Escolar Documentos
Profissional Documentos
Cultura Documentos
: Project Tittle :
System
Name of Canal
Area, ha
Length of Canal,m
1.30.S150.43
Design F.S.L U/S (m)
Design F.S.L D/S (m)
Highest Bendang Level, m
Lowest Bendang Level, m
Average Bendang Level,m
Typical Section
Section 1 CH 0 - CH 940
Bottom Width,b (m)
Depth,d (m)
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
b
Calculation
=
=
=
=
=
=
=
=
=
=
=
ISU A1
T1
30.13
940
3.71
3.222
3.209
2.603
2.906
Farm Road
0.75
0.60
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 3.110 3.710 4.010 2.930
50 3.100 3.700 4.000 2.930
100 3.090 3.690 3.990 2.930
150 3.080 3.680 3.980 2.930
200 3.070 3.670 3.970 2.890
250 3.060 3.660 3.960 2.722
300 3.050 3.650 3.950 2.792
350 3.040 3.640 3.940 2.972
400 3.030 3.630 3.930 2.852
450 3.020 3.620 3.920 2.998
500 3.010 3.610 3.910 3.209
550 3.000 3.600 3.900 3.209
600 2.990 3.590 3.890 3.410
650 2.980 3.580 3.880 3.297
700 2.970 3.570 3.870 3.294 `
750 2.960 3.560 3.860 3.187
750 2.960 3.260 3.560 3.187 FSL DP 0.3m
800 2.950 3.250 3.550 3.187
850 2.940 3.240 3.540 2.733
900 2.930 3.230 3.530 2.685
940 2.922 3.222 3.522 2.593
T1 (CH 0 - CH 940)
4.500
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Le
600 650 700 750 750 800 850 900 940
600 650 700 750 750 800 850 900 940
System
Name of Canal
Area, ha
Length of Canal,m
1.30.S150.43
Design F.S.L U/S (m)
Design F.S.L D/S (m)
Highest Bendang Level, m
Lowest Bendang Level, m
Average Bendang Level,m
Typical Section
Section 1 CH 0 - CH 610
Bottom Width,b (m)
Depth,d (m)
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
b
Calculation
=
=
=
=
=
=
=
=
=
=
=
ISU A1
T1a
14.39
610
3.71
3.588
3.209
2.603
2.906
Farm Road
0.60
0.45
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 3.260 3.710 4.010 2.099
50 3.250 3.700 4.000 3.066
100 3.240 3.690 3.990 3.066
150 3.230 3.680 3.980 3.066
200 3.220 3.670 3.970 2.867
250 3.210 3.660 3.960 2.997
300 3.200 3.650 3.950 2.956
350 3.190 3.640 3.940 2.950
400 3.180 3.630 3.930 3.101
450 3.170 3.620 3.920 2.978
500 3.160 3.610 3.910 3.006
550 3.150 3.600 3.900 3.057
600 3.140 3.590 3.890 3.057
610 3.138 3.588 3.888 2.994
T1a (CH 0 - CH 610)
4.500
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 610
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
Job No. : Project Tittle :
System
Name of Canal
Area, ha
Length of Canal,m
1.30.S150.43
Design F.S.L U/S (m)
Design F.S.L D/S (m)
Highest Bendang Level, m
Lowest Bendang Level, m
Average Bendang Level,m
Typical Section
Section 1 CH 0 - CH 230
Bottom Width,b (m)
Depth,d (m)
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
b
Calculation
=
=
=
=
=
=
=
=
=
=
=
ISU A1
T1b
4.71
230
3.546
3.500
3.209
2.603
2.906
Farm Road
0.60
0.45
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remark
Level
(m) (m) (m)
0 3.096 3.546 3.846 3.200
50 3.086 3.536 3.836 3.200
100 3.076 3.526 3.826 3.200
150 3.066 3.516 3.816 3.200
200 3.056 3.506 3.806 3.002
230 3.050 3.500 3.800 3.002
T1b (CH 0 - CH 230)
4.500
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 230
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
Job No. : Project Tittle :
System
Name of Canal
Area, ha
Length of Canal,m
1.30.S150.43
Design F.S.L U/S (m)
Design F.S.L D/S (m)
Highest Bendang Level, m
Lowest Bendang Level, m
Average Bendang Level,m
Typical Section
Section 1 CH 0 - CH 350
Bottom Width,b (m)
Depth,d (m)
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
b
Calculation
=
=
=
=
=
=
=
=
=
=
=
ISU A2
T2
48.45
590
3.300
3.082
2.736
2.304
2.520
Farm Road
0.75
0.60
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
Area, A (m^3)
2/3 1/2
Q= R S A
n
