219.58 0.66
Feb 433.00 199.37 0.69
Mar 456.41 236.14 0.70
Abr 456.33 215.68 0.66
May 465.10 235.51 0.68
Jun 449.52 222.86 0.69
Jul 435.90 223.50 0.69
Ago 439.13 235.18 0.72
Sep 449.69 229.97 0.71
Oct 473.64 241.50 0.69
Nov 475.35 238.83 0.70
Dic 485.94 235.29 0.65 485.94 2733.43 10.45% 6.79%
2002 Ene 479.11 231.02 0.65
Feb 455.05 209.54 0.69
Mar 457.68 226.05 0.66
Abr 458.62 218.91 0.66
May 470.18 235.07 0.67
Jun 495.19 221.38 0.62
Jul 480.54 229.66 0.64
Ago 459.15 236.11 0.69
Sep 472.01 229.84 0.68
Oct 479.33 242.60 0.68
Nov 456.32 234.14 0.71
Dic 415.55 205.39 0.66 495.19 2719.70 1.90% -0.50%

69

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 9
Historia de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR
(Continuacin)
DEMANDA MAX. ENERGA DEMANDA (MW) ENERGA % CRECIMIENTO ANUAL
AO MES FC
MW GWh MAX ANUAL ACUMULADA DEMANDA MAX ENERGA
2003 Ene 404.00 203.87 0.68
Feb 456.31 201.74 0.66
Mar 452.92 229.42 0.68
Abr 462.90 219.18 0.66
May 447.10 234.57 0.71
Jun 441.07 219.35 0.69
Jul 435.28 227.75 0.70
Ago 435.78 231.90 0.72
Sep 454.77 231.67 0.71
Oct 459.71 243.43 0.71
Nov 467.63 236.26 0.70
Dic 486.02 237.07 0.66 486.02 2716.19 -1.85% -0.13%
2004 Ene 462.07 226.00 0.66
Feb 494.25 229.11 0.67
Mar 477.37 251.28 0.71
Abr 468.51 234.48 0.70
May 463.93 242.63 0.70
Jun 485.23 238.07 0.68
Jul 491.32 248.36 0.68
Ago 460.47 247.34 0.72
Sep 493.40 242.55 0.68
Oct 496.22 252.76 0.68
Nov 489.55 248.40 0.70
Dic 503.90 253.32 0.68 503.90 2914.30 3.68% 7.29%

70

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 10
Pronsticos de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR

DEMANDA DEMANDA ENERGA % CRECIMIENTO ANUAL


AO MES MAXIMA ENERGA FC (MW) ACUMULADA DEMANDA ENERGA
MW GWh MAX ANUAL GWh MAX
2005 Ene 495.99 242.10 0.66
Feb 509.55 232.20 0.68
Mar 507.65 267.00 0.71
Abr 513.81 265.80 0.72
May 524.09 268.67 0.69
Jun 521.89 260.66 0.69
Jul 507.66 268.17 0.71
Ago 527.65 270.21 0.69
Sep 535.85 268.73 0.70
Oct 548.67 280.04 0.69
Nov 554.58 273.40 0.68
Dic 556.38 272.31 0.66 556.38 3169.30 10.41% 8.75%
2006 Ene 535.70 266.61 0.67
Feb 546.58 254.38 0.67
Mar 547.64 282.82 0.69
Abr 543.36 270.44 0.69
May 542.88 282.85 0.70
Jun 540.54 272.12 0.70
Jul 525.75 278.52 0.71
Ago 546.40 282.21 0.69
Sep 554.84 280.16 0.70
Oct 568.05 291.78 0.69
Nov 574.11 285.12 0.69
Dic 575.92 283.88 0.66 575.92 3330.89 3.51% 5.10%
2007 Ene 554.46 277.92 0.67
Feb 565.66 265.21 0.70
Mar 566.71 294.84 0.70
Abr 562.22 281.94 0.70
May 561.67 294.87 0.71
Jun 559.19 283.68 0.70
Jul 543.84 290.36 0.72
Ago 565.15 294.20 0.70
Sep 573.82 292.07 0.71
Oct 587.43 304.18 0.70
Nov 593.65 297.24 0.70
Dic 595.45 295.94 0.67 595.45 3472.46 3.39% 4.25%
2008 Ene 573.22 289.73 0.68
Feb 584.75 276.48 0.70
Mar 585.77 307.37 0.71
Abr 581.08 293.92 0.70
May 580.45 307.41 0.71
Jun 577.85 295.74 0.71
Jul 561.93 302.70 0.72
Ago 583.90 306.71 0.71
Sep 592.81 304.49 0.71
Oct 606.81 317.11 0.70
Nov 613.18 309.87 0.70
Dic 614.99 308.52 0.67 614.99 3620.06 3.28% 4.25%

71

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 10
Pronsticos de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR
(Continuacin)
DEMANDA DEMANDA ENERGA % CRECIMIENTO ANUAL
AO MES MAXIMA ENERGA FC (MW) ACUMULADA DEMANDA ENERGA
MW MAX ANUAL GWh MAX
2009 Ene 591.97 302.05 0.69
Feb 603.83 288.24 0.71
Mar 604.83 320.43 0.71
Abr 599.94 306.41 0.71
May 599.24 320.47 0.72
Jun 596.50 308.31 0.72
Jul 580.02 315.57 0.73
Ago 602.65 319.75 0.71
Sep 611.79 317.43 0.72
Oct 626.19 330.59 0.71
Nov 632.71 323.04 0.71
Dic 634.53 321.64 0.68 634.53 3773.93 3.18% 4.25%
2010 Ene 610.73 314.89 0.69
Feb 622.91 300.49 0.69
Mar 623.90 334.05 0.72
Abr 618.80 319.44 0.72
May 618.03 334.09 0.73
Jun 615.16 321.42 0.73
Jul 598.12 328.98 0.74
Ago 621.39 333.34 0.72
Sep 630.77 330.92 0.73
Oct 645.57 344.64 0.72
Nov 652.24 336.77 0.72
Dic 654.07 335.31 0.69 654.07 3934.34 3.08% 4.25%
2011 Ene 629.49 328.27 0.70
Feb 641.99 313.26 0.73
Mar 642.96 348.25 0.73
Abr 637.66 333.01 0.73
May 636.82 348.29 0.74
Jun 633.81 335.08 0.73
Jul 616.21 342.97 0.75
Ago 640.14 347.51 0.73
Sep 649.76 344.99 0.74
Oct 664.95 359.29 0.73
Nov 671.78 351.09 0.73
Dic 673.60 349.56 0.70 673.60 4101.57 2.99% 4.25%
2012 Ene 648.24 342.22 0.71
Feb 661.08 326.58 0.74
Mar 662.03 363.05 0.74
Abr 656.52 347.17 0.73
May 655.61 363.10 0.74
Jun 652.47 349.32 0.74
Jul 634.30 357.55 0.76
Ago 658.89 362.28 0.74
Sep 668.74 359.65 0.75
Oct 684.33 374.56 0.74
Nov 691.31 366.01 0.74
Dic 693.14 364.42 0.71 693.14 4275.91 2.90% 4.25%

72

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 10
Pronsticos de Energa (MWh) y
la Demanda (MW) del Sistema ENELBAR
(Continuacin)
DEMANDA DEMANDA ENERGA % CRECIMIENTO ANUAL
AO MES MAXIMA ENERGA FC (MW) ACUMULADA DEMANDA ENERGA
MW MAX ANUAL GWh MAX
2013 Ene 667.00 356.77 0.72
Feb 680.16 340.46 0.74
Mar 681.09 378.49 0.75
Abr 675.38 361.93 0.74
May 674.40 378.53 0.75
Jun 671.12 364.17 0.75
Jul 652.39 372.74 0.77
Ago 677.64 377.68 0.75
Sep 687.73 374.94 0.76
Oct 703.71 390.48 0.75
Nov 710.84 381.57 0.75
Dic 712.68 379.91 0.72 712.68 4457.66 2.82% 4.25%
2014 Ene 685.76 371.94 0.73
Feb 699.24 354.93 0.73
Mar 700.15 394.57 0.76
Abr 694.24 377.31 0.75
May 693.19 394.62 0.77
Jun 689.77 379.65 0.76
Jul 670.48 388.59 0.78
Ago 696.39 393.73 0.76
Sep 706.71 390.88 0.77
Oct 723.09 407.08 0.76
Nov 730.37 397.79 0.76
Dic 732.22 396.06 0.73 732.22 4647.14 2.74% 4.25%
2015 Ene 704.51 387.74 0.74
Feb 718.32 370.01 0.77
Mar 719.22 411.35 0.77
Abr 713.10 393.35 0.77
May 711.98 411.40 0.78
Jun 708.43 395.79 0.78
Jul 688.57 405.10 0.79
Ago 715.14 410.46 0.77
Sep 725.69 407.49 0.78
Oct 742.47 424.38 0.77
Nov 749.90 414.69 0.77
Dic 751.76 412.89 0.74 751.76 4844.67 2.67% 4.25%

73

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 11
Historia de Demanda Mxima No Coincidente (MW)
Sistema Barquisimeto
AOS
Sistema Subestacin 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999
2000 2001 2002 2003
Barquisimeto 31.24 33.77 32.18 41.33 39.12 40.67 38.02 40.61 39.19
39.77 39.44 38.77 25.24
ZonaIndustrial 37.14 37.28 31.09 32.18 36.04 39.69 46.68 44.25 46.95 50.47
54.80 59.81 58.95 62.98
Centro 8.32 12.29 14.16 20.27
Barreto 24.10 27.38 28.99 27.43 30.35 32.38 34.18 33.20 37.79 41.04 38.77 35.85 39.91 35.62
Ujano 4.05 2.99 14.86 24.48 28.00 32.88 35.79 42.19 45.46 45.78 43.41 44.53
Este 20.54 25.90 31.11 24.45 26.40 31.39 31.12 31.55 32.05 37.13 33.67 38.32 37.99 39.40
Norte-Duaca 22.89 24.64 26.19 25.12 32.01
Carabal 13.98 21.39 18.56 19.58 19.83 27.86 30.47 33.37 32.07 32.48 33.96 36.75 35.31 37.36
Barquisimeto

Manzano 4.00 1.45 3.16 1.50 2.37 6.34 6.46 7.05 7.65 8.77 8.54 10.31 11.54 12.97
Poleo 38.36 30.22 30.11 25.71 26.04 32.77 35.51 37.11 40.28 38.91 40.83 35.39 40.26 39.48
AguaViva 8.13 18.43 12.10 11.22 11.69 14.71 15.33 15.92 20.89 18.62 19.69 21.19 22.41 22.92
LaMiel 3.93 4.96 4.90 5.29 5.49
Planta2 49.00 48.58 48.19 43.92 44.33 38.29 38.07 37.84 43.28 38.98 36.86 37.74 38.62 39.26
Planta1 27.80 34.37 36.19 25.50 39.07 37.08 34.14 29.02 30.98 30.05 30.91 32.90 34.41 39.97
Total SistemaBarquisimeto 223.05 276.24 277.32 246.66 292.31 324.11 340.62 340.22 368.32 404.66 421.17 436.86 446.13 457.5
%CRECIMIENTO 23.85 0.39 -11.06 18.51 10.88 5.09 -0.12 8.26 9.87 4.08 3.73 2.12 2.55
SistemaBarq. - Energos 231.80 238.87 252.00 251.67 275.44 282.18 307.83 314.76 300.33 288.53 305.37
%CRECIMIENTO 3.05 5.50 -0.13 9.44 2.45 9.09 2.25 -4.58 -3.93 5.84

Planta2 13.91 14.93 16.47 16.54 16.19 15.85 16.72 17.38 20.17 19.84 16.79 21.50 23.40 22.47
Planta1 8.66 8.96 9.41 9.25 9.74 9.87 9.53 10.72 12.03 11.56 12.42 13.38 15.18 13.62
Carora

Total SistemaCarora 22.57 23.89 25.88 25.79 25.93 25.72 26.25 28.11 32.20 31.40 29.21 34.88 38.58 36.09
%CRECIMIENTO 5.85 8.33 -0.35 0.54 -0.81 2.06 7.08 14.55 -2.48 -6.99 19.42 10.61 -6.45
SistemaCarora- Energos 23.35 23.35 22.30 22.95 26.94 26.87 27.35 29.15 31.55 33.42 33.57
%CRECIMIENTO 0.00 -4.50 2.91 17.39 -0.26 1.79 6.58 8.23 5.93 0.45

Sub-Total (1) 245.62 300.13 303.20 272.45 318.24 349.83 366.87 368.33 400.51 436.06 450.37 471.74 484.71 493.58
%CRE(Sub-Total 1) 22.19 1.02 -10.14 16.81 9.93 4.87 0.40 8.74 8.87 3.28 4.74 2.75 1.83
Sub-Total (2) 255.15 262.22 274.30 274.62 302.38 309.05 335.18 343.91 331.88 321.95 338.94
%CRE(Sub-Total 2) 2.77 4.61 0.12 10.11 2.21 8.45 2.60 -3.50 -2.99 5.28
SubsistemaBarquisimeto-Carora(Energos) 221.00 240.75 253.75 258.00 267.00 267.20 300.20 303.64 328.94 334.88 357.54 347.96 343.08
%CRE(SubSist. Barq-Car.) 8.94 5.40 1.67 3.49 0.07 12.35 1.15 8.33 1.81 6.77 -2.68 -1.40

Sub-Total (1): SumatoriadelosMWdelasSS/EEdelosSubsistemasBarquisimetoyCarora


Sub-Total (2): SumatoriadelosMWdelosSubsistemasBarquisimetoyCarora(Energos)
Valoresestimadospor faltademedicin

74

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 12
Historia de Demanda Mxima No Coincidente (MW)
Sistema Regiones

A
OS
S
iste
m a S
ub e
sta
cin 1
990 1
991 1
992 1
993 1
994 1
995 1
996 1
997 1
9 98 1
9 99 2
0 00 2
0 01 2
0 02 2
0 03
L
aP astora 2.9
6 5.0
5 5.2
0 4.5
7 4.3
1 3.7
8
Hum oca
ro 2.3
7 3.0
6 2.8
6 2.3
9 2.0
8 2.2
5
Tota
lS ubsis
temaPa
st+H um 5.3
3 8.1
1 8.0
6 6.9
6 6.3
8 6.0
2
Tocuyo3 4
,5K V 6
.20 6.6
0 6.2
3 7.2
7 7.4
0 7.2
6 7.2
6

Toc
u y
o13
,8K
V 1
1.6
5 1
2.6
4 1
3.1
8 1
2.0
5 1
5.1
0 1
5.0
7 1
4.7
2

Q
uib
or-2
4k V 1
2 .8
1 1
2 .2
0 1
2 .8
3 1
3 .7
2 1
3 .2
5 1
4 .8
7 1
4 .6
3
Q
uib
or-S a
n a
re 2.73 2.90 3.34 3.80 6.34 6.37 6.81

Hidrola
ra1 15kV 7.29 7.29 7.29 7.29 7.25 7.29 7.28
TotalSub s
istemaQ uib
-Toc
u y
o -H
idro 4
0 .6
8 4
1 .6
2 4
2 .8
6 4
4 .1
2 4
9 .3
4 5
0 .8
5 5
0 .6
9
L
n eaQ uibor-Toc
u y
o1 1
5kV 4
2 .0
5 4
2 .7
6 4
3 .5
6 4
7 .0
7 4
6 .7
7 4
5 .2
5 5
3 .6
2
Regiones

S
ide
tur1
15k
V 3
5.0
3 4
1.1
5 4
9.3
8 5
0.4
8 5
7.8
1 5
8.4
1 5
6.6
0

P
uric
aure1
15k
V 2
.63 2
.66 2
.82 2
.93 2
.91 3
.15 3
.09

A
gua
d aG
rand
e13
,8k
V 4
.48 4
.83 5
.00 5
.80 5
.93 6
.42 6
.97
A
gua
d aG
rand
e34
,5k
V 4
.96 5
.43 5
.42 6
.15 6
.28 6
.67 7
.24

D
uac
a 5
.53 6
.40 6
.13 6
.72 6
.42 6
.96 7
.35

L
aMie
l-D
ema
sec
a 5
.04 5
.49 5
.31 4
.87 4
.69 4
.59 6
.00

S
ub-Tota
lS S/E ES is
tem aRegio
nes 9
8.3
5 1
07 .5
8 1
16 .9
3 1
21 .0
7 1
33 .3
8 13
7 .0
5 1
37 .9
4
%CRES ub-To ta
l 9.3 9 8.6 8 3.5 4 10.17 2
.7 5 0.6 5
S
ub-Tota
lS istem a
sR e
g io
nes 8
0.0
4 85.49 91.49 99.09 1
07 .3
1 10
3 .4
4 1
28 .1
8
%CRES ub-To ta
l 6.8 0 7.0 1 8.3 2 8.2 9 -3.60 23.92

S
ub-Tota
lSis
tema
sRe
g io
nes
: S
uman
oco
incid
ented
elo
sm
ximo
sded
ema
nda(M
W )d
ela
sin
terco
nexio
nese
n11
5kVylaco
m p
rap
orlo
spu
nto
sfro
nte
ras

75

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 13
Historia de Demanda Mxima No Coincidente (MVA)
Sistema Barquisimeto

AOS
Sistema Subestacin 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999
2000 2001 2002 2003 2004
Barquisim eto 34.71 37.52 35.76 45.90 44.42 46.80 44.26 47.33 45.43
45.76 45.05 42.75 29.12 26.12
ZonaIndustrial 41.27 41.42 34.54 35.75 40.03 43.67 56.28 48.00 51.08 53.37
57.45 63.23 62.08 67.16 67.08
Centro 10.98 14.67 18.07 21.49 27.66
Barreto 26.78 30.42 32.21 30.48 33.71 36.75 39.75 37.82 42.89 42.98 41.10 37.99 41.64 37.47 37.06
Ujano 4.50 3.32 16.50 25.72 29.70 35.42 37.89 44.03 46.49 48.53 46.31 47.66 46.96
Este 22.82 28.78 34.57 27.17 29.32 34.86 33.88 33.28 33.86 36.79 35.60 40.45 42.21 43.78 45.34
Norte-Duaca 22.89 24.64 26.19 25.12 32.01 24.88
Carabal 15.53 23.77 20.62 21.75 22.02 31.44 33.62 37.85 35.24 35.93 35.68 37.95 37.15 39.52 40.45
Barquisimeto

Manzano 4.45 1.61 3.51 1.66 2.63 6.88 6.97 7.62 8.29 9.51 9.25 11.46 12.82 14.41 15.68
Poleo 42.62 33.58 33.45 28.57 28.92 36.40 40.71 41.56 45.04 43.19 44.18 38.79 43.70 43.62 45.76
AguaViva 9.03 20.48 13.44 12.46 12.98 15.87 16.74 17.31 22.05 19.16 20.57 22.31 23.97 24.86 26.20
LaMiel 4.47 5.87 5.93 5.74 5.99 6.95
Planta2 54.45 53.98 53.55 48.71 49.24 43.06 41.20 41.34 46.24 42.55 40.44 41.93 42.91 43.62 44.32
Planta1 30.89 38.19 40.21 28.32 43.39 42.47 39.06 32.17 33.46 32.77 33.52 35.54 37.01 41.35 38.58
Total Sistem aBarquisimeto 247.83 306.93 308.12 273.96 324.66 361.54 384.71 376.63 403.39 433.07 451.52 470.01 481.47 492.1 493.03
%CRECIMIENTO 23.85 0.39 -11.09 18.50 11.36 6.41 -2.10 7.10 7.36 4.26 4.09 2.44 2.20 0.20
SistemaBarq. - Energos 267.66 281.93 301.21 297.32 314.37 327.99 344.13 349.88 340.82 330.31 345.22 345.99
%CRECIMIENTO 5.33 6.84 -1.29 5.73 4.33 4.92 1.67 -2.59 -3.08 4.51 0.22

Planta2 15.46 16.59 18.30 18.37 17.98 17.61 18.58 19.32 22.41 22.05 18.65 23.89 25.99 24.97 25.30
Planta1 9.62 9.96 10.46 10.28 10.81 10.96 10.59 11.92 13.37 12.84 13.80 14.86 16.87 15.13 15.63
Carora

Total SistemaCarora 25.08 26.55 28.76 28.65 28.80 28.57 29.17 31.23 35.78 34.89 32.45 38.75 42.86 40.10 40.93
%CRECIMIENTO 5.85 8.32 -0.37 0.52 -0.81 2.11 7.08 14.55 -2.48 -6.99 19.42 10.61 -6.45 2.07
SistemaCarora- Energos 24.69 24.37 23.37 23.84 28.67 28.75 29.63 30.93 34.25 37.01 36.86 37.84
%CRECIMIENTO -1.30 -4.10 2.01 20.26 0.28 3.06 4.39 10.73 8.04 -0.38 2.65

Sub-Total (1) 272.92 333.48 336.88 302.61 353.46 390.11 413.88 407.87 439.16 467.96 483.97 508.76 524.34 532.16 533.97
%CRE(Sub-Total 1) 22.19 1.02 -10.17 16.80 10.37 6.09 -1.45 7.67 6.56 3.42 5.12 3.06 1.49 0.34
Sub-Total (2) 292.35 306.30 324.58 321.16 343.04 356.74 373.76 380.81 375.07 367.32 382.08 383.83
%CRE(Sub-Total 2) 4.77 5.97 -1.05 6.81 3.99 4.77 1.89 -1.51 -2.07 4.02 0.46
Subsistem aBarquisimeto-Carora(Energos) 237.63 258.87 287.89 297.76 309.27 312.56 339.95 351.40 364.77 384.98 403.08 393.34 384.82 409.78
%CRE(SubSist. Barq-Car.) 8.94 11.21 3.43 3.87 1.06 8.76 3.37 3.80 5.54 4.70 -2.42 -2.17 6.49

Sub-Total (1): SumatoriadelosMVAdelasSS/EEdelosSubsistemasBarquisimetoyCarora


Sub-Total (2): SumatoriadelosMVAdelosSubsistemasBarquisimetoyCarora(Energos)
Valoresestimadospor faltademedicin
76

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 14
Historia de Demanda Mxima No Coincidente (MVA)
Sistema Regiones

A
OS
S
iste
m a S
ubesta
ci
n 1
990 1
991 1
992 1
993 1
994 1
995 1
996 1
997 1
9 98 1
9 99 2
0 00 2
0 01 2
0 02 2
0 03 2
0 04
LaPastora 3.2
9 5.5
6 5.6
9 5.0
5 4.7
1 4.1
9 4.0
6
Hum oca
ro 2.4
1 3.1
3 2.9
2 2.4
6 2.1
3 2.3
3 2.7
1
Tota
lSu bsis
temaPa
st+H um 5.7
0 8.6
9 8.6
1 7.5
1 6.8
3 6.5
2 6.7
7
Tocuyo3 4
,5K V 6
.86 7.5
5 7.1
4 8.0
9 8.2
6 8.1
8 8.1
5 8.0
1

To
cuy
o13
,8K
V 1
3.0
3 1
4.3
2 1
4.4
2 1
2.8
5 1
5.9
1 1
6 0 1
.1 5.3
8 2
0.0
0

Q
uib
or-2
4k V 1
5 .2
2 1
4 .5
1 1
5 .2
4 1
6 .2
4 1
3 .4
2 1
5 .2
7 1
5 .0
2 2
0 .2
7
Q
uib
or-S a
n a
re 2.73 2.90 3.34 3.80 7.00 7.09 7.44 7.54

Hidrola
ra1 1
5k V 8.59 8.59 8.57 8.76 8.75 8.79 8.72 7.14
TotalSub s
istemaQuib
-Toc
u y
o -H
idro 4
6 .4
3 4
7 .8
7 4
8 .7
1 4
9 .7
4 5
3 .3
4 5
5 .4
4 5
4 .7
1 6
2 .9
6
L
n eaQ uibor-To
cuy
o1 1
5kV 4
2 .0
5 4
2 .7
6 4
3 .5
6 4
7 .0
7 4
6 .7
7 4
5 .2
5 5
3 .6
2 5
5 .4
5

S
ide
tur 3
5.5
0 3
5.5
0 3
5.5
0 3
5.5
0 3
5.5
0 3
5.5
0 3
5.5
0 3
5.5
0
Regiones

P
uric
aure1
15k
V 2
.88 2
.88 2
.88 2
.88 2
.88 2
.88 2
.88 2
.88

A
gua
d aG
ran
de1
3,8k
V 4
.71 5
.25 5
.23 6
.47 6
.36 7
.12 7
.19 7
.10
A
gua
d aG
ran
de3
4,5k
V 6
.55 7
.09 7
.26 8
.68 6
.94 7
.21 7
.65 7
.63

D
uac
a 6
.41 7
.49 7
.19 7
.86 7
.50 7
.73 8
.17 8
.60

L
aMie
l-D
ema
sec
a 6
.19 6
.84 7
.01 6
.49 5
.60 5
.77 6
.00 8
.45

S
ub-To
talSS/E ES is
temaRegio
nes 1
08.6
6 1
12 .9
1 1
13 .7
8 1
17.6
2 1
18 .1
1 1
21 .6
5 1
22.1
0 133.12
%CRESub-To ta
l 3.9 1 0.7 6 3.38 0.4 2 3.0 0 0.37 9.03
S
ub-To
talSistem a
sR egio
nes 96.45 97.24 1
04.9
7 1
15 .9
4 1
34 .4
0 1
40.0
0 119.84
%CRESub-To ta
l 0.8 2 7.95 10.45 15.92 4.17 -1
4 .4
0

