Você está na página 1de 9

LISTS OF ARCHITECTURAL FINISHES

BASEMENT LEVEL DOORS QTY DESCRIPTION / TYPE


a) FIRE PUMP ROOM 1 DOUBLE SWING DOOR METAL?
W 1
A/C 1
ELECT 1
TEL 1
b.) CONSUMER SWITCH ROOM 1 DOUBLE SWING DOOR METAL?
c.) COLUMN GUARDS LXWXH
d.) HANDICAP SIGNAGE ON FLOOR
e.) MDF ROOM 1 DOUBLE SWING DOOR
f.) FIREFIGHTING LOBBY 1
STAIRCASE#1 ST1 1 DOOR WITH GLASS METAL?
LIFT LOBBY 1 1 DOOR WITH GLASS METAL?
TIMBER
HR 1 SINGLE SWING DOOR
SPD - - DOOR?
-

G.) FIREFIGHTING LOBBY 2 2 SINGLE SWING DOOR METAL?


LIFT LOBBY 2 2 DOOR WITH GLASS
STAIRCASE#2 ST2 1 DOOR WITH GLASS METAL?
ELECT 1 TIMBER?
A/C 1 TIMBER?
TEL 1 TIMBER?
HR 1 TIMBER?
SINGLE SWING DOOR SIZES
SUMMARY OF DOORS@ BASEMENT SINGLEMETAL
SWING DOOR
3 DOUBLETIMBER
SWING DOOR
FE DOOR WITH GLASS SEETHRU
RAMP AREA COLUMN GUARD

FLOORS COLUMNS
5 COLUMNS NEED
TIMBER /.,MN?>,MNBVCXZ
COLUMN GUARD

TIMBER?
TIMBER?
TIMBER?
TIMBER?
EETHRU
FLOOR

ANTISTATIC VINYL WITHCONCEALED FLOOR TRUCKING

ANTI SLIP CONTRASTING COLOUR NOSING STRIP


ANTI STATIC THICK HEAVY DUTY VINYL

HOMOGENOUS NON SLIP TILES


HOMOGENOUS CERAMIC TILES

INTERLOCKING PAVER FINISH


LAMINATED FLOORING

PEEBLED WASH FINISH


HOMOGENOUS VINYL
CONCRETE TOPPING

POLISHED GRANITE
CEMENT SCREED

AERATION SLAB

LANDSCAPE
HARDENER
DEVELOPMENT OF 2 KUNG CHONG ROAD
FACILTY TYPE NUMBER OF UNITS
BASEMENT
Driveway x
Fire Pump Room 1 x
Sprinkler Tank Area 1 x
CSR ( Central Supply Room ) 1 x
MDF (Main Distribution Frame) 1 x
Transfer Tank and Pump Space 1 x
Staircase 2 x x

Lobby x
Service Ducts x
1st STOREY
Driveway x x
Bin Centre 1 x
Veh Ramp to and from Basement 2 x
Toilets 2 x
Accessible Toilets 1 x
Pantry 1 x
Cleaner Room 1 x
Staircase 2 x x
Lobby 2
ESS 1
Fire Command / Guard House 1
Service Ducts
Servicing Area
2nd Storey
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Toilets 2 x
Accessible Toilets ( HT ) 1
Pantry 1 x
Staircase 2
Lobby 2 x
Service Ducts x x
Servicing Area

3rd Storey
Toilets
Accessible Toilets ( HT )
Pantry
Cleaner Room
Staircase
Lobby
Service Ducts
Servicing Area
Landscape Deck

4th Storey
Toilets
Accessible Toilets ( HT )
Pantry
Staircase
Lobby
Service Ducts
Servicing Area

5th STOREY
Toilets
Accessible Toilets ( HT )
Pantry
Staircase
Lobby
Service Ducts
Servicing Area

6TH STOREY
Toilets
Accessible Toilets ( HT )
Pantry
Staircase
Lobby
Service Ducts
Servicing Area
Office Area
IT Server Room

ROOF
Toilets
Accessible Toilets ( HT )
Pantry
Staircase
Lobby
Service Ducts
Servicing Area
Office Area
IT Server Room
x
x
x
x
x
x
x
x
x
x
x
x
x
x

18
EMULSION PAINT

19
STC 50 SLIDING FOLDING PARTITION

20
STC 50 ACOUSTIC PANEL

21
GLAZED CERAMIC TILES TO 2.2M HEIGHT

22
CALCIUM SILICATE OR CEMENT BOARD WITH INSULATION
WALL

x
x
23
FULL HAIGHT CURTAIN WALL SYSTEM WITH LOW E GLASS

24
GLAZED CERAMIC TILES TO FULL HEIGHT

x
25
PU PAINT ( 1.5M HEIGHT)

26
DRYWALL SYSTEM

27
28

x
x
x
x
x
x
x
x
x
x
x
x

29
EMULSION PAINT

30
STC 50 ACOUSTIC CEILING
CEILING

31
SUSPENDED CEILING
32

THERMALLY INSULATED CEILING MEMBRANE/BOARD


x

33

SUSPENDED METAL CEILING


OTHERS
Landing to be provided with Ap

Você também pode gostar