Qpresaturation
U-Canal Section(mm)
00..1155
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
=
Calculation
=
=
=
=
=
=
=
=
=
=
600
0.1
0.60
0.50
0.300
1.600
0.188
0.0002 (1/5000)
0.015
0.0927 m3/s
92.66 l/s
16.47 l/s
x 600
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
0.15
T2 (CH 0 - CH 590)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Drainage
Level
(m) (m) (m)
0 2.700 3.300 3.550 2.575
50 2.690 3.290 3.540 2.395
100 2.680 3.280 3.530 2.447
150 2.670 3.270 3.520 2.521
200 2.660 3.260 3.510 2.521
250 2.650 3.250 3.500 2.566
300 2.640 3.240 3.490 2.516
350 2.630 3.230 3.480 2.638
350 2.630 3.130 3.380 2.638 FSL Drop 0.1m
400 2.620 3.120 3.370 2.666
450 2.610 3.110 3.360 2.729
500 2.600 3.100 3.350 2.748
550 2.590 3.090 3.340 2.761
590 2.582 3.082 3.332 2.741
T2 (CH 0 - CH 590)
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 350 400 450 500 550 590
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
Job No. : Project Tittle :
System
Name of Canal
Area, ha
Length of Canal,m
1.30.S150.43
Design F.S.L U/S (m)
Design F.S.L D/S (m)
Highest Bendang Level, m
Lowest Bendang Level, m
Average Bendang Level,m
Typical Section
Section 1 CH 0 - CH 780
Bottom Width,b (m)
Depth,d (m)
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
b
Calculation
=
=
=
=
=
=
=
=
=
=
=
ISU A2
T2a
14.85
780
3.130
2.974
2.626
2.175
2.401
Farm Road
0.60
0.50
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.630 3.130 3.380 2.595
50 2.620 3.120 3.370 2.595
100 2.610 3.110 3.360 2.581
150 2.600 3.100 3.350 2.617
200 2.590 3.090 3.340 2.592
250 2.580 3.080 3.330 2.541
300 2.570 3.070 3.320 2.564
350 2.560 3.060 3.310 2.565
400 2.550 3.050 3.300 2.539
450 2.540 3.040 3.290 2.431
500 2.530 3.030 3.280 2.409
550 2.520 3.020 3.270 2.317
600 2.510 3.010 3.260 2.368
650 2.500 3.000 3.250 2.505
700 2.490 2.990 3.240 2.513
750 2.480 2.980 3.230 2.569
780 2.474 2.974 3.224 2.510
T2a CH 0 - CH 780
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 780
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
System = B1 and B2
Name of Canal = T3
Area, ha = 68.54 (B1)
51.32 (B2)
Length of Canal,m = 1550
Design F.S.L U/S (m) = 3.500
Design F.S.L D/S (m) = 2.890
Highest Bendang Level, m = 2.850
Lowest Bendang Level, m = 1.684
Average Bendang Level,m = 2.267
Typical Section
Farm Road
b
Section 1 CH 0 - CH 1170
Bottom Width,b (m) = 0.90
Depth,d (m) = 0.75
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.675
Wetted Perimeter, P (m) = 2.400
R = A/P (m) = 0.281
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.2732 m3/s
= 273.18 l/s
Qpresaturation = 240.00 l/s
Job No. :
U-Canal Section(mm)
Q = R 2/3S1/2 A
Area, A (m^3)
n
Qpresaturation
U-Canal Section(mm)
Q = R 2/3S1/2 A
00..1155
=
AIS CONSULTANTS
=
900
Project Tittle :
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Calculation
=
=
=
=
=
=
=
=
=
=
=
900
=
=
=
x
0.90
0.60
0.540
2.100
0.257
0.3
900
0.0002 (1/5000)
0.015
0.2059 m3/s
205.87 l/s
180.00 l/s
0.60
0.45
0.15
900
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 61.10 l/s
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.750 3.500 3.800 2.846 Section 1
50 2.740 3.490 3.790 2.800
100 2.730 3.480 3.780 2.861
150 2.720 3.470 3.770 2.868
200 2.710 3.460 3.760 2.725
250 2.700 3.450 3.750 2.724
300 2.690 3.440 3.740 2.747
350 2.680 3.430 3.730 2.778
400 2.670 3.420 3.720 2.842
450 2.660 3.410 3.710 2.833
500 2.650 3.400 3.700 2.774
550 2.640 3.390 3.690 2.749
600 2.630 3.380 3.680 2.749
650 2.620 3.370 3.670 2.743
700 2.610 3.360 3.660 2.742
750 2.600 3.350 3.650 2.757
800 2.590 3.340 3.640 2.813
850 2.580 3.330 3.630 2.706
900 2.570 3.320 3.620 2.696