S
ub-To
talS
iste
m a
sRe
g io
nes
: S
uman
oco
incid
ented
elo
sm
xim
osd
ede
m a
nda(M
W )d
ela
sin
terco
nexio
nese
n11
5kVylaco
m p
rap
orlo
spu
nto
sfro
nte
ras

77

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 15
Pronstico de Demanda Mxima No Coincidente (MW)
Sistema Barquisimeto

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Barquisimeto 40.52 41.08 41.65 42.21 42.77 43.34 43.90 44.46 45.03 45.59 46.16
Zona Industrial 66.37 69.07 71.76 74.45 77.14 79.83 82.53 85.22 87.91 90.60 93.30
Centro 19.71 20.96 22.21 23.46 24.71 25.96 27.21 28.46 29.71 30.96 32.21
Barreto 32.00 32.70 33.40 34.10 34.79 35.49 36.19 36.89 37.59 38.29 38.99
Ujano 38.24 40.28 42.32 44.37 46.41 48.45 50.79 52.83 54.87 56.91 58.95
Este 39.68 41.00 42.32 43.65 44.97 46.29 47.62 48.94 50.26 51.58 52.91
Carabal 38.04 38.89 39.74 40.60 41.45 42.30 43.16 44.01 44.87 45.72 46.57
Barquisimeto

Norte-Duaca 24.97 26.52 28.07 29.63 31.18 32.74 32.62 34.29 35.84 37.40 38.95
Manzano 15.16 16.26 17.39 18.51 19.64 20.77 21.89 23.02 24.15 25.28 26.41
Poleo 42.89 44.45 46.01 47.58 49.14 50.70 52.27 53.83 55.39 56.95 58.52
Agua Viva 25.82 26.87 27.92 28.96 30.01 31.05 32.10 33.14 34.19 35.24 36.28
La Miel - Sarare 3.20 3.31 3.42 3.54 3.65 3.76 3.87 3.99 4.10 4.21 4.32
Planta2 43.01 43.83 44.66 45.49 46.32 47.15 47.98 48.81 49.64 50.46 51.29
Planta1 26.98 27.11 27.25 27.38 27.51 27.65 27.78 27.91 28.05 28.18 28.31
Total Sistema Barquisimeto 456.58 472.35 488.13 503.92 519.70 535.49 549.90 565.81 581.59 597.38 613.17
%CRECIMIENTO -0.11 3.45 3.34 3.23 3.13 3.04 2.69 2.89 2.79 2.71 2.64
Sistema Barq. - Energos 312.98 319.70 325.71 331.55 337.35 343.14 348.93 354.73 360.52 366.31 372.10
%CRECIMIENTO 3.23 2.15 1.88 1.79 1.75 1.72 1.69 1.66 1.63 1.61 1.58

Planta2 22.32 23.12 23.81 24.48 25.16 25.83 26.51 27.19 27.86 28.54 29.21
Planta1 14.19 14.64 15.09 15.54 15.98 16.43 16.88 17.33 17.78 18.23 18.68
Carora

Total Sistema Carora 36.51 37.75 38.89 40.02 41.14 42.27 43.39 44.52 45.64 46.77 47.89
%CRECIMIENTO -0.89 3.41 3.01 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41
Sistema Carora - Energos 37.80 38.96 40.12 41.28 42.44 43.60 44.76 45.92 47.08 48.24 49.40
%CRECIMIENTO 10.85 3.07 2.98 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41

Sub-Total (1) 493.09 510.10 527.02 543.93 560.84 577.76 593.29 610.32 627.24 644.15 661.06
%CRE (Sub-Total 1) -0.17 3.45 3.32 3.21 3.11 3.02 2.69 2.87 2.77 2.70 2.63
Sub-Total (2) 350.78 358.66 365.83 372.83 379.79 386.74 393.70 400.65 407.60 414.55 421.50
%CRE (Sub-Total 2) 4.00 2.25 2.00 1.91 1.87 1.83 1.80 1.77 1.73 1.71 1.68
Subsistema Barquisimeto-Carora (Energos) 376.21 387.81 399.42 411.05 422.68 434.31 445.94 457.57 469.20 480.83 492.46
%CRE (SubSist. Barq-Car.) 4.74 3.08 2.99 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42

Sub-Total (1): Sumatoria de los MVA de las SS/EE de los Subsistemas Barquisimeto y Carora
Sub-Total (2): Sumatoria de los MVA de los Subsistemas Barquisimeto y Carora (Energos)

78

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 16
Pronstico de Demanda Mxima No Coincidente (MW)
Sistema Regiones

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
LaP astora 5.464 7.503 7.703 7.902 8.101 8.300 8.500 8.70 8.90 9.10 9.30
Hum ocaro 2.462 2.619 2.775 2.931 3.087 3.243 3.399 3.56 3.71 3.87 4.02
Total SubsistemaPast+Hum 7.927 10.122 10.477 10.833 11.188 11.544 11.899 12.25 12.61 12.97 13.32
Tocuyo34,5K V 7.821 9.958 10.295 10.631 10.968 11.305 11.641 11.98 12.31 12.65 12.99

Tocuyo13,8KV 18.200 17.408 17.869 18.356 18.913 19.570 20.269 20.93 21.59 22.25 22.90

Quibor-24kV 13.343 13.843 14.343 14.843 15.343 15.843 16.345 16.85 17.35 17.85 18.35
Quibor(Sanare+INOS) 7.574 7.912 8.250 8.588 8.927 9.265 9.603 9.94 10.28 10.62 10.96

Hidrolara115kV 7.650 7.650 7.650 7.650 7.650 7.650 7.650 7.65 7.65 7.65 7.65
Total SistemaQ uib-Tocuyo-Hidro 54.588 56.771 58.407 60.069 61.801 63.633 65.508 67.35 69.19 71.02 72.85
LneaQ uibor-Tocuyo115kV 54.695 55.934 57.172 58.411 59.650 60.888 62.127 63.37 64.60 65.84 67.08
Regiones

Sidetur 63.908 63.908 63.908 63.908 63.908 63.908 63.908 63.91 63.91 63.91 63.91

Puricaure115kV 2.919 2.989 3.059 3.129 3.199 3.269 3.339 3.41 3.48 3.55 3.62

AguadaGrande13,8kV 6.840 7.112 7.383 7.655 7.927 8.198 8.470 8.74 9.01 9.29 9.56
AguadaGrande34,5kV 6.567 6.820 7.074 7.327 7.580 7.833 8.087 8.34 8.59 8.85 9.10

LaMiel (DEMASECA-DESTILERIASUNIDAS) 6.300 6.300 6.300 6.300 6.300 6.300 6.300 6.300 6.300 6.300 6.300

Sub-Total SS /EESistem aR egiones 141.227 144.064 146.314 148.589 150.935 153.381 155.870 158.323 160.776 163.222 165.664
%CR ES ub-Total -0.985 2.008 1.562 1.555 1.578 1.621 1.623 1.57 1.55 1.52 1.50
Sub-Total SistemasR egiones 108.96 109.77 111.02 112.74 114.47 116.20 117.93 119.656 121.38 123.11 124.84
%CR ES ub-Total -6.70 0.74 1.14 1.56 1.53 1.51 1.49 1.47 1.44 1.42 1.40

Sub-Total SistemasRegiones: Sum anocoincidentedelosmximosdedemanda(MW)delasinterconexionesen115kVylacompra


porlospuntosfronteras

79

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 17
Pronstico de Demanda Mxima No Coincidente (MVA)
Sistema Barquisimeto - Carora

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Barquisimeto 46.57 47.22 47.87 48.52 49.16 49.81 50.46 51.11 51.76 52.40 53.05
Zona Industrial 71.37 74.26 77.16 80.05 82.95 85.84 88.74 91.63 94.53 97.42 100.32
Centro 22.66 24.10 25.53 26.97 28.41 29.84 31.28 32.72 34.15 35.59 37.03
Barreto 34.04 34.79 35.53 36.27 37.02 37.76 38.50 39.24 39.99 40.73 41.47
Ujano 40.68 42.85 45.03 47.20 49.37 51.54 54.03 56.20 58.37 60.54 62.72
Este 42.21 43.62 45.03 46.43 47.84 49.25 50.65 52.06 53.47 54.88 56.28
Carabal 40.90 41.82 42.74 43.65 44.57 45.49 46.41 47.32 48.24 49.16 50.08
Barquisimeto

Norte-Duaca 27.74 29.47 31.19 32.92 34.65 36.37 36.24 38.10 39.83 41.55 43.28
Manzano 16.66 17.87 19.11 20.34 21.58 22.82 24.06 25.30 26.54 27.78 29.02
Poleo 46.62 48.31 50.01 51.71 53.41 55.11 56.81 58.51 60.21 61.91 63.61
Agua Viva 26.90 27.99 29.08 30.17 31.26 32.35 33.44 34.53 35.62 36.70 37.79
La Miel - Sarare 4.00 4.14 4.28 4.42 4.56 4.70 4.84 4.98 5.12 5.26 5.40
Planta2 47.26 48.17 49.08 49.99 50.90 51.81 52.72 53.63 54.54 55.46 56.37
Planta1 26.98 27.11 27.25 27.38 27.51 27.65 27.78 27.91 28.05 28.18 28.31
Total Sistema Barquisimeto 494.59 511.72 528.88 546.03 563.19 580.35 595.96 613.25 630.41 647.57 664.73
%CRECIMIENTO 0.32 3.46 3.35 3.24 3.14 3.05 2.69 2.90 2.80 2.72 2.65
Sistema Barq. - Energos 347.76 355.22 361.90 368.39 374.83 381.27 387.71 394.14 400.57 407.01 413.44
%CRECIMIENTO 0.51 2.15 1.88 1.79 1.75 1.72 1.69 1.66 1.63 1.61 1.58

Planta2 24.80 25.69 26.45 27.20 27.95 28.70 29.46 30.21 30.96 31.71 32.46
Planta1 15.76 16.26 16.76 17.26 17.76 18.26 18.76 19.26 19.76 20.25 20.75
Carora

Total Sistema Carora 40.57 41.95 43.21 44.46 45.71 46.96 48.21 49.46 50.71 51.96 53.21
%CRECIMIENTO -0.89 3.41 3.01 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41
Sistema Carora - Energos 41.08 42.35 43.61 44.87 46.13 47.39 48.65 49.92 51.18 52.44 53.70
%CRECIMIENTO 8.58 3.07 2.98 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41

Sub-Total (1) 535.16 553.67 572.09 590.50 608.90 627.31 644.17 662.72 681.13 699.53 717.94
%CRE (Sub-Total 1) 0.22 3.46 3.33 3.22 3.12 3.02 2.69 2.88 2.78 2.70 2.63
Sub-Total (2) 388.84 397.57 405.51 413.26 420.96 428.66 436.36 444.05 451.75 459.45 467.14
%CRE (Sub-Total 2) 1.31 2.24 2.00 1.91 1.87 1.83 1.80 1.76 1.73 1.70 1.67
Subsistema Barquisimeto-Carora (Energos) 418.01 430.90 443.80 456.72 469.64 482.56 495.49 508.41 521.33 534.26 547.18
%CRE (SubSist. Barq-Car.) 2.01 3.08 2.99 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42

Sub-Total (1): Sumatoria de los MVA de las SS/EE de los Subsistemas Barquisimeto y Carora
Sub-Total (2): Sumatoria de los MVA de los Subsistemas Barquisimeto y Carora (Energos)
80

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 18
Pronstico de Demanda Mxima No Coincidente (MVA)
Sistema Regiones

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
LaP asto ra 5.939 8.156 8.372 8.589 8.806 9.022 9.239 9.46 9.67 9.89 10.10
Hum o caro 2.539 2.700 2.861 3.022 3.183 3.344 3.505 3.67 3.83 3.99 4.15
Total Sub sistemaPast+Hum 8.478 10.856 11.233 11.611 11.988 12.366 12.743 13.12 13.50 13.88 14.25
Tocu yo34,5K V 8.690 11.064 11.438 11.812 12.187 12.561 12.935 13.31 13.68 14.06 14.43
Tocuyo13,8KV 19.570 18.718 19.214 19.738 20.336 21.043 21.795 22.51 23.22 23.93 24.63
Quibor-24kV 15.885 16.480 17.075 17.670 18.265 18.861 19.458 20.05 20.65 21.25 21.84
Quibor(Sanare+INOS) 7.889 8.242 8.594 8.946 9.299 9.651 10.004 10.36 10.71 11.06 11.41

Hidrolara115kV 9.000 9.000 9.000 9.000 9.000 9.000 9.000 9.00 9.00 9.00 9.00
Total SistemaQ u ib-Tocuyo-Hidro 61.034 63.504 65.322 67.167 69.087 71.116 73.191 75.23 77.26 79.29 81.31
LneaQ uibor-Tocuyo115kV 60.772 62.148 63.525 64.901 66.277 67.654 69.030 70.41 71.78 73.16 74.54
Regiones

Sidetur 67.000 67.000 67.000 67.000 67.000 67.000 67.000 67.00 67.00 67.00 67.00
Puricaure115kV 3.173 3.249 3.325 3.401 3.477 3.554 3.630 3.71 3.78 3.86 3.94
A
guadaGrande13,8kV 7.355 7.647 7.939 8.231 8.523 8.815 9.108 9.40 9.69 9.98 10.28
A
guadaGrande34,5kV 8.209 8.525 8.842 9.158 9.475 9.792 10.108 10.42 10.74 11.06 11.37

LaMiel (DEMA
SECADESTILERIA
SUNIDAS) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00

Sub-Total SS /EES istem aR egiones 153.558 156.716 159.223 161.756 164.364 167.081 169.845 172.57 175.29 178.01 180.72
%CR ES ub -To tal 15.351 2.056 1.599 1.591 1.613 1.653 1.654 1.604 1.578 1.550 1.524
Sub-Total Sistem asR egiones 117.165 118.030 119.372 121.230 123.088 124.946 126.804 128.66 130.52 132.38 134.24
%CR ES ub -To tal -2.23 0.74 1.14 1.56 1.53 1.51 1.49 1.465 1.44 1.42 1.40

Sub-Total SistemasRegiones: Sum anocoincidentedelosmximosdedemanda(MW)delasinterconexionesen115kVylacompra


porlospuntosfronteras

81

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 19
Pronstico de Demanda Mxima No Coincidente (MW)
Con Nuevos Desarrollos
Sistema Barquisimeto - Carora

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Barquisimeto 40.52 41.08 41.65 42.21 42.77 43.34 43.90 44.46 45.03 45.59 46.16
Zona Industrial 66.37 69.07 71.76 44.67 46.29 47.90 49.52 51.13 52.75 54.36 55.98
Oeste 30.42 31.52 32.62 33.72 34.82 35.92 37.02 38.12
Centro 19.71 20.96 22.21 23.46 24.71 25.96 27.21 28.46 29.71 30.96 32.21
Barreto 32.00 32.70 33.40 34.10 34.79 35.49 36.19 36.89 37.59 38.29 38.99
Ujano 38.24 40.28 42.32 44.37 46.41 48.45 50.79 52.83 54.87 56.91 58.95
Este 42.21 43.62 45.03 46.43 47.84 49.25 50.65 36.44 37.43 38.41 39.40
Morn 14.68 15.08 15.47 15.87
Barquisimeto

Norte-Duaca 24.97 26.52 28.07 29.63 31.18 32.74 32.62 34.29 35.84 37.40 38.95
Palavecino 16.53 17.26 17.99 18.72 19.45 20.18 20.91 21.63 22.36 23.09
Carabal 38.04 27.22 27.82 28.42 29.02 29.61 30.21 30.81 31.41 32.00 32.60
Manzano 15.16 16.26 17.39 18.51 19.64 20.77 21.89 23.02 24.15 25.28 26.41
Poleo 42.89 44.45 46.01 47.58 49.14 50.70 52.27 53.83 55.39 56.95 58.52
Agua Viva 25.82 24.95 26.00 27.04 28.09 29.13 30.18 31.22 32.27 33.32 34.36
Planta2 43.01 43.83 44.66 45.49 46.32 47.15 47.98 48.81 49.64 50.46 51.29
Planta1 24.55 24.67 24.79 24.92 25.04 25.16 25.28 25.40 25.52 25.64 25.77
Total Sistema Barquisimeto 453.49 472.16 488.38 505.23 521.48 537.72 552.58 568.01 584.23 600.45 616.67
%CRECIMIENTO -0.79 4.12 3.43 3.45 3.21 3.11 2.76 2.79 2.86 2.78 2.70
Sistema Barq. - Energos 312.98 319.70 325.71 331.55 337.35 343.14 348.93 354.73 360.52 366.31 372.10
%CRECIMIENTO 3.23 2.15 1.88 1.79 1.75 1.72 1.69 1.66 1.63 1.61 1.58

Planta2 22.32 23.12 23.81 19.59 20.13 20.67 21.21 21.75 22.29 22.83 23.37
Planta1 14.19 14.64 15.09 12.43 12.79 13.15 13.51 13.86 14.22 14.58 14.94
Carora

El Roble 7.99 8.21 8.43 8.66 8.88 9.10 9.33 9.55


Total Sistema Carora 36.51 37.75 38.89 40.00 41.12 42.25 43.37 44.49 45.62 46.74 47.86
%CRECIMIENTO 3.41 3.01 2.85 2.81 2.73 2.66 2.59 2.52 2.46 2.40
Sistema Carora - Energos 37.80 38.96 40.12 41.28 42.44 43.60 44.76 45.92 47.08 48.24 49.40
%CRECIMIENTO 3.07 2.98 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41

Sub-Total (1) 490.00 509.91 527.27 545.23 562.60 579.97 595.95 612.50 629.85 647.19 664.53
%CRE (Sub-Total 1) 4.06 3.40 3.41 3.19 3.09 2.76 2.78 2.83 2.75 2.68
Sub-Total (2) 350.78 358.66 365.83 372.83 379.79 386.74 393.70 400.65 407.60 414.55 421.50
%CRE (Sub-Total 2) 2.25 2.00 1.91 1.87 1.83 1.80 1.77 1.73 1.71 1.68
Subsistema Barquisimeto-Carora (Energos) 368.55 379.14 389.72 400.31 410.90 421.48 432.07 442.66 453.24 463.83 474.41
%CRE (SubSist. Barq-Car.) 2.87 2.79 2.72 2.64 2.58 2.51 2.45 2.39 2.34 2.28

Sub-Total (1): Sumatoria de los MVA de las SS/EE de los Subsistemas Barquisimeto y Carora
Sub-Total (2): Sumatoria de los MVA de los Subsistemas Barquisimeto y Carora (Energos)

82

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 20
Pronstico de Demanda Mxima No Coincidente (MW)
Con Nuevos Desarrollos
Sistema Regiones

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Hum ocaro 2.46 2.62 2.77 2.93 3.09 3.24 3.40 3.56 3.71 3.87 4.02
Guarco 3.67 3.78 3.91 4.05 4.19 4.32 4.45 4.58
Total Tocuyo34,5KV 2.46 2.62 2.77 6.60 6.87 7.16 7.45 7.74 8.03 8.32 8.60
Tocuyo13,8KV 18.20 17.41 17.87 14.68 15.13 15.66 16.22 16.75 17.28 17.80 18.32
Total Tocuyo 20.66 20.03 20.64 21.29 22.00 22.81 23.67 24.49 25.31 26.12 26.93

Quibor-24kV 13.34 13.84 14.34 14.84 15.34 15.84 16.34 16.85 17.35 17.85 18.35
Quibor (Sanare+INOS) 7.57 7.91 8.25 8.59 8.93 9.27 9.60 9.94 10.28 10.62 10.96
Total Quibor 20.92 21.76 22.59 23.43 24.27 25.11 25.95 26.79 27.63 28.47 29.31

Hidrolara115kV 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65
Total SistemaQuib-Tocuyo-Hidro 49.23 49.43 50.89 52.37 53.92 55.57 57.27 58.93 60.58 62.24 63.88

LaPastora 5.46 7.50 7.70 7.90 8.10 8.30 8.50 8.70 8.90 9.10 9.30

Sidetur 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91
Regiones

Puricaure115kV 2.92 2.99 3.06 3.13 3.20 3.27 3.34 3.41 3.48 3.55 3.62

AguadaG rande(Churuguara) 6.57 6.82 7.07 7.33 7.58 7.83 8.09 8.34 8.59 8.85 9.10
Siquisique 2.88 2.99 3.09 3.20 3.31 3.42 3.53 3.64
SantaInes 2.88 2.99 3.09 3.20 3.31 3.42 3.53 3.64
Total AguadaG rande34.5kV 6.57 6.82 7.07 13.08 13.55 14.02 14.50 14.97 15.44 15.91 16.39
AguadaG rande13,8kV 18.20 17.41 17.87 14.68 15.13 15.66 16.22 16.75 17.28 17.80 18.32
Total AguadaG rande 24.77 24.23 24.94 27.76 28.68 29.68 30.71 31.71 32.72 33.72 34.71
LaMiel (LaMiel - Sarare) 3.20 3.31 3.42 3.54 3.65 3.76 3.87 3.99 4.10 4.21 4.32
LaM iel (Dem aseca- DestileriasUnidas) 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30
Total LaM iel 9.50 9.61 9.72 9.84 9.95 10.06 10.17 10.29 10.40 10.51 10.62

Sub-Total SS/EESistemaRegiones 155.79 157.67 160.22 164.91 167.76 170.79 173.90 176.94 179.98 183.02 186.04
%CRESub-Total 1.21 1.62 2.92 1.73 1.81 1.82 1.75 1.72 1.68 1.65
Sub-Total SistemasRegiones 108.96 109.77 111.02 112.74 114.47 116.20 117.93 119.66 121.38 123.11 124.84
%CRESub-Total 0.74 1.14 1.56 1.53 1.51 1.49 1.47 1.44 1.42 1.40

Sub-Total SistemasRegiones: Sum anocoincidentedelosmximosdedemanda(MW) delasinterconexionesen115kVylacompra


por lospuntosfronteras

83

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 21
Pronstico de Demanda Mxima No Coincidente (MVA)
Con Nuevos Desarrollos
Sistema Barquisimeto - Carora

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Barquisimeto 46.57 47.22 47.87 48.52 49.16 49.81 50.46 51.11 51.76 52.40 53.05
Zona Industrial 71.37 74.26 77.16 48.03 49.77 51.51 53.24 54.98 56.72 58.45 60.19
Oeste 32.02 33.18 34.34 35.50 36.65 37.81 38.97 40.13
Centro 22.66 24.10 25.53 26.97 28.41 29.84 31.28 32.72 34.15 35.59 37.03
Barreto 34.04 34.79 35.53 36.27 37.02 37.76 38.50 39.24 39.99 40.73 41.47
Ujano 40.68 42.85 45.03 47.20 49.37 51.54 54.03 56.20 58.37 60.54 62.72
Norte-Duaca 27.74 29.47 31.19 32.92 34.65 36.37 36.24 38.10 39.83 41.55 43.28
Este 42.21 43.62 45.03 46.43 47.84 49.25 50.65 36.44 37.43 38.41 39.40
Barquisimeto

Moran 15.62 16.04 16.46 16.88


Palavecino 17.55 18.32 19.10 19.87 20.65 21.42 22.20 22.97 23.75 24.52
Carabal 40.90 29.27 29.91 30.56 31.20 31.84 32.48 33.13 33.77 34.41 35.05
Manzano 16.66 17.87 19.11 20.34 21.58 22.82 24.06 25.30 26.54 27.78 29.02
Poleo 46.62 48.31 50.01 51.71 53.41 55.11 56.81 58.51 60.21 61.91 63.61
Agua Viva 26.90 25.99 27.08 28.17 29.26 30.35 31.44 32.53 33.62 34.70 35.79
Planta2 47.26 48.17 49.08 49.99 50.90 51.81 52.72 53.63 54.54 55.46 56.37
Planta1 26.98 27.11 27.25 27.38 27.51 27.65 27.78 27.91 28.05 28.18 28.31
Total Sistema Barquisimeto 490.59 510.58 528.10 545.61 563.13 580.65 596.62 614.27 631.79 649.31 666.83
%CRECIMIENTO 4.08 3.43 3.32 3.21 3.11 2.75 2.96 2.85 2.77 2.70
Sistema Barq. - Energos 347.76 355.22 361.90 368.39 374.83 381.27 387.71 394.14 400.57 407.01 413.44
%CRECIMIENTO 2.15 1.88 1.79 1.75 1.72 1.69 1.66 1.63 1.61 1.58

Planta2 24.80 25.69 26.45 21.76 22.36 22.96 23.56 24.17 24.77 25.37 25.97
Planta1 15.76 16.26 16.76 13.81 14.21 14.61 15.01 15.41 15.80 16.20 16.60
Carora

El Roble 7.99 8.21 8.43 8.66 8.88 9.10 9.33 9.55


Total Sistema Carora 40.57 41.95 43.21 43.56 44.78 46.01 47.23 48.45 49.67 50.90 52.12
%CRECIMIENTO 3.41 3.01 0.80 2.81 2.73 2.66 2.59 2.52 2.46 2.40
Sistema Carora - Energos 41.08 42.35 43.61 44.87 46.13 47.39 48.65 49.92 51.18 52.44 53.70
%CRECIMIENTO 3.07 2.98 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41

