Sewage Treatment Plant (1 st Stage) CAJRO C,ONSULT


SHASLANGA - BANHA

Supply & Erection of


SHABLANGA - BANHA - SEWAGE TR.EATMENT PLANT- STAGE 1
Bill of Quantities A- Mechanical Works
- ~ ---

Item No. Description of Item Unit Quantity Unit Price TOTAL


--"----- Amount Brought Forward
(Cont.) Final Sedimentation Tank (2 Tanks) (Section 2.5)

Valves I (!i(!ing & fitting!

5.4 All required valves, pipes, fittings, special pieces, penstocks, weirs, - L.S.
gauges, ... etc according to contract drawings and mechanical specs .up to

1 meter outside the buildins.:.ltem (2.5.9) up to{ 2~5.11)

Weathereroof housing panel C/W all accessories according to and

5.5
mechanical specs item no. ( 2.5.12).

-- L.S.

S(!are (!arts for the above items according to contract drawings and

5.6
mechanical specs item (2.5.14).
- L.S.
I
TOTAL OF THIS PAGE
TOTAL CARRIED FORWARD I
-

'