950 2.560 3.310 3.610 2.632
1000 2.550 3.300 3.600 2.632
1050 2.540 3.290 3.590 2.632
1100 2.530 3.280 3.580 2.612
1150 2.520 3.270 3.570 2.636
1170 2.516 3.266 3.716 2.636 Section 2
1170 2.516 3.116 3.566 2.636 FSL Dp 0.15m
1200 2.510 3.110 3.560 2.509
1250 2.500 3.100 3.550 2.536
1300 2.490 3.090 3.540 2.716
1350 2.480 3.080 3.530 2.636
1400 2.470 3.070 3.520 2.540
1440 2.462 3.062 3.362 2.671 Section 3
1440 2.462 2.912 3.212 2.671 FSL Dp 0.15m
1450 2.460 2.910 3.210 2.671
1500 2.450 2.900 3.200 2.560
1550 2.440 2.890 3.190 2.445
T3 (CH 0 - CH 1150)
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1170 1170 1200 1250 1300 1350 1400 1440 1440 1450 1500 1550
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
System = ISU B1
Name of Canal = T3a
Area, ha = 24.24
Typical Section
Farm Road
b
Section 1 CH 0 - CH 260
Bottom Width,b (m) = 0.75
Depth,d (m) = 0.60
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.450
Wetted Perimeter, P (m) = 1.950
R = A/P (m) = 0.231
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.1596 m3/s
= 159.62 l/s
Qpresaturation = 85.00 l/s
00..1155
U-Canal Section(mm) = 750 x 750
T3a (CH 0 - CH 260)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.634 3.234 3.534 2.749
50 2.624 3.224 3.524 2.749
100 2.614 3.214 3.514 2.790
150 2.604 3.204 3.504 2.752
200 2.594 3.194 3.494 2.759
250 2.584 3.184 3.484 2.795
260 2.582 3.182 3.482 2.795
T3a (CH 0 - CH 260)
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 260
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
System = ISU B2
Name of Canal = T3b
Area, ha = 9.62
Typical Section
Farm Road
b
Section 1 CH 0 - CH 160
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 34.00 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T3b (CH 0 - CH 160)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.465 2.915 3.215 2.540
50 2.455 2.905 3.205 2.730
100 2.445 2.895 3.195 2.730
150 2.435 2.885 3.185 2.691
160 2.433 2.883 3.183 2.588
T3b (CH 0 - CH 160)
3.500
3.000
2.500
Depth (m)
2.000
1.500
1.000
0.500
0.000
0 50 100 150 160
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
System = ISU B2
Name of Canal = T3c
Area, ha = 13.5
Typical Section
Farm Road
b
Section 1 CH 0 - CH 525
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 47.20 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T3c (CH 0 - CH 525)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.461 2.911 3.211 2.540
50 2.451 2.901 3.201 2.679
100 2.441 2.891 3.191 2.666
150 2.431 2.881 3.181 2.627
200 2.421 2.871 3.171 2.627
250 2.411 2.861 3.161 2.542
300 2.401 2.851 3.151 2.542
350 2.391 2.841 3.141 2.561
400 2.381 2.831 3.131 2.559
450 2.371 2.821 3.121 2.508
500 2.361 2.811 3.111 2.508
525 2.356 2.806 3.106 2.505
T3c (CH 0 - CH 525)
3.500
3.000
2.500
Depth (m)
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 525
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 500
Bottom Width,b (m) = 0.75
Depth,d (m) = 0.60
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.450
Wetted Perimeter, P (m) = 1.950
R = A/P (m) = 0.231
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.1596 m3/s
= 159.62 l/s
Qpresaturation = 154.15 l/s
00..1155
U-Canal Section(mm) = 750 x 750
0.15
CCRBD 1a1 Alor Setol (CH 0 - CH 500)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 3.300 3.900 4.200 2.618
50 3.290 3.890 4.190 2.622
100 3.280 3.880 4.180 2.719
150 3.270 3.870 4.170 2.759
200 3.260 3.860 4.160 2.841
250 3.250 3.850 4.150 2.803
300 3.240 3.840 4.140 2.924
350 3.230 3.830 4.130 2.888
400 3.220 3.820 4.120 2.952
450 3.210 3.810 4.110 2.796
500 3.200 3.800 4.100 2.939
CCRBD 1a1 Alor Setol (CH 0 - CH 500)