Sub-Total (1) 531.16 552.53 571.31 589.17 607.91 626.65 643.85 662.72 681.47 700.21 718.95
%CRE (Sub-Total 1) 4.02 3.40 3.13 3.18 3.08 2.74 2.93 2.83 2.75 2.68
Sub-Total (2) 388.84 397.57 405.51 413.26 420.96 428.66 436.36 444.05 451.75 459.45 467.14
%CRE (Sub-Total 2) 2.24 2.00 1.91 1.87 1.83 1.80 1.76 1.73 1.70 1.67
Subsistema Barquisimeto-Carora (Energos) 409.50 421.26 433.03 444.79 456.55 468.31 480.08 491.84 503.60 515.36 527.13
%CRE (SubSist. Barq-Car.) 2.87 2.79 2.72 2.64 2.58 2.51 2.45 2.39 2.34 2.28

Sub-Total (1): Sumatoria de los MVA de las SS/EE de los Subsistemas Barquisimeto y Carora
Sub-Total (2): Sumatoria de los MVA de los Subsistemas Barquisimeto y Carora (Energos)
84

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 22
Pronstico de Demanda Mxima No Coincidente (MVA)
Con Nuevos Desarrollos
Sistema Regiones

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Humocaro 2.54 2.70 2.86 3.02 3.18 3.34 3.50 3.67 3.83 3.99 4.15
Guarco 3.95 4.07 4.21 4.36 4.50 4.64 4.79 4.93
Total Tocuyo34.5kV 2.54 2.70 2.86 6.97 7.25 7.55 7.86 8.17 8.47 8.77 9.07
Tocuyo13,8KV 19.57 18.72 19.21 15.79 16.27 16.83 17.44 18.01 18.58 19.14 19.70
Total Tocuyo 22.11 21.42 22.08 22.76 23.52 24.39 25.30 26.17 27.05 27.91 28.77

Quibor-24kV 15.88 16.48 17.08 17.67 18.27 18.86 19.46 20.05 20.65 21.25 21.84
Quibor (Sanare+INOS) 7.89 8.24 8.59 8.95 9.30 9.65 10.00 10.36 10.71 11.06 11.41
Total Quibor 23.77 24.72 25.67 26.62 27.56 28.51 29.46 30.41 31.36 32.31 33.26
Hidrolara115kV 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00
Total SistemaQuib-Tocuyo-Hidro 54.88 55.14 56.74 58.38 60.08 61.90 63.76 65.58 67.41 69.22 71.03

LaPastora 5.94 8.16 8.37 8.59 8.81 9.02 9.24 9.46 9.67 9.89 10.10
Sidetur 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00
Regiones

Puricaure115kV 3.17 3.25 3.33 3.40 3.48 3.55 3.63 3.71 3.78 3.86 3.94

AguadaGrande(Churuguara) 8.21 8.53 8.84 9.16 9.48 9.79 10.11 10.42 10.74 11.06 11.37
Siquisique 3.06 3.18 3.29 3.41 3.53 3.64 3.76 3.88
SantaInes 3.06 3.18 3.29 3.41 3.53 3.64 3.76 3.88
Total AguadaGrande34.5kV 8.21 8.53 8.84 15.28 15.83 16.38 16.93 17.48 18.03 18.58 19.13
AguadaGrande13.8kV 19.57 18.72 19.21 15.79 16.27 16.83 17.44 18.01 18.58 19.14 19.70
Total AguadaGrande 27.78 27.24 28.06 31.07 32.10 33.21 34.36 35.48 36.60 37.72 38.83

LaMiel (LaMiel - Sarare) 4.00 4.14 4.28 4.42 4.56 4.70 4.84 4.98 5.12 5.26 5.40
LaM iel (DEM ASECA- DESTILERIASUNIDAS) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Total LaM iel 11.00 11.14 11.28 11.42 11.56 11.70 11.84 11.98 12.12 12.26 12.40

Sub-Total SS/EESistemaRegiones 169.77 171.93 174.78 179.85 183.02 186.39 189.83 193.21 196.59 199.95 203.30
%CRESub-Total 1.27 1.66 2.90 1.76 1.84 1.85 1.78 1.75 1.71 1.68
Sub-Total SistemasRegiones 117.17 118.03 119.37 121.23 123.09 124.95 126.80 128.66 130.52 132.38 134.24
%CRESub-Total 0.74 1.14 1.56 1.53 1.51 1.49 1.47 1.44 1.42 1.40

Sub-Total SistemasRegiones: Sumanocoincidentedelosmximosdedemanda(MW) delasinterconexionesen115kVylacompra


por lospuntosfronteras

85

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 23
Pronstico de Demanda Mxima Coincidente (MW)
Con Nuevos Desarrollos (FC=0.9)
Sistema Barquisimeto - Carora

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Barquisimeto 40.52 41.08 41.65 42.21 42.77 43.34 43.90 44.46 45.03 45.59 46.16
Zona Industrial 59.74 62.16 64.58 40.20 41.66 43.11 44.56 46.02 47.47 48.93 50.38
Oeste 27.38 28.37 29.36 30.35 31.34 32.33 33.32 34.31
Centro 19.71 20.96 22.21 23.46 24.71 25.96 27.21 28.46 29.71 30.96 32.21
Barreto 32.00 32.70 33.40 34.10 34.79 35.49 36.19 36.89 37.59 38.29 38.99
Ujano 38.24 40.28 42.32 44.37 46.41 48.45 50.79 52.83 54.87 56.91 58.95
Este 35.71 36.90 38.09 39.28 40.47 41.66 42.85 30.83 31.66 32.50 33.33
Morn 14.68 15.08 15.47 15.87
Barquisimeto

Norte-Duaca 24.97 26.52 28.07 29.63 31.18 32.74 32.62 34.29 35.84 37.40 38.95
Palavecino 14.88 15.54 16.19 16.85 17.50 18.16 18.81 19.47 20.13 20.78
Carabal 34.23 24.50 25.04 25.58 26.11 26.65 27.19 27.73 28.26 28.80 29.34
Manzano 15.16 16.26 17.39 18.51 19.64 20.77 21.89 23.02 24.15 25.28 26.41
Poleo 38.60 40.00 41.41 42.82 44.22 45.63 47.04 48.45 49.85 51.26 52.67
Agua Viva 23.24 22.46 23.40 24.34 25.28 26.22 27.16 28.10 29.04 29.98 30.93
Planta2 38.71 39.45 40.20 40.94 41.69 42.43 43.18 43.93 44.67 45.42 46.16
Planta1 22.10 22.20 22.31 22.42 22.53 22.64 22.75 22.86 22.97 23.08 23.19
Total Sistema Barquisimeto 422.92 440.37 455.61 471.43 486.70 501.96 515.85 532.71 548.01 563.32 578.63
%CRECIMIENTO -7.48 4.13 3.46 3.47 3.24 3.14 2.77 3.27 2.87 2.79 2.72

Sistema Barq. - Energos 312.98 319.70 325.71 331.55 337.35 343.14 348.93 354.73 360.52 366.31 372.10

%CRECIMIENTO 3.23 2.15 1.88 1.79 1.75 1.72 1.69 1.66 1.63 1.61 1.58

Planta2 20.09 20.80 21.42 17.63 18.11 18.60 19.09 19.57 20.06 20.55 21.03
Planta1 12.77 13.17 13.58 11.19 11.51 11.83 12.16 12.48 12.80 13.12 13.45
El Roble 7.19 7.39 7.59 7.79 7.99 8.19 8.39 8.60
Carora

Total Sistema Carora 32.86 33.98 35.00 36.00 37.01 38.02 39.03 40.04 41.06 42.07 43.08
%CRECIMIENTO 3.41 3.01 2.85 2.81 2.73 2.66 2.59 2.52 2.46 2.40

Sistema Carora - Energos 37.80 38.96 40.12 41.28 42.44 43.60 44.76 45.92 47.08 48.24 49.40

%CRECIMIENTO 3.07 2.98 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41

Sub-Total (1) 455.78 474.35 490.61 507.43 523.71 539.98 554.88 572.75 589.07 605.39 621.70
%CRE (Sub-Total 1) 4.07 3.43 3.43 3.21 3.11 2.76 3.22 2.85 2.77 2.70
Sub-Total (2) 350.78 358.66 365.83 372.83 379.79 386.74 393.70 400.65 407.60 414.55 421.50
%CRE (Sub-Total 2) 2.25 2.00 1.91 1.87 1.83 1.80 1.77 1.73 1.71 1.68
Subsistema Barquisimeto-Carora (Energos) 368.55 379.14 389.72 400.31 410.90 421.48 432.07 442.66 453.24 463.83 474.41
%CRE (SubSist. Barq-Car.) 2.87 2.79 2.72 2.64 2.58 2.51 2.45 2.39 2.34 2.28

Sub-Total (1): Sumatoria de los MVA de las SS/EE de los Subsistemas Barquisimeto y Carora
Sub-Total (2): Sumatoria de los MVA de los Subsistemas Barquisimeto y Carora (Energos)

86

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 24
Pronstico de Demanda Mxima Coincidente (MW)
Con Nuevos Desarrollos (FC=0.9)
Sistema Regiones

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Hum ocaro 2.46 2.62 2.77 2.93 3.09 3.24 3.40 3.56 3.71 3.87 4.02
Guarco 3.67 3.78 3.91 4.05 4.19 4.32 4.45 4.58
Total Tocuyo34,5KV 2.46 2.62 2.77 6.60 6.87 7.16 7.45 7.74 8.03 8.32 8.60
Tocuyo13,8KV 18.20 17.41 17.87 14.68 15.13 15.66 16.22 16.75 17.28 17.80 18.32
Total Tocuyo 20.66 20.03 20.64 21.29 22.00 22.81 23.67 24.49 25.31 26.12 26.93

Quibor-24kV 13.34 13.84 14.34 14.84 15.34 15.84 16.34 16.85 17.35 17.85 18.35
Quibor (Sanare+INOS) 7.57 7.91 8.25 8.59 8.93 9.27 9.60 9.94 10.28 10.62 10.96
Total Quibor 20.92 21.76 22.59 23.43 24.27 25.11 25.95 26.79 27.63 28.47 29.31

Hidrolara115kV 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65 7.65
Total SistemaQuib-Tocuyo-Hidro 49.23 49.43 50.89 52.37 53.92 55.57 57.27 58.93 60.58 62.24 63.88

LaPastora 5.46 7.50 7.70 7.90 8.10 8.30 8.50 8.70 8.90 9.10 9.30

Sidetur 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91 63.91
Regiones

Puricaure115kV 2.92 2.99 3.06 3.13 3.20 3.27 3.34 3.41 3.48 3.55 3.62

AguadaGrande(Churuguara) 6.57 6.82 7.07 7.33 7.58 7.83 8.09 8.34 8.59 8.85 9.10
Siquisique 2.88 2.99 3.09 3.20 3.31 3.42 3.53 3.64
SantaInes 2.88 2.99 3.09 3.20 3.31 3.42 3.53 3.64
Total AguadaGrande34.5kV 6.57 6.82 7.07 13.08 13.55 14.02 14.50 14.97 15.44 15.91 16.39
AguadaGrande13,8kV 6.91 7.19 1.49 1.55 1.60 1.66 1.71 1.77 1.82 1.89 1.95
Total AguadaGrande 13.48 14.01 8.57 14.62 15.15 15.68 16.21 16.74 17.26 17.81 18.33
LaMiel (LaMiel - Sarare) 3.20 3.31 3.42 3.54 3.65 3.76 3.87 3.99 4.10 4.21 4.32
LaMiel (Dem aseca- DestileriasUnidas) 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30
Total LaMiel 9.50 9.61 9.72 9.84 9.95 10.06 10.17 10.29 10.40 10.51 10.62

Sub-Total SS/EESistemaRegiones 144.50 147.45 143.85 151.77 154.23 156.79 159.39 161.96 164.53 167.11 169.66
%CRESub-Total 2.04 -2.44 5.51 1.62 1.66 1.66 1.61 1.59 1.57 1.53
Sub-Total SistemasRegiones 108.96 109.77 111.02 112.74 114.47 116.20 117.93 119.66 121.38 123.11 124.84
%CRESub-Total 0.74 1.14 1.56 1.53 1.51 1.49 1.47 1.44 1.42 1.40

Sub-Total SistemasRegiones: Sumanocoincidentedelosmximosdedemanda(MW) delasinterconexionesen115kVy lacompra


por lospuntosfronteras

87

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 25
Pronstico de Demanda Mxima Coincidente (MVA)
Con Nuevos Desarrollos (FC=0.9)
Sistema Barquisimeto - Carora

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Barquisimeto 46.57 47.22 47.87 48.52 49.16 49.81 50.46 51.11 51.76 52.40 53.05
Zona Industrial 64.23 66.84 69.44 43.23 44.79 46.36 47.92 49.48 51.05 52.61 54.17
Oeste 28.82 29.86 30.90 31.95 32.99 34.03 35.07 36.11
Centro 22.66 24.10 25.53 26.97 28.41 29.84 31.28 32.72 34.15 35.59 37.03
Barreto 34.04 34.79 35.53 36.27 37.02 37.76 38.50 39.24 39.99 40.73 41.47
Ujano 40.68 42.85 45.03 47.20 49.37 51.54 54.03 56.20 58.37 60.54 62.72
Norte-Duaca 27.74 29.47 31.19 32.92 34.65 36.37 36.24 38.10 39.83 41.55 43.28
Este 42.21 43.62 45.03 46.43 47.84 49.25 50.65 36.44 37.43 38.41 39.40
Barquisimeto

Morn 15.62 16.04 16.46 16.88


Palavecino 15.79 16.49 17.19 17.88 18.58 19.28 19.98 20.68 21.37 22.07
Carabal 36.81 26.35 26.92 27.50 28.08 28.66 29.24 29.81 30.39 30.97 31.55
Manzano 16.66 17.87 19.11 20.34 21.58 22.82 24.06 25.30 26.54 27.78 29.02
Poleo 41.95 43.48 45.01 46.54 48.07 49.60 51.13 52.66 54.19 55.72 57.25
Agua Viva 24.21 23.39 24.37 25.35 26.33 27.31 28.29 29.27 30.25 31.23 32.21
Planta2 42.53 43.35 44.17 44.99 45.81 46.63 47.45 48.27 49.09 49.91 50.73
Planta1 24.28 24.40 24.52 24.64 24.76 24.88 25.00 25.12 25.24 25.36 25.48
Total Sistema Barquisimeto 464.59 483.52 500.22 516.92 533.62 550.32 565.48 582.32 599.02 615.73 632.43
%CRECIMIENTO 4.07 3.45 3.34 3.23 3.13 2.75 2.98 2.87 2.79 2.71
Sistema Barq. - Energos 347.76 355.22 361.90 368.39 374.83 381.27 387.71 394.14 400.57 407.01 413.44

%CRECIMIENTO 2.15 1.88 1.79 1.75 1.72 1.69 1.66 1.63 1.61 1.58

Planta2 22.32 23.12 23.81 19.59 20.13 20.67 21.21 21.75 22.29 22.83 23.37
Planta1 14.19 14.64 15.09 12.43 12.79 13.15 13.51 13.86 14.22 14.58 14.94
El Roble 7.19 7.39 7.59 7.79 7.99 8.19 8.39 8.60
Carora

Total Sistema Carora 36.51 37.75 38.89 39.20 40.30 41.40 42.51 43.61 44.71 45.81 46.91
%CRECIMIENTO 3.41 3.01 0.80 2.81 2.73 2.66 2.59 2.52 2.46 2.40
Sistema Carora - Energos 41.08 42.35 43.61 44.87 46.13 47.39 48.65 49.92 51.18 52.44 53.70

%CRECIMIENTO 3.07 2.98 2.89 2.81 2.73 2.66 2.59 2.53 2.46 2.41

Sub-Total (1) 501.10 521.27 539.11 556.12 573.92 591.73 607.98 625.92 643.73 661.53 679.34
%CRE (Sub-Total 1) 4.03 3.42 3.16 3.20 3.10 2.75 2.95 2.84 2.77 2.69
Sub-Total (2) 388.84 397.57 405.51 413.26 420.96 428.66 436.36 444.05 451.75 459.45 467.14
%CRE (Sub-Total 2) 2.24 2.00 1.91 1.87 1.83 1.80 1.76 1.73 1.70 1.67
Subsistema Barquisimeto-Carora (Energos) 409.50 421.26 433.03 444.79 456.55 468.31 480.08 491.84 503.60 515.36 527.13
%CRE (SubSist. Barq-Car.) 2.87 2.79 2.72 2.64 2.58 2.51 2.45 2.39 2.34 2.28

Sub-Total (1): Sumatoria de los MVA de las SS/EE de los Subsistemas Barquisimeto y Carora
Sub-Total (2): Sumatoria de los MVA de los Subsistemas Barquisimeto y Carora (Energos)
88

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla N 26
Pronstico de Demanda Mxima Coincidente (MVA)
Con Nuevos Desarrollos (FC=0.9)
Sistema Regiones

AOS
Sistema Subestacin 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Hum ocaro 2.54 2.70 2.86 3.02 3.18 3.34 3.50 3.67 3.83 3.99 4.15
Guarco 3.95 4.07 4.21 4.36 4.50 4.64 4.79 4.93
Total Tocuyo34.5kV 2.54 2.70 2.86 6.97 7.25 7.55 7.86 8.17 8.47 8.77 9.07
Tocuyo13,8KV 19.57 18.72 19.21 15.79 16.27 16.83 17.44 18.01 18.58 19.14 19.70
Total Tocuyo 22.11 21.42 22.08 22.76 23.52 24.39 25.30 26.17 27.05 27.91 28.77
Quibor-24kV 15.88 16.48 17.08 17.67 18.27 18.86 19.46 20.05 20.65 21.25 21.84
Quibor (Sanare+INOS) 7.89 8.24 8.59 8.95 9.30 9.65 10.00 10.36 10.71 11.06 11.41
Total Quibor 23.77 24.72 25.67 26.62 27.56 28.51 29.46 30.41 31.36 32.31 33.26
Hidrolara115kV 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00 9.00
Total SistemaQuib-Tocuyo-Hidro 54.88 55.14 56.74 58.38 60.08 61.90 63.76 65.58 67.41 69.22 71.03
LaPastora 5.94 8.16 8.37 8.59 8.81 9.02 9.24 9.46 9.67 9.89 10.10
Sidetur 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00
Regiones

Puricaure115kV 3.17 3.25 3.33 3.40 3.48 3.55 3.63 3.71 3.78 3.86 3.94

AguadaGrande(Churuguara) 8.21 8.53 8.84 9.16 9.48 9.79 10.11 10.42 10.74 11.06 11.37
Siquisique 3.06 3.18 3.29 3.41 3.53 3.64 3.76 3.88
SantaInes 3.06 3.18 3.29 3.41 3.53 3.64 3.76 3.88
Total AguadaGrande34.5kV 8.21 8.53 8.84 15.28 15.83 16.38 16.93 17.48 18.03 18.58 19.13
AguadaGrande13.8kV 7.35 7.65 1.59 1.65 1.70 1.76 1.82 1.88 1.94 2.01 2.07
Total AguadaGrande 15.56 16.17 10.43 16.92 17.53 18.14 18.75 19.36 19.97 20.59 21.20

LaMiel (LaMiel - Sarare) 4.00 4.14 4.28 4.42 4.56 4.70 4.84 4.98 5.12 5.26 5.40
LaMiel (DEMASECA- DESTILERIASUNIDAS) 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Total LaMiel 11.00 11.14 11.28 11.42 11.56 11.70 11.84 11.98 12.12 12.26 12.40

Sub-Total SS/EESistemaRegiones 157.56 160.86 157.15 165.71 168.46 171.31 174.22 177.08 179.95 182.82 185.67
%CRESub-Total 2.09 -2.30 5.45 1.66 1.70 1.69 1.64 1.62 1.60 1.56
Sub-Total SistemasRegiones 117.17 118.03 119.37 121.23 123.09 124.95 126.80 128.66 130.52 132.38 134.24
%CRESub-Total 0.74 1.14 1.56 1.53 1.51 1.49 1.47 1.44 1.42 1.40

Sub-Total SistemasRegiones: Sumanocoincidentedelosmximosdedemanda(MW) delasinterconexionesen115kVylacompra


por lospuntosfronteras

89

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6. ANLISIS TCNICO DEL SISTEMA ELECTRICO ENELBAR

6.1. Sistema De Transmisin

Situacin Actual.

En la actualidad el sistema de transmisin se encuentra operando con cinco (5)


unidades autotransformadoras de 100 MVA 230/115 kV, tres (3) en la S/E Barquisimeto y
dos (2) en la S/E Manzano. Estas unidades permiten la importacin de potencia desde el
sistema interconectado nacional, sin embargo la demanda actual del sistema que asciende
en lo que va de ao hasta un valor mximo registrado de 530 MW, no permite la operacin
del sistema de transmisin en 115 kV en anillo cerrado. Lo anterior dificulta el
funcionamiento adecuado del sistema, ya que la operacin en anillo abierto disminuye los
niveles de confiabilidad y calidad de servicio.

Para mejorar la condicin nombrada anteriormente, se estn llevando a cabo un


conjunto de actividades y obras de expansin. Es as como tanto la construccin de la
Subestacin y Planta Palavecino (Obras en proceso) como la instalacin del tercer
autotransformador de 100 MVA, 230/115 kV en la S/E Manzano, vienen a constituir un
amplio reforzamiento para las instalaciones existentes. Ello permitir la correcta
operatividad del sistema de transmisin asegurando la satisfaccin de la demanda esperada
para los prximos tres a cinco (3 a 5) aos. Es decir, la puesta en servicio de las obras
mencionadas anteriormente asegura el suministro de energa elctrica de forma segura y
confiable hasta aproximadamente el ao 2010. A partir de esta fecha e incluso antes se debe
proseguir con los planteamientos establecidos en este plan de expansin, los cuales estn
destinados a darle una orientacin ordenada al crecimiento de la demanda elctrica en todo
el Estado Lara.

Anlisis a mediano y largo plazo.

Como se coment antes, una vez puesta en servicio las obras descritas, el sistema de
transmisin opera con normalidad y se garantiza su correcto funcionamiento ante una
contingencia simple hasta aproximadamente el ao 2010. En este ao, el anillo 115kV
presenta deficiencias en cuanto a su operatividad, ya que la salida de una de las lneas de
transmisin que lo conforma, por falla y/o mantenimiento produce la sobrecarga de algunas
de las que quedaran en operacin, lo cual viola las condiciones operativas y criterios
establecidos en cuanto al diseo del sistema.

Lo anterior significa que posterior al ao 2010, el sistema debe adecuarse y


expandirse para satisfacer la demanda de los aos siguientes. De acuerdo a las
caractersticas actuales del sistema elctrico y a la ubicacin geogrfica del Sistema
ENELBAR, es probable que tengan que ejecutarse proyectos de generacin. De hecho el
Proyecto Planta Palavecino representa la primera fase de un proyecto general de expansin
de generacin. Sin embargo, conociendo la gran cantidad de recursos que una instalacin
de esta envergadura requiere, entonces es posible que las expansiones siguientes puedan
estar orientadas al desarrollo de obras de transmisin que faciliten la compra de energa al

90

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Sistema Interconectado Nacional, ya que esta forma de expansin representara una
inversin inicial mucho menor que la construccin de una nueva planta de generacin.

6.1.1. Escenario de expansin de generacin.

De acuerdo con los posibles escenarios analizados al principio de este plan, es


importante estudiar la posibilidad de continuar con el desarrollo del plan de expansin de
generacin. La conveniencia de ello es fundamental, ya que la generacin de energa
hidroelctrica en el pas ha experimentado serias dificultades en los ltimos tres aos.
Adems de esto, el crecimiento de la demanda infiere la necesidad de incrementar la
generacin interna en el caso de que puedan presentarse emergencias en el sistema
interconectado nacional.

En reuniones realizadas con la Vicepresidencia de Ingeniera, se dieron a conocer


los lineamientos bsicos de la expansin de generacin para su evaluacin. Estos
lineamientos se basan en un plan de adquisicin de nuevas unidades de generacin de
acuerdo con un estudio realizado por la firma TECNOCONSULT. Dicho plan se muestra
en la tabla N 9.

Tabla N 27.
Plan de Adquisicin de Nuevas Unidades de Generacin.
Escenario Expansin de Generacin.

Potencia Nominal Potencia Efectiva Costo


Ao MW MW MM US $

1 40 35 19.9
2 40 35 19.9
3 40 35 19.9
4 85 74 32.6
5 85 74 32.6
6 85 74 32.6
7 172 150 63.3

Totales 547 477 220.8


Fuente: TECNOCONSULT
Nota: Las unidades sombreadas corresponden a la fase I del Plan, actualmente en desarrollo.
(Planta Palavecino)

El Plan de Expansin de Generacin mostrado en la tabla anterior, se estableci


para ser llevado a cabo en tres fases las cuales se describen a continuacin:

Fase I

91

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Esta fase agrupa las primeras tres unidades de generacin, es decir la instalacin de
tres (3) unidades de 40 MW.
Fase II

Esta fase agrupa las tres unidades de generacin siguientes, es decir la instalacin de
tres (3) unidades de 85 MW.

