PROJECT REF/PO NO

MODEL /ITEM NO
SP-161200009/4300061060 SS90A/3Z-1601-A
No Document Name Document No

1 GENERAL ARRANGEMENT DRAWING FOR ABSORPTION CHILLER CZZJ949GA1

2 MAXIMUM NOZZLE LOAD ALLOWABLE (FORCE AND MOMENT) CZZJ949GA1

3 FOUNDATION DRAWING CZZJ949FD1

4 ANCHOR BOLT DETAILS CZZJ949FD2

5 INTERNAL P & I CZZJ949PI1


6 EXTERNAL P & I CZZJ949PE1

7 Vacuum Pump motor data sheet ( pump data sheet yet to submit) CZZJ94VAC1
VACUUM PUMP CATALOGUE VD Series
8 ABSORBENT PUMP DATA SHEET Q FZ-1237
9 REFRIGERANT PUMP DATA SHEET Q FZ-1236
10 ABSORPTION CHILLER DATA SHEET CZZJ94DTS1
11 Sectional drawing Absorber & Evaporator
12 Sectional drawing Generator & Condensor
13 Sectional drawing H.E
14 Seactional drawing vacuum pump showing part no.
15 sectional drawing refrigerant pump showing part list Q FJ-1812A
16 sectional drawing absorbent pump showing part list Q FJ-1813A
17 Noise data
18 Lubrication list
19 Steam control valve data sheet CZZJ94SV1

SS2-8110-1100/SS2-8210-
0100/SS2-AVP300-0100/SS2-5190-
20 Steam control sectional drawing showing part no. & BOQ 0700
21 Instrument list INSTRUMENT INDEX
22 Instrument drawing
23 Instrument hookup drawing
24 Typical installation for electrical wiring
27 I/O list CZZJ94DSIO
28 Performance curve CZZJ949PC1
29 Alarm & trip list
30 Local switch box drawing CZZJ94 8343
31 Wiring terminals CZZJ94 8343

32 Installation Manual

33 Operation & maintenance manual


34 Rust prevention procedure
35 Storage & preservation procedure
36 Reassembling procedure
37 therminal insulation HOT CZZJ949IN1
38 therminal insulation COLD CZZJ949IN1
39 Manufacturing schedule indicative project schedule
40 Sub Vender list
41 Spare part list SW 1621-6F(1)
42 Inspection & Test plan QA /QC
43 WPS & PQR
44 Utility Consumption CZZJ949UCI
45 Name plate drawing
46 Rigging drawing WITH SITE ASSSEMBLY PROCEDUR
47 INPUT/OUTPUT DETAILS FOR PLC CZZJ94DSIO
48 CABLE SPECIFICATION CZZJ94 CAB1
49 INSTRUMENT DATA SHEET
Chilled Water Inlet Temperature Sensor CZZJ949INP1 ( P&ID Ref)
Chilled Water Outlet Temperature Sensor ( FOR CONTROL) CZZJ949INP1 ( P&ID Ref)
Chilled Water Outlet Temperature Sensor ( FOR TRIP) CZZJ949INP1 ( P&ID Ref)
Cooling water Inlet temperature sensor CZZJ949INP1 ( P&ID Ref)
Coolling water outlet temperature sensor CZZJ949INP1 ( P&ID Ref)
Condensed Refrigerant temperature sensor CZZJ949INP1 ( P&ID Ref)
Dilute temperature sensor CZZJ949INP1 ( P&ID Ref)
Overflow temperature sensor CZZJ949INP1 ( P&ID Ref)
Spray Solution temperature Sensor CZZJ949INP1 ( P&ID Ref)
Generator temperature Sensor CZZJ949INP1 ( P&ID Ref)
Absolute Pressure transmitter CZZJ949INP1 ( P&ID Ref)
Chilled Water Inlet Temperature Transmitter CZZJ949INP1 ( P&ID Ref)
Chilled Water Outlet temperature Transmitter( for trip) CZZJ949INP1 ( P&ID Ref)
Chilled Water Outlet temperature Transmitter( for Control) CZZJ949INP1 ( P&ID Ref)
Condensed Refrigerant temperature Transmitter CZZJ949INP1 ( P&ID Ref)
Cooling water inlet temperature transmitter CZZJ949INP1 ( P&ID Ref)
Cooling water outlet temperature transmitter CZZJ949INP1 ( P&ID Ref)
Chilled water Differential pressure transmitter-1 CZZJ949INP1 ( P&ID Ref)
Chilled water Differential pressure transmitter-2 CZZJ949INP1 ( P&ID Ref)
Dilute Solution temeprature transmitter CZZJ949INP1 ( P&ID Ref)
Generator temperature transmitter CZZJ949INP1 ( P&ID Ref)
Overflow temperature transmitter CZZJ949INP1 ( P&ID Ref)
Spray Solution temperature Transmitter CZZJ949INP1 ( P&ID Ref)
Solenoid valve data Sheet CZZJ949SOV1
50 LOGIC DAIGRAMS
51 JUNCTION BOX LAYOUT AND SPECIFICATION
Analogue Juntion Box CZZJ94 8341
Level relay Junction Box CZZJ94 8344
Solenoid valve Junction Box CZZJ94 8342
52 LOCAL CONTROL PANEL LAYOUT AND WIRING DAIGRAMS CZZJ94 8343
53 CONTROL NARRATIVES
54 SHOP TESTING PROCEDURE LT-1 REV 5/01PIS45049 REV 3
55 QUALITY ASSURANCE AND QUALITY CONTROL PROCEDURE QAP-VAM-SS90ACU-2-ZJ94
56 PACKAGING AND PRESERVATION TCPIS15088
57 PAINTING AND PROTECTION FPCPC30000_0
58 INSTRUMENT CALIBRATION DELIVERY
59 QA/QA REPORTS, ERECTION AND O&M MANUALS
60 WARRANTY AND GUANTEE
61 INSTRUMENT LAYOUT
ISSUED BY