4.500
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 250
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 42.00 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T4a (CH 0 - CH 250)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.550 3.000 3.300 2.618
50 2.540 2.990 3.290 2.610
100 2.530 2.980 3.280 2.545
150 2.520 2.970 3.270 2.500
200 2.510 2.960 3.260 2.516
250 2.500 2.950 3.250 2.591
T4a (CH 0 - CH 250)
3.500
3.000
2.500
Depth (m)
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 520
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 77.76 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T4c (CH 0 - CH 520)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 3.200 3.650 3.950 2.939
50 3.190 3.640 3.940 3.046
100 3.180 3.630 3.930 2.854
150 3.170 3.620 3.920 2.255
200 3.160 3.610 3.910 2.626
250 3.150 3.600 3.900 2.832
300 3.140 3.590 3.890 2.845
350 3.130 3.580 3.880 2.946
400 3.120 3.570 3.870 2.946
450 3.110 3.560 3.860 2.838
500 3.100 3.550 3.850 2.810
520 3.096 3.546 3.846 2.833
T4c (CH 0 - CH 520)
4.500
4.000
3.500
3.000
Depth (m)
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 520
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 620
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 65.87 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T4b (CH 0 - CH 620)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.550 3.000 3.300 2.622
50 2.540 2.990 3.290 2.642
100 2.530 2.980 3.280 2.709
150 2.520 2.970 3.270 2.759
200 2.510 2.960 3.260 2.735
250 2.500 2.950 3.250 2.663
300 2.490 2.940 3.240 2.663
350 2.480 2.930 3.230 2.475
400 2.470 2.920 3.220 2.475
450 2.460 2.910 3.210 2.703
500 2.450 2.900 3.200 2.504
550 2.440 2.890 3.190 2.511
600 2.430 2.880 3.180 2.459
620 2.426 2.876 3.176 2.459
T4b (CH 0 - CH 620)
3.500
3.000
2.500
Depth (m)
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 620
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 510
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 52.45 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T4d (CH 0 - CH 510)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 2.550 3.000 3.300 2.660
50 2.540 2.990 3.290 2.642
100 2.530 2.980 3.280 2.657
150 2.520 2.970 3.270 2.524
200 2.510 2.960 3.260 2.646
250 2.500 2.950 3.250 2.549
300 2.490 2.940 3.240 2.541
350 2.480 2.930 3.230 2.510
400 2.470 2.920 3.220 2.468
450 2.460 2.910 3.210 2.402
500 2.450 2.900 3.200 2.367
510 2.448 2.898 3.198 2.367
T4d (CH 0 - CH 510)
3.500
3.000
2.500
Depth (m)
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 510
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 1080
Bottom Width,b (m) = 0.90
Depth,d (m) = 0.70
Free board (m) = 0.2
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.630
Wetted Perimeter, P (m) = 2.300
R = A/P (m) = 0.274
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.2505 m3/s
= 250.52 l/s
Qpresaturation = 222.00 l/s
00..1155
U-Canal Section(mm) = 900 x 900
0.15
Blok CCRBD 1a 1a1 Alor Tok Raja (CH 0 - CH 1080)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 3.300 4.000 4.350 2.712
50 3.290 3.990 4.340 2.745
100 3.280 3.980 4.330 2.650
150 3.270 3.970 4.320 2.660
200 3.260 3.960 4.310 2.166
250 3.250 3.950 4.300 3.063
300 3.240 3.940 4.290 3.063
350 3.230 3.930 4.280 2.691
400 3.220 3.920 4.270 2.884
450 3.210 3.910 4.260 2.884
500 3.200 3.900 4.250 2.859
550 3.190 3.890 4.240 2.947
600 3.180 3.880 4.230 2.980
650 3.170 3.870 4.220 3.033
700 3.160 3.860 4.210 2.965
750 3.150 3.850 4.200 3.079
800 3.140 3.840 4.190 1.628
850 3.130 3.830 4.180 2.845
900 3.120 3.820 4.170 2.140
950 3.110 3.810 4.160 2.845