Fase III

Esta fase corresponde a la ltima unidad de generacin, es decir la instalacin de


una (1) unidad de 172 MW.

Es importante destacar que en la medida que el plan se vaya desarrollando, el


mismo puede ir teniendo modificaciones en base a los escenarios que se cristalicen en el
futuro y a los acuerdos a los que la empresa pueda llegar en conjunto con los organismos
del estado a quien corresponda otorgar los recursos para este tipo de planes. De esta forma,
el valor de las capacidades de las unidades a instalar pueden sufrir modificaciones as como
tambin los tipos de tecnologa, combustible a usar entre otros.

Ubicacin fsica para el desarrollo del Plan de Expansin de Generacin.

El estudio realizado por la firma TECNOCONSULT prev el desarrollo de un Plan


de Expansin de Generacin en varias etapas y se evala la entrada de cada unidad de
generacin al sistema teniendo en cuenta tanto la capacidad energtica como el aspecto
econmico de la operacin. Ahora bien, desde el punto de vista fsico, el estudio no
estableci lineamientos sobre posibles reas de ubicacin de las futuras plantas para la
operacin eficiente, tomando en cuenta los aspectos de cargabilidad y adecuacin del
sistema de transmisin existente. Para ello la Gerencia de Planificacin y Desarrollo, a
travs del Departamento de Planificacin elabor varios estudios.

A continuacin se mencionan los lineamientos resultado de estos estudios:

El primer informe fue realizado en diciembre de 2002, referencia [ ]. Dicho informe


concluye bsicamente que la primera fase del Plan de Expansin de Generacin
deba llevarse a cabo en la futura Subestacin Palavecino, ya que en dicho sitio la
inyeccin de potencia al sistema de transmisin ofreca las mejores condiciones de
cargabilidad de las instalaciones existentes. Adems el hecho de que para entonces,
el desarrollo de la Subestacin Palavecino era apenas un proyecto incipiente, era
recomendable aprovechar esa nueva instalacin para desarrollar un proyecto global
en donde coexistieran el desarrollo de una subestacin de transmisin y distribucin
destinada a mejorar las condiciones del servicio elctrico en el Municipio
Palavecino y a la vez se pudiese llevar a cabo el desarrollo de una planta de
generacin.

92

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


El segundo estudio se realiz en Agosto 2003, referencia [ ]. En este estudio se
establecieron estrategias y lineamientos para el desarrollo de las fases II y III del
Plan de Expansin de Generacin dependiendo del tipo de unidad de generacin a
usar y teniendo en cuenta el destino final del parque generador actual. De forma
general se establecieron los siguientes lineamientos:

Opcin 1

La fase II puede llevarse a cabo, mediante una ampliacin de la S/E


Zona Industrial. Para ello se planteaba que en este caso el nmero
mximo de unidades a instalar sera de dos (2) unidades y que el
rango de potencia deba estar entre 80 y 100 MW mximo. Se
determin que el exceso de 100 MW, funcionalmente no es lo ms
conveniente, ya que el sistema de transmisin existente tiene ciertas
caractersticas internas que dificultaran la salida de una potencia
superior a la indicada con anterioridad. Otro aspecto de inters que
fue establecido claramente, se refiere al hecho de que la potencia de
una de las unidades debera ser inyectada directamente hacia la
futura S/E Oeste. Para ello se debe construir un tramo de lnea
exclusivamente para dicha funcin, sin modificar en lo absoluto el
anillo 115 kV existente.

La fase III estara destinada a desarrollarse en la zona norte-este de la


ciudad de Barquisimeto, especficamente en las cercanas del
polgono de tiro y hacia la parte norte de la Autopista Circunvalacin
Norte, siempre hacia el Este de la Fbrica de Cemento que existe en
las inmediaciones, este proyecto se conoce en este plan como Centro
Generador Polgono o CGP. Esto ltimo es de suma importancia, ya
que evitara posibles problemas de contaminacin a las futuras
instalaciones. En este caso, el desarrollo sera una instalacin
completamente nueva, tenindose caractersticas especiales que son
deseables para una instalacin de este tipo las cuales se nombran a
continuacin: fcil acceso, cercano a la red de gas existente, facilidad
de interconexin con el sistema de transmisin ya que tanto el
sistema 230 como el de 115 kV pasan por dicha zona.
Opcin 2

Este caso supone que las fases II y III se lleven a cabo en un solo
sitio constituida por una planta totalmente nueva y a su vez que la
misma tenga amplias posibilidades de crecer a futuro incluso con
capacidades mayores a 150 MW. Esta opcin tiene amplias
posibilidades de ser desarrollada, especficamente cuando la
ampliacin de la S/E Zona Industrial para incrementar su capacidad
de generacin resulte en una opcin difcil de llevar a cabo o que en
el tiempo no sea lo ms conveniente para el sistema de transmisin.
Un ejemplo de ello puede ser el caso de que se decida implantar una
93

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


solucin con unidades cuya capacidad supere los 100 MW y que el
nmero de unidades a instalar sea superior a dos. Para este caso
particular, no es conveniente ampliar la S/E Zona Industrial ya que
en dicha subestacin el nmero mximo de unidades a instalar no
puede ser superior a dos, bsicamente por razones de espacio fsico.
Lo anterior justifica canalizar esfuerzos hacia la construccin
definitiva del CGP, con amplias posibilidades de expansin a futuro.
Desde dicha instalacin se llevara la potencia elctrica generada
hasta los sitios que el sistema requiera mediante la construccin de
un adecuado corredor de lneas de transmisin en 115 kV.

6.1.2. Escenario de expansin mediante nuevos puntos de


interconexin.

Teniendo en cuenta lo comentado anteriormente en cuanto a la operatividad del


sistema en el tiempo, una vez llevados a cabo los proyectos tanto la Planta Palavecino como
la incorporacin del tercer autotransformador de 100 MVA en la S/E Manzano, se tienen
aproximadamente 5 aos en los cuales dichas instalaciones permiten la operacin eficiente
y segura del sistema de transmisin. Ms all del ao 2012, se debe ir a una expansin que
permita satisfacer el crecimiento de la demanda esperada para esta poca. Anteriormente se
analiz el caso donde las fases II y III del Plan de Expansin de Generacin se ponan en
prctica, sin embargo y como se coment anteriormente, dichos planes representan costos
de inversin muy elevados, de hecho para este caso la empresa debe buscar mecanismos
extraordinarios para acceder a dichos recursos mediante entes estatales conjuntamente con
el Ministerio de Energa y Petrleo.

En el caso para el cual el sistema requiera de una gran cantidad de megavatios


producto del crecimiento de la demanda y los planes de expansin de generacin se vean de
alguna manera retrasados por la indisponibilidad de recursos, la empresa debe acometer
entonces la ampliacin de su sistema de transmisin mediante el desarrollo de un tercer
punto de interconexin.

Esta instalacin estara destinada al incremento de al menos 150 MW en la


capacidad instalada para la importacin de potencia desde el Sistema Interconectado
Nacional. Es decir, la construccin de una subestacin en niveles de tensin 230 y 115 kV
tambin en las inmediaciones del polgono de tiro y de caractersticas similares a las
existentes tanto en la S/E Barquisimeto como en la S/E Manzano. Esta instalacin sera
desarrollada en su primera fase para albergar dos autotransformadores de 100 MVA con la
posibilidad de expansin en una tercera unidad.

La forma de interconexin al sistema 115 kV sera prcticamente la misma que para


el caso del CGP, sin embargo, al ser este un punto de interconexin, la alimentacin
primaria ms adecuada result ser mediante el desvo de la lnea Yaracuy Barquisimeto
230 kV. Est lnea de transmisin pasa muy cerca al rea escogida para desarrollar dicha
instalacin, por lo que las inversiones necesarias en lnea de transmisin a 230 kV seran
mnimas.

94

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Por otra parte, desde el punto de vista de distribucin, la construccin de la S/E
Polgono como un punto de interconexin con el Sistema Interconectado Nacional, puede
ser aprovechada para el desarrollo de un patio de 24 kV cuya funcin bsica sera para
distribucin local. Este patio estara equipado con una barra del tipo principal y
transferencia que permita la llegada de dos (2) transformadores de 42 MVA, 115/24 kV con
la posibilidad de instalacin de un tercero a mediano y largo plazo. Con esta instalacin se
alimentar a los sectores del Jebe, San Lorenzo, Planta de Cemento y todos los desarrollos
habitacionales y similares que de alguna manera se establecern en la zona una vez sea
culminada la Autopista Circunvalacin Norte en su totalidad. Esto a su vez permitir la
descarga parcial de la S/E Ujano, la cual estar reservada para tomar la carga futura del este
y norte de la ciudad de Barquisimeto, conjuntamente con la S/E Este y el futuro
Distribuidor Morn.

Desde el punto de vista de Transmisin, la S/E Polgono alimentar a las


Subestaciones Planta II, Ujano y Norte respectivamente a travs de lneas de transmisin en
115 kV, similares a las que componen el anillo 115 kV. Los detalles de construccin y
esquemas en general se encuentran en la seccin de Requerimientos Tcnicos de este Plan
de Expansin (Ver .Punto 7).

6.1.3. Necesidades de nuevas subestaciones de transmisin y


distribucin.

6.1.3.1. Municipio Iribarren

El Municipio Iribarren es el ms importante del estado Lara desde el punto de vista


del consumo de energa elctrica, ya que el mismo presenta una demanda mxima
aproximada de 370 MW, representando esto un 70% de la totalidad de la demanda
suministrada al Estado Lara por la C.A. ENELBAR. El nmero de clientes atendidos en
este Municipio es de aproximadamente 220000 suscriptores y la poblacin que es atendida
es de 900.000 habitantes..

Para el periodo en estudio desarrollado en este Plan de Expansin, dicho municipio


presenta una serie de necesidades en obras elctricas las cuales se analizan a continuacin:

Subestacin Centro

A corto plazo, especficamente para el ao 2006, dicha subestacin requiere la


ampliacin de las barras tanto de 115 como de 24 kV con el objeto de lograr la instalacin
de la tercera y ltima unidad de transformacin de 42 MVA. Dicho equipo es necesario
para aumentar la capacidad de suministro elctrico requerido por el rea de influencia de la
subestacin, debido fundamentalmente a que en la actualidad la capacidad firme de esta
instalacin ha sido superada, lo que dificulta la alimentacin de toda la carga en ausencia de
una unidad de transformacin bien sea por falla y/o mantenimiento.

Esta obra permitir mejorar el servicio elctrico a los sectores NorOeste y Oeste de
la Ciudad de Barquisimeto y es un medio que se enmarca dentro de los objetivos
95

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


estratgico de la empresa, principalmente el de Mejorar la Prestacin del Servicio, que a su
vez permiten establecer la infraestructura elctrica requerida por el Polo de Desarrollo
Barquimeto-Cabudare-San Jos de Tintn, el cual esta dentro del Plan de Desarrollo del
Estado Lara.

Subestacin Ujano

Para satisfacer de demanda elctrica tanto de la parte este como norte de la ciudad
de Barquisimeto, la Subestacin Ujano debe ser objeto de una ampliacin a nivel de su
esquema en 115 kV.

En la actualidad dicha Subestacin presenta a nivel de 115 kV un esquema en anillo


de cuatro (4) celdas el cual debe ampliarse a un mximo de seis (6). Mediante esta
ampliacin se espera lograr lo siguiente:

Una (01) salida de lnea en 115 kV para la alimentacin de la futura


Subestacin Norte.

Una (01) salida para la alimentacin un segundo transformador de 83


MVA, 115/24 kV. Este equipo es necesario para ampliar la
capacidad de suministro de la subestacin lo cual a su vez permitir
satisfacer la demanda del este de la ciudad de Barquisimeto en el
mediano y largo plazo.

Es importante sealar que el la actualidad la Subestacin Ujano presenta problemas


fsicos a nivel de suelos, lo que puede generar serios problemas de hundimientos de algunas
estructuras. De acuerdo al comentario anterior es conveniente antes de proceder con la
ampliacin propuesta en este plan, realizar un diagnostico general de dicha situacin, a
objeto de verificar la conveniencia o no de realizar mejoras a nivel de la parte civil o si por
el contrario lo ms adecuado sera la construccin de un patio en 115 kV totalmente nuevo.

Esto ltimo es de suma importancia, ya que las necesidades de ampliacin son a


corto plazo, especficamente en el periodo 2006-2007, por lo que debe tomarse una
decisin al respecto para proceder con la ampliacin requerida de acuerdo a las necesidades
planteadas anteriormente.

Esta obra permitir mejorar el servicio elctrico a los sectores Sureste y Este de la
Ciudad de Barquisimeto, al sector Norte del Municipio Iribarren y al Municipio Crespo en
su totalidad, siendo un medio que se enmarca dentro de los objetivos estratgico de la
empresa, principalmente el de Mejorar la Prestacin del Servicio, que a su vez permiten
establecer la infraestructura elctrica requerida por los Polos de Desarrollo Barquimeto-
Cabudare-San Jos de Tintn y Tamaca-Duaca-Santa Ins-Moroturo, los cuales estn
dentro del Plan de Desarrollo del Estado Lara.

96

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Ampliacin a 115kV del Distribuidor Norte

El distribuidor Norte es alimentado actualmente mediante dos (2) lneas expresas en


24 kV de aproximadamente 20 kms de longitud desde la S/E Ujano. A su vez, dicho
distribuidor alimenta de forma radial y a travs de una lnea expresa en 24 kV de
aproximadamente 17 kms de longitud, a la S/E Duaca en el Municipio Crespo.

En conjunto, la demanda del subsistema Norte-Duaca supera en la actualidad los 20


MW. Para este nivel de carga y teniendo en cuenta la gran longitud de las lneas expresas
que alimentan al Distribuidor Norte, la calidad de servicio se ha visto afectada, ya que en
horas de alta carga se han presentado deficiencias debido fundamentalmente a las grandes
cadas de voltaje, problema este que se vuelve aun ms crtico al producirse el disparo de
una de las lneas expresas.

En vista de los elementos expuestos anteriormente y teniendo en cuenta las grandes


perspectivas de crecimiento tanto de la zona norte de Iribarren (Cuj-Tamaca) as como
tambin el Municipio Crespo (Duaca), se plantea la necesidad de ampliar dicho
Distribuidor a un nivel de tensin de 115 kV. Esta ampliacin permitir entre otras cosas lo
siguiente:

Reforzar e independizar todo el sistema elctrico de la zona norte de Barquisimeto


as como del Municipio Crespo.
Eliminar los problemas existentes de cadas de voltaje y variaciones sucesivas de
voltaje (Flikers)
Permitir la alimentacin a futuro del Municipio Urdaneta por parte de la C.A.
ENELBAR, ya que desde la S/E Norte se podr construir un tramo de lnea en 115
kV que permita interceptar la lnea existente Aroa Aguada Grande. De esta
forma, el Municipio Urdaneta se independizara del Sistema CADAFE. Esto
ltimo sera una solucin adicional a mediano y largo plazo.

Las ampliaciones previstas para lograr llevar al Distribuidor Norte a 115 kV, tienen un
comienzo a partir del ao 2006 y deberan entrar en servicio a finales del ao 2007.

Esta obra permitir mejorar el servicio elctrico a el sector Norte del Municipio
Iribarren y al Municipio Crespo en su totalidad, siendo un medio que se enmarca dentro de
los objetivos estratgico de la empresa, principalmente el de Mejorar la Prestacin del
Servicio, que a su vez permiten establecer la infraestructura elctrica requerida por los
Polos de Desarrollo Barquimeto-Cabudare-San Jos de Tintn y Tamaca-Duaca-Santa
Ins-Moroturo, los cuales estn dentro del Plan de Desarrollo del Estado Lara.

S/E Oeste

La zona oeste de Barquisimeto ha experimentado grandes crecimientos en los


ltimos aos caracterizados fundamentalmente por ser del tipo residencial y comercial. De
acuerdo a la revisin de los planes locales, existen otros proyectos residenciales,
comerciales y adicional a ello la posible construccin de una zona industrial IV. Adems de

97

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


lo citado anteriormente, es un hecho la realizacin a corto plazo del proyecto del transporte
masivo para la Ciudad de Barquisimeto. Este proyecto contempla una serie de obras,
muchas de las cuales estarn ubicadas al oeste de Barquisimeto.

Tomando en cuenta lo anterior y por otra parte la necesidad que existe en la


actualidad de descargar la S/E Zona Industrial, debido fundamentalmente a la saturacin en
carga y a la dificultad de construir nuevos circuitos de distribucin en la zona, se hace
necesario construir una nueva subestacin hacia el oeste de la ciudad de Barquisimeto. Esta
nueva subestacin ser construida para satisfacer los siguiente:

A nivel de distribucin:

Absorber futuros crecimientos de demanda en la zona oeste de la ciudad de


Barquisimeto.

Descargar a la S/E Zona Industrial.

Alimentar la futura Zona Industrial IV.

A nivel de transmisin:

Reforzar la alimentacin a nivel de 115 kV de la S/E Quibor mediante la


construccin de la lnea de transmisin Oeste-Qubor.

Reforzar el sistema futuro 115 kV hacia las Ciudades de Carora y El Tocuyo


mediante la construccin de la lnea Oeste Distribuidor de Transmisin San Pablo.

El diseo de esta subestacin debe prever la posibilidad del desarrollo de un futuro


punto de interconexin en 230 kV, cuya alimentacin se hara a travs del desvo de
las lneas Yaracuy-Manzano. Esto ltimo no entra en el periodo de estudio, sin
embargo a largo plazo habr necesidad de inyectar potencia elctrica en la zona
oeste del sistema de transmisin, especficamente en el periodo 2015 2025, por lo
que el desarrollo de la futura S/E Oeste debe realizarse con un alto nivel de
ingeniera tomando todas estas previsiones y a su vez contar con un amplio espacio
fsico que permita el crecimiento a mediano y largo plazo de esta nueva instalacin.

En lneas generales, los procesos para la construccin de la S/E Oeste deben


comenzar en el ao 2007 y la subestacin debera entrar en servicio a ms tardar a finales
del ao 2008.

Esta obra permitir mejorar el servicio elctrico al sector Oeste de la Ciudad de


Barquisimeto y a los Municipios Jimnez, Morn, Andrs Eloy Blanco y Torres, siendo un
medio que se enmarca dentro de los objetivos estratgico de la empresa, principalmente el
de Mejorar la Prestacin del Servicio, que a su vez permiten establecer la infraestructura
elctrica requerida por los Polos de Desarrollo Barquimeto-Cabudare-San Jos de Tintn,

98

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Eje Cafetalero, Valle de Quibor, Tocuyo Medio y San Francisco-Quebrada Arriba-
Palmarito, los cuales estn dentro del Plan de Desarrollo del Estado Lara.

Caso Especial: Proyecto Transbarca.

Actualmente en la ciudad de Barquisimeto se construye el Sistema de Transporte


masivo conocido como TRANSBARCA. Al principio no se conocieron detalles exactos
sobre la magnitud de dicho proyecto desde el punto de vista elctrico, lo que influy
negativamente en las estimaciones de demanda realizadas hasta el ao pasado (2005). Hoy
en da, se conoce al menos de forma global la carga general que demandar dicho proyecto.
En lneas generales se habla de aproximadamente 40 MVA de carga, de los cuales 12 MVA
estaran destinados al nuevo terminal de pasajeros mientras que los restantes 28 MVA
estaran distribuidos a lo largo de toda la ciudad para la alimentacin de estaciones y los
puestos de rectificacin del sistema.

En reuniones realizadas con los responsables de dicho proyecto, se solicitaron a


ENELBAR, la alimentacin de dichas cargas mediante lneas expresas desde diferentes
subestaciones, sin embargo, el Sistema Enelbar no est diseado para dar ese tipo de
servicio y por otro lado, en algunas subestaciones candidatas a dar alimentacin a ciertas
cargas de dicho sistema, no existe la infraestructura como para ceder una salida en 24 kV
que preste servicio integro a un cliente en particular.

Es importante destacar que un bloque de carga de 40 MVA es elevado y su impacto


sobre el sistema de distribucin es considerable, ya que los crecimientos anuales que
experimenta el sistema de distribucin no tienen la caractristica de un gran bloque, sino
ms bien crecimientos lineales por el orden del 3 al 5%. Dichos crecimientos son
manejables y rapidamente asignados al sistema mediante ampliaciones programadas en
cada subestacin del sistema o simplemente asignadas a los circuitos con disponibilidad de
capacidad.

En lneas generales, se buscar en lo posible las mejores soluciones para alimentar


efectivamente este nuevo bloque de carga. Para ello, el personal de Ingeniera y
Construccin de Distribucin est trabajando sobre la forma de alimentacin ms adecuada
con el menor impacto sobre el sistema de distribucin existente. Por otra parte, este plan
consider ampliaciones en instalaciones existentes y tambin prevee la construccin de la
S/E Oeste. Este conjunto de obras ofrecern capacidad suficiente para satisfacer dicha
demanda en particular as como tambin los crecimientos naturales tanto en el oeste como
en el centro y este de la Ciudad de Barquisimeto.

Este plan tambin propone una alternativa para alimentar la mayora de la carga de
dicho sistema de transporte sin afectar en gran medida el sistema de distribucin existente,
no obstante este punto ser abordado en el capitulo Proyectos Especiales.

99

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.1.3.2. Municipio Palavecino.

El Municipio Palavecino tiene la mayor parte de su carga concentrada en la ciudad


de Cabudare, caracterizndose la misma por ser de predominio residencial, ya que en esta
ciudad se concentran gran cantidad de centros residenciales. El nmero de clientes
atendidos en este Municipio es de aproximadamente 42000 suscriptores y la poblacin que
es atendida es de 135.000 habitantes..

La infraestructura elctrica encargada de distribuir energa elctrica a este municipio


esta constituida por los distribuidores Agua Viva y Carabal, dichos distribuidores son
alimentados en 24 kV desde el sistema del Municipio Iribarren, la subestacin Manzano
alimenta mediante dos expresos en 24 kV al distribuidor Agua Viva y las subestaciones
Ujano y Este alimentan mediante un expreso en 24 kV, uno desde cada subestacin al
distribuidor Carabal. El distribuidor Agua Viva cuenta con dos circuitos de distribucin en
24 kV y dos circuitos expresos en 24 kV que alimentan al llenadero de Maporal y a la
subestacin La Miel respectivamente. El distribuidor Carabal cuenta con cinco circuitos de
distribucin en 24 kV.

En vista al crecimiento de demanda elctrica en este Municipio, la capacidad de


suministro de los distribuidores mencionados anteriormente se ha vuelto insuficiente,
adicionalmente, la zonas de servicio en el Municipio ha superado a las de los distribuidores,
lo cual origina que disminuya el nivel de calidad de servicio prestado en estas zonas, para
solucionar los problemas actuales y previendo absorber crecimientos futuros de carga, se
hace necesario la construccin de la subestacin Palavecino, dicha obra ser descrita a
continuacin.

S/E Palavecino

Aunque la S/E Palavecino no se encuentra en Iribarren, sino en el Municipio del


mismo nombre, su importancia para el sistema de transmisin y distribucin ser altamente
relevante, ya que all se generarn 120 MW que entrarn al sistema a finales del ao 2005.
Para el mediano plazo, especficamente para el ao 2010, dicha subestacin deber ampliar
su capacidad de distribucin mediante la puesta en servicio de una tercera unidad de
transformacin de 42 MVA, ya que para esa poca su capacidad firme se ver rebasada. La
instalacin de dicho equipo permitir una mejor operacin de la subestacin, adems de que
garantizar satisfacer la demanda futura del Municipio Palavecino.

Esta obra permitir mejorar el servicio elctrico a toda la poblacin del Estado Lara,
siendo un medio que se enmarca dentro de los objetivos estratgico de la empresa,
principalmente el de Mejorar la Prestacin del Servicio, que a su vez permiten establecer la
infraestructura elctrica requerida por todos los polos de desarrollo del Estado.

6.1.4. Expansin de la red de transmisin 115kV.

La red de transmisin existente tiene caractersticas especiales que se adaptan a los


requerimientos de cada subsistema. A nivel de Barquisimeto y Cabudare, la red de
100

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


transmisin est conformada por un anillo en 115 kV con conductor 900 MCM. Este diseo
permite la operacin de cada lnea para una capacidad de 160 MVA en condiciones
normales, mientras que en emergencia dichas lneas pueden operar a una carga mxima de
200 MVA.

Por otra parte, la red de transmisin que atiende al occidente del estado Lara y que
atiende especficamente a las Subestaciones Qubor, Tocuyo y Sistema Carora opera a un
nivel de tensin de 115 kV, pero el diseo esta basado en un conductor 350 MCM, lo que
permite la transmisin en condiciones normales de 80 MVA y la carga mxima en
emergencia puede ascender hasta 100 MVA.

En funcin del crecimiento de la demanda y a la necesidad de dar servicio a las


nuevas subestaciones a ser desarrolladas en el sistema, la red de transmisin en 115 kV,
debe adecuarse a las nuevas exigencias. Esto significa que debe ser construidos nuevos
tramos de lneas que permiten tanto la alimentacin de las nuevas instalaciones como el
reforzamiento de las ya existentes.

En este orden de ideas, se har a continuacin una breve descripcin de cmo debe
ir expandindose la red de transmisin 115 kV, para lograr los objetivos mencionados
anteriormente.