Customer : Eastern Petrochemical Comoany (SHARQ) THERMAX

1st issue Schedule Rev.0 Rev.1 DATED Rev.2 DATED

11/30/2016 12/30/2016 CZZJ949GA1_3 1/1/2017

11/30/2016 12/30/2016 CZZJ949GA1_3 1/1/2017

11/30/2016 12/30/2016 CZZJ949FD1( REV2) 1/1/2017

11/30/2016 12/30/2016 CZZJ949FD1( REV2) 1/1/2017

CZZJ949PI1_2/SA16 CZZJ949PI1_3/SA16-
11/30/2016 12/30/2016 -PO-EF-004 1/1/2017 PO-EF-004 1/8/2017
11/30/2016 12/30/2016 CZZJ949PE1_2 1/1/2017

12/15/2016 1/8/2017
1/8/2017
11/30/2016 12/28/2016 Q FJ-1813A 1/1/2017
11/30/2016 12/28/2016 Q FJ-1812A 1/1/2017
11/30/2016 12/28/2016 CZZJ94DTS1( REV 2) 1/1/2017 CZZJ94DTS1( REV 3) 1/8/2017
2/28/2017
2/28/2017
2/28/2017
1/25/2017
1/1/2017
1/1/2017

12/25/2016 CZZJ94SV1_1

1/5/2017 1/8/2017
12/26/2016
1/16/2017
1/16/2017

11/30/2016
1/1/2017

12/26/2016
12/26/2016
1/1/2017
1/1/2017
11/30/2016
1/15/2017
12/29/2016 1/8/2017

1/1/2017
1/31/2017
2/15/2017
11/30/2016
12/15/2016

12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/15/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/12/2016
12/26/2016
1/30/2017

12/26/2016
12/26/2016
12/26/2016
12/26/2016
1/15/2017
12/26/2016
12/26/2016
12/26/2016
12/26/2016
4/29/2017
4/29/2017
After Commissioning
will be updated
shortly
TO
Saudi Basic Industries
Coorporation (Sabic) Remark (issue Purpose) Thermax Comment

Rev.3

Rev. 4 has been submited on 16 Jan.2017

Rev. 4 has been submited on 16 Jan.2017

Rev. 5 has been submited on 19 Jan.2017

Rev. 5 has been submited on 19 Jan.2017

Rev. 5 has been submited on 17Jan. 2017

Combained with Internal P&ID

Rev. 2 has been submited on 27 Dec


2016,Comments awaited. Will submit Rev
3(with sectional drawing) on 31 Jan 2017
will be submited 31 Jan 2017
Rev 2 has been submited on 22 Dec 2016
Rev 2 has been submited on 22 Dec 2016
Rev 3 has been submited on 30 Dec 2016

Included in Rev 3 Datasheet


Submited with Pump Datasheet
Submited with Pump Datasheet

Rev. 1 has been submited on 29 Dec2016

Part specification submited on 5 Jan2017

Rev 0 has been submited on 28 Dec 2016

part of O&M Manual, will be submited on


15 Feb 2016
part of O&M Manual, will be submited on
15 Feb 2017
Rev 0 has been submited on 27 Dec 2016

Rev 0 has been submited on 28 Dec 2016

Included in O&M