1000 3.100 3.800 4.150 2.563
1050 3.090 3.790 4.140 2.939
1080 3.084 3.784 4.134 2.939
Blok CCRBD 1a 1a1 Alor Tok Raja (CH 0 - CH 1080)
5.000
4.500
4.000
3.500
Depth (m)
3.000
2.500
2.000
1.500
1.000
0.500
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1080
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 650
Bottom Width,b (m) = 0.60
Depth,d (m) = 0.45
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.270
Wetted Perimeter, P (m) = 1.500
R = A/P (m) = 0.180
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.0812 m3/s
= 81.15 l/s
Qpresaturation = 50.24 l/s
00..1155
U-Canal Section(mm) = 600 x 600
0.15
T5 (CH 0 - CH650)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 5.350 5.800 6.100 5.486
50 5.340 5.790 6.090 5.146
100 5.330 5.780 6.080 3.878
100 4.130 4.580 4.880 3.878 FSL Dp 1.2m
150 4.120 4.570 4.870 3.782
200 4.110 4.560 4.860 3.669
250 4.100 4.550 4.850 3.746
300 4.090 4.540 4.840 3.520
350 4.080 4.530 4.830 3.539
400 4.070 4.520 4.820 3.134
450 4.060 4.510 4.810 3.134
450 3.160 3.610 3.910 3.134 FSL Dp 0.9m
500 3.150 3.600 3.900 3.089
550 3.140 3.590 3.890 2.762
600 3.130 3.580 3.880 2.884
650 3.120 3.570 3.870 3.168
T5 (CH 0 - CH 650)
7.000
6.000
5.000
Depth (m)
4.000
3.000
2.000
1.000
0.000
0 50 100 100 150 200 250 300 350 400 450 450 500 550 600 650
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)
1 . 3 S 0 .4 3
AIS CONSULTANTS
3186K, Tingkat 1, Kompleks Permint Harmoni
Jalan Engku Sar, Jalan Batas Baru
20300 Kuala Terengganu, Terengganu
Sheet No. :
Designed by
Date
Checked by
0.15
Date
Job No. : Project Tittle :
DESIGN TERTIARY CANAL
Calculation Remarks
Blok CCRBD 1a 1a1
Typical Section
Farm Road
b
Section 1 CH 0 - CH 600
Bottom Width,b (m) = 0.90
Depth,d (m) = 0.70
Free board (m) = 0.15
Q = R 2/3S1/2 A
n
Area, A (m^3) = 0.630
Wetted Perimeter, P (m) = 2.300
R = A/P (m) = 0.274
Reach Slope, S = 0.0002 (1/5000)
Manning roughness coefficent, = 0.015
Qdesign = 0.2505 m3/s
= 250.52 l/s
Qpresaturation = 192.13 l/s
Job No. :
U-Canal Section(mm)
Project Tittle :
DESIGN TERTIARY CANAL
Qdesign
Q = R 2/3S1/2 A
Area, A (m^3)
R = A/P (m)
Reach Slope, S
Qpresaturation
n
U-Canal Section(mm)
00..1155
=
AIS CONSULTANTS
=
900
Calculation
=
=
=
=
=
=
=
=
=
=
=
750
x
0.75
0.60
0.15
0.450
1.950
0.231
900
0.0002 (1/5000)
0.015
0.1596 m3/s
159.62 l/s
96.00 l/s
x 750
Sheet No. :
Designed by
Date
Checked by
Date
Remarks
0.15
T6 (CH 0 - CH1270)
Proposed
Existing Ground
Chainage (m) Invert Level Full Supply Level Farm Road Level Remarks
Level
(m) (m) (m)
0 4.300 5.000 5.300 3.709
50 4.290 4.990 5.290 4.993
100 4.280 4.980 5.280 5.019
150 4.270 4.970 5.270 4.908
200 4.260 4.960 5.260 4.324
250 4.250 4.950 5.250 4.933
300 4.240 4.940 5.240 3.476
350 4.230 4.930 5.230 3.489
400 4.220 4.920 5.220 4.170
450 4.210 4.910 5.210 3.994
500 4.200 4.900 5.200 3.948
550 4.190 4.890 5.190 3.871
600 4.180 4.880 5.180 3.410 Section 2
600 4.180 4.730 5.030 3.410 FSL Dp 0.15m
650 4.170 4.720 5.020 3.669
700 4.160 4.710 5.010 3.664
750 4.150 4.700 5.000 3.950
800 4.140 4.690 4.990 3.631
850 4.130 4.680 4.980 3.457
900 4.120 4.670 4.970 3.543
950 4.110 4.660 4.960 3.599
1000 4.100 4.650 4.950 3.364
1050 4.090 4.640 4.940 3.707
1100 4.080 4.630 4.930 3.595
1150 4.070 4.620 4.920 3.564
1200 4.060 4.610 4.910 3.795
1250 4.050 4.600 4.900 3.401
1270 4.046 4.596 4.896 3.966
T6 (CH 0 - CH 1270)
6.000
5.000
4.000
Depth (m)
3.000
2.000
1.000
0.000
0 50 100 150 200 250 300 350 400 450 500 550 600 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1270
Chainage (m)
Existing Ground Level Proposed Farm Road Level (m) Proposed Full Supply Level Proposed Invert Level (m)