6.1.4.1. Red de Transmisin 115 kV Barquisimeto y Cabudare


Subestacin Palavecino

Actualmente se encuentra en construccin la Planta y Subestacin Palavecino en el


Municipio del mismo nombre. Mediante esta obra se colocarn a disposicin del sistema
elctrico la cantidad de 80 MW en una primera fase, la cual aumentar a 120 MW en su
fase final. Para aprovechar este recurso energtico, la red de transmisin en este caso ser
adecuada mediante la insercin en el anillo 115 kV de la Subestacin Palavecino. Para ello,
la lnea de transmisin existente Manzano Ujano 115 kV, ser seccionada a la altura de la
Avenida Intercomunal Barquisimeto Cabudare en el sector llamado La Hacienda. Desde
all, se construir el tramo de lnea doble terna de aproximadamente 8 kms de longitud
hasta la barra 115 kV de la Subestacin Palavecino. Esta lnea asegura la salida de gran
parte de la potencia que genere la Planta Palavecino, hacia el sistema de transmisin
115kV.

Subestacin Norte

Como se mencion anteriormente, el Distribuidor Norte ser ampliado a un nivel de


tensin de 115 kV para albergar dos unidades de transformacin de 30 MVA, 115/24 kV
cada una. La forma de alimentacin para dicha ampliacin se har a travs de la
construccin de una lnea de transmisin 115 kV desde la S/E Ujano. Para este caso existen
ciertos elementos que conviene destacar a continuacin:

En primer lugar, se propone hacer uso del corredor existente de llegada de la lnea
Ujano Planta II en el lado de la S/E Ujano. La razn de esto radica en que el
primer tramo de esta lnea, antes del quiebre cercano a la circunvalacin norte
101

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


donde toma rumbo hacia la S/E Planta II, puede reutilizarse. Para ello, este tramo de
lnea debe ser repotenciado mediante el cambio de estructuras simples a estructura
doble terna. Esto a su vez permite liberar este tramo de problemas adicionales de
servidumbres, ya que se usara el mismo derecho de paso de la lnea existente Ujano
Planta II 115 kV.

En segundo lugar y teniendo en cuenta que a futuro este tramo de lnea permitir la
interconexin con la S/E y/o Planta Polgono, debe preverse que los primeros 5 kms
del tramo hacia la S/E Norte, deben construirse en conductor 900 MCM, despus de
este tramo, la lnea siguiente debe construirse con un conductor cuyo calibre
mnimo sea de al menos 500 MCM.

A futuro e incluso ms all del ao horizonte (2015), la S/E Norte requerir de una
segunda alimentacin, por lo que se recomienda que los 15 kms de lnea de
transmisin restante sean construidos con estructuras doble terna. La figura No. 2,
muestra el aspecto inicial de la torre, mientras que la figura No. 3 muestra la fase
final una vez equipada la terna adicional a futuro.

Figura No. 6
Aspecto de la estructura doble terna, con una sola terna
Equipada.

102

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Figura No. 7
Aspecto de la estructura doble terna, cuando ya se han equipado ambas ternas por razones
de ampliaciones en el sistema.

Subestacin Oeste

La alimentacin primaria de la S/E Oeste en su fase inicial se realizar a travs del


desvo de la lnea existente Zona Industrial Centro 115 kV. La lnea nombrada
anteriormente ser seccionada a nivel del cruce con la Avenida Florencio Jimnez. A partir
de all se construir un tramo de aproximadamente 10 kms de longitud hasta la barra 115
kV de la futura S/E Oeste. Durante los primeros tres aos de entrada en servicio de dicha
instalacin, permitir reforzar tanto a la S/E Quibor como al Distribuidor San Pablo 115
kV, ya que desde all se construirn las lneas Oeste Quibor y Oeste San Pablo 115 kV.
Estas nuevas lneas de transmisin son necesarias para reforzar y aumentar la calidad y
confiabilidad en el servicio elctrico de las regiones o Municipios al oeste de Barquisimeto.

6.1.4.2. Red de Transmisin 115 kV, Sistema Regiones


Distribuidor de Transmisin San Pablo

Recientemente entr en servicio la lnea de transmisin San Pablo Tocuyo, como


refuerzo a la calidad del servicio prestado a los Municipios Morn y Jimnez, adems de
aumentar la confiabilidad del sistema elctrico asociado en vista de que en la Ciudad de El
Tocuyo existe la reserva de agua que surte a la Ciudad de Barquisimeto. No obstante, la
forma de conexin fue realizada mediante un t-off a la lnea Zona Industrial Carora 115
kV en el sector llamado San Pablo. Esta forma de conexin ha sido realizada con carcter
provisional, ya que la forma de conexin en t-off trae problemas de coordinacin de
protecciones, lo cual a su vez dificulta la correcta operatividad del sistema.

103

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Por otra parte, la demanda esperada de todo el subsistema integrado por las
Subestaciones Quibor, Tocuyo, Hidrolara, Carora y La Pastora, supera ampliamente los 130
MW, siendo este un valor muy alto para ser manejado eficientemente por la red de
transmisin existente. Lo anterior justifica la construccin de un distribuidor de lneas de
transmisin cuyo objetivo fundamental es el seccionamiento de lneas muy largas mediante
la creacin de una barra general que permita la llegada de otras lneas y salidas hacia los
sitios donde la carga lo requiera.

Es as como en las cercanas donde fue construido el t-off de la lnea San Pablo
Tocuyo, debe construirse dicho distribuidor. Luego las lneas que vienen desde el sistema
Barquisimeto debern ser desviadas hacia este distribuidor para luego continuar hacia la
Ciudades de Carora y El Tocuyo respectivamente. Adems, esto permite que cada salida de
lnea sea equipada con interruptores automticos, lo que mejora ampliamente la
operatividad y mantenimiento del sistema de transmisin, ya que la falla en una lnea, solo
involucra a dicha lnea y solo a ella. Esto no suele suceder cuando existe un t-off.

104

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2. Sistema Regiones

6.2.1. Anlisis Preliminar.

El sistema Regiones est conformado por todas las instalaciones que se ubican en el
estado Lara, con la excepcin de las que se encuentran dentro del Municipio Iribarren, es
decir, est conformado por los subsistemas que alimentan a los municipios Andrs Eloy
Blanco, Crespo, Jimnez, Morn, Palavecino, Simn Planas, Torres y Urdaneta del Estado
Lara.

La mayora de estos subsistemas tienen la caracterstica de poseer una sola


subestacin principal, exceptuando a los municipios Palavecino y Torres, los cuales poseen
ms de una subestacin principal. Para el caso del Municipio Palavecino, no ser
considerado en este punto del trabajo, ya que el anlisis del sistema de dicho municipio se
realiz en conjunto con la del Municipio Iribarren, debido a que ambos subsistemas
conforman un solo subsistema elctrico. El anlisis para Municipio Torres ser realizado
considerando dos subsistemas elctricos dentro del Municipio, uno que est conformado
por las subestaciones que alimentan a la ciudad de Carora y sus zonas circunvecinas
(Torres1), siendo el mismo el principal subsistema del Municipio, en donde se cuenta con
la mayor participacin de la carga manejada por dicho Municipio; el segundo subsistema
identificado ser el conformado por la subestacin La Pastora (Torres2).

En la siguiente pgina se presenta una tabla en donde se muestran diversas


caractersticas generales de los subsistemas elctricos que alimentan a los municipios
considerados, y la misma permite realizar un diagnstico exploratorio de la situacin actual
y futura de dichos subsistemas.

Observando los valores presentados en la tabla No.10 , se puede apreciar que en la


mayor parte de los municipios analizados, los valores lmites de capacidad, ya sea por parte
de la fuente o de distribucin, son superados por los valores estimados de carga dentro del
perodo de tiempo considerado por este plan.

La solucin a cada problemtica ser planteada por municipio, en vista de que cada
uno de ellos tiene caractersticas particulares que lo diferencian de los otros, y dado que el
sistema elctrico de cada municipio depende de una subestacin principal, ubicada en la
mayora de veces en su capital, se puede analizar la problemtica y plantear soluciones
particulares.

105

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Tabla No . 28
Caractersticas Generales de los sistemas elctricos por Municipio.

Cap. Cap. Carga Estimada Carga Estimada


kV Cap. kV Cap. kV Cap. Cap Confiable
Municipio Confiable Confiable (ao) (ao)
Fuente Fuente Subtrans. Subtrans. Distribucin Distribucin Distribucin
Fuente Subtrans. Subtrans. Distribucin
Andrs Eloy 8.24 MVA (2006)
24 10 MVA 0 MVA ---------- ---------- ---------- 13.8 12.5 MVA 8.125 MVA ----------
Blanco 10.36 MVA (2012)
Crespo 24 20 MVA 0 MVA ---------- ---------- ---------- 13.8 12.5 MVA 8.125 MVA ---------- 7.67 MVA (2005)
Jimnez 115 160 MVA 70 MVA ---------- ---------- ---------- 24 50 MVA 26 MVA ---------- 26.62 MVA (2008)
Morn 115 160 MVA 70 MVA 34.5 10 MVA 0 MVA 13.8 36 MVA 20.8 MVA 4.15 MVA (2015) 21.04 MVA (2010)
Simn 24 5 MVA 10.5 MVA (2005)
5 MVA ---------- ---------- ---------- 13.8 15 MVA 11.5 MVA ----------
Planas 34.5 10 MVA 11.68 MVA (2011)
Torres1 115 160 MVA 80 MVA ---------- ---------- ---------- 24 60 MVA 39 MVA ---------- 41.08 MVA (2005)
Torres2 115 30 MVA 5 MVA ---------- ---------- ---------- 13.8 12.5 MVA 10.625 MVA ---------- 10.10 MVA (2015)
Urdaneta 115 80 MVA 0 MVA 34.5 10 MVA 0 MVA 13.8 10 MVA 0 MVA 10.11 MVA (2011) 10.28 MVA (2015)

Notas:
1. El subsistema principal del Municipio Torres (Subestaciones Planta II y Planta I Carora) est identificado como Torres1 y el otro
subsistema identificado anteriormente ( S/E La Pastora) como Torres2
2. La carga de subtransmisin de los Municipios Torres (Torres1 y Torres2) y Jimnez est agregado en el valor de carga de distribucin.
3. Los valores colocados en la columna de estimacin, ya sea para subtransmisin o distribucin, corresponden a valores de carga estimados
en donde se supera algunos de los lmite del subsistema, ya sea la capacidad de la fuente o la capacidad de distribucin, y en caso de no
superar el lmite de capacidad se coloca el valor del ltimo ao del perodo estudiado.

106

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2.2. Andrs Eloy Blanco

La economa de este Municipio se basa en el turismo y la agricultura, mas


especficamente, el cultivo y comercializacin del caf. El nmero de clientes atendidos en
este Municipio es de aproximadamente 7000 suscriptores y la poblacin que es atendida es
de 45000 habitantes. El sector residencial constituye el de mayor participacin en el total de
energa consumida por los suscriptores, ubicndose su participacin en un 60 %
aproximadamente.

La infraestructura elctrica encargada de distribuir energa elctrica a este municipio


es la subestacin Sanare, ubicada en el sector Palo Verde del poblado de Sanare, la misma
cuenta actualmente con dos transformadores de 5/6.25MVA, 24/13.8kV, y es alimentada
radialmente en 24 kV mediante una lnea expresa proveniente de la subestacin Quibor, y
para el suministro del servicio elctrico posee tres circuitos de distribucin en 13.8 kV, de
los cuales uno de ellos alimenta a la poblacin de Cubiro, poblado del Municipio Jimnez.

El punto ms dbil actual del sistema elctrico del municipio, lo constituye el


expreso en 24 kV que alimenta a la subestacin Sanare, que bajo la prdida del mismo, se
pierde el suministro de energa elctrica en todo el municipio, careciendo de toda
confiabilidad. Adicionalmente para el ao 2006, el valor estimado de carga supera la
capacidad firme de distribucin de la subestacin Sanare, originando la necesidad de
aumentar la capacidad de transformacin. Finalmente, para el ao 2012, se estima que la
carga manejada por la subestacin supere el lmite de capacidad de la lnea expresa en 24
kV que alimenta a la subestacin.

Inicialmente para mejorar la capacidad suministro a la subestacin Sanare y darle


confiabilidad a la misma, se plantea la necesidad de construir un segundo expreso en 24 kV
desde la subestacin Quibor del Municipio Jimnez, esto permitira mantener el suministro
de energa elctrica al Municipio, ante la salida de cualquiera de las lneas expresas de 24
kV que alimentan a la subestacin Sanare. La construccin de este segundo expreso est
planteada para el ao 2008.

Para solventar el caso de la superacin de la carga con respecto a la capacidad firme


de la subestacin, hecho que se espera que ocurra entre los aos 2006-2007, se plantea la
necesidad de instalar una tercera unidad transformadora de 5/6.25 MVA 24/13.8 kV para el
ao 2008.

Por ltimo, en vista que la carga estimada supera la capacidad lmite del expreso
actual existente, se plantea la necesidad de reconstruir dicho expreso, mediante el cambio
del conductor 1/0 Aluminio por 336 MCM, y as permitir que ambos expresos puedan
soportar la carga ante la salida del otro. Esta reconstruccin debe ser realizada en al ao
2012.

Todo lo anteriormente planteado constituye las obras que requiere el sistema


elctrico del Municipio para solventar las necesidades actuales y futuras, pero en recientes
visitas con el personal operativo encargado del servicio en el Municipio, se plante que
107

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


existe una problemtica con respecto al circuito Cubiro, que no se resuelve con las obras
planificadas.

La Problemtica existente consiste que el circuito Cubiro de la S/E Sanare, tiene una
ruta muy complicada para los operadores, existiendo tramos del circuito en donde solo se
puede llegar a pie, y otras simplemente no tienen acceso. Esto origina que las fallas que
ocurren sobre este circuito muchas veces duren mas de 24hrs, incrementando los costos
operativos de ENELBAR y empeorando cada vez mas la calidad de servicio en la zona. En
ciertas ocasiones se ha evaluado el hecho de transferir la carga de este circuito, a un
transformador ubicado en la poblacin de Quebrada Seca de 1.5 MVA 24/13.8 kV, pero en
vista que el mismo es muy pequeo, no se cuenta con capacidad de respaldo suficiente para
la demanda de Cubiro.

Para solventar la problemtica anteriormente planteada, se propuso evaluar una


segunda alternativa que se origina mediante modificaciones de las obras contempladas
inicialmente. La segunda alternativa comprende la construccin de una pequea
subestacin entre los poblados de Paso Real y Cubiro, con un transformador de 5MVA
24/13.8kV, la instalacin de este transformador origina que no se requiera instalar una
tercera unidad de 5 MVA 24/13.8 kV en la subestacin Sanare, ya que parte de la carga
manejada por la subestacin sera transferida a la nueva subestacin, esta nueva subestacin
cumplira con alimentar a los habitantes de Paso Real y Cubiro, quienes actualmente
dependen de la subestacin Sanare y del transformador de 1.5MVA ubicado en el poblado
de Quebrada Seca y alimentado por el Circuito Rodeo de la Subestacin Quibor. Dicha
subestacin sera alimentada por un expreso en 24kV desde la Subestacin Quibor, lo que
originara que no se construya el segundo expreso entre las subestaciones Sanare y Quibor.

El implementar la segunda opcin no se contara con confiabilidad de la fuente que


alimenta a la subestacin Sanare y a la nueva subestacin, ya que cada subestacin estara
alimentada de un solo expreso en 24 kV desde Quibor, lo que implica la necesidad de
construir un expreso de emergencia entre la nueva subestacin y la S/E Sanare, quedando
entonces un pequeo anillo entre estas dos subestaciones y la S/E Quibor, dando de este
modo la confiabilidad necesaria al municipio Andrs Eloy Blanco y a la nueva subestacin.

Actualmente se est evaluando la segunda alternativa, para determinar las ventajas y


desventajas de la misma ante la planteada en el Plan, los resultados de esta evaluacin sern
publicados en la futura actualizacin de este Trabajo.

Las obras contempladas permitirn mejorar el servicio elctrico para el Municipio


Andrs Eloy Blanco, y son medios que se enmarcan dentro de los objetivos estratgico de
la empresa, principalmente el de Mejorar la Prestacin del Servicio, y a su vez permiten
establecer la infraestructura elctrica requerida por el Polo de Desarrollo EJE
CAFETALERO, el cual est dentro del Plan de Desarrollo del Estado Lara.

108

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2.3. Municipio Crespo

La economa de este Municipio de basa principalmente en la agricultura,


adicionalmente la actividad comercial, el turismo y la explotacin de los recursos mineros,
a travs de los yacimientos de piedra caliza, deben ser considerados en el desarrollo
municipal por la importancia de su potencial. El nmero de clientes atendidos es este
Municipio es de aproximadamente 15200 suscriptores y la poblacin que es atendida es de
45000 habitantes. El sector residencial constituye el de mayor participacin en el total de
energa consumida por los suscriptores, ubicndose su participacin en un 60 %
aproximadamente.

La carga del Municipio es suplida por medio de la Subestacin Duaca, ubicada en la


poblacin de Duaca, la misma tiene instalado dos transformadores de 5/6.25MVA,
24/13.8kV; la subestacin es alimentada radialmente por medio de un expreso en 24 kV
desde el distribuidor Norte, y este a su vez es alimentado radialmente a travs de dos
expreso en 24 kV desde la Subestacin Ujano.

Actualmente la subestacin no cuenta con confiabilidad a nivel de su fuente, ya que


ante la salida del expreso de 24 kV proveniente del distribuidor Norte, se pierde todo el
suministro al Municipio. Adicionalmente la demanda mxima registrada en la subestacin,
se ha ubicado cerca del lmite de capacidad firme de la misma, lo que podra originar que
en un corto plazo, de uno a dos aos se supere dicha capacidad firme, ya que se cuentan con
proyectos de futuros crecimientos en la zona, como lo son la reconstruccin del centro
turstico en los Baos De Guape, y desarrollos industriales de procesamiento de Sisal, es
importante destacar que en este municipio, tambin se han visto numerosos proyectos
habitacionales, que podran requerir una gran demanda elctrica, que originara la perdida
de la confiabilidad del suministro al superar la capacidad firme de la subestacin Duaca.

La problemtica actual anteriormente planteada, sera resuelta mediante la


construccin de un segundo expreso en 24 kV desde el distribuidor Norte, lo que permitira
brindar la confiabilidad requerida ante la salida de alguno de los expresos que alimenta a la
subestacin Duaca, permitiendo la continuidad del servicio elctrico. Para el caso de que
cuando la carga del Municipio supere la capacidad firme de la subestacin, se tiene previsto
la instalacin de una tercera unidad transformadora de 5/6.25MVA 24/13.8kV, lo que le
brindara una capacidad firme a la subestacin suficiente para alimentar confiablemente la
carga del municipio en todo el perodo de tiempo de este Plan, estas obras estn
contempladas para el ao 2007.

Las obras contempladas permitirn mejorar el servicio elctrico para el Municipio


Crespo, y son medios que se enmarcan dentro de los objetivos estratgico de la empresa,
principalmente el de Mejorar la Prestacin del Servicio, y a su vez permiten establecer la
infraestructura elctrica requerida por el Polo de Desarrollo TAMACA-DUACA-SANTA
INES-MOROTURO, el cual est dentro del Plan de Desarrollo del Estado Lara.

109

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2.4. Municipio Jimnez.

La economa de este Municipio de basa principalmente en la agricultura, en segundo


plano pero no de menor importancia, tambin se tiene el turismo, la recreacin y la
produccin artesanal. El nmero de clientes atendidos es este Municipio es de
aproximadamente 20400 suscriptores y la poblacin que es atendida es de 82000
habitantes. El sector residencial constituye el de mayor participacin en el total de energa
consumida por los suscriptores, ubicndose su participacin en un 50 % aproximadamente,
en segundo lugar se tiene al sector comercial con un 20 % del total del Municipio.

El Municipio Jimnez cuenta con una subestacin ubicada en su capital, Quibor. La


subestacin Quibor tiene instalado dos unidades transformadoras que llevan el 115 kV a 24
kV, uno de 20MVA y uno 30MVA, ambos surten a todos los circuitos de distribucin de
dicho Municipio y a la subestacin Sanare en el Municipio Andrs Eloy Blanco mediante
un circuito expreso en 24kV. La subestacin Quibor es alimentada en 115kV a travs de
una lnea de transmisin proveniente de la Subestacin Manzano en el Municipio Iribarren,
y esta lnea a su vez, alimenta en este nivel de tensin a la Subestacin El Tocuyo.

Es importante destacar que la lnea de transmisin S/E Manzano - S/E Quibor, no


cuenta con equipos de proteccin en el extremo de la S/E Quibor, ya que este subsistema
Manzano-Quibro-El Tocuyo era alimentado en forma radial, pero en vista a la existencia de
una segunda alimentacin a este subsistema, mediante la construccin de la lnea 115kV
San Pablo-El Tocuyo, se hace necesario el equipamiento de dicha lnea en el patio de
115kV en la Subestacin de Quibor, en vista de no permitir el corte del suministro de la
subestacin Quibor, ante el caso de la salida de la lnea 115 kV Manzano-Quibor. Este
equipamiento est previsto a ser realizado para el ao 2006.

La situacin actual del servicio elctrico en el Municipio Jimnez, est determinada


por la obsolescencia del transformador de 20MVA en la subestacin Quibor y la violacin
de la capacidad firme de la subestacin, la cual se estima sea para el ao 2008, en donde la
carga pronosticada superara a la capacidad firme de suministro de energa a nivel de 24kV.
La solucin a esta problemtica sera el reemplazo del transformador de 20 MVA 115/24
kV por uno de 30 MVA 115/24 kV, y as poder brindar una mayor capacidad,
adicionalmente se estara mejorando el servicio ya que el transformador a sustituir no
cuenta con regulacin automtica, caracterstica imprescindible de la nueva unidad a
instalar. El cambio de la unidad transformadora se estima que sea para al ao 2008.

Por otra parte, en el ao 2008, se espera se construya la subestacin Oeste en el


municipio Iribarren, desde esta subestacin se espera reforzar al subsistema de regiones,
para lo cual se plantea la necesidad de construir una lnea 115 kV entre la subestaciones
Oeste y Quibor, esto requiere que el patio de 115kV de la subestacin Quibor tenga una
llegada de lnea disponible, para lo cual se determina que para el ao 2009 se debera
ampliar la barra de 115kV de la Subestacin Quibor, paralelamente a la construccin de la
lnea de transmisin simple terna 115kV, S/E Oeste - S/E Quibor.

110

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Las obras contempladas permitirn mejorar el servicio elctrico para los Municipios
Jimnez y Andrs Eloy Blanco, y son medios que se enmarcan dentro de los objetivos
estratgico de la empresa, principalmente el de Mejorar la Prestacin del Servicio, y a su
vez permiten establecer la infraestructura elctrica requerida por los Polo de Desarrollo
VALLE DE QUIBOR y EJE CAFETALERO, los cuales estn dentro del Plan de
Desarrollo del Estado Lara.

111

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2.5. Municipio Morn.

La economa de este Municipio de basa principalmente en la agricultura. El nmero


de clientes atendidos en este Municipio es de aproximadamente 21200 suscriptores y la
poblacin que es atendida es de 112500 habitantes. El sector residencial constituye el de
mayor participacin en el total de energa consumida por los suscriptores, ubicndose su
participacin en un 40 % aproximadamente, en segundo lugar se tiene al sector industrial
con un 30 % del total del Municipio, este ltimo resultado se ve muy influenciado por la
existencia de la Planta de Nestle ubicada en la ciudad de El Tocuyo.

La S/E Tocuyo es la encargada de distribuir la energa elctrica en este municipio y


est ubicada en la ciudad de El Tocuyo. Esta subestacin es alimentada por medio de dos
lneas de transmisin en 115kV, una desde la Subestacin Quibor en el Municipio Jimnez,
y otra desde la Intercepcin de la lnea Zona Industrial Planta II Carora a nivel del sector
de San Pablo. Desde esta subestacin se alimenta a las subestaciones Humocaro, La
Pastora y Sabaneta en 34.5kV, estas dos ltimas pertenecientes al Municipio Torres. La
subestacin cuenta con un transformador 115/34.5kV de 10MVA y dos transformadores
115/13.8kV de 16 y 20 MVA respectivamente.

Comparando la carga estimada de la subestacin El Tocuyo con la capacidad


instalada en la subestacin a nivel de 13.8 kV, podemos decir que la capacidad firme de la
subestacin es superada en el ao 2010, lo que podra originar la necesidad de aumentar la
capacidad de transformacin de 115/13.8 kV, pero en visitas a la poblacin analizada, se
pudo comprobar la existencia de problemas de tensin en ciertos sectores del Municipio,
especficamente en las poblaciones de Guarico y Anzotegui, debido a la gran extensin
del circuito que alimentan a estas poblaciones.

Para solucionar la problemtica del Municipio se propone la construccin de una


nueva subestacin en la poblacin de Guarico, mediante la instalacin de un transformador
de 5MVA, 34.5/13.8kV alimentado por un expreso en 34,5 kV desde la subestacin El
Tocuyo, con esto se alimentara la carga de esta parroquia con una mejor calidad de
servicio y se liberara carga en 13.8 kV de la Subestacin El Tocuyo, lo que originara no
requerir de capacidad adicional de transformacin en dicha subestacin a nivel de 13,8 kV.

En caso de la salida del transformador de 115/34.5 kV en la subestacin El Tocuyo,


la subestacin Guarico podra ser alimentada en 13,8 kV por medio del circuito de
distribucin actualmente en uso, para ello se debe prever mantener un punto de
transferencia en 13,8 kV entre el sistema de distribucin de la nueva subestacin y el
sistema de distribucin de la subestacin El Tocuyo. Por otra parte, para el caso de la
alimentacin a la subestacin Humocaro, la cual depende tambin del transformador de
115/34,5 kV de la Subestacin El Tocuyo, se puede alimentar desde la subestacin La
Pastora, mediante la utilizacin de la lnea 34,5 kV que alimenta actualmente a la
subestacin La Pastora desde la subestacin Humocaro. Estas operaciones le brindan
confiabilidad al suministro de energa, a las subestaciones en 34,5kV existentes en el
Municipio ante la contingencia analizada.

112

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Ahora, el circuito que alimenta a la poblacin de Anzotegui presenta la misma
problemtica, pero con niveles de carga menores a la de Guarico, se espera mas adelante
implementar una solucin similar a la de Guarico. La propuesta consiste en la construccin
de una subestacin en el poblado de Anzotegui mediante la instalacin de un
transformador de 5MVA, 34.5/13.8kV y la construccin de un expreso en 34,5 kV desde la
subestacin Guarico hasta la nueva subestacin. De realizarse la construccin de la
Subestacin Anzotegui, hara falta la incorporacin de un segundo transformador
115/34.5kV en la subestacin El Tocuyo, para darle una mayor confiabilidad al sistema de
este municipio.

Las obras contempladas permitirn mejorar el servicio elctrico para el Municipio Morn, y
son medios que se enmarcan dentro de los objetivos estratgicos de la empresa,
principalmente el de Mejorar la Prestacin del Servicio, y a su vez permiten establecer la
infraestructura elctrica requerida por el Polo de Desarrollo EJE CAFETALERO, el cual
est dentro del Plan de Desarrollo del Estado Lara.

113

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2.6. Municipio Simn Planas

La Principal actividad econmica del municipio Simn Planas es la agropecuaria.


Con respecto a la actividad industrial, los principales centros de produccin son: las
empresas Destileras Unidas y DEMASECA, los cuales actan como los mayores
generadores de empleo en la zona. El nmero de clientes atendidos es este Municipio es de
aproximadamente 5200 suscriptores y la poblacin que es atendida es de 30000 habitantes.
Los sectores principales de consumo son el Industrial y residencial, los cuales constituyen
los de mayor participacin en el total de energa consumida por los suscriptores, ubicndose
la participacin de ambos en un 70 % aproximadamente, y la participacin de estos
sectores es parecida. El consumo del sector industrial en este municipio se ve influenciada
por la produccin de las empresas anteriormente mencionadas.

En el Municipio Simn Planas, la S/E La Miel es la encargada de distribuir la


energa del sector, esta subestacin tiene dos fuentes de alimentacin, una de ellas esta
constituida por un expreso proveniente del distribuidor Agua Viva en 24kV (conductor
336MCM, 500Amp Aproximadamente), este Distribuidor, a su vez, es alimentado por
medio de dos expresos en 24kV de la S/E Manzano, la otra alimentacin es por medio de
una lnea expresa en 34,5 kV que parte de la subestacin Acarigua I de Eleoccidente. La
subestacin tiene instalado tres unidades transformadoras, una de 5 MVA 24/13.8 kV y
dos de 5 MVA 34.5/13.8 kV.

Actualmente, la carga manejada por la subestacin La Miel ha superado la


capacidad limite operativa de la misma, y en vista a esta situacin, no se cuenta con una
capacidad de suministro confiable que permita mantener el servicio a la hora de alguna
contingencia de algn equipo, ya sea unidad transformadora o expreso de alimentacin. En
consecuencia a lo anterior, no se puede cubrir aumentos de demanda, ni mucho menos los
nuevos requerimientos del municipio, tales como la Construccin de la Zona Industrial, del
Ferrocarril y el Hospital (informacin verbal de la Alcalda).

En funcin de lo expuesto anteriormente, el sistema necesita una ampliacin


urgente, ya que la Ley Orgnica del Servicio Elctrico, obliga a la empresa a cumplir con
todas las solicitudes de servicio y en la Norma de Calidad del Servicio de Distribucin de
Electricidad, se indican las penalizaciones en las que se puede incurrir por el
incumplimiento de la Ley. Adems, uno de los objetivos de la empresa es conseguir el
aumento de la satisfaccin de sus clientes, para lo cual requiere contar con infraestructuras
que permitan el buen desenvolvimiento de la vida en cualquier rincn del rea de cobertura
y no convertir a ENELBAR en un ente obstructor del progreso.

Luego de visitar la S/E La Miel, se pudo comprobar que existe una gran
disponibilidad de terreno adyacente a la subestacin, por lo que se pueden plantear
alternativas con libertad de espacio para dar solucin a esta problemtica. Adems, se
levant la informacin de los equipos que se encuentran actualmente en la Subestacin, y
se encontraron varios que pueden ser reutilizables para la expansin.

114

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


El estudio consisti en plantear una serie de opciones de expansin para ser
evaluadas tcnica y econmicamente, y lograr contar con la capacidad de suministro
necesario por este municipio, las opciones estudiadas fueron las siguientes:

O
Oppcciioonneess D
Deessccrriippcciinn
1 Alimentacin en 24kV
1.a 2 Expresos de 24kV: 1 en 336MCM y 1 en 795MCM
1.b 2 Expresos de 24kV: 2 en 795MCM
2 Alimentacin en 115kV
2.a Anillo 115kV: Derivacin en Lnea Cabudare - Acarigua I
Anillo 115kV: Derivacin en Lnea Yaritagua - Acarigua
2.b II
2.c Radial 115kV: Lnea 115kV de Palavecino

El objetivo de la evaluacin tcnica era calcular la capacidad mxima de


transferencia de Potencia Bajo el Criterio n-1, es decir, en caso de contingencia; para cual
se model el Sistema Interconectado Nacional completo, en el programa DigSILENT
10.31. Adems, se calcularon las prdidas para los escenarios del pronstico de Demanda
con la Alimentacin en 24kV, de manera de cuantificar la cantidad de prdidas a las que se
expone el sistema.

Luego de la evaluacin tcnica, se realiz un anlisis de rentabilidad de los


proyectos que representan las opciones que calificaron tcnicamente, para justificar
econmicamente alguna de las propuestas; de este modo se garantiza la satisfaccin del
cliente, dndole una mayor calidad de servicio, y se puede seleccionar la opcin mas
rentable para la empresa.

De la Evaluacin Econmica se obtiene que la opcin ms rentable sea la


Alimentacin en 115kV, mediante la derivando la lnea Yaritagua Acarigua II. Esta
opcin cuenta con las siguientes ventajas:
- Los ndices de falla en las lneas de 115kV son mucho menores que para las lneas
de 24kV.
- Las tarifas de compra en 115kV son menores que las de 34.5kV.
- En caso de falla en alguna de las lneas que alimentaran a la S/E, existe un
respaldo, evitando que el cliente se quede sin servicio.
- Se ahorrara el 100% de las penalizaciones de las que se podra ser objetivo en este
momento.

Cabe destacar que las prdidas en el expreso existente, representan el 0.5% de las
prdidas totales del sistema ENELBAR. Esto implica que al eliminarlo se contribuye de
gran manera con la eficiencia del sistema, ya que estas prdidas quedaran eliminadas con
la alimentacin en 115kV.

Las obras contempladas permitirn mejorar el servicio elctrico para el Municipio


Simn Planas, y son medios que se enmarcan dentro de los objetivos estratgico de la

115

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


empresa, principalmente el de Mejorar la Prestacin del Servicio, y a su vez permiten
establecer la infraestructura elctrica requerida por el Polo de Desarrollo
FERROVIARIO BURIA, el cual est dentro del Plan de Desarrollo del Estado Lara.
Municipio Urdaneta.

El Municipio Urdaneta del Estado Lara, que se encuentra a una distancia de


aproximadamente 150km de la ciudad de Barquisimeto y es el segundo municipio en
extensin con 3.623 km2. Las restricciones de agua han hecho de este municipio un
tradicional productor de pia, sisal y ganado caprino. Se destaca por la produccin de
frutas, hortalizas y cereales, maz y sorgo. Las condiciones agroclimticas permiten dos
cosechas anuales de sorgo. El nmero de clientes atendidos es este Municipio es de
aproximadamente 10100 suscriptores y la poblacin que es atendida es de 55000
habitantes. El sector residencial constituye el de mayor participacin en el total de energa
consumida por los suscriptores, ubicndose su participacin en un 55 % aproximadamente.

Este Municipio es uno de los sectores que presenta ms fallas. La responsable de


surtir de energa elctrica es la subestacin Aguada Grande, la cual es alimentada por
medio una de lnea radial simple terna en 115kV con un conductor 336 MCM proveniente
del estado Yaracuy, a travs de la subestacin Aroa perteneciente a la empresa CADAFE.
La S/E Aguada Grande es la nica que alimenta a una gran extensin geogrfica a travs de
un transformador con una capacidad de 10 MVA, 115/13.8kV. Tambin cuenta con un
transformador de 10MVA115/34.5kV, al cual se tiene un circuito que alimenta a las
subestaciones Churuguara y Santa Cruz de Bucaral de Eleoccidente en 34.5kV.

Uno de los grandes problemas que est pasando el subsistema de este Municipio, es
la falta de confiabilidad de la fuente de suministro, en donde se ha visto afectada por la
prdida del mismo mediante la salida de la lnea 115 kV que alimenta a la subestacin
Aguada Grande, esta caracterstica es consecuencia de que esta subestacin constituye la
cola de un subsistema en 115 kV de la empresa Eleoccidente, y en vista a cualquier
dificultad de este subsistema aguas arriba, se tiene un impacto directo en el suministro de la
subestacin Aguada Grande. La solucin a esta problemtica es tratado en el punto del
anlisis del sistema de transmisin de este trabajo, en donde se platea como solucin:
independizar la alimentacin de dicha subestacin, mediante la construccin de una lnea
de transmisin en 115 kV de 30km desde la subestacin Norte e interceptar a la lnea 115
kV Aroa-Aguada Grande.

Por otra parte, se realiz un recorrido a todo el sistema del Municipio Urdaneta,
observando que los circuitos ramales son muy extensos y gran parte de su recorrido es por
zonas montaosas y de difcil acceso, que dificultan las labores de mantenimiento. La
subestacin Agua Grande posee tres circuitos de distribucin: Santa Ins, Siquisique y
Aguada Grande, los cuales alimentan a las poblaciones de Aguada Grande, Siquisique,
casero Agua Viva, Santa Ins, Moroturo y otra gran cantidad de pequeos caseros al norte
de Estado Lara. Su tensin nominal de funcionamiento es de 13.8kV. Los circuitos poseen
una diversidad de conductores que van desde el aluminio 2/0 hasta el conductor de cobre
nmero 6, y los troncales de los circuitos Santa Ins y Siquisique son de aproximadamente
75km y 60km de longitud respectivamente.
116

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


Actualmente la subestacin Aguada Grande carece de confiabilidad en el suministro
de la carga, tanto para 13,8 kV como para 34,5 kV, y adems, analizando la carga estimada
de la subestacin para el nivel de tensin 13,8 kV, se puede observar que para el ao 2015
se supera la capacidad instalada de la subestacin en 13.8 kV. La solucin inmediata sera
ampliar la capacidad de transformacin en 13,8 kV, pero esto no contribuira en mejorar la
confiabilidad de suministro y la calidad de servicio, debido a la extensin de los circuitos
de distribucin.

Para evaluar la calidad de suministro del sistema de distribucin de electricidad, se


procedi a simular dicho sistema en el programa de anlisis, esto permiti determinar que
las prdidas en los circuitos Santa Ins y Siquisique registran valores de 536.38 kW y
519.99 kW, equivalente al 50.5 % y 48.95 % respectivamente, adicionalmente se realiz el
anlisis de las tensiones presentes en cada uno de los circuitos, de lo que podemos decir que
los circuitos Santa Ins y Siquisique superan el porcentaje establecido en los criterios de
cadas de tensin para redes rurales, ya que presentan una variacin de tensin de -29 % y -
26 %. El criterio de planificacin establece que los Sistema Regiones acepta hasta un 10%
del valor nominal en condiciones normales, siempre y cuando existan mecanismos para
corregir al menos hasta -5% aguas abajo del transformador principal. De los resultados
obtenidos para el sistema original, se determin que los circuitos Santa Ins y Siquisique
deben ser normalizados en cuanto a los niveles de tensin, ya que registran grandes
prdidas y una cada de tensin superior al -10 %, que es el mximo permitido para
circuitos rurales.

De acuerdo con el conocimiento del sistema y la problemtica plateada, se proponen


dos alternativas de expansin, una debido a la necesidad de satisfacer la demanda futura de
potencia y energa, y la segunda para generar amplias mejoras y lograr una reduccin
importante en las prdidas de los circuitos. A continuacin se especificar con ms detalle
cada una ellas:

Alternativa 1:

La S/E Aguada para el ao 2015, necesita una ampliacin con una unidad
transformadora de 10 MVA 115/13.8 kV en paralelo al transformador ya existente,
cubriendo la demanda exigida.

Alternativa 2:

Tomando en cuenta la reduccin de prdidas, la cada de tensin, calidad de servicio


y confiabilidad. Es necesario construir dos subestaciones ubicadas en las poblaciones
Siquisique y Santa Ins. En las nuevas subestaciones se debe instalar como mnimo un
transformador de 5 MVA 34.5/13.8 kV, con lo cual se garantiza el consumo actual y futuro.
Las nuevas subestaciones sern alimentadas por medio de dos expresos 34.5 kV con
conductor 336 MCM, proveniente de la S/E Aguada Grande con una longitud de 33 y 22
km para la S/E Siquisique y Santa Ins respectivamente. Para la alimentacin de los

117

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


expresos provenientes de la S/E Aguada Grande, es necesaria la ampliacin de dicha
subestacin con una unidad transformadora de 10 MVA 115/34,5.

Las alternativas planteadas fueron evaluadas tcnica y econmicamente, para


garantizar la satisfaccin del cliente, dndole una mayor calidad de servicio, seleccionando
la opcin ms rentable para la empresa.

Del estudio tcnico se obtuvo importantes resultados, entre los cuales se determin
en el clculo de las prdidas tcnicas en el perodo 2004-2008, que la alternativa 2 reducen
las prdidas en un promedio de 51,6 %, lo que implica un ahorro en el costo del suministro
de la energa en el Municipio.

De acuerdo a los anlisis realizados, result ser ms ventajoso para el sistema, la


alternativa que contempla la construccin de dos nuevas subestaciones, una en Santa Ins y
la otra en Siquisique, alternativa 2, ya que la misma result ser la ms rentable, y adems es
la que da mejor solucin tcnica a la problemtica del Municipio Urdaneta, por la
disminucin tan significativa en prdidas tcnicas y ahorro de costos mantenimiento.

En vista de que la solucin propuesta origina el diseo y construccin de dos


subestaciones alimentadas en forma radial, las cuales solo contaran con un solo expreso y
un solo transformador para cumplir su misin, para poder dar confiabilidad a estas
subestaciones, se requiere mantener un punto de conexin de los circuitos de las nuevas
subestaciones con los circuitos de la subestacin Aguada Grande, y de este modo, ante la
salida de la lnea expresa que alimenta a alguna de las subestaciones o del transformador de
las nuevas subestaciones, se pueda alimentar la carga mediante el sistema de distribucin de
la subestacin Aguada Grande, situacin que durara mientras se reestablece el sistema.

Las obras contempladas permitirn mejorar el servicio elctrico para el Municipio


Urdaneta, y son medios que se enmarcan dentro de los objetivos estratgico de la empresa,
principalmente el de Mejorar la Prestacin del Servicio, y a su vez permiten establecer la
infraestructura elctrica requerida por los Polos de Desarrollo TOCUYO MEDIO y
TAMACA-DUACA-SANTA INES-MOROTURO, los cuales estn dentro del Plan de
Desarrollo del Estado Lara.

118

Plan de Expansin del Sistema de Transmisin Periodo 2006-2015


6.2.7. Municipio Torres.

El Municipio Torres del Estado Lara, es el de mayor extensin de Estado con


6954km2. La economa de este municipio gira en torno a la produccin de azcar y la
actividad ganadera. Presenta buenas perspectivas para la produccin, comercializacin y
exportacin de hortalizas y frutas. La actividad vincola se ha desarrollado y ha adquirido
renombre nacional. Posee ventajas comparativas para el desarrollo de la actividad
agroindustrial e industrial debido a su excelente localizacin geogrfica e importancia en la
produccin de caa de azcar, caf y ganadera. El nmero de clientes atendidos en este
Municipio es de aproximadamente 41000 suscriptores y la poblacin atendida es de 165000
habitantes. El sector residencial constituye el de mayor participacin en el total de energa
consumida por los suscriptores, ubicndose su participacin en un 50 % aproximadamente.

Debido a la gran extensin geogrfica de este Municipio, se cuentan con tres


subsistemas, los cuales alimentan a ciertas zonas en particular. El subsistema elctrico
principal lo constituye el formado por las subestaciones que alimentan a la ciudad de
Carora, capital del Municipio, y desde el mismo se alimentan a diversos poblados del
Municipio, este subsistema es el que maneja una mayor cantidad de carga elctrica; el
segundo subsistema en cuanto al consumo de carga se refiere, es el formado principalmente
por la subestacin La Pastora; y el tercer subsistema es el que est compuesto por el
conjunto de subestaciones alimentadas desde la subestacin Puricaure. A continuacin se
realizar un anlisis separado de cada subsistema por separado.

El subsistema principal del Municipio est conformado por dos subestaciones


ubicadas en la ciudad de Carora, la principal de las mismas es la subestacin Planta II de
Carora, la cual es alimentada en 115 kV por medio de dos lneas provenientes de las
subestaciones Barquisimeto y Zona Industrial, ubicadas ambas en la ciudad de
Barquisimeto. La subestacin Planta II posee dos unidades transformadoras de 30 MVA
115/24 kV cada una, y alimenta a la otra subestacin de la ciudad por medio de dos
expresos en 24 kV, dicha subestacin tiene el nombre de Planta I Carora. Desde ambas
subestaciones se alimentan a otras poblaciones adems de la ciudad de Carora, como es el
caso de las poblaciones de Aregue, Atarigua, Sicarigua, Ro Tocuyo, Arenales entre otros.

Actualmente la carga registrada a nivel 115 kV en la subestacin Planta II Carora,


ha superado la capacidad firme de la misma a nivel de 24 kV, lo que origina que ante la
salida de una de las unidades transformadoras de 30 MVA 115/24 kV, no se cubre toda la
carga, situacin ya vivida en este subsistema.

Para solventar la problemtica actual se debe buscar la manera de incrementar la


capacidad de transformacin en este subsistema, para ello se realizaron varias visitas al
Municipio, y dentro de las cuales se evaluaron diversas opciones para lograr la expansin,
las mismas se orientaban a dos alternativas: la primera era incrementar al nmero de
unidades de transformacin en la subestacin Planta II Carora y la otra consista en la
construccin de una nueva subestacin 115/24 kV en la ciudad de Carora.

La primera alternativa evaluada, incrementar las unidades de transformacin en


Planta II Carora, no es factible ni es recomendable a largo plazo, la factibilidad depende de
119
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
la disponibilidad de que la infraestructura actual de la subestacin en permitir la instalacin
de una tercera unidad transformadora, la barra actual 115 kV de la subestacin se encuentra
copada, es decir, no permite la incorporacin de otro elemento, ni es posible la ampliacin
de la misma. Por otro lado, se pudo constatar que en la ciudad de Carora est naciendo
nuevos centros de cargas que se alejan de los existentes. Estas condiciones dieron fuerza a
la segunda alternativa, el construir una nueva subestacin en la ciudad.

Una vez determinado la orientacin de los nuevos centros de carga en la ciudad, se


procedi a ubicar zonas estratgicas para la construccin de una nueva subestacin 115/24
kV; el resultado de estas actividades establece que la nueva subestacin estara ubicada en
la zona sureste de la ciudad, dentro de los nuevos centros de carga y adems cerca de las
lneas 115 kV que alimentan a la subestacin Planta II Carora.

Esta nueva subestacin fue bautizada con el nombre de El Roble, ya que la misma
estara dentro del sector El Roble de Carora. Esta subestacin se alimentara por medio de
la desviacin de la lnea 115 kV Barquisimeto-Planta II Carora, tendra en su primera etapa,
una capacidad lmite de suministro de energa elctrica de 60 MVA en 24 kV, en vista que
contara con dos unidades de 30 MVA 115/24 kV. Esta obra est contemplada para el ao
2010.

El segundo subsistema, considerado inicialmente, est constituido por las redes que
alimentan a las zonas que se encuentran al sur del Municipio, especficamente en la
poblacin de La Pastora y sus zonas circunvecinas. Este subsistema esta conformado por
dos subestaciones: La Pastora y Sabaneta. Ambas, son alimentadas mediante un mismo
expreso proveniente de la S/E El Tocuyo en 34.5kV.

La subestacin La Pastora es de niveles 34,5kV y 13,8kV, y posee una unidad


transformadora de 5 MVA 34,5/13,8 kV. La subestacin Sabaneta y tiene instalado un
transformador de 2,5 MVA 34,5/13,8 kV.

Actualmente se est construyendo la nueva subestacin La Pastora, la cual tendr


niveles de tensin 115 kV, 34,5 kV y 13,8 kV; en su primera etapa contar con un
transformador de 15/20 MVA 115/34,5 kV y dos transformadores de 5/6,25 MVA
34,5/13,8 kV, alimentada mediante una lnea 115 kV desde la subestacin Planta II Carora.
Desde esta subestacin se alimentar a la subestacin Sabaneta en 34,5 kV. Se estima esta
obra sea inaugurada y puesta en servicio en el primer trimestre del ao 2006. La nueva
subestacin La Pastora permitir aumentar la capacidad de suministro a la zona y mejorar la
calidad del mismo, ya que actualmente se tiene carga represada y niveles de tensin de
suministro por debajo de lo aceptado por las normas y criterios establecidos.

El nico punto dbil de esta nueva subestacin dentro del subsistema analizado, es
que no se cuenta con capacidad suficiente de respaldo ante la salida del transformador de
115/34,5 kV de la Pastora y/o de la lnea 115 kV que proviene de la subestacin Planta II
Carora, solo se podra recuperar parte de la carga de la subestacin La Pastora utilizando el
sistema 34,5 kV que alimentaba anteriormente a la subestacin, pero la ocurrencia de la
situacin analizada es de baja probabilidad, ya que la instalacin es nueva y las tasas de
falla en estas condiciones y para el nivel de tensin involucrado (115 kV) son relativamente
120
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
bajas, para al caso de que la prdida de la unidad transformadora, la subestacin est
diseada para trabajar con dos unidades, lo que mejorara la operacin en caso de ser
desfavorable. La subestacin Sabaneta no tendra problemas, ya que sera alimentada desde
la subestacin El Tocuyo.

Para el Largo Plazo, se determina la necesidad de aumentar la capacidad de


distribucin en la subestacin La Pastora, ya que se estaran superando el mximo de
capacidad firme de la subestacin a nivel 13,8 kV, esta situacin requiere la instalacin de
una tercera unidad transformadora de 5/6,25 MVA 34,5/13,8 kV, lo que permitira operar a
la subestacin con el grado de confiabilidad requerido en 13,8 kV. La instalacin de la
tercera unidad est prevista a realizar entre los aos 2012-2015, el ao exacto depende del
comportamiento de la carga una vez puesto en servicio la nueva subestacin La Pastora.

Por ltimo, el tercer subsistema del Municipio est conformado por las
subestaciones Puricaure, Palmarito, Quebrada Arriba y La Mamita, estas subestaciones
alimentan principalmente las zonas rurales del oeste y noroeste del Municipio.

La subestacin Puricaure constituye la fuente de suministro al resto de las dems


subestaciones, esta subestacin posee niveles de tensin 115 kV y 34,5 kV, su alimentacin
es mediante una lnea 115 kV proveniente de la subestacin Machango de la empresa
ENELCO, tiene instalado un transformador de 7,5 MVA 115/34,5 kV. Alimenta a las
subestaciones Palmarito, Quebrada Arriba y La Mamita en 34,5 kV, es la nica subestacin
de ENELBAR que no cuenta con circuitos de distribucin.

Las subestaciones Palmarito, Quebrada Arriba y La Mamita son las encargadas de la


distribucin en este subsistema, todas son alimentadas en 34,5 kV y poseen una unidad
transformadora de 34,5/13,8 kV con una capacidad de 2,65 MVA, 2,5 MVA y 2,5 MVA
respectivamente.

La debilidad de este subsistema es el hecho de que las instalaciones no cuentan con


capacidad de reserva ante la prdida de algn elemento, pero la capacidad actual en la
mayora de los casos, tienen un nivel de utilizacin que no supera el 50 % del limite, esto
permite inferir que se cuenta con capacidad de afrontar crecimientos en esta zona, lo que si
el sistema no puede soportar la salida de algn elemento, lo que conlleva a tener tiempos de
recuperacin del sistema relativamente bajos, para as evitar tener prdidas del suministro
por perodos elevados.

En este subsistema no se tiene contemplado elaborar obras dentro del perodo del
plan, lo que se plante es prever espacio en la nueva subestacin El Roble de Carora, para
construir un patio en 34,5 Kv que permita reforzar al subsistema en cuestin.

Las obras contempladas permitirn mejorar el servicio elctrico para el Municipio


Torres, y son medios que se enmarcan dentro de los objetivos estratgico de la empresa,
principalmente el de Mejorar la Prestacin del Servicio, y a su vez permiten establecer la
infraestructura elctrica requerida por los Polos de Desarrollo TOCUYO MEDIO y SAN
FRANCISCO- QUEBRADA ARRIBA - PALMARITO, los cuales estn dentro del Plan
de Desarrollo del Estado Lara.
121
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
6.2.8. Anlisis Final

Una vez construidas las obras mencionadas anteriormente, se logra mejorar la


prestacin del servicio elctrico en todas las zonas que cubre el subsistema de regiones, en
la tabla No. 11 se comparan las futuras condiciones generales de los subsistemas por cada
municipio, con las cargas estimadas en el ltimo ao del perodo del Plan, en dicha tabla se
puede apreciar que los subsistemas de cada municipio tendrn los elementos requeridos
para permitir el buen desenvolvimiento de la sociedad a que fue diseado, impulsando el
progreso y permitiendo el desarrollo de la poblacin, y as contribuir a la visin de la
empresa, convertir a ENELBAR en la empresa lder del sector.

122
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla No. 29
Caractersticas Generales de los sistemas elctricos por Municipio al final del perodo de Estudio y las obras planificadas implementadas.

Cap. Cap. Carga Estimada Carga Estimada


KV kV Cap. kV Cap. Cap Confiable
Municipio Cap. Fuente Confiable Confiable (ao) (ao)
Fuente Subtrans Subtrans Distribucin Distribucin Distribucin
Fuente Subtrans. Subtrans. Distribucin
Andrs Eloy
24 40 MVA 20 MVA ---------- ---------- ---------- 13.8 18.75 MVA 16.25 MVA ---------- 11.41 MVA (2015)
Blanco
Crespo 24 40 MVA 20 MVA ---------- ---------- ---------- 13.8 18.75 MVA 16.25 MVA ---------- 14 MVA (2015)

Jimnez 115 240 MVA 160 MVA ---------- ---------- ---------- 24 60 MVA 39 MVA ---------- 34 MVA (2015)

Sist. de
Morn 115 160 MVA 80 MVA 34.5 10 MVA 13.8 36 MVA 20.8 MVA 9.07 MVA (2015) 19.70 MVA (2015)
Distribucin
Simn
115 120 MVA 60 MVA ---------- ---------- ---------- 13.8 40 MVA 26 MVA ---------- 12.4 MVA (2015)
Planas

Torres1 115 240 MVA 160 MVA ---------- ---------- ---------- 24 90 MVA 69 MVA ---------- 54 MVA (2015)
Torres2 115 30 MVA 5 MVA ---------- ---------- ---------- 13.8 17.5 MVA 13 MVA ---------- 10.10 MVA (2015)
Sist. de
Urdaneta 115 80 MVA 0 MVA 34.5 20MVA 13 MVA 13.8 10 MVA 19.13 MVA (2015) 2.07 MVA (2015)
Distribucin

Notas:
1. El subsistema principal del Municipio Torres (Subestaciones Planta II y Planta I Carora) est identificado como Torres1 y el otro subsistema
identificado anteriormente ( S/E La Pastora) como Torres 2
2. La carga de subtransmisin de los Municipios Torres (Torres 1 y Torres 2) y Jimnez est agregado en el valor de carga de distribucin.
3. Los valores colocados en la columna de estimacin, ya sea para subtransmisin o distribucin, corresponden a valores del ltimo ao del
perodo estudiado.
4. El las columnas de capacidad confiable, esta presente la opcin Sist. de Distribucin, lo que indica que la confiabilidad en este nivel de
suministro viene dado por el sistema de distribucin del subsistema en particular.

123
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7. REQUERIMIENTOS TCNICOS DE LAS NUEVAS INSTALACIONES Y AMPLIACIONES

7.1. Sistema Barquisimeto

7.1.1. S/E Manzano


Ampliacin S/E Manzano
Patio 23/1150 kV

S/E Ujano
Auto 3
100MVA
230/115kV

Patio 24kV
Auto1
83 MVA 100MVA
115/24kV 230/115kV

Patio 24kV 83 MVA


Auto 2
100MVA
115/24kV
230/115kV

S/E Quibor S/E Centro

115kV
Ampliacin

124
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.2. S/E Centro

S /E C E N T R O S/E CENTRO
AC T U AL AMPLIACIN

S/E M AN ZANO S/E MANZANO


S/E ZO N A S/E ZONA
IN D U STR IAL INDUSTRIAL

115 kV 115 kV

T1 T2 T1 T2 T2
42 M VA 42 M VA 42 MVA 42 MVA 42 MVA
115/24kV 115/24kV 115/24kV 115/24kV 115/24kV
EFAC EC EFAC EC EFACEC EFACEC

E nlace
24 kV 24 kV 24 kV
Enlace
24 kV
Enlace
24 kV

Barreto B arreto R adial R adial R adial Barreto Barreto Radial Radial Radial Radial Radial Radial
N o. 1 N o. 2 N o. 1 N o. 2 N o. 3 No. 1 No. 2 No. 1 No. 2 No. 3 No. 4 No.5 No. 6

125
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.3. S/E Ujano

S/E Ujano
Actual

PLANTA II MANZANO

UJANO
115 kV

T1
83 MVA
J. SCHNEIDER

Enlace

IT
UJANO IT
24 kV

Este

Norte 1 Uj-14 Uj-13 Este Carabal Uj-23 Uj-24 Norte 2

126
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E Ujano
Ampliacin

PLANTA II NORTE y /o POLIGONO PALAVECINO

UJANO
115 kV

T1 T2
83 MVA 83 MVA
J. SCHNEIDER NUEVO

Enlace

IT
UJANO IT
24 kV

Este

Moran 1 Uj-14 Uj-13 Reserv a Morn 2 Uj-23 Uj-24 Este

127
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.4. S/E Norte

DISTRIBUIDOR NORTE
ACTUAL

Ujano 1 Ujano 2

Condensadores
24 kV

Radial 1 Radial 2 Duaca

128
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E NORTE
Ampliacin (Fase I)

UJANO 115 kV

115 kV

T1 T2
30 MVA 30 MVA
115/24 kV 115/24 kV

Enlace
24 kV 24 kV

IT IT

Radila 1 Reserva Duaca 1 Norte 2 Duaca 2 Reserva

129
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E NORTE
Ampliacin (Fase Final)

AGUADA
POLGONO I GRANDE 115 kV POLGONO II

115 kV

T1 T2 T2
30 MVA 30 MVA 30 MVA
115/24 kV 115/24 kV 115/24 kV

Enlace Enlace
24 kV 24 kV 24 kV

IT IT IT

Reserva Reserva
Futura Futura

130
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Alimentacin inicial de la S/E Norte 115/24kV. Alimentacin de la S/E Norte 115/24kV, una vez entre
Ao 2006. en servicio la S/E Polgono 230/115/24kV.
Periodo 2010-2015.

S/E Norte
S/E Norte

Tramo de lnea en 115 kV


Doble Terna (Una equipada)
con conductor 500 MCM S/E Polgono 230/115/24 kV.
como mnimo.

Autopista En este punto, se secciona la lnea


existente. Luego la lnea hacia la S/E 2 X 100 MVA
Circunvalacin Norte
Norte se desvia hacia la nueva S/E
Polgono 115kV. Posteriormente se debe
construir un tramo de lnea adicional
hasta la S/E Planta II.

S/E Planta II Cercanas del Hacia S/E Planta II


Polgono
de tiro.
Tramo de lnea en 115 kV Doble
Terna con
conductor 900 MCM.
Aproximadamente 5 kms,
en este caso se aprovecha la lnea
existente S/E Ujano
S/E Ujano
Ujano-Planta II 115 kV.

Nota: El esquema presentado es independiente de como se desarrolle la


S/E Polgono, es decir
sea una Planta o una subestacin de interconexin, las obras descritas
aqu se mantienen.

131
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.5. S/E Oeste
S/E OESTE
Patio 24kV

Etapa inicial Etapa final

T1 T2 T3
42 MVA 42 MVA 42 MVA
115/24kV 115/24kV 115/24kV

Enlace No.1 Enlace No.2


Barra Principal 24 kV

Transferencia Transferencia Transferencia


No. 1 No. 2 No. 3

Salida Salida Salida Salida Salida Salida Salida Salida Salida


No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

132
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E OESTE (Patio 115 kV)

Fase Final (2015-2025) Fase Inicial (2008)

AT1 AT3 CENTRO QUIBOR SAN PABLO


115 kV 115 kV 115 kV

T3 T2 T1 Zona Industrial
AT2
42 MVA 42 MVA 42 MVA 115 kV

133
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E OESTE (Ampliacin 2015 - 2025)
Patio 230kV

S/E Manzano 230kV S/EYaracuy 230kV

BP

BT

AT1 AT2 AT3


100 MVA 100 MVA 100 MVA

134
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.6. S/E Palavecino

Patio 24kV

Etapa inicial Etapa final

T1 T2 T3
42 MVA 42 MVA 42 MVA
115/24kV 115/24kV 115/24kV

Enlace No.1 Enlace No.2


Barra Principal 24 kV

Transferencia Transferencia Transferencia


No. 1 No. 2 No. 3

Salida Salida Salida Salida Salida Salida Salida Salida Salida


No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

135
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S /E P A L A V E C IN O (F a s e In ic ia l)
P a tio 1 1 5 k V

M ANZANO T1 T2

U JA N O
60 M VA 60 M VA
1 3 .8 /11 5 k V 1 3 .8 /11 5 k V

G G
G 1 G 2
50 M VA 50 M VA

136
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S /E P A L A V E C IN O (F a s e fin a l)
P a tio 11 5 k V

MANZANO R ESER VA
T1 T2 T3

U JAN O
60 MVA 60 MVA 60 MVA R ESER VA
1 3 .8 /11 5 k V 1 3 .8 /11 5 k V 1 3 .8 /11 5 k V

G G G
G1 G2 G3
50 MVA 50 MVA 50 MVA

137
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.7. Dist. Morn
Barquisimeto. (Zona Centro-Este)
S/E Ujano

Esquema de barra y posible ubicacin geogrfica


Distribuidor Morn 24 kV
Periodo 2012-2015

Ujano I Ujano II

S/E Planta 1 Enlace

S/E Este

S/E Poleo IT
MORAN IT
24 kV

C1 C2 C3 C4

138
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Esquema Definitivo SS/EE Ujano, Este y Dist. Moran (2012-2015)
PLANTA II NORTE y/o POLIGONO PALAVECINO

UJANO
115 kV

T1 T2
83 MVA 83 MVA
J. SCHNEIDER NUEVO

Enlace

IT UJANO IT
24 kV

Uj-14 Uj-13 Reserva Uj-23 Uj-24

83 MVA
STROMBERG

Enlace

ESTE
IT MORAN IT
24 kV
24 kV

VENEZUELA TACHIRA SANTA MORAN


ELENA

C1 C2 C3 C4

139
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.1.8. Planta Polgono, S/E Polgono
PLANTAPOLIGONO
Barra Principal y Transferencia
Patio 115kV

Etapa inicial Etapa final

Unidades de generacin en un rango


de 85-150 MW

Enlace No.1
Barra Principal 115 kV

Transferencia Transferencia
No. 1 No. 2

Planta II Ujano Norte 1 Norte 2 Reserva Reserva

140
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
PLANTAPOLIGONO
Unidades de generacin en un rango
Esquema en Interruptor y Medio
de 85-150 MW
Patio 115kV

Reserva 2

Planta II Norte 1 Ujano Norte 2 Reserva 1

141
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E POLIGONO
Patio 24kV

Etapa inicial Etapa final

T1 T2 T3
42 MVA 42 MVA 42 MVA
115/24kV 115/24kV 115/24kV

Enlace No.1 Enlace No.2


Barra Principal 24 kV

Transferencia Transferencia Transferencia


No. 1 No. 2 No. 3

Salida Salida Salida Salida Salida Salida Salida Salida Salida


No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

142
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E POLIGONO (Fase final)
Patio 115kV
AT1 AT2 AT3
NORTE_1 NORTE_2

PLANTA II UJANO T1 T2 T3
42 MVA 42 MVA 42 MVA

143
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E POLIGONO (Fase Final)
Patio 230kV
S/E Barquisimeto S/E Yaracuy
230kV 230kV
BP

IT

RESERVA

BT

AT1 AT2 AT3


100 MVA 100 MVA 100 MVA

144
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.2. Sistema De Transmisin

7.2.1. Sub-Sistema Regiones


Ao 2005
Situacin Actual
Transmisin Regiones

S/E Planta II Carora S/E Barquisimeto

S/E Zona
Industria
l

S/E El Tocuyo

S/E Qubor S/E Manzano

S/E La Pastora
145
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ao 2009
Construccin S/E El Roble
Desvo de Lnea S/E Barquisimeto Planta II Carora

S/E Planta II Carora S/E El Roble S/E Barquisimeto

S/E Zona
Industria
l

S/E El Tocuyo

S/E Qubor S/E Manzano

S/E La Pastora

146
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ao 2009
Desvo de lnea S/E La Pastora-Planta II
Carora hacis S/E El Roble

S/E Planta II Carora S/E El Roble S/E Barquisimeto

S/E Zona
Industrial

S/E El Tocuyo
S/E Oeste

S/E Qubor S/E Manzano

S/E La Pastora

147
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ao 2009
Cosntruccin de Lnea S/E Oeste S/E
Quibor

S/E Planta II Carora S/E El Roble S/E Barquisimeto

S/E Zona
Industrial

Conductor 350MCM
30km, 115kV

S/E El Tocuyo
S/E Oeste

S/E Qubor S/E Manzano


S/E La Pastora

148
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ao 2010
Desvo de lneas S/E Barquisimeto S/E El Roble y
S/E Zona Industrial S/E Plante II Carora, hacia
Distribuidor San Pablo

S/E Planta II Carora S/E El Roble S/E Barquisimeto


Conductor 350MCM
10km en total, 115kV

S/E San Pablo


S/E Zona
Industrial

S/E El Tocuyo
S/E Oeste

S/E Qubor S/E Manzano


S/E La Pastora

149
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ao 2010
Construccin de Lnea S/E Oeste Distribuidor
San Pablo

S/E Planta II Carora S/E El Roble S/E Barquisimeto

S/E San Pablo


S/E Zona
Industrial

Conductor 350MCM
40km, 115kV
S/E El Tocuyo
S/E Oeste

S/E Qubor S/E Manzano


S/E La Pastora

150
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ao 2010
Construccin de tramo de Lnea desde S/E Norte
hasta Interseccin lnea S/E Aroa - S/E Aguada
Grande
S/E Aguada Grande

Conductor 350MCM
30km, 115kV

S/E Aroa (CADAFE)


S/E Norte

151
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3. Sistema Regiones

7.3.1. S/E La Miel


S/E LA MIEL
ACTUAL

Acarigua 34.5 kV
Agua Viva 24 kV

T2
5 MVA T1
34.5/13.8kV 5 MVA
CAIVET 23.9/13.8 kV

T1
5 MVA
34.5/13.8kV
Pauwels
Enlace
13.8 kV 13.8 kV

Demaseca
Destileras La Mel Sarare

152
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E LA MIEL
Ampliacin (Fase I)

ACARIGUA II
YARITAGUA 115 kV 115kV

115 kV

T1 T2
15/20 MVA 15/20 MVA
115/13.8kV 115/13.8kV

Enlace
13.8 kV 13.8 kV

IT IT

Demaseca La Miel Destileras Sarare

153
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E LA MIEL
Ampliacin (Fase Final)

YARITAGUA 115 ACARIGUA II


kV 115kV RESERVA

115 kV

T1 T2 T3
15/20 MVA 15/20 MVA 15/20 MVA
115/13.8kV 115/13.8kV 115/13.8kV

Enlace Enlace
13.8 kV 13.8 kV 13.8 kV

IT IT IT

Demaseca La Miel Destileras Sarare Reserva Reserva

154
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.2. S/E El Tocuyo

S/E EL TOCUYO
ACTUAL

HIDROLARA QUIBOR SAN PABLO

T1 T2
16 MVA 20 MVA 10 MVA
115/13.8kV 115/13.8kV 115/34.5kV
AEG TOSHIBA

Barra 13.8 kV Enlace No.1 Barra 34.5 kV

BORO TOCUYO I TOCUYO II HUMOCARO


GUARICO
ANZOATEGUI

155
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E EL TOCUYO
AMPLIACIN

HIDROLARA QUIBOR SAN PABLO

115 kV

T1 T2
16 MVA 20 MVA 10 MVA
115/13.8kV 115/13.8kV 115/34.5kV
AEG TOSHIBA

Barra Principal 13.8 kV Enlace No.1 Barra Principal 34.5 kV

Transferencia Transferencia
No. 1 No. 2

BORO ANZOATEGUI
TOCUYO I TOCUYO II GUARICO HUMOCARO
GUARICO

156
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.3. S/E Quibor

S/E QUIBOR
ACTUAL

EL TOCUYO MANZANO

115 kV

T1 T2
20 MVA 30 MVA
115/24kV 115/24kV
PAUWELS SIEMENS

Enlace No.1
Barra Principal 13.8 kV

Transferencia Transferencia
No. 1 No. 2

SANARE I INOS EL SAN QUIBOR


RODEO JOSE

157
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E Q U IB O R
AM P L IAC I N

EL T O C U YO O EST E MAN ZAN O

115 kV

T1 T2
30 MVA 30 MVA
115/24kV 115/24kV
SIEMEN S

Barra Principal 13.8 kV Enlace N o.1

T ransferencia T ransferencia
N o. 1 N o. 2

SAN AR E I IN O S Q U IBO R EL SAN SAN AR E II


R O D EO JO S

158
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.4. S/E Aguada Grande

S/E AGUADAGRANDE
ACTUAL

S/E AROA 115 kV


(ELEOCCIDENTE)

T1
10 MVA
10 MVA
115/34.5kV
115/13.8kV

Barra 13.8 kV Barra 34.5 kV

SIQUISIQUE SANTA AGUADA


INES GRANDE

CHURUGUARA

159
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/E AGUADA GRANDE
AMPLIACIN

S/E NORTE
115 kV
115 kV

T1 T2
10 MVA 10 MVA 10 MVA
115/34.5kV 115/34.5kV 115/13.8kV

Enlace No.1
Barra Principal 34.5 kV Barra Principal 13.8 kV

Transferencia Transferencia
No. 1 No. 2

CHURUGUARA SIQUISIQUE SANTA INES SIQUISIQUE SANTA AGUADA


INES GRANDE

160
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.5. SS/EE Santa Ins y Siquisique

Esquema bsico para la subestacin


Santa Insy Siquisique
34.5 / 13.8 kV

13.8 kV

5/6.25 MVA R1 C1
34.5/13.8 kV

R2
Aguada Grande
34.5 kV

R2 C2

Nota: Salvo que sea de forma provisional o no se disponga en el instante de puesta en servicio, la llegada en 34.5 kV
siempre debe estar equipada con un interruptor de potencia, adems debe preveerse el terreno sufieciente para albergar
una segunda unidad de transformacin a futuro.

161
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.6. S/E Duaca
S/E DUACA
ACTUAL

Distribuidor Norte
24 kV

T1 T1
5/6.25 5/6.25
MVA MVA
24/13.8kV 24/13.8kV

R R

DUACA EL ENEAL

162
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Ampliacin

Norte1 Norte2
24 kV 24 kV

T1 T1 T1
5/6.25 5/6.25 5/6.25
MVA MVA MVA
24/13.8kV 24/13.8kV 24/13.8kV

R R R R

URBANO RURAL DUACA EL ENEAL

163
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.7. S/E Guarico

Esquema bsico para la subestacin


Guarico
34.5 / 13.8 kV

5/6.25 MVA 13.8 kV R1 C1


El Tocuyo 34.5 kV 34.5/13.8 kV

R
R2 C2

Nota: Salvo que sea de forma provisional o no se disponga en el instante de puesta en servicio, la llegada en 34.5 kV
siempre debe estar equipada con un interruptor de potencia, adems debe preveerse el terreno sufieciente para albergar
una segunda unidad de transformacin a futuro.

164
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.8. S/E Sanare
S /E S A N A R E
A C TU AL

S u b e s ta c i n Q u ib o r
24 kV

T1 T1
5 /6 .2 5 5 /6 .2 5
M VA M VA
2 4 /1 3 .8 k V 2 4 /1 3 .8 k V

R R R R

R A D IA L 1 R A D IA L 2 R A D IA L 3 R A D IA L 4

165
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S /E S A N A R E
E X P A N S I N

E x p re s o E x p re s o
Q u ib o r-S a n a re 1 Q u ib o r-S a n a re 2
24 kV 24 kV

T1 T2 T3
5 /6 .2 5 M V A 5 /6 .2 5 M V A 5 /6 .2 5 M V A
2 4 /1 3 .8 k V 2 4 /1 3 .8 k V 2 4 /1 3 .8 k V

R R R R R R

R A D IA L 1 R A D IA L 2 R A D IA L 3 R A D IA L 4 R A D IA L 5 R A D IA L 6

166
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.9. S/E El Roble
S/E EL ROBLE CARORA
Patio 24kV

Etapa Inicial Etapa final

T1 T2 T3
30 MVA 30 MVA 30 MVA
115/24kV 115/24kV 115/24kV

Enlace Enlace
24 kV 24 kV 24 kV

IT IT IT

Salida Salida Salida Salida Salida Salida Salida Salida Salida


No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9

Nota : Cada salida debe manejar


un mximo de 7 MVA

167
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
S/EEL ROBLECARORA
Patios 115 y 34.5 kV

Primera Fase

T1 T2 T3
30 MVA 30 MVA 30 MVA

115 kV
T1
10 MVA
115/34.5
34.5 kV
kV

Enlace
T2
10 MVA
115/34.5 Alimentacin ejes
kV Tocuyo Medio y
San Francisco-Quebrada
Arriba-Palmarito

115 kV

S/E PlantaII S/E La Pastora S/E Barquisimeto Segunda Lnea hacia


Carora (S/E San Pablo) S/E San Pablo

Ampliaciones a
Largo Plazo

168
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.10. Dist. San Pablo
ESQUEMA GENERAL
DISTRIBUIDOR SAN PABLO 115kV

S/E BARQUISIMETO S/E ZONA INDUSTRIAL S/EOESTE


RESERVA 115 kV 115 kV 115 kV

RESERVA S/E PLANTA II S/E EL ROBLE S/E EL TOCUYO


CARORA 115 kV 115 kV
115 kV
169
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
7.3.11. S/E La Pastora

Subestacin La Pastora
(Situacin Actual)
115 / 34.5 / 13.8 kV

115 kV 34.5 kV 13.8 kV

R C1

R C2
5 /6.25 MVA
34.5/13.8 kV

Planta II Carora 115 kV


R C3

R C4
5 /6.25 MVA
15 /20 MVA
34.5/13.8 kV
115/34.5 kV
R

Humocaro 34.5 kV

170
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Subestacin La Pastora
(Ampliacin)
115 / 34.5 / 13.8 kV

13.8 kV
115 kV 34.5 kV

R C1
5 /6.25 MVA
34.5/13.8 kV
R C2

5 /6.25 MVA
34.5/13.8 kV
Planta II Carora 115 kV
R C3

R C4
5 /6.25 MVA
15 /20 MVA
34.5/13.8 kV
115/34.5 kV
R

Humocaro 34.5 kV

171
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
8. NIVELES DE CORTOCIRCUITO

Los Niveles de Cortocircuito se presentan en diferentas tablas con el objetivo de facilitar a


los usuarios de estos datos la ubicacin de los mismos. A continuacin se describen cada
una de ellas:

La tabla 12 muestra los niveles actuales de cortocircuito, tanto trifsicos como monofsicos
en todas las barras del Sistema Barquisimeto-Carora hasta 24kV, sin incluir las
subestaciones de Regiones. Caso Ao 2005.

La tabla 13 presenta los niveles de cortocircuito tanto en MVA como en kA, medidos en la
salida de las reactancias instaladas en la salida de los circuitos de distribucin. Caso Ao
2005.

La tabla 14 muestra los niveles de cortocircuito para el ao 2006, tanto trifsicos como
monofsicos en todas las barras del Sistema Barquisimeto-Carora hasta 24kV, sin incluir
las subestaciones de Regiones. En este caso se ha considerado la entrada en servicio del
tercer autotransformador en la S/E Manzano y la Planta Palavecino 2 X 40 MW.

La tabla 15 presenta los niveles de cortocircuito tanto en MVA como en kA, medidos en la
salida de las reactancias instaladas en la salida de los circuitos de distribucin. Caso Ao
2006.

La tabla 16 muestra los niveles de cortocircuito por ao hasta el 2015, tanto trifsicos como
monofsicos en todas las barras del Sistema ENELBAR hasta 13.8kV, incluyendo las
subestaciones de Regiones en MVA.

La tabla 17 muestra los niveles de cortocircuito por ao hasta el 2015, tanto trifsicos como
monofsicos en todas las barras del Sistema ENELBAR hasta 13.8kV, incluyendo las
subestaciones de Regiones en kA.

172
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 30
Niveles de Cortocircuito.
Sistema Barquisimeto - Carora.
Caso: Ao 2005
Trifsico Monofsico
Barra kV MVA kA R1 X1 MVA kA R0 X0
Agua Viva 24 251.700 6.055 0.174 2.282 74.120 5.349 0.336 3.175
Barquisimeto 24 529.210 12.731 0.045 1.087 201.330 14.530 0.007 0.677
Barquisimeto 115 2,499.500 12.549 0.426 5.274 881.170 13.272 0.308 4.251
Barquisimeto 230 4,150.790 10.419 1.251 12.683 1,213.820 9.147 1.690 17.838
Barreto 24 279.130 6.715 0.215 2.052 80.100 5.781 0.432 3.032
Carabal 24 277.250 6.670 0.619 1.983 58.330 4.210 0.899 5.655
Centro 24 339.170 8.159 0.082 1.696 126.000 9.093 0.040 1.172
Centro 115 1,755.570 8.814 0.956 7.472 522.930 7.876 1.805 10.017
Este 24 318.790 7.669 0.283 1.785 113.740 8.029 0.076 1.435
Este 115 835.430 4.194 2.990 15.544 243.430 3.666 3.046 22.047
Manzano * 24 502.710 12.093 0.056 1.144 191.930 13.852 0.015 0.751
Manzano 115 2,021.400 10.148 0.575 6.517 707.630 10.658 0.377 5.553
Manzano 230 4,655.010 11.685 1.260 11.318 1,285.620 9.682 2.085 18.239
Norte 24 104.070 2.504 1.239 5.394 16.780 1.211 4.202 22.854
Planta I 24 344.830 8.295 0.192 1.659 75.560 5.453 0.515 3.831
Planta I Carora 24 113.790 2.737 1.749 4.750 36.740 2.652 2.089 5.138
Planta II* 24 746.830 17.966 0.016 0.771 261.910 18.901 0.002 0.239
Planta II 115 1,688.230 8.476 1.022 7.767 519.450 7.824 1.346 9.296
Planta II Carora 24 149.560 3.598 1.274 3.634 58.820 4.245 0.151 2.137
Planta II Carora 115 246.360 1.237 26.494 46.688 87.550 1.319 5.310 45.786
Poleo 24 372.520 8.961 0.118 1.542 112.690 8.133 0.247 2.003
Sidetur 115 671.410 3.371 7.657 18.148 149.790 2.256 20.490 44.387
Ujano* 24 374.130 9.000 0.207 1.526 135.750 9.797 0.066 1.146
Ujano 115 993.800 4.989 2.429 13.084 291.040 4.384 2.755 18.194
Zona Industrial* 24 614.460 14.782 0.041 0.937 256.870 18.538 0.004 0.382
Zona Industrial 115 1,984.570 9.963 0.764 6.620 583.670 8.791 1.341 9.119
* Niveles en barra. Para valores despus de las reactancias asociadas a los circuitos, ver tabla siguiente.

Trifsico Monofsico
Barras de Interconexin kV MVA kA R1 X1 MVA kA R0 X0
Cabudare 115 2,313.150 11.613 0.449 5.700 837.750 12.618 0.202 4.327
Cabudare 230 4,750.230 11.924 1.116 11.080 1,415.240 10.658 1.393 14.945
Yaracuy 230 8,423.840 21.146 0.314 6.272 3,428.250 25.817 0.124 2.825

Tabla N 31
Niveles de Cortocircuito en MVA y kA.
Reactancias instaladas en la salida de los circuitos de distribucin.
Caso: Ao 2005
Valor de la Niveles de Cortocircuito e Impedancias Equivalentes
Subestacin kV Reactancia Trifsico Monofsico
(ohm) MVA kA R1 X1 MVA kA R0 X0
Barquisimeto 1.4400 384.810 9.257 0.039 1.496 138.350 9.984 0.007 1.162
Manzano 0.5498 339.790 8.174 0.056 1.694 122.210 8.820 0.016 1.321
Planta II 24 1.0990 307.990 7.409 0.016 1.870 104.810 7.564 0.002 1.338
Ujano 0.5498 276.170 6.644 0.207 2.075 97.880 7.064 0.660 1.696
Zona Industrial 0.5498 387.340 9.318 0.041 1.487 148.000 10.681 0.004 0.932

173
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 32
Niveles de Cortocircuito.
Sistema Barquisimeto - Carora.Caso: Ao 2006
Trifsico Monofsico
Barra kV MVA kA R1 X1 MVA kA R0 X0
Agua Viva 24 257.650 6.198 0.171 2.229 75.320 5.436 0.337 3.157
Barquisimeto 24 540.750 13.009 0.045 1.064 204.990 14.794 0.008 0.675
Barquisimeto 115 2,772.070 13.917 0.418 4.752 957.310 14.418 0.341 4.161
Barquisimeto 230 4,331.070 10.872 1.210 12.154 1,251.190 9.422 1.738 17.659
Barreto 24 284.350 6.841 0.213 2.014 81.080 5.851 0.433 3.021
Carabal 24 211.500 5.088 0.512 2.675 37.120 2.679 1.805 9.902
Centro 24 346.930 8.346 0.080 1.658 128.430 9.269 0.041 1.161
Centro 115 1,973.050 9.906 0.908 6.641 571.360 8.605 1.861 9.543
Este 24 287.300 6.911 0.107 2.002 107.300 7.744 0.056 1.350
Este 115 1,230.130 6.176 1.912 10.580 351.590 5.295 2.517 15.791
Manzano * 24 537.740 12.936 0.052 1.070 200.190 14.447 0.016 0.733
Manzano 115 2,463.460 12.368 0.499 5.345 851.820 12.829 0.430 4.750
Manzano 230 4,898.100 12.295 0.958 10.758 1,355.530 10.208 2.022 17.274
Norte 24 104.490 2.514 1.127 5.396 16.870 1.218 4.182 22.727
Palavecino 24 386.750 9.304 0.110 1.485 152.190 10.984 0.012 0.803
Palavecino 115 1,821.210 9.143 1.003 7.192 650.690 9.800 0.444 5.786
Planta I 24 347.800 8.367 0.190 1.645 76.050 5.489 0.517 3.830
Planta I Carora 24 114.280 2.749 1.748 7.727 36.850 2.660 2.089 5.138
Planta II* 24 760.840 18.303 0.015 0.757 267.890 19.333 0.002 0.238
Planta II 115 2,091.870 10.502 0.825 6.268 620.390 9.344 1.404 8.322
Planta II Carora 24 150.430 3.619 1.274 3.611 59.110 4.266 0.152 2.136
Planta II Carora 115 248.520 1.248 26.487 46.154 88.170 1.328 5.317 45.780
Poleo 24 385.720 9.279 0.115 1.489 115.490 8.334 0.248 1.985
Sidetur 115 673.640 3.382 7.652 18.080 150.020 2.260 20.491 44.384
Ujano* 24 376.400 9.055 0.095 1.527 140.900 10.169 0.046 1.019
Ujano 115 1,616.340 8.115 1.337 8.072 473.860 7.137 2.056 11.235
Zona Industrial* 24 617.760 14.861 0.040 0.932 258.100 18.626 0.004 0.382
Zona Industrial 115 2,101.910 10.553 0.757 6.246 606.380 9.133 1.364 9.057
* Niveles en barra. Para valores despus de las reactancias asociadas a los circuitos, ver tabla siguiente.

Trifsico Monofsico
Barras de Interconexin kV MVA kA R1 X1 MVA kA R0 X0
Cabudare 115 2,341.350 11.755 0.443 5.631 845.590 12.736 0.203 4.324
Cabudare 230 4,871.610 12.229 1.102 10.803 1,439.110 10.837 1.402 14.921
Yaracuy 230 8,703.920 21.849 0.309 6.070 3,527.170 26.562 0.126 2.812

Tabla N 33
Niveles de Cortocircuito en MVA y kA.
Reactancias instaladas en la salida de los circuitos de distribucin.
Caso: Ao 2006
Valor de la Niveles de Cortocircuito e Impedancias Equivalentes
Subestacin kV Reactancia Trifsico Monofsico
(ohm) MVA kA R1 X1 MVA kA R0 X0
Barquisimeto 1.4400 390.880 9.403 0.039 1.473 140.060 10.108 0.008 1.160
Manzano 0.5498 350.740 8.437 0.053 1.641 125.500 9.057 0.017 1.303
Planta II 24 1.0990 310.350 7.466 0.015 1.856 105.750 7.632 0.002 1.337
Ujano 0.5498 277.020 6.664 0.095 2.077 100.430 7.248 0.046 1.569
Zona Industrial 0.5498 388.640 9.349 0.040 1.482 148.400 10.710 0.004 0.932

174
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 34
Niveles de Cortocircuito (MVA).
Sistema ENELBAR
Caso: Ao 2005 - 2015
Trifsico Monofsico
Interconexin Exp. Generacin Interconexin Exp. Generacin
Barra kV 2005 2006 2010 2005 2006 2010
2015 2015 2015 2015
Barquisimeto 230 4,150.79 4,331.07 4,813.49 4,924.53 5,366.23 1,213.82 1,251.19 1,395.77 1,469.96 1,520.59
Manzano 230 4,655.01 4,898.10 5,279.04 4,566.51 4,123.31 1,285.62 1,355.53 1,481.41 1,315.91 1,117.48
Oeste 230 *** *** *** 4,149.07 *** *** *** *** 1,184.95 ***
Polgono 230 *** *** *** 5,194.68 *** *** *** *** 1,497.78 ***

Barquisimeto 115 2,499.50 2,772.07 3,009.78 3,496.21 3,919.11 881.17 957.31 1,098.41 1,250.48 1,387.63
Centro 115 1,755.57 1,973.05 2,247.17 2,344.93 2,422.32 522.93 571.36 643.95 664.01 673.90
El Roble Carora 115 *** *** 612.39 647.65 663.05 *** *** 207.13 215.98 220.34
Este 115 835.43 1,230.13 1,408.92 2,090.91 1,997.38 243.43 351.59 398.03 563.19 567.48
Manzano 115 2,021.40 2,463.46 3,007.59 2,996.38 3,112.06 707.63 851.82 1,033.87 1,018.44 1,017.41
Norte 115 *** *** 758.52 1,153.36 1,089.58 *** *** 216.17 309.19 302.68
Oeste 115 *** *** 2,062.55 3,191.53 2,799.30 *** *** 588.50 1,049.36 880.42
Palavecino 115 *** 1,821.21 1,969.19 2,261.83 2,297.10 *** 650.69 675.20 765.35 778.36
Planta II 115 1,688.23 2,091.87 2,222.76 2,931.46 3,032.69 519.45 620.39 663.64 858.42 903.70
Planta II Carora 115 246.36 248.52 612.39 647.65 660.86 87.55 88.17 205.79 214.55 218.14
Polgono 115 *** *** *** 3,135.64 2,621.21 *** *** *** 1,050.84 975.31
Ujano 115 993.80 1,616.34 1,696.25 2,790.19 2,626.79 291.04 473.86 511.27 837.47 849.74
Zona Industrial 115 1,984.57 2,101.91 2,305.23 2,945.03 3,195.98 583.67 606.38 695.65 882.79 1,078.28

Aguada Grande 115 128.67 128.67 152.59 152.59 152.59 27.84 27.84 32.91 32.91 32.91
Hidrolara 115 251.25 256.29 705.42 744.06 748.83 66.68 66.62 168.31 174.88 175.49
La Pastora 115 *** 287.60 303.62 311.99 315.51 *** 66.35 86.02 87.46 88.14
Puricaure 115 167.26 167.26 167.26 167.26 167.26 36.21 36.21 36.21 36.21 36.21
Qubor 115 479.12 499.02 1,199.44 1,308.81 1,321.59 133.15 132.08 304.44 326.71 327.79
San Pablo 115 *** *** 1,322.09 1,500.71 1,528.90 *** *** 370.62 409.87 416.74
Sidetur 115 671.41 673.64 691.11 691.36 693.90 149.79 150.02 152.94 152.96 153.22
Tocuyo 115 273.87 279.87 914.01 980.99 989.49 74.60 74.52 229.51 241.99 243.16

Aguada Grande 34.5 69.73 57.75 79.36 79.36 79.36 22.48 22.48 20.62 20.62 20.62
Guarico 34.5 *** *** 52.10 52.32 52.32 *** *** 11.77 11.80 11.80
Humocaro 34.5 30.65 30.73 33.22 33.31 33.32 7.58 7.58 8.10 8.11 8.12
La Mamita 34.5 29.67 29.67 29.67 29.67 29.67 8.37 8.37 8.37 8.37 8.37
La Pastora 34.5 18.78 123.00 123.09 124.49 125.04 4.39 34.22 42.94 43.29 43.45
Palmarito 34.5 27.30 27.30 27.30 27.30 27.30 7.61 7.61 7.61 7.61 7.61
Puricaure 34.5 73.83 73.83 73.83 73.83 73.83 28.62 28.62 28.62 28.62 28.62
Quebrada Arriba 34.5 35.80 35.80 35.80 35.80 35.80 10.42 10.42 10.42 10.42 10.42
Santa Ins 34.5 *** *** 42.52 42.52 42.52 *** *** 8.70 8.70 8.70
Siquisique 34.5 *** *** 36.68 36.68 36.68 *** *** 7.31 7.31 7.31
Tocuyo 34.5 78.33 78.89 94.22 94.91 95.00 26.70 26.72 33.54 33.79 33.82

175
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 34
Niveles de Cortocircuito (MVA).
Sistema ENELBAR
Caso: Ao 2005 2015
(Continuacin)
Trifsico Monofsico
Interconexin Exp. Generacin Interconexin Exp. Generacin
Barra kV 2005 2006 2010 2005 2006 2010
2015 2015 2015 2015
Agua Viva 24 251.70 257.65 415.99 415.00 418.18 74.12 75.32 98.07 97.98 98.14
Barquisimeto 24 529.21 540.75 549.11 563.21 574.31 201.33 204.99 209.17 213.72 217.41
Barreto 24 279.13 284.35 289.37 290.89 292.30 80.10 81.08 82.14 82.43 82.64
Carabal 24 277.25 211.50 170.49 216.27 216.75 58.33 37.12 33.25 37.24 37.28
Centro 24 339.17 346.93 354.32 356.63 358.76 126.00 128.43 131.07 131.80 132.36
Duaca 24 46.42 46.58 123.50 130.79 129.93 7.37 7.39 21.48 22.02 21.98
El Roble Carora 24 *** *** 306.76 315.57 319.19 *** *** 119.74 122.57 123.86
Este 24 318.79 287.30 295.94 317.11 315.74 113.74 107.30 110.53 118.29 118.36
Manzano 24 502.71 537.74 602.69 602.15 607.51 191.93 200.19 219.57 219.15 219.99
Morn 24 *** *** *** 349.20 346.42 *** *** *** 66.48 66.79
Norte 24 104.07 104.49 334.76 393.74 386.11 16.78 16.87 124.65 145.46 143.85
Oeste 24 *** *** 349.56 371.43 366.56 *** *** 132.31 142.51 140.19
Palavecino 24 *** 386.75 347.53 402.86 404.53 *** 152.19 134.01 151.13 151.73
Planta I 24 344.83 347.80 359.65 361.98 362.22 75.56 76.05 76.96 77.29 77.35
Planta I Carora 24 113.79 114.28 155.40 157.62 158.39 36.74 36.85 46.46 46.87 47.03
Planta II 24 746.83 760.84 885.47 899.65 901.15 261.91 267.89 319.33 325.14 326.14
Planta II Carora 24 149.56 150.43 306.24 315.02 318.13 58.82 59.11 119.39 122.20 123.30
Poleo 24 372.52 385.72 503.28 502.84 506.55 112.69 115.49 138.04 137.86 138.19
Polgono 24 *** *** *** 371.70 *** *** *** *** 139.25 ***
Qubor 24 164.29 166.79 250.48 255.02 255.55 54.64 54.64 83.42 84.92 85.02
Sanare 24 41.22 41.36 79.03 79.46 79.51 7.51 7.51 14.67 14.71 14.72
Ujano 24 374.13 376.40 380.39 416.14 718.20 135.75 140.90 143.04 156.62 273.03
Zona Industrial 24 614.46 617.76 622.69 634.00 637.27 256.87 258.10 260.39 264.82 266.84

Aguada Grande 13.8 69.45 57.75 79.00 79.00 79.00 22.48 22.48 20.36 20.36 20.36
Duaca 13.8 32.68 32.74 56.85 58.33 58.16 14.50 14.52 23.17 23.66 23.61
Guarico 13.8 *** *** 34.72 34.82 34.82 *** *** 8.86 8.88 8.88
Humocaro 13.8 22.92 22.97 24.27 24.32 24.32 10.34 10.36 10.88 10.90 10.90
La Pastora 13.8 15.68 49.00 49.84 50.07 50.16 7.32 19.00 19.19 19.26 19.29
Sanare 13.8 32.95 33.05 54.52 54.73 54.75 15.06 15.10 25.26 25.35 25.37
Santa Ins 13.8 *** *** 30.46 30.46 30.46 *** *** 7.04 7.04 7.04
Siquisique 13.8 *** *** 27.45 27.45 27.45 *** *** 6.12 6.12 6.12
Tocuyo 13.8 123.92 125.32 171.79 174.12 174.41 40.57 40.63 59.49 60.27 60.36

176
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 35
Niveles de Cortocircuito (kAcc).
Sistema ENELBAR
Caso: Ao 2005 2015
Trifsico Monofsico
Interconexin Exp. Generacin Interconexin
Barra kV 2005 2006 2010 2005 2006 2010
2015 2015 2015
Barquisimeto 230 10.43 10.88 12.10 12.38 13.49 9.15 9.43 10.52 11.08
Manzano 230 11.70 12.31 13.27 11.48 10.36 9.69 10.22 11.17 9.92
Oeste 230 *** *** *** 10.43 *** *** *** *** 8.93
Polgono 230 *** *** *** 13.06 *** *** *** *** 11.29

Barquisimeto 115 12.56 13.93 15.13 17.57 19.70 13.29 14.44 16.56 18.86
Centro 115 8.82 9.92 11.30 11.79 12.18 7.89 8.62 9.71 10.01
El Roble Carora 115 *** *** 3.08 3.26 3.33 *** *** 3.12 3.26
Este 115 4.20 6.18 7.08 10.51 10.04 3.67 5.30 6.00 8.49
Manzano 115 10.16 12.38 15.12 15.06 15.64 10.67 12.84 15.59 15.36
Norte 115 *** *** 3.81 5.80 5.48 *** *** 3.26 4.66
Oeste 115 *** *** 10.37 16.04 14.07 *** *** 8.87 15.82
Palavecino 115 *** 9.15 9.90 11.37 11.55 *** 9.81 10.18 11.54
Planta II 115 8.49 10.51 11.17 14.73 15.24 7.83 9.35 10.01 12.94
Planta II Carora 115 1.24 1.25 3.08 3.26 3.32 1.32 1.33 3.10 3.24
Polgono 115 *** *** *** 15.76 13.18 *** *** *** 15.85
Ujano 115 5.00 8.12 8.53 14.02 13.20 4.39 7.15 7.71 12.63
Zona Industrial 115 9.98 10.57 11.59 14.80 16.06 8.80 9.14 10.49 13.31

Aguada Grande 115 0.65 0.65 0.77 0.77 0.77 0.42 0.42 0.50 0.50
Hidrolara 115 1.26 1.29 3.55 3.74 3.76 1.01 1.00 2.54 2.64
La Pastora 115 *** 1.45 1.53 1.57 1.59 *** 1.00 1.30 1.32
Puricaure 115 0.84 0.84 0.84 0.84 0.84 0.55 0.55 0.55 0.55
Qubor 115 2.41 2.51 6.03 6.58 6.64 2.01 1.99 4.59 4.93
San Pablo 115 *** *** 6.65 7.54 7.68 *** *** 5.59 6.18
Sidetur 115 3.37 3.39 3.47 3.48 3.49 2.26 2.26 2.31 2.31
Tocuyo 115 1.38 1.41 4.59 4.93 4.97 1.12 1.12 3.46 3.65

Aguada Grande 34.5 1.17 0.97 1.33 1.33 1.33 1.13 1.13 1.04 1.04
Guarico 34.5 *** *** 0.87 0.88 0.88 *** *** 0.59 0.59
Humocaro 34.5 0.51 0.51 0.56 0.56 0.56 0.38 0.38 0.41 0.41
La Mamita 34.5 0.50 0.50 0.50 0.50 0.50 0.42 0.42 0.42 0.42
La Pastora 34.5 0.31 2.06 2.06 2.09 2.09 0.22 1.72 2.16 2.18
Palmarito 34.5 0.46 0.46 0.46 0.46 0.46 0.38 0.38 0.38 0.38
Puricaure 34.5 1.24 1.24 1.24 1.24 1.24 1.44 1.44 1.44 1.44
Quebrada Arriba 34.5 0.60 0.60 0.60 0.60 0.60 0.52 0.52 0.52 0.52
Santa Ins 34.5 *** *** 0.71 0.71 0.71 *** *** 0.44 0.44
Siquisique 34.5 *** *** 0.61 0.61 0.61 *** *** 0.37 0.37
Tocuyo 34.5 1.31 1.32 1.58 1.59 1.59 1.34 1.34 1.69 1.70

177
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015
Tabla N 35
Niveles de Cortocircuito (kAcc).
Sistema ENELBAR
Caso: Ao 2005 2015
(Continuacin)
Trifsico Monofsico
Interconexin Exp. Generacin Interconexin
Barra kV 2005 2006 2010 2005 2006 2010
2015 2015 2015
Agua Viva 24 6.06 6.21 10.02 10.00 10.07 5.36 5.44 7.09 7.08
Barquisimeto 24 12.75 13.02 13.23 13.56 13.83 14.55 14.81 15.11 15.44
Barreto 24 6.72 6.85 6.97 7.01 7.04 5.79 5.86 5.93 5.96
Carabal 24 6.68 5.09 4.11 5.21 5.22 4.21 2.68 2.40 2.69
Centro 24 8.17 8.36 8.53 8.59 8.64 9.10 9.28 9.47 9.52
Duaca 24 1.12 1.12 2.97 3.15 3.13 0.53 0.53 1.55 1.59
El Roble Carora 24 *** *** 7.39 7.60 7.69 *** *** 8.65 8.86
Este 24 7.68 6.92 7.13 7.64 7.60 8.22 7.75 7.99 8.55
Manzano 24 12.11 12.95 14.52 14.50 14.63 13.87 14.46 15.86 15.83
Morn 24 *** *** *** 8.41 8.34 *** *** *** 4.80
Norte 24 2.51 2.52 8.06 9.48 9.30 1.21 1.22 9.01 10.51
Oeste 24 *** *** 8.42 8.95 8.83 *** *** 9.56 10.30
Palavecino 24 *** 9.31 8.37 9.70 9.74 *** 11.00 9.68 10.92
Planta I 24 8.31 8.38 8.66 8.72 8.72 5.46 5.49 5.56 5.58
Planta I Carora 24 2.74 2.75 3.74 3.80 3.81 2.65 2.66 3.36 3.39
Planta II 24 17.99 18.32 21.33 21.67 21.70 18.92 19.36 23.07 23.49
Planta II Carora 24 3.60 3.62 7.38 7.59 7.66 4.25 4.27 8.63 8.83
Poleo 24 8.97 9.29 12.12 12.11 12.20 8.14 8.34 9.97 9.96
Polgono 24 *** *** *** 8.95 *** *** *** *** 10.06
Qubor 24 3.96 4.02 6.03 6.14 6.15 3.95 3.95 6.03 6.14
Sanare 24 0.99 1.00 1.90 1.91 1.91 0.54 0.54 1.06 1.06
Ujano 24 9.01 9.07 9.16 10.02 17.30 9.81 10.18 10.34 11.32
Zona Industrial 24 14.80 14.88 15.00 15.27 15.35 18.56 18.65 18.81 19.13

Aguada Grande 13.8 2.91 2.42 3.31 3.31 3.31 2.82 2.82 2.56 2.56
Duaca 13.8 1.37 1.37 2.38 2.44 2.44 1.82 1.82 2.91 2.97
Guarico 13.8 *** *** 1.45 1.46 1.46 *** *** 1.11 1.12
Humocaro 13.8 0.96 0.96 1.02 1.02 1.02 1.30 1.30 1.37 1.37
La Pastora 13.8 0.66 2.05 2.09 2.10 2.10 0.92 2.39 2.41 2.42
Sanare 13.8 1.38 1.38 2.28 2.29 2.29 1.89 1.90 3.17 3.19
Santa Ins 13.8 *** *** 1.28 1.28 1.28 *** *** 0.88 0.88
Siquisique 13.8 *** *** 1.15 1.15 1.15 *** *** 0.77 0.77
Tocuyo 13.8 5.19 5.25 7.20 7.29 7.31 5.10 5.11 7.48 7.57

178
Plan de Expansin del Sistema de Transmisin Periodo 2006-2015